This Contract is entered into on, or as of,this date by and between the Town of North Andover
(the "Town"), and
Contractor: Specialized Roofing Company, Inc.
Address: 27 High Street
North Billerica, MA 01862
Telephone Number: 978-670-9090
p f
Fax Number: 978-670-9038
:
l. This is a Contract for the procurement of the following:
Perform roof inspections, repairs and maintenance for the period of April 1, 2018 through
March 31, 2019 (with two additional one-year renewals solely at the discretion of the Town)
in accordance with the Invitation for Bids dated February 21, 2018
2. The Contract price to be paid to the Contractor by the Town of Not Andover is:
Roof inspections $80.00 per hour
Roof repairs/maintenance $92.00 per hour
Materials/Supplies 7.0% mark-up
3. Payment will be made as follows:
Upon completion of work and receipt of invoice (net 30) !>
4. Definitions
i
4.1 Acceptance: All Contracts require proper acceptance of the described goods or
services by the Town of North Andover. Proper acceptance shall be understood to
include inspection of goods and certification of acceptable performance for services by
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 1
authorized representatives of the Town to insure that the goods or services are complete
and are as specified in the Contract.
'4
4.2 Contract Documents: All documents relative to the Contract including (where used)
Instructions to Bidders, Proposal Form, General Conditions, Supplementary General
Conditions, General Specifications, Other Specifications included in Project Manual,
Drawings, and all Addenda issued during the bidding period. The Contract documents
are complementary, and what is called for by any one shall be as binding as if called for
by all. The intention of the document is to include all labor and materials, equipment and
transportation necessary for the proper performance of the Contract.
4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as
the sense and particular Contract so require) include Vendor, Contractor, Engineer, or
other label used to identify the other party in the particular Contract. Use of the term
E
"Contractor" shall be understood to refer to any other such label used.
l
4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the
services are performed, or the goods delivered, in accordance with Contract documents,
as modified by approved Amendments and Change Orders.
4.5 Goods: Goods, Supplies or Materials.
4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes r
one who furnished material worked to a special design according to the Drawings or j
Specifications of this work,but does not include one who merely furnishes material not so
i
worked.
4.7 Work: The services or materials contracted for, or both.
5. Term of Contract and Time for Performance
This Contract shall be fully performed by the Contractor in accordance with the provisions of the
Contract Documents on or before March 31, 2019, unless extended pursuant to a provision for
extension contained in the Contract documents at the sole discretion of the Town, and not subject
to assent by the Contractor, and subject to the availability and appropriation of funds as certified
by the Town Accountant. The time limits stated in the Contract documents are of the essence of
the Contract.
6. Subject to Appropriation
Notwithstanding anything in the Contract documents to the contrary, any and all payments which
the Town is required to make under this Contract shall be subject to appropriation or other
availability of funds as certified by the Town Accountant. In the absence of appropriation, this [,
Contract shall be immediately terminated without liability for damages, penalties or other
charges.
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 2
7. Permits and Approvals
Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance
of the Contract shall be secured and paid for by the Contractor.
8. Termination and Default
8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice
when in the best interests of the Town by providing notice to the Contractor, which shall be
in writing and shall be deemed delivered and received when given in person to the
Contractor, or when received by fax, express mail, certified mail return receipt requested,
regular mail postage prepaid or delivered by any other appropriate method evidencing
actual receipt by the Contractor. Upon termination without cause, Contractor will be paid
for services rendered to the date of termination.
8.2 For Cause. 1f the Contractor is determined by the Town to be in default of any term or
condition of this Contract, the Town may terminate this Contract on seven (7) days notice
by providing notice to the Contractor, which shall be in writing and shall be deemed
delivered and received when given in person to the Contractor, or when received by fax,
express mail, certified mail return receipt requested,,regular mail postage prepaid or u
delivered by any other appropriate method evidencing actual receipt by the Contractor.
8.3 Default. The following shall constitute events of a default under the Contract:
1) any material misrepresentation made by the Contractor to the Town; 2) any failure to
perform any of its obligations under this Contract including, but not limited to the
following: (i) failure to commence performance of this Contract at the time specified
in this Contract due to a reason or circumstance within the Contractor's reasonable
control, (ii) failure to perform this Contract with sufficient personnel and equipment or
with sufficient material to ensure the completion of this Contract within the specified
time due to a reason or circumstance within the Contractor's reasonable control, (iii)
failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv)
failure to promptly re-perform within a reasonable time the services that were rejected
by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for
reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a
material term of this Contract, including, but not limited to, the provision of insurance
and non-discrimination, (vii) any other acts specifically and expressly stated in this
Contract as constituting a basis for termination of this Contact, and (viii) failure to
comply with any and all requirements of state law and/or regulations, and Town bylaw
and/or regulations.
9. The Contractor's Breach and the Town's Remedies
Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be
deemed a material breach of this Contract, and the Town of North Andover shall have all the
rights and remedies provided in the Contract documents, the right to cancel, terminate, or
suspend the Contract in whole or in part, the right to maintain any and all actions at law or in
equity or other proceedings with respect to a breach of this Contract, including damages and
(Rev 5-2007)Contract by and between Town of North Andover and Specialized hoofing Company,Inc. Page 3
f
specific performance, and the right to select among the remedies available to it by all of the s
above.
I
From any sums due to the Contractor for services, the Town may keep the whole or any part of
the amount for expenses, losses and damages incurred by the Town as a consequence of
procuring services as a result of any failure, omission or mistake of the Contractor in providing
r
services as provided in this Contract.
10. Statutory Compliance
10.1 This Contract will be construed and governed by the provisions of applicable federal,
state and local laws and regulations; and wherever any provision of the Contract or
S
Contract documents shall conflict with any provision or requirement of federal, state or
local law or regulation, then the provisions of law and regulation shall control. Where
applicable to the Contract, the provisions of the General Laws are incorporated by
reference into this Contract, including, but not limited to, the following:
General Laws Chapter 30B—Procurement of Goods and Services.
General Laws Chapter 30, Sec. 39, et seq: -Public Works Contracts.
General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts.
10.2 Wherever applicable law mandates the inclusion of any term and provision into a
hall be understood to import suc
h term or provision
municipal contract this Sections p mu p
p
into this Contract. To whatever extent any provision of this Contract shall be
inconsistent with any law or regulation limiting the power or liability of cities and
towns, such law or regulation shall control.
10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on
the performance of the Contract. If the Contractor performs the Contract in violation of
any applicable law or regulation, the Contractor shall bear all costs arising therefrom.
10.4 The Contractor shall keep itself fully informed of all existing and future State and
National Laws and Municipal By-laws and Regulations and of all orders and decrees of
any bodies or tribunals having jurisdiction in any manner affecting those engaged or
employed in the work, of the materials used in the work or in any way affecting the
conduct of the work. if any discrepancy or inconsistency is discovered in the Drawings,
Specifications or Contract for this work in violation of any such law, by-law, regulation,
order or decree, it shall forthwith report the same in writing to the Town. It shall, at all
times, itself observe and comply with all such existing and future laws, by-laws,
regulations, orders and decrees; and shall protect and indemnify the Town of North
Andover, and its duly appointed agents against any claim or liability arising from or
based on any violation whether by him or its agents, employees or subcontractors of any
such law, by-law, regulation or decree.
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 4
A
g
11. Conflict of Interest
k
P
Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest
Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which
shall constitute a violation of that law. The Contractor shall be deemed to have investigated the
application of M.G.L. c. 268A to the performance of this Contract; and by executing the
Contract documents the Contractor certifies to the Town that neither it nor its agents,
employees, or subcontractors are thereby in violation of General Laws Chapter 268A. I
12. Certification of Tax Compliance
I
This Contract must include a certification of tax compliance by the Contractor, as required by
General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors
Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision).
13. Discrimination
The Contractor will carry out the obligations of this Contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151B (Law Against
Discrimination) and any executive orders, rules, regulations, and requirements of the
Commonwealth of Massachusetts as they may from time to time be amended.
14. Assignment
Assignment of this Contract is prohibited, unless and only to the extent that assignment is
provided for expressly in the Contract documents.
15. Condition of Enforceability gainst the Town
This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is
signed by the Town Manager or its designee; and (2) endorsed with approval by the Town
Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the
Town Counsel as to form..
16. Corporate Contractor
If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's
Certificate certifying the corporate capacity and authority of the party signing this Contract for
the corporation. Such certificate shall be accompanied by a letter or other instrument stating that
such authority continues in full force and effect as of the date the Contract is executed by the
Contractor. This Contract shall not be enforceable against the Town of North Andover unless
and until the Contractor complies with this section.
The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws,
Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto,
relating to the appointment of the Commissioner of Corporations as its attorney, shall file with
the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its
(Rev 5-2007)Contract by and between Town of North Andover and Specialized hoofing Company,Inc. Page 5
Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the
r
Commonwealth.
u
17. Liability of Public Officials
To the full extent permitted by law, no official, employee, agent or representative of the Town of
North Andover shall be individually or personally liable on any obligation of the Town under this
Contract.
18. Indemnification
I
The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents
and employees, from and against any and all damages, liabilities, actions, suits, proceedings,
claims, demands, losses, costs, expenses, recoveries and judgments of every nature and
description (including reasonable attorneys' fees) that may arise in whole or in part out of or in
connection with the work being performed or to be performed, or out of any act or omission by
the Contractor, its employees, agents, subcontractors, material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
regardless of whether or not it is caused in part by any party indemnified hereunder. The
Contractor further agrees to reimburse the Town for damage to its property caused by the
Contractor, its employees, agents, subcontractors or material men, and anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable,
including damages caused by his, its or their use of faulty, defective, or unsuitable material or
equipment, unless the damage is caused by the Town's gross negligence or willful misconduct.
The existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this contract.
19. Workers Compensation Insurance
The Contractor shall provide by insurance for the payment of compensation and the furnishing of
other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's
Compensation Act) to all employees of the Contractor who are subject to the provisions of
Chapter 152 of the General Laws of Massachusetts.
Failure to provide and continue in force such insurance during the period of this Contract shall be
deemed a material breach of this Contract, shall operate as an immediate termination thereof, and
Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure
to provide the insurance required by this Article.
The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this
Contract before the same shall be binding on the parties thereto, except if specifically waived by
the Town.
20. Documents, Materials,Etc.
Any materials, reports, information, data, etc. given to or prepared or assembled by the
Contractor under this Contract are to be kept confidential and shall not be made available to any
individual or organization by the Contractor (except agents, servants, or employees of the
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 6
s
I
Contractor) without the prior written approval of the Town, except as otherwise required by law.
The Contractor shall comply with the provisions Chapter 66A of the General Laws of
Massachusetts as it relates to public documents, and all other state and federal laws and y
regulations relating to confidentiality, security, privacy and use of confidential data.
Any materials produced in whole or in part under this Contract shall not be subject to copyright,
except by the Town, in the United States or any other country. The Town shall have unrestricted
authority to, without payment of any royalty, commission, or additional fee of any type or nature,
publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole
or in part, any reports, data or other materials prepared under this Contract.
All data, reports, programs, software, equipment, furnishings, and any other documentation or
product paid for by the Town shall vest in the Town at the termination of this Contract. The 3
Contractor shall at all times, during or after termination of this Contract, obtain the prior written
approval of the Town before making any statement bearing on the work performed or data
collected under this Contract to the press or issues any material for publication through any
medium.
21. Audit, Inspection and Recordkeepin
At any time during normal business hours, and as often as the Town may deem it reasonably
necessary, there shall be available in the office of the Contractor for the purpose of audit,
y is
examination, and/or to make excerpts or transcript all records, contracts, invoices, materials,
payrolls, records of personnel, conditions of employment and other data relating to all matters
covered by this Agreement.
22. Payment
The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the
Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work
completed and acceptance from the Town of the work completed.
23. Waiver and Amendment
Amendments, or waivers of any additional term, condition, covenant, duty or obligation
contained in this Contract may be made only by written amendment executed by all signatories to
the original Agreement, prior to the effective date of the amendment.
To the extent allowed by law, any conditions, duties, and obligations contained in this Contract
may be waived only by written Agreement by both parties.
Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver,
nor in any manner limit the legal or equitable remedies available to that party. No waiver by
either party of any default or breach shall constitute a waiver of any subsequent default or breach
of a similar or different matter.
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 7
i
k
24. Forum and Choice of Law
This Contract and any performance herein shall be governed by and be construed in accordance
with the laws of the Commonwealth. Any and all proceedings or actions relating to subject
matter herein shall be brought and maintained in the courts of the Commonwealth or the federal
district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This
paragraph shall not be construed to limit any other legal rights of the parties.
25. Notices
Any notice permitted or required under the provisions of this Contract to be given or served by
either of the parties hereto upon the other party hereto shall be in writing and signed in the name
or on the behalf of the party giving or serving the saine. Notice shall be deemed to have been
received at the time of actual service or three (3) business days after the date of a certified or
registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent
to the address set forth in the Contract and to the Town of North Andover by being sent to the
Town Manager, Town Hall, 120 Main Street,Not Andover,Massachusetts 01845.
26. Binding on Successors
t
This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in €'
I
interest(and where not corporate, the heirs and estate of the Contractor).
27. Complete_Contract
This instrument, together with its endorsed supplements, and the other components of the
contract documents, constitutes the entire contract between the parties, with no agreements other
�I
than those incorporated herein.
28. Supplemental Conditions
The gp apply foregoing provisions a 1 to all contracts to which the Town of North Andover shall be a
g
p —
artY g. One of the following "Supp lements" must be "checked" as applicable to this Contract,
_
shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The
Supplement contains additional terms governing the Contract:
[ ] GOODS
SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods
(governed by the provisions of General Laws Chapter
30B)
[ ] SERVICES
SUPPLEMENT"S" - Applicable to Contracts for the procurement of Services
(governed by the provisions of General Laws Chapter
30B)
[X ] CONSTRUCTION
SUPPLEMENT "C" - Applicable to Contracts for Construction
(Rev 5-2007)Contract by and between Town of North Andover and Specialized Roofing Company,Inc. Page 8
IN WITNESS WHEREOF the parties have hereto and to two other identical instruments set forth
their hands the day and year first above written.
THE TOWN THE CONTRACTOR
u
w
vi io cpartment ead 4CMnanyytNamc
.
l
u
Town Manager Date Signature Date
Pm � .
Prin Name &Title
Federal Iden 'fic 'on
No. '-
117
APPROVED AS TO FORM:
own Counsel Date
CERTIFICATION AS TO AVAILABILITY OF FUNDS:
Town Acc taut Date
(Rev 5-2007)Contract by and between Town of North,Andover and Specialized Roofing Company,Inc. Page 9
i
s
k
SUPPLEMENT"C"
[] CONSTRUCTION
SUPPLEMENT"C"-Applicable to Contracts for the construction of
(1)Public Buildings and Public Works
(governed by the provisions of General Laws Chapter 30B);
(2)Public Buildings
(governed by the provisions of General Laws Chapter 149,§ 44A,
et seq.); and
r
(3)Public Works
(governed by the provisions of General Laws Chapter 30, §39M, ct seq)
1. This forth supplements the Town of North Andover"Contract and General Conditions"and applies
only to contracts for the construction,reconstruction,alteration,remodeling or repair of public works
or public buildings.
2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be
understood to be a term and condition of this Contract. The Contractor agrees to secure such bond
y
(where required)in the form required by the Town and provide an original thereof to the Town prior
to the commencement of performance. '',
3. E uali
3.1. In the case of a closed Specification written for a specific item or items to be furnished under
the Base Bid,such specifications shall,as applicable, be in compliance with the
Massachusetts General Laws,Chapter 30, Section 39M and Chapter 149, Sec.44A et seq.
3.2. Where the name of an item,material or manufacturer is mentioned in the Specifications or !
on the Drawings,except as above noted,the intent is to establish a standard and in no way
should be construed to exclude any item or manufacturer not mentioned by name,but whose
product meets the Specifications as to design,utility and quality. Final decision shall rest
with the Project Representative as to its acceptability.
4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of
goods or services provided by more than twenty-five(25%)per cent,in compliance with Sec. 13 of
Chapter 30B.
5. The Contractor will carry out the obligations of this contract in full compliance with all of the
requirements imposed by or pursuant to General Laws Chapter 151, Sec. 1,et seq. (Minimum Wage
Law)and any executive orders,rules,regulations,and requirements of the Commonwealth of
Massachusetts as they may from time to time be amended. The Contractor will at all times comply
with the wage rates as determined by the Commissioner of the Department of Labor and Industries,
under the provisions of General Laws Chapter 149, Sections 26 and 27D(Prevailing Wage),as shall
be in force and as amended.
6. The Contractor shall continuously maintain adequate protection of all work from damage and shall
protect the property of the Town and others,including adjacent property,from injury or loss arising
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page l
and Specialized Roofing Company,Inc.
s
'S
y
3
in connection with the Contract. The Contractor shall make good any such damage, injury or lass,
except as may be directly due to errors hi the Contract Documents or caused by agents or employees
of the Town,or due to causes beyond the Contractor's control and not the Contractor's fault or
negligence. i
3
7. The Contractor shall take all necessary precautions for the safety of employees on the work,and shall
comply with all applicable provisions of Federal,State and local laws and codes to prevent accidents
or injury to peersons on,about or adjacent to the premises where the work is being performed. The
Contractor will erect and properly maintain at all times,as required by the conditions and progress of
the work,all necessary safeguards for the protection of workers and the public, shall post danger
signs warning against the hazards created by such features of construction such as pits,protruding r
nails,hosts,well holes,elevator hatchways,scaffolding,window openings, stairways and falling
materials;and shall designate a responsible member of its organization on the work,whose duty shall
be the prevention of accidents.
8. The Town shall at all times have access to the work wherever it is in preparation or progress and the
Contractor shall provide suitable accommodations for such access.
9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants,
all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the
construction superintendent,foreman,or assistants are unacceptable to the Town,then upon seven
days notice from the Town,the Contractor shall replace such person or persons with people
acceptable to the Town.
10. The Contractor shall give efficient supervision to the work,using its best skill and attention. The
Contractor shall carefully study and compare the drawings, specifications and other instructions and
shall at once report to the Town any error, inconsistency or omission which shall be discovered.
Included in this responsibility shall be supervision of all work performed by subcontractors on the
work.
11. If the Contractor should neglect to prosecute the work properly,or fail to perform the contract or any
of its provisions,the Town,upon three days written notice,may,without prejudice to any other
remedy it may have,make good such deficiencies and may deduct the cost thereof from the payment
then or thereafter due the Contractor.
12. Inspection by the Town's Project Representative
12.1. The Town shall have the right to designate a Project Representative who may make periodic
visits to the site to familiarize the Town generally with the progress and quality of the work,
and to determine in general if the work is proceeding in accordance with the Contract
Documents. The Project Representative will not be required to make exhaustive or
continuous on-site inspections to check the quality or quantity of the work,and will not be
responsible for the Contractor's failure to carry out the construction work in accordance with
the Contract Documents. During such visits and on the basis of these observations while at
the site,the Project Representative will keep the Town informed on the progress of the work,
will endeavor to guard the Town against defects and deficiencies in the work of contractors,
and may condemn structural work as failing to conform to the Contract Documents. The
Project Representative shall have authority to act on behalf of the Town only to the extent
expressly delegated by the Town,which shall be shown to the Contractor,and shall have
authority to stop the work whenever such stoppage may reasonably be necessary to insure
the proper execution of the Contract.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 2
and Specialized Roofing Company,Inc.
'r
p,
I
6
12.2. In connection with the work,the Project Representative shall not be responsible for j
constriction methods,means,techniques, sequences or procedures employed by the
Contractor or the Contractor's safety programs,requirements,regulations,or precautions.
a
13. Decisions of the Project Representative
13.1. The Project Representative shall,within a reasonable time,make decisions on all claims of
the Town or the Contractor and on all other matters relating to the execution and progress of
the structural work or the interpretation of the Contract Documents.
13.2. The Project Representative's decision,in matters relating to the project,shall be final, if
within the terms of the Contract Documents.
13.3. If,however,the Project Representative fails to render a decision within ten days after the
parties have presented their evidence,either party may then avail itself of the remedies
provided in this contract or available to it by law. If the Project Representative renders a
decision after such remedies have commenced,such decision may be entered as evidence
but shall not disturb or interrupt such proceedings except where such decision is acceptable
to the patties concerned.
14.1 Use of Premises by the Contractor:
14.1. The Contractor shall confine its apparatus, the storage of materials and the operations of
its workmen to limits indicated by taw, by-laws,permits or directions of the Town and
shall not unreasonably encumber the premises with its materials.
14.2. The Contractor shall not load or permit any part of the structure to be loaded with a
weight that will endanger its safety.
15. Maintenance of Premises:
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by its employees or work, and at the completion of the work it shall remove all its
rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall
leave its work"broom-clean", or its equivalent, unless more exactly specified. In case of dispute,
the Town may remove the rubbish and charge the cost to the several contractors, as the Town
shall determine to be just.
16. Right to Terminate
If the Contractor should(1)be adjudged a bankrupt, (2)make a general assignment for the benefit
of creditors,(3)have a receiver appointed on account of its insolvency, (4)persistently or
repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5)fail
to matte prompt payment to subcontractors or to providers of materials or labor, (6)persistently
disregard laws and regulations or lawful directives of the Town, or(7)be guilty of a substantial
violation of any provision of the Contract,then the Town may,without prejudice to any other
right or remedy and after giving the Contractor(or any surety) seven days written notice,
terminate the contract and the employment of the Contractor and take possession of the premises
and of all materials,tools and appliances thereon and finish the work by whatever method it
deems appropriate.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 3
and Specialized Roofing Company,Inc.
b
�i
In such cases,the Contractor shall not be entitled to receive any further payment until the work is
finished. If the unpaid amount owed to the Contractor for work already completed shall exceed
the expense of finishing the work, including compensation for additional architectural,
managerial, legal and administrative services, such excess shall be paid to the Contractor. if such
expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town.
The Contractor shall not be relieved of liability to the Town by virtue of any termination of this
contract, and any claim for damages against the Contractor relating to the Contractor's
performance ruder this contract shall survive any termination hereunder.
Notwithstanding any other provision of this Agreement, the Town reserves the right at any time
in its absolute discretion to suspend or terminate this Agreement in whole or in part for its 1
convenience upon seven days written notice to the Contractor. The Town shall incur no liability
b reason of such termination except for the obligation to a compensation for all work
y p g pay p r
performed by the Contractor and accepted by the Town to the termination date.
17. ProUess Payments:
17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported
to the extent required by the Town by invoices or other vouchers, showing payments for
materials and labor, payments to Subcontractors and such other evidence of the
Contractor's right to payment.
17.2. The Contractor shall,before the first application, submit to the Town a schedule of values
of the various parts of the work, including quantities aggregating the total sum of the
Contract, divided so as to facilitate payments to Subcontractors, made out in such form as
the Town and the Contractor may agree upon,and, if required, supported by such
evidence as to its correctness. This schedule, when approved by the Town, shall be used
as a basis for payment, unless it is found to be in error. If applying for payments,the
Contractor shall submit a statement based upon this schedule.
18. Withholding of Pa menu
18.1. The Town may withhold or, on account of subsequently discovered evidence,nullify the
whole or part of any payment to such extent as may be necessary in its reasonable
opinion to protect the Town of North Andover from loss on account of:
18.1.1. Defective work not remedied.
18.1.2. Claims filed or reasonable evidence indicating probable filing of claims.
18.1.3. Failure of the Contractor to make payments properly to Subcontractors or
for material or labor. €'
18.1.4. A reasonable doubt that the Contract can be completed for the balance
then unpaid.
18.1.5, Damage to another contractor.
18.1.6. Delays resulting in liquidated damages.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 4
and Specialized Roofing Company,Inc.
1$.2. Withholding of payments shall be in strict compliance with statutory requirements.
19. Claims by Contractor and Liabi.li1y of Town
All claims by the Contractor against the Town shall,unless otherwise provided by law,be
initiated by a written claim submitted to the Town no later than seven(7)calendar days after the
event or the first appearance of the circumstances causing the claim. The claim shall set forth in
detail all known facts and circumstances supporting the claim. The Contractor shall continue its
performance under this contract regardless of the submission or existence of any claims.
The limit of liability of the Town under this Agreement is limited to the compensation provided <
herein for work actually performed, and shall in no event include liability for delays or for
incidental, special or consequential damages or lost profits or for damages or loss from causes
beyond the Town's reasonable control.
i;
20. Liquidated Damages:
Because both parties recognize(1)that the time for completion of this Contract is of the essence,
(2)that the Town will suffer loss if the work is not completed within the contract time specified,
plus any extension thereof allowed in accordance with the provisions of this contract, and(3)the
delays,expense and difficulties involved in a legal proceeding to determine the actual loss
suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay
the Town as liquidated damages representing an estimate of delay damages,not as a penalty,the
sum of One Thousand Dollars($1,000)per day for each calendar day of delay until the work is
completed,whether the work is completed by the Contractor or some other person. The Town's
right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a
legal action for damages in lieu of or in addition to its option to impose liquidated damages. The
Town may deduct any liquidated damages from money due the Contractor, and if such payment is
insufficient to cover the liquidated damages,then the Contractor shall pay the amount due.
21. The Contractors' Mutual Responsibillli
Should the Contractor cause damage to any separate subcontractor on the work,the Contractor
agrees, upon due notice,to settle with such contractor by agreement,or by recourse to remedies
provided by law or by the provisions of the contract. If such separate contractor sues the Town
on account of any damage alleged to have been sustained,the Town shall notify the Contractor,
who shall defend such proceedings at the Town's expense and, if any judgment against the Town
arises therefrom,the Contractor shall pay or satisfy it and pay all costs incurred by the Town.
22. Separate Contracts:
22.1. The Town reserves the right to let other Contracts in connection with this work under
similar General Conditions. The Contractor shall afford other contractors reasonable
opportunity for the introduction and storage of their materials and the execution of their
work, and shall properly connect and coordinate its work with theirs.
22.2. If any part of the Contractor's work depends, for proper execution or results,upon the
work of any other contractor,the Contractor shall inspect and promptly report to the
Town any defects in such work that render it unsuitable for such proper execution and
results. Failure of the Contractor to so inspect and report shall constitute an acceptance
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 5
and Specialized Roofing Company,Inc.
i
}
of the other contractor's work as fit and proper for the reception of its work except as to
defects which may develop in the other contractor's work after the execution of its work.
i
22.3. To insure the proper execution of its subsequent work,the Contractor shall measure work
already in place and shall at once report to the Town any discrepancy between the
executed work and the Drawings.
23. Subcontracts:
23.1. All Subcontracts shall be awarded in conformity with the requirements of the General
Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive.
23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and
omissions of its Subcontractors and of persons either directly or indirectly employed by l
them, as it is for the acts and omissions of persons directly employed by it.
23.3. Nothing contained in the Contract Documents shall create any contractual relationship
between any Subcontractor and the Town.
24. Contractor-Subcontractor Relations:
The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound
by the terms of the Agreement,the General Conditions of the Contract,the Supplementary
far as applicable to its work including
Drawings and Specifications,as a ,
General Conditions the , pp g
g p
the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A,
et seq.
1
25. ftideinnification:
I'.
25.1. The Contractor shall indemnify,defend and save harmless the Town, its officers, agents j
and employees from and against any and all damages, liabilities, actions, suits,
proceedings, claims, demands, losses, recoveries and judgments of every nature and
description(including reasonable attorneys' fees)brought or recovered against them that
may arise in whole or in part out of or in connection with the work being performed or to
be performed, or out of any act or omission by the Contractor, its employees,agents,
subcontractors,material men, and anyone directly or indirectly employed by any of them
or anyone for whose acts any of them may be liable,regardless of whether or not it is
caused in part by any party indemnified hereunder. The Contractor further agrees to
reimburse the Town for damage to its property caused by Contractor, its employees,
agents, subcontractors or material men, and anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may be liable, including damages
caused by his, its or their use of faulty, defective or unsuitable material or equipment,
unless the damage is caused by the Town's gross negligence or willful misconduct.The
existence of insurance shall in no way limit the scope of the Contractor's indemnification
under this Contract.
25.2. 1n any and all claims against the Town or any of their agents or employees by any
employee of the Contractor, any Subcontractor, anyone directly or indirectly employed
by any of them or anyone for whose acts any of them may be liable,the indemnification
obligation under this paragraph shall not be limited in any way by any limitation on the
amount or type of damages, compensation or benefits payable by or for the Contractor or
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page b
and Specialized Roofing Company,Inc.
2
any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other
employee benefit acts.
25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and
minimum limits of liability acceptable under the Contract. However, it shall be the
Contractor's responsibility to purchase and maintain insurance of such character and in
such amounts as will adequately protect it and the Town from and against all claims,
damages, losses and expenses resulting from exposure to any casualty liability in the
performance of the Work.
26. The Contractor's Insurance:
26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor
from claims set forth below which may arise out of or result from the Contractor's
operations under the Contract, whether such operations be by itself or by any ,
Subcontractor or by anyone directly or indirectly employed by any of them or by anyone ,
for whose acts any of them may be liable.
26.1.1. Claims under Worker's Compensation, disability benefit and other similar
employee benefit acts;
1
26.1.2. Claims for damages because of bodily injury, occupational sickness or j
disease,or death of its employees, and claims insured by usual personal
injury liability coverage;
26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of
any person other than its employees, and claims insured by usual personal
liability coverage;
26.1.4. Claims for damages because of injury to or destruction of tangible property,
including loss of use resulting therefrom.
26.2. The insurance required by the above shall be written for not less than the following
minimum limits of liability:
26.2.1. Worker's Compensation Insurance Requirements
Workers' Compensation coverage as required by the laws of the Commonwealth of
Massachusetts.
26.2.2. Liability Insurance Requirements
Liability insurance shall include all major divisions and shall be on a comprehensive
general basis including Premises and Operations, Owners and Contractor's Protective,
Products and Completed Operations, and Owned,Non-owned and Hired Motor Vehicles.
All such insurance shall be written for not less than any limits of liability required by law,
unless otherwise provided in the contract documents, or the following limits,whichever
are greater:
(Rev 5-2007)supplement"C"to Contract between the Town of North Andover Page 7
and Specialized Roofing Company,Inc.
s
r
b
Z
Comprehensive General Liability Insurance (Broad Form)
Bodily Injury $1,000,000 per person '
:
$2,000,000 aggregate
Property Damage $1,000,000 per occurrence
$2,000,000 aggregate K
Automobile Liability Insurance $500,000 per person
$1,000,000 per occurrence
Excess Liability(Umbrella) $2,000,000
26.3. The above insurance policies shall also be subject to the following requirements:
I
26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as
hereinafter specified under Paragraph entitled"Protective Liability Insurance"
shall be written by one and the same insurance company to avoid the expense of E
duplicate and/or overlapping coverage and to facilitate and expedite the
settlement of claims.
26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed
with the Town prior to commencement of the work. Renewal certificates shall be 3
addressed to and filed with the Town at least ten(10)days prior to the expiration
date of required policies.
26.3.3. No insurance coverage shall be subject to cancellation without at least thirty(30)
days prior written notice forwarded by registered or certified mail to the Town.
The Town shall also be notified of the attachment of any restrictive amendments
to the policies.
26.3.4. All Certificates of Insurance shall be on the"MIIA"or"ACORD"Certificate of
Insurance form, shall contain true transcripts from the policies, authenticated by
the proper officer of the Insurer,evidencing in particular those insured,the extent
of coverage,the location and operations to which the insurance applies,the
expiration date and the above-mentioned notice clauses.
26.3.5. All premium costs shall be included in the Contractor's bid.
26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be
maintained without interruption from date of the Contract until date of final
payment and termination of any coverage required to be maintained after
payment.
27. Protective Liabili1y Insurance:
27.1. The Contractor shall purchase and maintain such insurance as described in the preceding
paragraph as will protect the Town from claims which may arise from operations under
the Contract, including operations performed for the named insureds by independent
contractors and general inspection thereof by the named insureds.
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page S
and Specialized Roofing Company,Inc.
a
r
l
i
3
a
27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town y
against Automobile Non-Ownership Liability in connection with the Contractor's
operations under the Contract,whether such operations be by itself or by any
Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone
for whose acts any of them may be liable.
27.3. The limits of liability for coverage required under the preceding paragraphs shall be as
specified under the provisions hereof governing the Contractor's General Liability
Policy.
27.4. The Town shall be named as an additional insured on the above referenced liability
Policies, and the Contractor's insurance shall be the primary coverage. The cost of such
insurance, including required endorsements and amendments, shall be the sole
responsibility of the Contractor.
28. Liens:
Neither the Final Payment nor any part of the retained percentage shall become due until the
Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the
Contract,or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as k
it has knowledge or information,the releases and receipts include all the labor and material for
which a lien could be filed. The Contractor shall comply with all statutory provisions of the
General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149
as amended (as a minimum requirement).
29. Guarantees:
29.1, The Contractor guarantees and warrants to the Town that all labor furnished under this
Contract will be competent to perform the tasks undertaken,that the product of such
labor will yield only first-class results,that materials and equipment furnished will be of
good quality and new unless otherwise permitted by this Contract, and that the Work will
be of good quality,free from faults and defects and in strict conformance with this
Contract. All Work not conforming to these requirements may be considered defective.
29.2. If at any time any part of the work constructed under the terms of this contract shall in the
opinion of the Town Manager require repairing due to defective work or materials
furnished by the Contractor, he may notify the Contractor in writing to make the required
repairs. If the Contractor shall neglect to start such repairs within ten days of the date of
giving it notice thereof and to complete the same to the satisfaction of the Town Manager
with reasonable dispatch,then the latter may employ other persons to make such repairs.
The Town shall charge the expense thereof to the Contractor and may use any moneys
still retained to pay for the same, and if such sum is insufficient,the Contractor shall be
obligated to pay the balance thereof.
29.3. All guarantees and warranties required in the various Sections of the Specifications which
originate with a Subcontractor or Manufacturer must be delivered to the Town before
final payment to the Contractor may be made for the amount of that subtrade or for the
phase of work to which the guarantee or warranty relates. The failure to deliver a
required guarantee or warranty shall be held to constitute a failure of the Subcontractor to
fully complete his work in accordance with the Contract Documents. The Contractor's
(Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 9
and Specialized Roofing Company,Inc.
I
obligation to correct work is in addition to, and not in substitution of, such guarantees or
warranties as tnay be required in the various Sections of the Specifications.
This Agreement is intended to take effect as a sealed instrument, Witness our hands and seals hereto:
Dated:.
The Contractor by; .. °°
uthorized Signature
The Town of North Andover by:
Tower/ManagerDepar Hcad
rvn Counsel
Approved as to Form
x.
Tow countant
Certiie as to Appropriation
(Rev 5-2007)Supplement"C to Contract between the Town of North Andover Page 10
and Specialized Roofing Company,Inc.
9
THE COMMONWEALTH OF MASSACHUSETTS
' EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
CHARLES D.HAKER As determined by the Director under the provisions of the ROSALIN ACOSTA
Covemor Secmlary
Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D MCKTNNEY
KARYN E.POLITO Director
Lt.Govemar
Awarding Authority: Town of North Andover
Contract Number: City/Town: NORTH ANDOVER
Description of Work: Perform as-needed repairs,service and related inspections,of roofs on all municipal and school buildings r
Job Location: Various locations
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the
"Wage Request Number"on all pages of this schedule.
• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards("DLS")if it has
not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK
projects(bid pursuant to G.L.c.149A),the earlier of. (a)the execution date of the GMP Amendment,or(b)the bid for the first
construction scope of work must be within 90-days of the wage schedule issuance date.
• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149,
§27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a
conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the
wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime
contractor,a filed sub-bidder,or any sub-contractor.
• All apprentices working on the project are required to be registered with the Massachusetts Department of Labor '
Standards,Division of Apprentice Standards(DLS/DAS). Apprentice must keep his/her apprentice identification card on
his/her person during all work hours on the project. An apprentice registered with DAS maybe paid the lower apprentice
wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS
regardless of whether or not they are registered with any other federal,state,local,or private agency must be paid the
journeyworlker's rate for the trade.
• The wage rates will remain in effect for the duration of the project,except in the case of multi-year public construction
projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.
Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the
contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects,awarding
authority must request an annual update no later than two weeks before the anniversary date,determined as the earlier of: (a)
the execution date of the GMT Amendment,or(b)the execution date of the first amendment to permit procurement of
construction services.Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than
these rates to covered workers. The annual update requirement is not applicable to 27F rental of equipment contracts.
• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll
reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years.
Each weekly payroll report must contain: the employee's name,address,occupational classification,hours worked,and wages
paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at
http://www,mass.gov/dols/pw.
• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative
obligation to inquire with DLS at(617)626-6953.
• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor
Division of the office of the Attorney General at(617)727-3465.
• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who
perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and
Issue Date: 02/14/2019 Wage Request Number: 20180214-034
Classification Effective Date Base Wage Health Pension Snpplemeutal Total Rate
Unemployment
y
Construction
(2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95
TEAMSTERS JOINT COUNCIL NO.10 7,ONE B
(3 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02
TEAMSTERS JOINT COUNCIL NO.10 ZONE B
(4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.99 $0.00 $54.14
TEAMSTERS JOINT COUNCIL NO.10 ZONE B
ADS/SUBMERSIBLE PILOT 09/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02
PILE DRIVER LOCAL 56(ZONE 1)
08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85
08/01/2019 $102.78 $990 $21.15 $0.00 $133.83
For apprentice rates see"Apprentice-PILE DRIVER"
AIR TRACK OPERATOR 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88
LABORERS--ZONE 2
06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72
12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56
06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43
12/01/2019 $36.99 $7.70 $13.60 $0.00 $59.29
06/01/2020 $37.88 $7.70 $13,60 $0.00 $59.18
12/01/2020 $38.77 $7.70 $13,60 $0.00 $60.07
06/01/2021 $39.69 $7.70 $13,60 $0.00 $60.99
12/01/2021 $40,60 $7.70 $13,60 $0,00 $61.90
For apprentice rates see"Apprentice-LABORER"
ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 12/01/2017 $35.90 $11.50 $7.10 $0.00 $54.50
HEAT&FROST INSULA TORS LOCAL 6(B OSTON) 06/01/2018 $36.90 $11.50 $7.10 $0.00 $55.50
12/01/2018 $37.90 $11.50 $7.10 $0.00 $56.50
06/01/2019 $38.90 $11.50 $7.10 $0.00 $57.50
12/01/2019 $3990 $11.50 $7.10 $0.00 $58.50
06/01/2020 $40.90 $11.50 $7.10 $0.00 $59,50
12/01/2020 $41.90 $11.50 $7.10 $0.00 $60.50
ASPHALT RAKER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.39
LABORERS-ZONE 2
06/01/2018 $3392 $7.70 $13.60 $0.00 $55.22
12/01/2019 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0,00 $56.93
12 01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.69
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORFR"
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEFRSLOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
BACKHOE/FRONT-END LOADER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERS LOCAL Q
For apprentice rates see"Apprentice-OPERATING ENGINEERS" j
----- -------------------- -------.------------ -------------------- ----
Issue Date: 02/14/2018 Wage Request Number: 20190214-034 Page 2 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate '
Unapt to ntent
BARCO-TYPE 7UMPING TAMPER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.39
LABORERS-7.ONL2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
:
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0,00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
I
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7,70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
BLOCK PAVER,RAMMER/CURB SETTER 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88
LABORERS-ZONE 2
06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72
i+
12/01/2019 $35.26 $7.70 $13.60 $0.00 $56.56
06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43
12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29
06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18
12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07
0 6/0 112 0 2 1 $39.69 $7.70 $13.60 $0.00 $60,99
12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90
For apprentice rates see"Apprentice-LABORER"
BOILERMAKER 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10
BOILERMAKERS LOCAL 29
t
Apprentice- BOILBRMAK 1-R-Local 29
Effective Date- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 65 $27.90 $6.97 $10.54 $0.00 $45.41
2 65 $2790 $6.97 $10.54 $0.00 $45.41
3 70 $30.04 $6.97 $11.35 $0.00 $48.36
4 75 $32.19 $6.97 $12.16 $0.00 $51.32
5 80 $34.34 $6.97 $12.97 $0.00 $54.28
6 85 $36.48 $6.97 $13.78 $0.00 $57.23
7 90 $38.63 $6.97 $14.59 $0.00 $60.19
8 95 $40.77 $697 $15.40 $0.00 $63.14
Notes:
. ......:
Apprentice to Journeyworker Ratio:l 5
------------------------- ---------------------- --- ------ -------------------- -------- -------------------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 3 of 33
Supplemental
Classification Effective Date Base Wage Health Pension Total Rate
Unemployment
BRICK/STONE/ARTIFICIAL.MASONRY(INCL.MASONRY 02/01/2018 $52.06 $10,75 $20.03 $0.00 $82.84
WATERPROOFING) 08/01/2018 $53.41 $10,75 $20.16 $0.00 $84.32 ,
BRICKLAYERS LOCAL 3(L}NN) y
02/01/2019 $54.05 $10.75 $20.16 $0.00 $84.96
t
09/01/2019 $55.40 $10.75 $20.30 $0.00 $86.45
02/01/2020 $56.04 $10.75 $20.30 $0.00 $97.09
08/01/2020 $57.39 $10.75 $20.45 $0.00 $98.59
02/01/2021 $58.03 $10.75 $20,45 $0.00 $89.23
08/01/2021 $59.43 $10.75 $20.61 $0.00 $90.79
02/01/2022 $60.02 $10.75 $20.61 $0.00 $91.38
E
Apprentice- BPUCKIPLASTER/CEMENT AMSON-Local 3 Lynn
Effective Date- 02/01/2018 Snpplcmenta€
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $26.03 $10.75 $20.03 $0.00 $56.81
2 60 $31.24 $10,75 $20.03 $0.00 $62.02
3 70 $36.44 $10.75 $20.03 $0.00 $67.22
4 80 $41.65 $10.75 $20.03 $0.00 $72.43
5 90 $46.95 $10.75 $20.03 $0.00 $77.63
Effective Date- 08/01/2018 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $26.71 $10.75 $20.16 $0.00 $57.62
2 60 $32.05 $10.75 $20.16 $0.00 $62.96
3 70 $37.39 $10.75 $20.16 $0.00 $6830
4 80 $42.73 $10.75 $20.16 $0.00 $73.64
5 90 $48.07 $10.75 $20.16 $0.00 $78.98
.:: . .
Notes:
Apprentice to Journeyworlcer Ratio.1:5
BULLDOZER/GRADER/SCRAPER 12/01/2017 $46.17 $10,50 $15.50 $0.00 $12.17
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
CAISSON&UNDERPINNING BOTTOM MAN 12/01/2016 $37.45 $7.60 $14.35 $0.00 $59.40
LABORERS-FOUNDATION AND MARINE
For apprentice rates see"Apprentice-LABORER"
CAISSON&UNDERPINNING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25
LABORERS-FOUNDATIONAND MARINE
For apprentice rates see"Apprentice-LABORER"
CAISSON&UNDERPINNING TOP MAN 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25
LABORERS-FOUNDATIONAND MARINE
For apprentice rates see"Apprentice-LABORER"
-------------------- --- -- --- --------------------- ........ -------------- -------- ----------------------------------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 4 of 33
l
l
Classification 1 ffective Date Base Wa a Health Pension Supplemental Total Rate
g Unemployment
z
CARBIDE CORE DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33,92 $7.70 $13,60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
.06/01/2019 $35.63 $7.70 $13.60 $0.00 $5693
e
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0,00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
CARPENTER 0 9/0 112 0 1 7 $39.28 $9.90 $17.50 $0.00 $66.68 F
CARPENTERS-ZONE 2(Eastern Massachusetts)
03/0 1120 1 8 $40.28 $9.90 $17.50 $0.00 $67,68
09/01/2018 $41.32 $9.90 $17.50 $0.00 $68.72
03/01/2019 $42.35 $9.90 $17.50 $0.00 $69.75
Apprentice- Cf1RPENTE'R-Zone 2 Eastern AM
Effective Date- 09/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemploymens Total Rate
1 50 $19.64 $990 $1.73 $0.00 $31.27
2 60 $23.57 $9.90 $1.73 $0.00 $35.20
3 70 $27.50 $9.90 $12.31 $0.00 $49.71
4 75 $29.46 $9.90 $12.31 $0.00 $51.67
5 80 $31.42 $9.90 $14.04 $0.00 $55.36
6 80 $31.42 $9.90 $14.04 $0.00 $55,36
7 90 $35.35 $9.90 $15.77 $0.00 $61.02
8 90 $35.35 $9.90 $15.77 $0.00 $61.02
Effective Date- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.14 $9,90 $1.73 $0.00 $31.77
2 60 $24.17 $9.90 $1.73 $0.00 $35.90
3 70 $28,20 $9.90 $12.31 $0.00 $50.41
4 75 $30.21 $9.90 $12.31 $0.00 $52.42
5 80 $32.22 $9.90 $14.04 $0.00 $56.16
6 80 $32.22 $9.90 $14.04 $0.00 $56.16
7 90 $36.25 $9.90 $15.77 $9.00 $61.92
8 90 $36.25 $9.90 $15.77 $0.00 $61.92
Notes:
s %Indentured After 10/1/17;45/45/55/55/70/70/80/80 1
Step 1&2$29.31/3&4$34.90/5&6$51.44/7&8$57.09
Apprentice to Journeyworker Ratio:1:5
------------- -------------- _---------------- ............... ---------------------------- ---------- ---
Issue Date: 02/14/2019 Wage Request Number: 20190214-034 Page 5 of 33
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemployment
CEMENT MASONRY/PLASTERING 01/01/2018 $46.02 $12.35 $22.41 $0.30 $91.08
BRICKLAYERSLOCAL 3(LYNN)
07/01/2018 $47.41 $12.35 $22.41 $0.30 $82.47
01/01/2019 $48.15 $12.35 $22.41 $0.30 $83.21
07/01/2019 $49.54 $12.35 $22.41 $0.30 $84.60
i
01/01/2020 $50.29 $12.35 $22.41 $0.30 $85.35
t
i
Apprentice- CEMENT MASONRYIPLASTERtNG-Eastei-n Mass(Lynn)
z
Effective Date- 01/01/2018 Supplemental G.
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $23.01 $12.35 $15.41 $0.00 $50.77
2 60 $27.61 $12.35 $17.41 $0.30 $57.67
3 65 $29.91 $12.35 $18.41 $030 $60.97
4 70 $32.21 $12.35 $19.41 $0.30 $64.27 [L
5 75 $34.52 $12.35 $20.41 $0.30 $67.58
i
6 80 $36.82 $12.35 $21.41 $0.30 $70.98
i
7 90 $41.42 $12.35 $22.41 $0.30 $76.48
Effective Date- 07/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $23.71 $12.35 $15.41 $0.00 $51.47
2 60 $28.45 $12.35 $17.41 $0.30 $58.51
3 65 $30.82 $12.35 MAI $0.30 $61.88
4 70 $33.19 $12.35 $19.41 $0.30 $65.25
5 75 $35.56 $12.35 $20.41 $0.30 $68.62
6 80 $37.93 $12.35 $21.41 $0.30 $7199
7 90 $42.67 $12.35 $22.41 $0.30 $77.73
Notes:
Steps 3,4 are 500 hrs.All other steps are 1,000 hrs.
__.. . , .
Apprentice to Journeyworker Ratio 1 3
CHAIN SAW OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
Cor apprentice rates see"Apprentice-LABORER"
CLAM SHELLS/SLi3RRY BUCKETS/HEADING MACHINES 12/01/2017 $47.63 $10.50 $15.50 $0.00 $73.63
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
COMPRESSOR OPERATOR 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
-------------- ------------- --------------------- ......... -------- -------- -------- ---------- --------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 6 of 33
i
Classification Effective llate Base Wage Health Peusiou Supplemental Total Rate i
Unemployment f
DELEADER(BRIDGE) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 u
PAINTERS LOCAL 35-7.ONE 2
k
N
Y
Apprentice- PAINTER Local 35 -BRIDGES/TANKS
Effective Date- 01/01/2017 Supplemental
i
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $25.71 $7.85 $0.00 $0.00 $33.56
l
2 55 $28.28 $7.85 $3.66 $0.00 $39.79
a
3 60 $30.95 $7.85 $3.99 $0,00 $42.69
4 65 $33.42 $7.85 $4.32 $0.00 $45.59
5 70 $35.99 $7.85 $14.11 $0.00 $57.95
6 75 $38.56 $7.85 $14.44 $0.00 $60.85
7 80 $41.13 $7.85 $14.77 $0.00 $63.75
8 90 $46.27 $7.85 $15.44 $0.00 $69.56
......, .,. .. .
Notes:
Steps are 750 hrs. i
Apprentice to Journe vorker Ratio y► :1.1
DEMO:ADZEMAN 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10
LABORERS-ZONE 2
06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05
12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00
06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00
12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00
For apprentice rates sec"Apprentice-LABORER"
DEMO:BACKHOE/LOADER/HAMMER OPERATOR 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10
LABORERS-ZONE 2
06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05
12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00
06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00
12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00
For apprentice rates see"Apprentice-LABORER"
DEMO:BURNERS 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85
LABORERS-ZONE 2
06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80
12/01/2018 $40.30 $7.70 $14,75 $0.00 $62.75
06/01/2019 $41.30 $7.70 $14,75 $0.00 $63.75
12/01/2019 $42.30 $7.70 $14,75 $0.00 $64.75
For apprentice rates see"Apprentice-LABORER"
DEMO:CONCRETE CUTTER/SAWYER 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10
1
LABORERS-ZONE 2
06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 I'
12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 '
06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00
12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00
For apprentice rates see"Apprentice-LABORER"
--------------- -----
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 7 of 33
is
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemployment
DEMO:JACKHAMMER OPERATOR 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60,85
LABORERS-ZONE 2
06/01/2018 $39.35 $7.70 $14,75 $0.00 $61,86 1
12/01/2019 $40.30 $7.70 $14.75 $0.00 $62.75
06/01/2019 $41.30 $7.70 $14,75 $0.00 $63.75
12/01/2019 $42.30 $7.70 $14.75 $0.00 $64.75
For apprentice rates see"Apprentice-LABORER"
l
DEMO:WRECKING LABORER 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10
LABORERS-ZONE 2
06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05
12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00
06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00
12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00
For apprentice rates see"Apprentice-LABORER"
DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72,17
OPERATING ENGINEFRS LOCAL I
For apprentice rates see"Apprentice-OPERATTNG ENGINEERS"
DIVER 08/01/2017 $61.98 $9.90 $21.15 $0.00 $93.03
t
PILE DR[VER LOCAL 56(7.0NE I)
08/01/2018 $65.20 $9.90 $21.15 $0.00 $96,25
08/01/2019 $68.52 $9.90 $21.15 $0.00 $99.57
For apprentice rates see"Apprentice-PILE DRIVER!'
i;
DIVERTENDER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32
PILE DRIVER LOCAL 56(ZONE 1)
08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62
08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99
For apprentice rates see"Apprentice-PILE DRIVER"
t'
DIVER TENDER(EFFLUENT) 08/01/2017 $66.41 $9.90 $21.15 $0.00 $97.46
PILEDRIVER LOCAL 56(ZONE 1)
08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91
08/01/2019 $73.41 $9.90 $21.15 $0.00 $104.46
For apprentice rates see"Apprentice-PILE DRIVER"
DIVER/SLURRY(EFFLUENT) 08/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02
PILEDRIVER LOCAL 56(ZONE 1)
08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 i
08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83
For apprentice rates see"Apprentice-PILE DRIVER"
DRAWBRIDGE OPERATOR(Construction) 09/01/2017 $49.28 $13.00 $17.49 $0.00 $79.76
ELECTRICIANS LOCAL 103
63/01/20I8 $50.15 $13,00 $17.85 $0.00 $81.00
09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23
03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46
For apprentice rates see"Apprentice-ELECTRICIAN"
ELECTRICIAN 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76
ELECTRICIANS LOCAL 103
03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00
09/01/2018 $51.34 $13.00 $17.99 $0.00 $82.23
03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 f
P
--------------- ---- ------------------------------ ---------------------- ------------------- -----------------
----------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 8 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
i
s
l
1
Apprentice- ELECTRICIAN-Local 103 E�
Effective Date- 09/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
a
1 40 $19.71 $13.00 $0.59 $0.00 $33.30
2 40 $19.71 $13.00 $0.59 $0.00 $33.30
3 45 $22.18 $13.00 $13.39 $0.00 $48.57
4 45 $22.18 $13.00 $13.39 $0.00 $48.57
l
5 50 $24.64 $13.00 $13.76 $0.00 $51.40
6 55 $27.10 $13,00 $14.12 $0.00 $54.22
7 60 $29.57 $13.00 $14,50 $0.00 $57.07
8 65 $32.03 $13.00 $14.87 $0.00 $59.90
9 70 $34.50 $13.00 $15.25 $0.00 $62.75
10 75 $36.96 $13.00 $15.62 $0.00 $65.58
Effective Date- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 $20.06 $13.00 $0.60 $0.00 $33.66
2 40 $20.06 $13.00 $0.60 $0.00 $33.66
3 45 $22.57 $13.00 $13.61 $0.00 $49.18
4 45 $22.57 $13.00 $13.61 $0.00 $49.18
l
5 50 $25.08 $13.00 $13.99 $0.00 $52.07
6 55 $27.58 $13.00 $14.38 $0.00 $54.96
7 60 $30.09 $13.00 $14,76 $0.00 $57.85
8 65 $32.60 $13.00 $15.15 $0.00 $60.75
9 70 $35.11 $13.00 $15.53 $0.00 $63.64
10 75 $37.61 $13.00 $1593 $0.00 $66.54
=Notes: :
App Prior 1/1103;30/35/40/45/50/55/65/70/75/80 l
i
r
Apprentice to Journeyworker Ratio:2:3***
ELEVATOR CONSTRUCTOR 01/01/2017 $55.86 $15.29 $15.71 $0.00 $86.95
ELEVATOR CONSTR UCTORS L 0 CA L 4
i
------ ------------------------ -----
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 9 of 33
i
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unernployment
Apprentice- ELEVATOR CONSTRUCTOR-Loca14
Effective Date- 01/01/2017 Supplemental s
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 50 $27.93 $15.28 $0.00 $0.00 $43.21
2 55 $30.72 $15.28 $15.71 $0.00 $61.71
3 65 $36.31 $15.28 $15.71 $0.00 $67.30
4 70 $39,10 $15.28 $15.71 $0.00 $70.09
s
5 80 $44.69 $15.28 $15.71 $0.00 $75.69
iNotes:
t
Steps 1-2 are 6 mos.;Steps 3-5 are I year
t
Apprentice to Journeytivorker Ratio:l:l
ELEVATOR CONSTRUCTOR HELPER 01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09
ELEVATOR CONSTRUCTORS LOCAL 4
For apprentice rates see"Apprentice-ELEVATOR CONSTRUCTOR"
FENCE&GUARD RAIL ERECTOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
i
LABORERS-ZONE 2 '
06/01/2019 $3392 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56,06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56,93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37,38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13,60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60,49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
FIELD ENG.INST.PERSON-BLDG,SITE,HVYMWY 11/01/2017 $42.88 $10.00 $15.25 $0.00 $68.13
OPERATING ENGINEERS LOCAL 4
05/01/2019 $43.59 $10.00 $15.25 $0.00 $68.84
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
FIELD ENGYARTY CHIEF-BLDG,SITE,I VY/HWY 11/01/2017 $44.34 $10.00 $15.25 $0.00 $69.59
OPERATING ENGINEERS LOCAL 4
05/01/2018 $45.06 $10.00 $15.25 $0.00 $70.31
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/IIWY 11/01/2017 $22.83 $10.00 $15.25 $0.00 $49,08
OPERATING ENGINEERS LOCAL 4
05/01/2018 $23.26 $10,00 $15.25 $0.00 $49.51
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
FIRE ALARM INSTALLER 09/01/2017 $49.28 $13,00 $17.48 $0.00 $79.76
ELECTRICIANS LOCAL 103
03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00
09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23
03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46
For apprentice rates see"Apprentice-ELECTRICIAN"
FIRE ALARM REPAIR MAINTENANCE 09/01/2017 $36.96 $13.00 $15.62 $0.00 $65.58
/COMMISSIONINGELEcTRIcIANs 03/01/2018 $37.61 $13.00 $15.93 $0.00 $66.54
LOCAL 103
09/01/2018 $38.51 $13,00 $15.96 $0.00 $67.47
03/01/2019 $39.40 $13.00 $15.98 $0.00 $68.38
For apprentice rates see"Apprentice-TELECONMIUMCATIONS TECHNICIAN"
------------------------- -- -----------------------.............. ---------- ------------ --------- ------------- --------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 10 of 33
a
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
I
FIREMAN(ASST.ENGINEER) 12/01/2017 $38.57 $10.50 $15.50 $0.00 $64.57
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
n
FLAGGER&SIGNALER 12/01/2017 $21.50 $7,70 $13.60 $0.00 $42.80
LABORERS-ZONE 2
06/01/2018 $21.50 $7.70 $13.60 $0.00 $42.80 l
12/01/2018 $22.50 $7.70 $13.60 $0.00 $43.80
06/01/2019 $22.50 $7.70 $13.60 $0.00 $43.80
12/01/2019 $23.50 $7.70 $13.60 $0.00 $44.80
06/01/2020 $23.50 $7.70 $13.60 $0.00 $44.80
E
12/01/2020 $24,50 $7.70 $13.60 $0.00 $45.80
06/01/2021 $24.50 $7.70 $13.60 $0.00 $45.80
12/01/2021 $24.50 $7.70 $13.60 $0.00 $45.90
For apprentice rates see"Apprentice-LABORER"
FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55
FLOORCOVERERS LOCAL 2168 ZONE I
Apprentice- FLOORCOVERER-Local 2168:Zone I
Effective Date03/01/2016 SuPPlementa
l
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $21.07 $9.80 $1.79 $0.00 $32.66
2 55 $23.17 $9.90 $1.79 $0.00 $34.76
3 60 $25.29 $9.80 $12.25 $0.00 $47.33
4 65 $27.38 $9.80 $12.25 $0.00 $49.43 ''
5 70 $29.49 $9.80 $14.04 $0.00 $53.33
6 75 $31.60 $9.80 $14.04 $0.00 $55.44
7 80 $33.70 $9.80 $15.83 $0.00 $59.33
8 85 $35.81 $9.80 $15.83 $0.00 $61.44
;Notes: Steps are 750 hrs. l
%After 0911/17;45/45/55/55/70/70/80180(1500hr Steps) i
Step 1&2$30.55/3&4$36.49/5&6$53.33/7&8$59.33
Apprentice to Journeyworker Ratio:l.l
FORKLIFT/CHERRY PICKER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERS LOCAL,4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
GENERATOR/LIGHTING PLANTIHEATERS 12/01/2017 $31.80 $10,50 $15.50 $0.00 $57.80
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
GLAZIER(GLASS PLANK/AIR BARRIER/INTERIOR Ol/01/2017 $40.91 $7.95 $16.10 $0.00 $64.86
SYSTEMS
GLAZIERS LOCAL 35(ZONE 2)
------------------------------ ------- ---------- ------- ------------------------------------- -- -- --- -----------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 11 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Uneluployment
i
Apprentice- GLAZIER-Local 35 Zone 2 �
Effective Date- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.46 $7.85 $0.00 $0.00 $29.31
2 55 $22.50 $7.85 $3.66 $0.00 $34.01
3 60 $24.55 $7.85 $3.99 $0.00 $36.39
4 65 $26.59 $7.85 $4.32 $0.00 $38.76
5 70 $28.64 $7.85 $14.11 $0.00 $50.60
6 75 $30.68 $7.85 $14.44 $0.00 $52.97 E
I
7 80 $32.73 $7.85 $14.77 $0.00 $55.35
8 90 $36.82 $7.85 $15.44 $0.00 $60.11
!Notes:
Steps are 750 hrs.
3
Apprentice to Jonrneyworker Ratio: _
1.1
HOISTING ENGINEER/CRANES/GRADALLS 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERSLOCAL-4
Apprentice-
OPERAT
ING ENGINEERS-Local 4
Effective Date- 12/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55 $25,65 $10.50 $0,00 $0.00 $36.15
2 60 $27.98 $10.50 $15.50 $0.00 $53.98
3 65 $30.31 $10.50 $15.50 $0.00 $56.31 ',
i
4 70 $32.64 $10.50 $15.50 $0.00 $58.64
5 75 $34.97 $10.50 $15.50 $0.00 $60.97 '.
6 80 $37.30 $10.50 $15.50 $0.00 $63.30
7 85 $39.64 $10.50 $15.50 $0.00 $65.64
8 90 $41.97 $10.50 $15.50 $0.00 $67.97
.. ....... .
Notes:. 1
i
i
...... . ...
Apprentice to Journeyworker Ratio:1:6
HVAC(DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84
SHEETMETAL WORKERS LOCAL 17-A
For apprentice rates see"Apprentice-SHEET METAL WORKER"
HVAC(ELECTRICAL CONTROLS) 09/01/2017 $49.29 $13.00 $17.48 $0.00 $79.76
ELECTRICIANS LOCAL 103
03/01/2018 $50,15 $13.00 $17.85 $0.00 $81.00
09/01/2018 $51,34 $13.00 $17.89 $0.00 $82.23
03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46
For apprentice rates see"Apprentice-ELECTRICIAN"
HVAC(TESTING AND BALANCING-AIR) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84
SHEETMETAL WORKERS LOCAL 17-A
------------ -------- --------- --- ----- ----------
Issue Date: 02/14/2018 Wage Request Number: 20 1 802 1 4-03 4 Page 12 of 33
Supplemental Total}late
Classification Effective Date Base Wage Health Pension Supplemental
For apprentice rates see"Apprentice-SHEET METAL WORKER"
HVAC(TESTING AND BALANCING-WATER) 03/01/2017 $4&86 $9.70 $16.14 $0.00 $74.70
PIPEFITTERS LOCAL 537(Local 138)
For apprentice rates see"Apprentice-PIPEFITTER"or"PLUMBER/PIPEFITTER"
HVAC MECHANIC 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70
PIPEFITTERS LOCAL 537(Local 138)
i
For apprentice rates see"Apprentice-PIPBFlTMR"or"PLUMSER/PIPEFITTER"
HYDRAULIC DRILLS 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.99
LABORERS-ZONE l
06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72
12/01/2019 $35.26 $7.70 $13.60 $0.00 $56.56
06/01/2019 $36,13 $7.70 $13.60 $0.00 $57.43
12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29
06/01/2020 $37.89 $7.70 $13.60 $0.00 $59.18
12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07
I>:
06/01/2021 $39.69 $7.70 $13.60 $0.00 $6099
12/01/2021 $40.60 $7.70 $13.60 $0.00 $6190
For apprentice rates see"Apprentice-LABORER"
INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04
HEAT&FROST INSULATORS LOCAL 6(BOSTON)
09/01/2018 $49.34 $11.75 $14.20 $0.00 $75.29
09/01/2019 $51.84 $11.75 $14.20 $0.00 $77.79
Apprentice- ASBESTOS INSULATOR(Pipes&Tanks)-Local 6 Boston
Effective fate- 09/01/2017 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $23.55 $11.75 $10.45 $0.00 $45.75
2 60 $28.25 $11.75 $11.20 $0.00 $51.20
3 70 $32.96 $11.7S $11.95 $0.00 $56.66
4 80 $37.67 $11.75 $12.70 $0.00 $62.12
i
Effective Date- 09/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $24.67 $11.75 $10.45 $0.00 $46.87
2 60 $29.60 $11.75 $11.20 $0.00 $52.55
3 70 $34.54 $11.75 $1195 $0.00 $58.24
4 80 $39.47 $11.75 $12.70 $0.00 $63.92
l Notes: 1
Steps are I year
Apprentice to Jonrneyworker Ratio-1:4
IRONWORKERIWELDER 03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.89
IRONYORKERSLOCAL 7(LAWRENCG'AREA)
------ -- ---------------------------- -------------- ---- -------------- ---------------------- ------------------ --
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 13 of33
Classification Effective Date Base Wage Health Pension SupplementalTotal Rate
Unemplovmeut
'S
Li
Apprentice- IRONWORKER-Local 7 Lmt rence
a
Effective Date- 03/16/2017 i
Sopplemea€al
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $24.14 $7.80 $20.95 $0.00 $52.79
t
2 70 $28.17 $7.80 $20.85 $0.00 $56.82
3 75 $30.18 $7.90 $20.85 $0.00 $58.83
4 80 $32.19 $7.80 $20.85 $0.00 $60.94
5 85 $34.20 $7.80 $20.85 $0.00 $62.85
6 90 $36.22 $7.80 $20.85 $0.00 $64.87
--- -
jNotes: k
d
Structural 1:6;Ornamental 1:4
Apprentice to Journeyworlcer Ratio: t
1
JACKHAMMER&PAVING BREAKER OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
r
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36A9 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60,49
1 210 1/2 02 1 $40.10 $7.70 $13.60 $0.00 $61.40
Por apprentice rates see"Apprentice-LABORLIV
LABORER 12/01/2017 $32.93 $7.70 $13.60 $0.00 $54.13
LABORERS-ZONE2
06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97
12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81
0 6/0 112 0 1 9 $35.38 $7.70 $13.60 $0.00 $56.68
12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0,00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0,00 $59.32
0 610 1/202 1 $38.94 $7.70 $13.60 $0,00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
------------------------------- ------ --------- ....... --------------------------- ---------
Issue Date: 0211 4/20 1 8 Wage Request Number: 20180214-034 Page 14 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unentuloyment
Apprentice- LABORER-Zane 2
Effective Date- 12/01/2017 Supplemental
r
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 60 $19.70 $7.70 $13.60 $0.00 $41.00
2 70 $22.98 $7.70 $13.60 $0.00 $44.28
3 80 $26.26 $7.70 $13.60 $0.00 $47.56
c
4 90 $29.55 $7.70 $13.60 $0.00 $50.85
is
i
t
Effective Date- 06/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $20.20 $7.70 $13.60 $0.00 $41.50
f
2 70 $23.57 $7.70 $13.60 $0.00 $44.87
3 80 $26.94 $7.70 $13.60 $0,00 $48.24
4 90 $30.30 $7.70 $13.60 $0.00 $51.60
Notes: l
Apprentice to Journeyworker Ratio:1:5
LABORER:CARPENTER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13
LABORERS-ZONE 2
06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97
12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81
06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68
12/01/2019 $36,24 $7.70 $13.60 $0.00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32
06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
For apprentice rates see"Apprentice-LABORER"
LABORER:CEMENT FINISHER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13
LABORERS-ZONF2
06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97
12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81
06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68
12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32
06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
For apprentice rates see"Apprentice-LABORER"
LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2017 $33,03 $7.70 $13,55 $0.00 $54.28
LABORERS-ZONE 2
06/01/2018 $33.87 $7.70 $13.55 $0.00 $55,12
12/01/2018 $34.71 $7.70 $13.55 $0.00 $55.96
06/01/2019 $35.58 $7.70 $13.55 $0.00 $56.83
12/01/2019 $36.44 $7.70 $13.55 $0.00 $57.69
For apprentice rates see"Apprentice-LABORER"
---------------------------- ----- --------------------- ------------------------------ -------------- -------- --------------------
Issue Date: 02/14/2019 Wage Request Number: 20 1 802 1 4-034 Page 15 of 33
Classification Effective Bate [lase Wa a Health Pension Supplemental Total Rate
g Unemployment i
i
LABORER:MASON TENDER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33,92 $7.70 $13.60 $0.00 $55.22
E
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $5693
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
LABORER:MULTI-TRADE TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54,13
LABORERS-ZONE 2
06/01/2018 $33.67 $7.70 $13.60 $0.00 $5497
12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81
06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.69
12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32
06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
For apprentice rates see"Apprentice-LABORER"
LABORER:TREE REMOVER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13
LABORERS-ZONE2
06/01/2019 $33.67 $7.70 $13.60 $0,00 $54.97
12/01/2019 $34.51 $7.70 $13.60 $0.00 $55.81
06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.69
12/0[/2019 $36.24 $7.70 $13.60 $0,00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32
06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
This classification applies to all tree work associated with the removal of standing trees,and trimming and removal of branches and limbs when the work is not done for
a utility company for the purpose of operation,maintenance or repair of utility company equipment.For apprentice rates see"Apprentice-LABORER"
LASER BEAM OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $S6.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 S59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
--- ------------- ......... - ----------------- ...... ----- ------------------------- ------------------- -
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 16 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
MARBLE&TILE FINISHERS 02/01/2018 $39.82 $10.75 $19.34 $0.00 $6891
BRICKLAYERS LOCAL 3-hti4RBLE&TILE
08/01/2018 $40.90 $10.75 $18.47 $0.00 $70.12
02/01/2019 $41.41 $10.75 $18.47 $0.00 $70.63
08/01/2019 $42.49 $10.75 $18.61 $0.00 $71.95
02/01/2020 $43.00 $10.75 $18.61 $0.00 $72.36
08/01/2020 $44.08 $10.75 $18.76 $0.00 $73.59
1
02/01/2021 $44.59 $10.75 $18.76 $0.00 $74.10
08/01/2021 $45.71 $10.75 $18.92 $0.00 $75.38
I'
02/01/2022 $46.18 $10.75 $18.92 $0.00 $75.85
Apprentice- MARBLE& TILE FINISHER-Local 3 Marble& Tile 3
Effective Date- 02/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate j
1 50 $19.91 $10.75 $18.34 $0.00 $49.00
2 60 $23.89 $10.75 $19.34 $0.00 $52.98
3 70 $27.87 $10.75 $18.34 $0.00 $56.96 '
4 80 $31.86 $10.75 $19.34 $0.00 $60.95
5 90 $35.84 $10.75 $18.34 $0.00 $64.93
Effective Date- 08/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.45 $10.75 $18.47 $0.00 $49.67
2 60 $24.54 $10.75 $18.47 $0.00 $53.76
3 70 $28.63 $10.75 $18.47 $0.00 $57.85
4 80 $32.72 $10.75 $18.47 $0.00 $61.94
5 90 $36.81 $10.75 $18.47 $0.00 $66.03
'Notes:
� I
Apprentice to Journeyworker Ratio:1:3
MARBLE MASONS,TILELAYERS&TERRAZZO MECH 02/01/2018 $52.10 $10.75 $20.03 $0.00 $82.88
BRICKLAYERS LOCAL 3-MARBLE&TILE
08/01/2019 $53.45 $10.75 $20.16 $0.00 $94.36
02/01/2019 $54.07 $10.75 $20.16 $0.00 $94.98
08/01/2019 $55.42 $10.75 $20.30 $0.00 $86.47
02/01/2020 $56.05 $10.75 $20.30 $0.00 $87.10
08/01/2020 $57.40 $10.75 $20.45 $0.00 $88.60
02/01/2021 $58.04 $10.75 $20.45 $0.00 $99.24
08/01/2021 $59.44 $10.75 $20.61 $0.00 $90.80
02/01/2022 $60.01 $10.75 $20.61 $0.00 $91.37
---- ------------------ ----- --------- -------- -- -------------------- ----------- --------------------
Issue Date: 02/14/2019 Wage Request Number: 20180214-034 Page 17 of 33
Classification Elfective Date Base Wage Health Pension Supplemental Total Rate
Unemoloymeut
s
Apprentice- MARBLE-TILE-TERRAZZO MECIIANIC-Local 3 Marble&Tile
Effective Date- 02/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $26.05 $10.75 $20.03 $0.00 $56.83
2 60 $31.26 $10.75 $20.03 $0.00 $62.04
3 70 $36.47 $10.75 $20.03 $0.00 $67.25
4 80 $410 $10.75 $20.03 $0.00 $72.46 i
5 90 $46.89 $10.75 $20.03 $0,00 $77.67
r
Effective Date- 08/01/2018 supplemental
Step percent ercent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $26.73 $10.75 $20.16 $0.00 $57.64
s
2 60 $32.07 $10.75 $20.16 $0.00 $62,98
3 70 $37.42 $10.75 $20.16 $0.00 $68.33 ',
4 80 $42.76 $10.75 $20.16 $0,00 $73.67
5 90 $48.11 $10.75 $20.16 $0.00 $79.02 ,
Notes.. .....,...
Apprentice to Journeyworker Ratio:1:5
MECH.SWI EPER OPERATOR(ON CONST. SITES) 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
....._....
MECHANICS MAINTENANCE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINF.ERSLOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
MILLWRIGHT(Zone 2) 10/01/2017 $36.32 $990 $18.50 $0.00 $64.72
MILLWRIGHTSLOCAL 1121-Zane 2
04/01/2018 $37.17 $990 $18.50 $0.00 $65.57
1 010 1/20 1 8 $38.02 $990 $18.50 $0.00 $66.42
04/01/2019 $38.87 $9.90 $18.50 $0.00 $67.27
----- ------------ -----------------------
Issue Date: 02/14/2018 Wage Request Number: 20 1 902 1 4-03 4 Page 18 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unem0ovutent
i
Apprentice- MILLWRIGHT-Local 1121 Zone 2
Effective Date- 10/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 55 $19.98 $9.90 $5.31 $0.00 $35.19
2 65 $23.61 $9.90 $15.13 $0.00 $48.64
3 75 $27.24 $9.90 $16.10 $0.00 $53.24
4 85 $30.87 $9.90 $17.06 $0.00 $57.83
Effective Date- 04/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 55 $20.44 $9.90 $5.31 $0.00 $35.65
2 65 $24.16 $9.90 $15.13 $0.00 $49.19 t
3 75 $27.88 $9.90 $16A0 $0.00 $53.98
4 85 $31.59 $9.90 $17.06 $0.00 $58.55
i
Notes:
� t
Steps are 2,000 hours
Apprentice- to Journe vorker Ratio:
yF o:1.5
MORTAR MIXER 12/01/2017 $33.09 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONF,2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
OILER(OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2017 $23.24 $10.50 $15.50 $0.00 $49.24
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
OILER(TRUCK CRANES,GRADALLS) 12/01/2017 $27.40 $10.50 $15.50 $0.00 $53.40
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
OTHER POWER DRIVEN EQUIPMENT-CLASS 11 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
PAINTER(BRIDGES/TANKS) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36
PAINTERSLOCAL 35-ZONE 2
------------------------------ ---------------------------- ------------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 19 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
unemplovment
1
i
4
`S
Apprentice- PAINTER Local 35 -BRIDGES/TANKS j
Effective Date- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 50 $25,71 $7.85 $0.00 $0,00 $33.56
2 55 $28.28 $7.85 $3.66 $0.00 $39.79
3 60 $30.85 $7.95 $3.99 $0.00 $42.69
4 65 $33.42 $7.85 $4.32 $0.00 $45.59
5 70 $35.99 $7.85 $14.11 $0.00 $5795
6 75 $38.56 $7.85 $14.44 $0.00 $60.85
7 80 $41.13 $7.85 $14.77 $0.00 $63.75
8 90 $46,27 $7.85 $15.44 $0.00 $69.56
Notes:
ESteps are 750 hrs. 1
C {
-,
Apprentice to Journeyworker Ratio:1:1
PAINTER(SPRAY OR SANDBLAST,NEW)* 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 �h
*1f 30%or more of surfaces to be painted are new construction,
NEW paint rate shall be used.PAINTERS LOCAL 35-ZONE 2
Apprentice- PAINTER Local 35 Zone 2-SpraylSandblast-New
Effective Date- 01/01/2017 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate [(
-1-- 50 $21.16 $7.85 $0.00 $0.00 $29.01
2 55 $23.27 $7.85 $3.66 $0.00 $34.78
3 60 $25.39 $7.85 $3.99 $0,00 $37.23
4 65 $27.50 $7.95 $4.32 $0.00 $39.67
5 70 $29.62 $7.85 $14.11 $0.00 $51.58
6 75 $31.73 $7.85 $14.44 $0.00 $54.02
7 80 $33.85 $7.85 $14.77 $0.00 $56.47
S 90 $38.08 $7.85 $15.44 $0.00 $61.37
Notes-
Steps are 750 hrs. f
A prentice to Journeyworker Ratio:l.1
PAINTER(SPRAY OR SANDBLAST,REPAINT) 01/01/2017 $40.37 $7.85 $16.10 $0,00 $64.32
PAINTERS LOCAL 35-ZONE 2
-------------------------- ------------------- ------------- --- --- ------------------ -------------------- --------------
lssue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 20 of 33
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate t
Unemployment k
Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast--Repaint
Effective Date- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.19 $7.95 $0.00 $0.00 $28.04
2 55 $22.20 $7.95 $3.66 $0.00 $33.71
3 60 $24.22 $7.85 $3.99 $0.00 $36.06
4 65 $26.24 $7.95 $4.32 $0,00 $38.41
5 70 $28.26 $7.95 $14.11 $0.00 $50.22
f
6 75 $30.28 $7.85 $14.44 $0.00 $52.57
7 80 $32.30 $7.85 $14.77 $0.00 $54.92
8 90 $36.33 $7.85 $15.44 $0.00 $59.62
[Notes:
Steps are 750 hrs.
Apprentice to Jonrueyrvoricer Ratio:1:1
PAINTER(TRAFFIC MARKINGS) 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13
LABORERS-.ZONE 2
06/01/2018 $33,67 $7.70 $13,60 $0.00 $54.97
12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81
06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68
12/01/2019 $36.24 $7.70 $13.60 $0,00 $57.54
06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43
12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 j
06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24
12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15
For Apprentice rates see"Apprentice-LABORER'
PAINTER/TAPER(BRUSH,NEW)* 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86
*If 30%or more of surfaces to be painted are new construction,
NEW paint rate shall be usecl.PAINTERSLOCAL 35-ZONE 2
----- --------- ---------- ----------------------------------- ---------------- ------ ----------------------- -----------
Issue Date: 02/14/2018 Wage Request Number: 20190214-034 Page 21 of 33
Supplemental Total Rate
Classification Effective Date Base Wage Health pension[ Unemplovnnent
L
4
Apprentice- PAINTER-Local 35 Zane 2-BRUSHNEW
Effective Date- 01/01/2017 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $20.46 $7.85 $0.00 $0.00 $28.31
2 55 $22.50 $7.85 $3.66 $0.00 $34.01
3 60 $24.55 $7.85 $3.99 $0.00 $36.39
4 65 $26.59 $7.85 $4.32 $0.00 $38.76 z
5 70 $29.64 $7.85 $14.11 $0.00 $50.60 I
6 75 $30,68 $7.85 $14.44 $0.00 $52.97
7 80 $32.73 $7.85 $14.77 $0.00 $55.35
8 90 $36.82 $7.85 $15.44 $0.00 $60.11
Notes-
1 Steps are 750 hrs.
s
Apprentice to Journeyworker Ratio:l:1
PAINTER/TAPER(BRUSH,REPAINT) 01/01/2017 $38.97 $7.95 $16.10 $0.00 $62.92
PAINTERS LOCAL 35-ZONE z
Apprentice- PAINTER Local 35.Zone 2-BRUSIIREPAIVT
Effective Date- 01/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $19,49 $7.85 $0.00 $0.00 $27.34
2 55 $21.43 $7.85 $3.66 $0.00 $32.94
3 60 $23.38 $7.85 $3.99 $0.00 $35.22
4 65 $25.33 $7.85 $4.32 $0.00 $37.50
5 70 $27.28 $7.85 $14.11 $0.00 $49.24
6 75 $29.23 $7.85 $14.44 $0.00 $51.52
7 80 $31.18 $7.85 $14.77 $0.00 $53.80
8 90 $35.07 $7.85 $15.44 $0.00 $58.36
Notes:
Steps are 750 hrs.
Appr entice to Journeyworker Ratio:l 1
PANEL&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35
TEAMSTERS JOINT COUNCIL NO.10 7.ONE B
PIER AND DOCK CONSTRUCTOR(UNDERPINNING AND 08/01/2017 $44.27 $9.90 $21,15 $0.00 $75.32
DECK) 08/01/2018 $46.57 $9.90 $21,15 $0.00 $77.62
PILE DRIVER LOCAL 56(ZONE 1)
08161/20 19 $48.94 $9.90 $21.15 $0.00 $79.99
For apprentice rates see"Apprentice-PILE DRIVER"
PILE DRIVER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32
PILE DRIVER LOCAL 56(70NL:1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62
08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99
Issue Date: 0211 4/20 1 8 Wage Request Number: 20180214-034 Page 22 of 33
Classification Effective Date Base Wage Health Pension Sapplemental
Total Rate ;
Unemployment
I
r,
Apprentice- PILEDRIVER-Local 56 Zone I
Effective Date- 08/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $22.14 $9.90 $21.15 $0.00 $53.19
2 60 $26.56 $9.90 $21.15 $0.00 $57.61
3 70 $30.99 $9.90 $21.15 $0.00 $62.04
4 75 $33.20 $9.90 $21.15 $0.00 $64.25
5 80 $35.42 $9.90 $21.15 $0.00 $66.47
6 80 $35.42 $9.90 $21.15 $0.00 $66.47
7 90 $39.84 $9.90 $21.15 $0.00 $70.99
z
8 90 $39.84 $9.90 $21.15 $0.00 $70.89
Effective Date- 08/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 50 $23.29 $9.90 $21.15 $0.00 $54.34
2 60 $27.94 $990 $21.15 $0.00 $58.99
3 70 $32.60 $9.90 $21.15 $0.00 $63.65
4 75 $34.93 $9.90 $21.15 $0.00 $65.98
5 80 $37.26 $9.90 $21.15 $0.00 $68.31
6 80 $37.26 $9.90 $21.15 $0.00 $68.31
7 90 $41.91 $9.90 $21.15 $0.00 $72.96
8 90 $41.91 $9.90 $21.15 $0.00 $72.96
I
Notes:
Apprentice to Journeyworker Ratio:1:5
PIPEFITTER&STEAMFITTER 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70
PIPEFI7TERS LOCAL 537(Local 138)
Apprentice- PIPEFITTER Loca1537(Local 138)
Effective Date- 03/01/2017 Supplementat
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 $19.54 $9.70 $5.50 $0.00 $34.74
2 45 $21.99 $9.70 $16.14 $0.00 $47.83
3 60 $29.32 $9.70 $16.14 $0.00 $55.16
4 70 $34.20 $9.70 $16.14 $0.00 $60.04
5 80 $39.09 $9.70 $16.14 $0.00 $64,93
Notes:
** 1:3;3:15; 1:10 thereafter 1 Steps are I yr.
t Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17 9:20;10:23(Max)
Apprentice to Jourueyworker Ratio'
--------------------------- -- ------------------- --- ............ ------------ .......... -----------
Issue Date. 02/14/2019 Wage Request Number: 20180214-034 Page 23 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment €
PIPELAYER 12/01/2017 $33.09 $7.70 $13.60 $0.00 $54.38 is
LABORERS-ZONE 2
0 6/0 112 0 1 8 $3392 $7.70 $13.60 $0.00 $55,22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.39 $7.70 $13.60 $0.00 $58.68
12/01/2020 $39.27 $7.70 $13.60 $0.00 $59.57 j
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60,49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61,40
For apprentice rates see"Apprentice-LABORER"
PLUMBER 09/01/2017 $49.86 $11.57 $15.26 $0.00 $76.69
PLUAlBERS&GASFI7TERS LOCAL 12(local 138)
03/01/2018 $51.36 $11.57 $15.26 $0.00 $78.19
09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69
03I01I2019 $54.36 $11.57
$15.26 $0.00 $91,19
09/01/2019 $55.86 $11.57 $15.26 $0.00 $82,69
0 3/0 112 0 20 $57.36 $11.57 $15.26 $0.00 $94,19
09/01/2020 $58.86 $11.57 $15.26 $0.00 $95.69 '.
03/01/2021 $60.36 $11.57 $15.26 $0.00 $87.19
Apprentice- PLUMBERIGASFITTER-Local 12(Local 138)
Effective Date- 09/01/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35 $17.45 $11.57 $5.54 $0.00 $34.56
2 40 $19.94 $11.57 $6.29 $0.00 $37,80
3 55 $27.42 $11.57 $8.53 $0.00 $47.52
4 65 $32,41 $11.57 $10.03 $0.00 $54.01
5 75 $37.40 $11.57 $11.52 $0.00 $60.49
Effective Date- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35 $17.98 $11.57 $5.54 $0.00 $35.09
2 40 $20.54 $11.57 $6.29 $0.00 $38.40
3 55 $29.25 $11.57 $8.53 $0.00 $48.35
4 65 $33.38 $11.57 $10.03 $0.00 $54.98
5 75 $38.52 $11.57 $11.52 $0.00 $61.61
=Notes:
Steps are !yr
Step 4 with lic$55.65 Step5 with lic$61.89
:.A_ "rentice to Journe work Apprentice y er Ratio:l:S
PNEUMATIC CONTROLS(TEMP.) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70
PIPF.FITTFRS LOCAL 537(Local 138)
For apprentice rates see"Apprentice-PIPEFIn ER'or"PLUMBER/PIPEFITTER"
-------------------------- ----------------------------------- ----------- ---------------- -------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 24 of 33
i
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
PNEUMATIC DRILL/TOOL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 i
I
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.39 $7.70 $13.60 $0.00 $58.69
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
POWDERMAN&BLASTER 12/01/2017 $33.83 $7.70 $13.60 $0.00 $55.13 E
LABORERS-ZONE 2
06/01/2018 $34.67 $7.70 $13.60 $0.00 $5597 E
12/01/2018 $35.51 $7.70 $13.60 $0.00 $56.81
06/01/2019 $36.38 $7.70 $13.60 $0.00 $57.69
l
12/01/2019 $37.24 $7.70 $13.60 $0.00 $58.54
06/01/2020 $38.13 $7.70 $13.60 $0.00 $59.43
12/01/2020 $39.02 $7.70 $13.60 $0.00 $60.32
06/01/2021 $39.94 $7.70 $13.60 $0.00 $61.24
12/01/2021 $40.85 $7.70 $13.60 $0.00 $62.15
For apprentice rates see"Apprentice-LABORER"
POWER SHOVEL/DERRICK/TRENCHING MACHINE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERS,LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
PUMP OPERATOR(CONCRETE) 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERS LOCAL 4
For apprenticc rates see"Apprentice-OPERATING ENGINEERS"
PUMP OPERATOR(DEWATERING,OTIIER) 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPFPAI'ING ENGINEERS"
READY-MTX CONCRETE DRIVER 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24
TEAMSTERS LOCAL 42
04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66
05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19
04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65
RECLAIWRS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
RESIDENTIAL WOOD FRAME(All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51.94
CARPENTERS-ZONE 2(Residential Mood)
RESIDENTIAL WOOD FRAME CARPENTER** 10/01/2017 $26.25 $7.07 $7.86 $0.00 $41.18
**The Residential Wood Frame Carpenter classification applies 04/01/2018 $26,67 $7.07 $7.86 $0.00 $41.60
only to the construction of new,wood frame residences that do
not exceed four stories including the basement.CARPENTFRS-ZONE 10/01/2018 $27.09 $7.07 $7.86 $0.00 $42.02
2(Residential II'ood) 04/01/2019 $27.52 $7.07 $7.86 $0.00 $42.45
10/01/2019 $27.95 $7.07 $7.86 $0.00 $42.89
As of 9/U09 Carpentry work on wood-frame residential WEAT IERIZATION projects shall be paid the RESIDENTIAL WOOD FRAME CARPENTER rate.
----------- --------- --- ------------------------------------------ ---------------------------- -- -- --- ---------- ----------
Issue Date: 02/14/2018 Wage Request Number: 20 1 802 1 4-034 Page 25 of 33
Classification Effective bate Base Wage Health Pension Supplemental Total Rate
Unemployment
1
k
Apprentice- CARPENTER(Residential Wood France)-Zo►ae 2
Effective Date- 10/01/2017 supplemental 1
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $15.75 $7.07 $0.00 $0.00 $22.92
2 60 $15.75 $7.07 $0.00 $0.00 $22.82
3 65 $17.06 $7.07 $7.86 $0.00 $31.99
4 70 $18.38 $7.07 $7.86 $0.00 $33.31
5 75 $19.69 $7.07 $7.86 $0,00 $34.62
6 80 $21.00 $7,07 $7.86 $0.00 $35.93
7 85 $22.31 $7.07 $7.86 $0.00 $37.24
8 90 $23.63 $7.07 $7.86 $0.00 $38,56
Effective Date- 04/01/2018 supplemental '
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 60 $16.00 $7.07 $0.00 $0.00 $23.07
2 60 $16.00 $7.07 $0.00 $0.00 $23,07
3 65 $17.34 $7.07 $7.86 $0.00 $32.27
4 70 $18.67 $7.07 $7.86 $0.00 $33.60
5 75 $20.00 $7.07 $7.86 $0.00 $34.93
6 80 $21.34 $7.07 $7.86 $0.00 $36.27 j
7 85 $22.67 $7.07 $7.86 $0.00 $37.60
8 90 $24.00 $7.07 $7.86 $0.00 $38.93
Notes:
%Indentured After 10/1/17;45/45/55/55/70/70/80/80
Step 1&2$18.88/3&4$26.26/5&6$33.31/7&8$35.93 i
Apprentice to Journeyworker Ratio.1.5
RIDE-ON MOTORIZED BAGGY OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38
LABORERS-ZONE 2
06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
For apprentice rates see"Apprentice-LABORER"
ROLLER/SPREADER/MULCHING MACHINE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
For apprentice rases see"Apprentice-OPERATING I NGINEERS"
ROOFER(Inc.Roofer Waterproofng&Roofer Damproofg) 02/01/2018 $42.36 $11.35 $14.80 $0.00 $68.51
ROOFERS LOCAL 33
68/01/2018 $43.46 $11.35 $I4.80 $0.00 $69.61
02/01/2019 $44.61 $11.35 $14.80 $0.00 $70.76
----------------------- --------- ---------------------- ------------------- ------I------------- --------- -------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 26 of 33
Classification Effective Date Base Wage Health Pension
Supplemental Total Rate
Unemployment
'e
a
1
Apprentice- ROOFER-Local 33
Effective Date- 02/01/201 S Supplemental
Step percent Apprentice Base Wage Health Pension Unemptoyment Total Rate y
I
1 50 $21.19 $11.35 $3.44 $0.00 $3597
2 60 $25.42 $11.35 $14.80 $0.00 $51.57
3 65 $27.53 $11.35 $14.80 $0.00 $53.68
4 75 $31,77 $11.35 $14.80 $0.00 $57.92
5 85 $36.01 $11,35 $14.80 $0.00 $62.16
Effective Date- 08/01/2018 Suppternental
5
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
5
1 50 $21.73 $11.35 $3.44 $0.00 $36.52
2 60 $26.08 $11.35 $14.80 $0.00 $52.23
a
3 65 $28,25 $11.35 $14.80 $0.00 $54.40
4 75 $32.60 $11.35 $14.80 $0.00 $58.75
5 85 $36.94 $11.35 $14.80 $0.00 $63.09
:Notes: ** 1:5,2:6-10,the 1:10;Reroofing: 1:4,then 1:1
Step 1 is 2000 hrs.;Steps 2-5 are 1000 hrs.
(Hot Pitch Mechanics`receive$1.00 hr.above ROOFER)
--
Apprentice to Journeysvorket Ratio:**
ROOFER SLATE/TILE/PRECAST CONCRETE 02/01/2018 $42.61 $11.35 $14.80 $0.00 $69.76
ROOFERSLOCAL 33
08I01/2018 $43.71 $11.35 $14.80 $0.00 $69,86
02/01/2019 $44.86 $11.35 $14,80 $0.00 $71,01 �
For apprentice rates see"Apprentice-ROOFER"
SHEETMETAL WORKER 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84
SHFETMLTtIL WORKERS LOCAL 17-A
i
----------- ------------------- ------ .............. ------- ---------- -------- ------------- -- -- --- ---------------------
Issue Date: 02/14/2018 Wage Request Plumber: 20180214-034 Page 27 of 33
Classification Effective Bate Base Wage ftealth Pension
Supplemental Total Rate
Uneinnlovmeut
k
S
s
Apprentice- SHEET METAL WORKER-Local 17-A
Effective Date- 02/01/2018 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 40 $17.64 $12.20 $5.61 $0.00 $35.45
i
2 40 $17.64 $12.20 $5.61 $0.00 $35.45
3 45 $19.85 $12.20 $10.95 $1.29 $44.19
4 45 $19.85 $12.20 $10.85 $1.29 $44.19
5 50 $22.06 $12.20 $11.80 $1.38 $47.44
6 50 $22.06 $12.20 $12.05 $1.39 $47.70
7 60 $26.47 $12.20 $13.70 $1.57 $53.94 i
8 65 $28.67 $12.20 $14.65 $1.67 $57.19
9 75 $33.08 $12.20 $16.56 $1.86 $63.70
10 85 $37.49 $12.20 $17.96 $2.03 $69.68
!Notes.
Steps are 6 mos. i
Apprentice to Journeyrvorker Ratio:1:4
SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93
PAINTERS LOCAL 35-ZONE Z
Apprentice- SIGN ERECTOR-Local 35 Zone 2
Effective Date- 06/01/2013 supplemental
Step percent Apprentice Base Wage Health Pension Unemptoyment Total Rate
1 50 $12.91 $T07 $0.00 $0.00 $19.98
2 55 $14.20 $7.07 $2.45 $0.00 $23.72
3 60 $15.49 $7.07 $2.45 $0.00 $25.01
4 65 $16.78 $7.07 $2.45 $0.00 $26.30
5 70 $18.07 $T07 $7.05 $0.00 $32.19
6 75 $19.36 $7.07 $7.05 $0.00 $33.48
7 M $20.65 $7.07 $7.05 $0.00 $34.77
8 85 $21.94 $7.07 $7.05 $0.00 $36.06
9 90 $23.23 $7.07 $7.05 $0.00 $37.35
iNotes:
Steps are 4 mos. €
Apprentice to Jon rneyrvorker Ratio:1:1
SPECIALIZED EARTH MOVING EQUIP<35 TONS 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24
TEAMSTERS JOINT COUNCIL NO.10 7,ONE R
SPECIALIZED EARTH MOVING EQUIP>35 TONS 12/01/2016 $32.73 $10.91 $10.89 $0.00 $54.53
TEAMSTERS JOINT COUNCIL NO.10 7.ONE B
---- -- ------------------------ ----- --------------- .......... -------------------- ------- ----- --------
Issue Date: 02/14/2019 Wage Request Number: 20180214-034 Page 28 of 33
Classification Effective Date Base Wage Health Pension Supplemental Total Rate
Unemployment
a
SPRINKLER FITTER 01/01/2018 $51.33 $9.12 $17.40 $0.00 $77.85
SPRINKLER FITTERS LOCAL 550-(Section B)Zone 2
03/01/2018 $52.68 $9.12 $17.40 $0.00 $79.20
10/01/2018 $54.03 $9.12 $17.40 $0.00 $80.55
01/01/2019 $54.03 $9.47 $17.60 $0.00 $81.10
03/01/2019 $55.38 $9.47 $17.60 $0.00 $82.45
10/01/2019 $56.73 $9.47 $17.60 $0.00 $83.80 j
03/01/2020 $58.08 $9.47 $17,60 $0.00 $85.15 }
10/01/2020 $59.43 $9.47 $17.60 $0.00 $86.50
03/01/2021 $60.78 $9.47 $17.60 $0.00 $87.85
Apprentice- SPRINKLER FITTER-Local 550(Section B)Zone 2
Effective Date- 01/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35 $17.97 $9.12 $8.90 $0.00 $35.99
2 40 $20.53 $9.12 $8.90 $0,00 $38.55
3 45 $23.10 $9.12 $8.90 $0.00 $41.12
4 50 $25.67 $9.12 $8.90 $0.00 $43.69
5 55 $29.23 $9.12 $8.90 $0.00 $46.25 i
6 60 $30.80 $9.12 MAO $0.00 $50.32
7 65 $33.36 $9,12 $10.40 $0.00 $52.88
8 70 $35,93 $9.12 $10.40 $0.00 $55.45
9 75 $38.50 $9.12 $10.40 $0.00 $58.02
i
10 80 $41.06 $9.12 $10.40 $0.00 $60.58
Effective Date- 03/01/201 S Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
1 35 $18.44 $9.12 $8.90 $0.00 $36.46
2 40 $21.07 $9.12 $8.90 $0.00 $39.09
3 45 $23.71 $9.12 $9.90 $0.00 $41.73
4 50 $26.34 $9.12 $890 $0.00 $44.36
5 55 $28.97 $9.12 $8.90 $0.00 $46.99
6 60 $31.61 $9.12 $10.40 $0.00 $51.13
7 65 $34.24 $9.12 $10.40 $0.00 $53.76
8 70 $36.98 $9.12 $i0.40 $0.00 $56.40
9 75 $39.51 $9.12 $10.40 $0.00 $59.03
10 80 $42.14 $9.12 $10.40 $0.00 $61.66
Notes:Apprentice entered prior 9/30/10:
40/45/5 0/5 5/60165/70/75/90/85
Steps are 850 hours 1
Apprentice to Journeyworker Ratio.1:3
STEAM BOILER OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL.4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
------------------------ ------------ ------ —----------------------- ------------- ------------- ---------------- ------------- -----------
Issue Date: 02/14/2019 Wage Request Number: 20180214-034 Page 29 of 33
i
Classification Effective Date Base Wage Health Pension Stepplemeattal i
Total Rate
Unemployment p
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
TELECOMMUNICATION TECHNICIAN 09/01/2017 $36.96 $13.00 $15.62 $0.00 $65.58 Y,
ELECTRICIANS LOCAL 103 I;
03/01/2018 $37.61 $13.00 $1593 $0.00 $66.54
09/01/2018 $39.51 $13.00 $1596 $0.00 $67.47
03/01/2019 $39,40 $13.00 $15.98 $0.00 $68.38
is
Apprentice- TELECOMMUNICATIONTECHNICIAN-Local 103 i
Effective Date- 09/01/2017 supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
l 40 $14.79 $13.00 $0.44 $0.00 $28.22
2 40 $14.78 $13.00 $0.44 $0.00 $28.22
3 45 $16.63 $13.00 $12.55 $0.00 $42.18
i
4 45 $16.63 $13.00 $12.55 $0,00 $42.18 l
5 50 $18.48 $13.00 $12.92 $0.00 $44.30
6 55 $20.33 $13.00 $13.10 $0.00 $46.43
7 60 $22.18 $13.00 $13.39 $0.00 $48.57
8 65 $24.02 $13.00 $13.66 $0.00 $50.68
9 70 $25.87 $13.00 $13.95 WOO $52,82 i
i
10 75 $27.72 $13.00 $14.22 $0.00 $54.94
Effective Date- 03/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension unemployment Total Rate
1 40 $15.04 $13.00 $0.45 $0.00 $28.49
2 40 $15.04 $13.00 $0.45 $0.00 $28.49
I
3 45 $16.92 $13.00 $12.74 $0.00 $42.66
4 45 $16.92 $13.00 $12.74 $0.00 $42.66
5 50 $18.81 $13.00 $13.03 $0.00 $44.84
6 55 $20.69 $13.00 $13.32 $0.00 $47.01
7 60 $22.57 $13.00 $13.61 WOO $49.19
8 65 $24.45 $13.00 $13.90 $0.00 $51.35
9 70 $26.33 $13.00 $14.19 $0.00 $53.52
10 75 $28.21 $13.00 $14.48 $0.00 $55.69
Notes.
Apprentice to Journeyworker Ratio:1:1
TERRAZZO FINISHERS 02/01/2019 $51.00 $10.75 $20.03 $0.00 $81.78
BRICKLAYERSLOCAL 3-MARBLE&TILE
08/01/2018 $52.35 $10.75 $20.16 $0.00 $83.26
02/01/2019 $52.99 $10.75 $20.16 $0.00 $83.90
08/01/2019 $54.34 $10.75 $20.30 $0.00 $95.39
02/01/2020 $54.99 $10.75 $20.30 $0.00 $96.03
08/01/2020 $56.33 $10.75 $20.45 $0.00 $87.53
02/01/2021 $56.97 $10.75 $20.45 $0.00 $98.17
08/01/2021 $58.37 $10.75 $20.61 $0.00 $89.73
02/01/2022 $58.96 $10.75 $20.61 $0.00 $90.32
--------------------- ............. --- -------------------- ----------- ----------------- ----- --- ----------- ---------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 30 of 33
{
Classification Effective Date Base Wage Health Pension Supplemental
Total Rate
Unemployment
s
i
Apprentice- TERRAZZO FINISHER-Local 3 Marble& Tile
Effective Date- 02/01/2018 Supplemental
Step percent Apprentice Base Wage Health Pension llncrnployment Total Rate
1 50 $25.50 $10.75 $20.03 $0.00 $56.28
2 60 $30.60 $10.75 $20.03 $0.00 $61.38 5
3 70 $35.70 $10.75 $20.03 $0.00 $66.48
4 80 $40.80 $10.75 $20.03 $0.00 $71.58 j
5 90 $45.90 $10.75 $20.03 $0.00 $76.68
Notes:
f
a
i
Apprentice to Journeyworkei Ratio:1.3
TEST BORING DRILLER 12/01/2016 $37.70 $7.60 $14.35 $0.00 $59.65
LABORERS-FOUNDATION AND K4RINE
For apprentice rates see"Apprentice-LABORER"
TEST BORING DRILLER HELPER 12/01/2016 $36.42 $7.60 $14.35 $0.00 $58.37
LABORERS-FOUNDATION AND MARINE
For apprentice rates see"Apprentice-LABORER"
TEST BORING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25
LABORERS-FOUNDATION AND AblRINE
For apprentice rates see"Apprentice-LABORER"
TRACTORS/PORTABLE STEAM GENERATORS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
.--.-... _. ----
TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2016 $33.02 S10.91 $10.89 $0.00 $54.82
TEAMSTERS JOINT COUNCIL NO.IO ZONE B
TUNNEL WORK-COMPRESSED AIR 12/01/2016 $49.58 $7.60 $14.75 $0.00 $70.93
LABORERS(COMPRESSED AIR)
For apprentice rates see"Apprentice-LABORER"
TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 12/01/2016 $50.58 $7.60 $14.75 $0.00 $72.93
LABORERS(COMPRESSED AIR)
For apprentice rates see"Apprentice-LABORER"
TUNNEL WORK-FREE AIR 12/01/2016 $40.65 $7.60 $14.75 $0.00 $63.00
LABORERS(FREE AIR TUNNEL)
For apprentice rates see"Apprentice-LABORER"
TUNNEL WORK-FREE AIR(HAZ.WASTE) 12/01/2016 $42.65 $7.60 $14.75 $0.00 $65.00
LABORERS(FREE AIR TUNNEL)
For apprentice rates see"Apprentice-LABORER"
VAC-HAUL 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24
TEAMSTERS JOINT COUNCIL NO.IO ZONE B
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 31 of 33
Supplemental Total Rate
Classification Effective Aate Base Wage health PensionUnemployment
WAGON DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.39
LABORERS-ZONE 2
46/41/2018 $33.92 $7.70 $13,60 $0.00 $55.22
12/01/2018 $34.76 $7.70 $13.60 $0,00 $56.06
06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93
12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79
06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68
12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57
06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49
12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40
1
For apprentice rates see"Apprentice-LABORER"
WASTE WATER PUMP OPERATOR 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63
OPERATING ENGINEERS LOCAL 4
For apprentice rates see"Apprentice-OPERATING ENGINEERS"
WATER METER INSTALLER 09/01/2017 $49.86 $11.57 $15.26 $0.00 $76.69
PLUILIBERS&GASFI7TERS LOCAL 12(Lncal138J 03/01/2018 $51.36 $11.$7 $15.26 $0.00 $78.19
09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69
03/01/2019 $54.36 $11.57 $15.26 $0.00 $81.19
09/01/2019 $55.86 $11.57 $15.26 $0.00 $82.69
03/01/2020 $57.36 $11.57 $15.26 $0.00 $84.19
09/01/2020 $58.86 $11.57 $15.26 $0.00 $85.69
03/01/2021 $60.36 $11.57 $15.26 $0.00 $87.19
For apprentice rates see"Apprentice-PLUMBER/PIPEFI'I'TER"or"PLUMBER/GASFITTER"
Outside Electrical-East
CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.81 $0.00 $36.70
OUTSIDE ELECTRICAL JVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
_- .._..
CABLEMAN(Underground Ducts&Cables) 09/03/2017 $38 45 $7.75 $9.53 $0.00 $55.73
OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
DRIVER/GROUNDMAN CDL 09/03/2017 $31,66 $7.75 $9.44 $0.00 $48.85
OUTSIDE ELECTRICAL JVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
DRIVER/OROUNDMAN-Inexperienced(<2000 Hrs) 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38
OUTSIDE ELECTRICAL JVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $38.45 $7.75 $13.61 $0.00 $59.81
OUTSIDE ELECTRICAL JVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
EQUIPMENT OPERATOR(Class B CDL) 09/03/2017 $33.92 $7.75 $10.21 $0.00 $51.88
OUTSIDE ELECTRICAL 1170AKERS-EASTLOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
GROUNDMAN 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38
OUTSIDE ELECTRICAL IVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN'
GROUNDMAN-Inexperienced(<2000 Hrs.) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29,71
OUTSIDE ELECTRICAL,JVORKERS-EAST LOCAL 104
For apprentice rates see"Apprentice-LINEMAN"
JOURNEYMAN LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59
OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104
---------- - ----------------------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 32 of 33
i
Supplemental i
Classification Effective Date Base Wage llealth Pension Total Rate
Unemployment
x
�C
Apprentice- LINEMAN(Outside Electrical)-East Local 104
Effective Date- 09/03/2017 Supplemental
Step percent Apprentice Base Wage Health Pension Unemployment Total Rate
s
1 60 $27.14 $7.75 $3,31 $0.00 $38.20
2 65 $29,40 $7.75 $3.39 $0.00 $40.53
3 70 $31.66 $7.75 $3.45 $0.00 $42.96
4 75 $33.92 $7.75 $5.02 $0.00 $46.69
5 80 $36.18 $7.75 $5.09 $0.00 $49.02
6 , 85 $38.45 $7.75 $5,15 $0.00 $51.35
7 90 $40.71 $7.75 $7.22 $0.00 $55.68
Notes:
E
i
Apprentice to Jonrneyworker Ratio:1:2
TELEDATA CABLE SPLICER 01/01/2016 $28.98 $4.25 $3.12 $0.00 $36.35
OUTSIDE ELECTRICAL JVOIXERS-EAST LOCAL 104
TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63
OUTSIDE ELECTRICAL JYORKERS-EAST LOCAL 104
TELEDATA WIREMAN/1NSTALLER/TECHNICIAN 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63
OUTSIDE ELECTRICAL,FVORKERS-EAST LOCAL 104
TREE TRIMMER 01/31/2016 $19.51 $3.55 $0.00 $0.00 $22.06
OUTSIDE ELECTRICAL JVORKERS-EAST LOCAL 104
This classification applies only to tree work done:(a)for a utility company,R.E.A-cooperative,or railroad or coal mining company,and(b)fur the purpose of
Operating,maintaining,or repairing the Wit ity company's equipment,and(e)by a person who is using hand or mechanical cutting methods and is not on the ground.
I.
This classification does not apply to wholesale tree removal
TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87
OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104
This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of
operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or mechanical cutting methods and is on the ground. This
classification does not apply to wholesale tree removal.
Additional Apprentice Information:
Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre-determined hourly wage rate established by the
Commissioner under the provisions of the M.G.L.c.149,ss.26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L.
c.23,ss.IIE-I IL.
All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L.c.23,ss.I lE-I I L.
Ail steps are six months(1000 hours.)
Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof,unless otherwise specified.
*s Multiple ratios are listed in the comment field.
*** APP to JM;1:1,2.2,2:3,3:4,4:4,4:5,4:6,5:7,6:7,6:8,6:9,7:10,8a0,8:11,S:12,9:13,10:13,10:14,etc.
**** APP to JM;1:1,1:2,2:3,2:4,3:5,4:6,4:7,5:8,6:9,6:10,7:11,8:12,8:13,9:14,10:15,10:16,etc.
----------- ------ ------------ ------- -------------- ------ ---------- -------- ------------- ------------- --------------
Issue Date: 02/14/2018 Wage Request Number: 20180214-034 Page 33 of 33
CERTIFICATE OF VOTE
At a duly authorized meeting the Board of Directors of the Specialized Roofing Company Inc.
held on January 9,2018 it was
VOTED, THAT
Stephen Reddy President
(Name) (Officer)
of Specialized Roofing Co.,Inc, be and hereby is authorized to execute contracts and bonds in the
name and on behalf of said Specialized Roofing Co.,Inc and affix its corporate seal hereto; and
such execution of any contract or obligation in the name of Specialized Roofing Co.,Inc on its
behalf by such officer under seal of Corporation shall be valid and binding upon
signature
I hereby certify that I am the clerk of the above named Specialized Roofing Co.,Inc and
that —Stephen Reddy is the duly elected officer as above of said
Specialized Roofing Co.,Inc and that the above vote has not been amended or rescinded and
remains in full force and effect as the date of this contract.
March 12,2018 :)y,
(Date) (Clerk)
Town of North Andover IFB Page 35 of 37
Roof Inspections,Repairs and Maintenance
CERTIFICATIONS
CERTIFICATE OF NON-COLLUSION
The undersigned certifies wider penalties of perjury that this bid or proposal has been made and
submitted in good faith and without collusion or fraud with any other person. As used in this
certification, the word "person" shall mean natural person, business, partnership, corporation,
committee, union, club or other organization, entity, or group of individuals.
Signature
Date March 12,2018
V
Stephen Reddy-President Specialized Roofing Company Inc.
Print Name&Title Company Name
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b),I
Stephen Reddy authorized signatory for Specialized Roofing Company Inc.
Arame of individual Name of contractor
do hereby certify under the pains and penalties of perjury that said contractor has complied with
all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to
taxes,permit or other fees,reporting of employees and contractors, and withholding and remitting
child support.
�4 March 12,2018
Signature Date
Town of North Andover 1FB Page 33 of 37
Roof Inspections,Repairs and Maintenance
CERTIFICATION
LABOR HARMONY AND OSHA TRAINING REQUIREMENTS
The undersigned certifies under penalties of perjury that he is able to furnish labor that can work
in harmony with all other elements of labor employed or to,be employed at the work
and
that all employees to be employed at the worksite and in the work will have completed an OSHA-
approved construction safety and health course lasting at least ten (10)hours.
March 12,2018
Signature .. .... Date
Stephen Reddy-President Specialized Roofing Company Inc.
Print Name& Title Company Name
Town of North Andover IFB Page 34 of 37
Roof Inspections,Repairs and Maintenance
Client#:232376 SPECIROOFI
DATE(MMJDDJYYYY)
ACORD,. CERTIFICATE OF LIABILITY INSURANCE 4/2 712 0 1 7
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT':If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must be endorsed.If SUBROGATION IS WAIVED,subject to
the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER CONTACT
NAME:
Marsh&McLennan Agency LLC PHONE 888 850-9400 866-795-8016
APC No Ext t AJC No
100 Front Street,Suite 800 E-MAIL
ADDRESS:
Worcester, MA 01608 INSURER(S)AFFORDING COVERAGE NAIL
888 850-9400 INSURER A:Continental Insurance Company v,"' 35289
INSURED INSURER B:Continental Casualty Company 20443
Specialized Roofing,Inc.
INSURER c
27 High Street
INSURER D
North Billerica, MA 01862
INSURER E
INSURER F:
COVERAGE'S CERTIFICATE NUMBER: REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE, MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTRR TYPE OF INSURANCE 1NSR WVD POLICY NUMBER MMJDDIYVYY MMIDDNYYY LIMITS
A .X COMMERCIAL GENERAL LIABILITY 5084198476 5I0112017 05101/2018 EACH OCCURRENCE $1,000,000'
CLAIMS-MADE p
OCCUR p Mq G 'f ELATED
PREMIS S Ea nccu".nce $100 000
MED...EXP(Any one person) $15,000
PERSONAL&ADV INJURY $11000 000'
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000
PRO- PRODUCTS $2,000000
POLICY � JECT �LOC r
OTHER,: $
A AUTOMOBILE LIABILITY 5084198462 5101I2017 05/01/201 EOa aocideD4SINGLE LIMIT 1,000,000
.X ANY AUTO BODILY INJURY(Per person) S
ALL OWNED SCHEDULED BODILY INJURY(Per accident) $
AUTOS AUTOS
X HIRED AUTOS NON-OWNED PROPERTY DAMAGE $
AUTOS Per swidenR
$
B X UMBRELLA LIAR X t�ccuR 5084198493 5/0112017 05101/2018 EACH OCCURRENCE _ $5 000 000
EXCESS LIAR _ CLAIMS-MADE AGGREGATE s5,000,000
DED I X RETENTION$10 000 $
B WORKERS COMPENSATION WC612640786 510112017 051011201 X PERTuTE I OTH-
AND EMPLOYERS,.LIABILITY
ANY PROPRIETORtPARTNERJEXECUTIVE Y J N E.L.EACH ACCIDENT $1 000 0q0'
OFFICER/MEMBER EXCLUDED? l NJ N J A
(Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $1,000,000
If yes,describe under
DESCRIPTION OF OPERATIONS below E.L.DISEASE POLICY LIMIT 1$1.000.000
A Equipment Floater 5084198462 5I01I2017 05101/2018 $50,000 Rented/Leased.
$25,000 Max Per Item
DESCRIPTION OF OPERATIONS 1 LOCATIONS J VEHICLES(ACORD 101.,Additional Remarks Schedule,may be attached If more apace is required)
The Town of North Andover is included as an additional insured on a primary basis as respects the general
liability and auto liability,if required by written contract for work performed by the named insured.The
umbrella is follow form.
CERTIFICATE HOLDER CANCELLATION
Town Of North Andover SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
Attn:Jo-Ann Lanenl DPW ACCORDANCE WITH THE POLICY PROVISIONS.
384 Osgood Street
North Andover,MA 01845 AUTHORIZED REPRESENTATIVE
@ 1988-2014 ACORD CORPORATION.All rights reserved.
ACORD 25(2014101) 1 of 1 The ACORD name and logo are registered marks of ACORD
#S2536419IM2536115 Bi1WCLC
PAYMENT BOND
Bond No, 9187905
KNOW ALL MEN BY THESE PRESENTS,that we ___,�gciarized Roofing, Inc.
with a place of business at 27 High Street, N.Billerica, MA01862
as Principal(the"Principal"),and Washington International Insurance ComP-9Dy----.,a
corporation qualified to do business in the Commonwealth of Massachusetts,with a place of business at
160 Gould Street,-Suite 118, Needham, MA 02494 as Surety
(the"Surety"),are held and firm)�bound unto the Town of North Andover, Massachusetts as Obligee
(the"Obligee"), in the sum of wenty-nine Thousand Eight Hundred And No/100THS lawful money of
UOLLAES, I qq Rnn.nni
the United States of America,to be paid to the Obligee,for which payment,well and truly to be made, we
bind ourselves, our respective heirs,executors,administrators, successors and assigns,jointly and
severally, firmly by these presents,
WHEREAS,the Principal has assumed and made a contract with the Obligee, hearing the date of
------------.for the construction of Roof Inspections, Rep4if s& Maintenance
for the Period of April.1, 2018 through March 31,2019
NOW,THE, CONDITIONS of this obligation are such that if the Principal and all subcontractors under
said contract shall pay for all labor performed or furnished and for all materials used or employed in said
contract and in any and all duly authorized modifications,alterations,extensions of tirne, changes or
additions to said contract that may hereafter be made,notice to the Surety of such modifications,
alterations,extensions of time,changes or additions being hereby waived,the foregoing to include,but
not be limited to, any other purposes or items set out in,and to be subject to,the provisions of
Massachusetts General Laws,Chapter 30, Section 39M, and Chapter 149,Section 29,as amended then
this obligation shall became null and void; otherwise,it shall remain in full force and virtue.
IN WIINESS WFM.REFORE, the Principal and Surety have hereto set their hands and seals this
.day off joj,�
PRINCIPAL SURETY
Specialized Roofing, Inc. Washington 1pt tipnal Ins ice Company
[Name and Sea[] [Attorney-in fac ,
'Sea
Q Timothy P. ns, Atto ney- n-Fact
v-r ,,, \e 93 Longwa r Cirice, No MA 02061
[Title] [Address]
781-681-6656
yco,�A nE)y r C
[Phone]
Phone]
Attest:
END OF PAYMENT BOND
SWISS RE CORPORATE SOLUTIONS
NORTH AMERICAN SPECIALTY INSURANCE COMPANY
WASHINGTON INTERNATIONAL INSURANCE COMPANY
GENERAL POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS,THAT North American Specialty Insurance Company,a corporation duly organized and existing under
laws of the State of New Hampshire,and having its principal office in the City of Overland Park,Kansas,and Washington International Insurance i!
Company,a corporation organized and existing under the laws of the State of New Hampshire and having its principal office in the City of Overland I;
Park,Kansas,each does hereby make,constitute and appoint:
JOHN C.DRISCOLL,TIMOTHY P.LYONS,CLAIRE A.CAVANAUGH,
DENNIS DRISCOLL,MARTIN L.DONOVAN and TYLER MARTIN
JOINTLY OR SEVERALLY
Its true and lawful Attorneys)-in-Fact,to make,execute,seal and deliver,for and on its behalf and as its act and deed,bonds or other writings
obligatory in the nature of a bond on behalf of each of said Companies,as surely,on contracts of suretyship as are or may be required or permitted by
law,regulation,contract or otherwise,provided that no bond or undertaking or contract or suretyship executed under this authority shall exceed the
amount of: FIFTY MILLION($50,000,000.00)DOLLARS
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both North American Specialty Insurance Company and Washington International Insurance Company at meetings duly called and held
on the 9th of May,2012:
"RESOLVED,that any two of the Presidents,any Managing Director,any Senior Vice President,any Vice President,any Assistant Vice President,
the Secretary or any Assistant Secretary be,and each or any of theta hereby is authorized to execute a Power of Attorney qualifying the attorney named
in the given Power of Attorney to execute on behalf of the Company bonds,undertakings and all contracts of surety,and that each or any of them
hereby is authorized to attest to the execution of any such Power of Attorney and to attach therein the seal of the Company; and it is
I'.
FURTHER RESOLVED,that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
binding upon the Company when so affixed and in the future with regard to any bond,undertaking or contract of surety to which it is attached."
ZAx Cy C'1{\P FY//`f �_. �ya�° SIAw- �Nsw
4f., y ,�4J:�ogP , TG
�? SEAL ;r�T s Steven P.Anderson,Senior vice President of Washington Internatlunal Insurance Cumpany E 2 j SEAL j
wi.7, 7973 rq n &Senior Vice President of North American Specialty Insurance Company Os �m
��i6�Y•.VAMPS.,'a�''�� t y'••`/Y Yea€ ',
Michael A.f;o, for ece resrdenEa \ as raglan nte3 nafion�mace Company rmMmiaspunnsa '
&Senior Vice President of North American Specialty Insurance Company
IN WITNESS WI IEREOF,North American Specialty Insurance Company and Washington International Insurance Company have caused their
official seals to be hereunto affixed,and these presents to be signed by their authorized officers this 20th day of October ,2017 .
North American Specialty Insurance Company
Washington International Insurance Company
State of Illinois
County of Cook ss:
On this 20th day of October 20 17 ,before me,a Notary Public personally appeared Steven P.Anderson ,Senior Vice President of
Washington International Insurance Company and Senior Vice President of North American Specialty Insurance Company and Michael A.Ito,
Senior Vice President of Washington International Insurance Company and Senior Vice President of North American Specialty Insurance
Company,personally known to me,who being by me duly sworn,acknowledged that they signed the above Power of Attorney as officers of and
acknowledged said instrument to he the voluntary act and deed of their respective companies.
OFFICIAL SEAL
Notary Pu6[i�_Statc of Illinois
My Comm.:ssian Exp;nCs M.Kenny,Notary Pubr€c
i=02621 --
I, Jeffrey Goldberg_the duly elected Assistant Secretary of North American Specialty Insurance Company and Washington
International Insurance Company,do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney given by said North
American Specialty Insurance Company and Washington International Insurance Company,which is still in full force and effect.
IN WITNESS WHEREOF,I have set my hand and affixed the seals ofthe Companies this Qr)-day of ,20 �.
Jeffrey Coldherg,Vice President&Assistant Secretary or
Washington International Insurance Company&North American Specialty Insurance Company