Loading...
HomeMy WebLinkAboutContract #: 1069 - From: 04-01-2018 To: 03-31-2019 - Martinez Road Construction, Inc - DPW TOWN OF NORTH ANDOVER CONTRACT f CONTRACT# DATE: p aO This Contract is entered into on, or as of, this date by and between the Town of North Andover (the"Town"), and Contractor: Martinez Road Construction, Inc. Address: 142 Clarendon Street F Fitchburg, MA 01420 Telephone Number: 978-342-8600 Fax Number: 978-342-2696 1. This is a Contract for the procurement of the following: Raising town-owned roadway structures and casting for the period of April 1, 2018 through March 31,2019 (with two additional one-year renewals solely at the discretion of the Town) in accordance with the Invitation for Bids dated February 21,2018 2. The Contract price to be paid to the Contractor by the Town of North Andover is: Raising Structures 8" and 12" round water $100.00 each Manholes $225.00 each Catch Basins $225.00 each Rebuild Structures $225.00 per vertical foot Temporary Steel Plates Remove MH or CB casting install steel plate and backfill $160.00 each Remove steel plate at MH or CB re-install casting $225.00 each Y 3. Payment will be made as follows: Upon completion of work and receipt of invoice (net 30) (Rev 5-2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Page I i 4. Definitions 4.1 Acceptance: All Contracts require proper acceptance of the described goods or services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, b Drawings, and all Addenda issued during the bidding period. The Contract documents s are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. " r with he Town. This term shall as 4.3 The Contractor: The other art to an Contract w t t party" y E the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. li y 4.7 Work: The services or materials contracted for, or both. 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before March 31, 2019, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation Notwithstanding anything in the Contract documents to the contrary, any and all payments which j. the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this (Rev 5-2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Page 2 Contract shall be immediately terminated without liability for damages, penalties or other charges. i 7. Permits and Approvals Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. 8. Termination and Default 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or 5 condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to !� perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified ' time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re-perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations. I 9. The Contractor's Breach and the Town's Remedies €, E Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Tow of North Andover shall have all the (Rev 5-2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Page 3 } K i rights and remedies provided in the Contract documents, the right to cancel, terminate, or suspend the Contract in whole or in part, the right to maintain any and all actions at law or in r equity or other proceedings with respect to a breach of this Contract, including damages and specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of procuring services as a result of any failure, omission or mistake of the Contractor in providing services as provided in this Contract. 10. Statutory Compliance 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B—Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, itself observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. (Rev 5-2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Page 4 11. Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the is application of M.G.L. c. 26$A to the performance of this Contract; and 6y executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. 12. Certification of Tax Compliance l This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors I ProvidingGoods, Services, or Real Estate Space to the Commonwealth or Subdivision). pI. i 13. Discrimination I The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151 B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town F This Contract is only binding upon, and enforceable against, the Town if: (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its (Rev 5-2007)Contract by and between'rown of North Andover and Martinez Road Construction,Inc. Page 5 i Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials To the full extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. 18. Indemnification The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, E including damages caused by his, its or their use of faulty, defective, or unsuitable material or E equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. i The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. 5 s Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate termination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials, Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the (Rev 5-2407)Contract by and between'Town of North Andover and Martinez Road Construction,Inc. Page 6 } g S s s Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts as it relates to public documents, and all other state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. 5 r Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted F authority to, without payment of any royalty, commission, or additional fee of any type or nature, publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit, Inspection and Recordkeeping At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by:this Agreement, 22. Payment forth in the Town agrees to make all reasonable efforts to a to the Contractor the sum set ort The ow g pay ' f n invoice detailingthe work Contractor's bid or proposal within thin 30 days of receipt o a p p �Y � ) Y p completed and acceptance fiom the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach f of a similar or different matter. (Rev 5-2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Page 7 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance } s with the laws of the Commonwealth. Any and all proceedings or actions relating to subject a matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. 4 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or !' registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent !' to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street,Not Andover, Massachusetts 01845. 26. Binding on Successors !' This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate,the heirs and estate of the Contractor). 27. Complete Contract i i This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes,the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of North Andover shall be a , party. One of the following "Supplements" must be "checked" as applicable to this Contract, , shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: E [ ] GOODS f SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) [ ] SERVICES SUPPLEMENT "S"- Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) > [X] CONSTRUCTION SUPPLEMENT"C" - Applicable to Contracts for Construction (Rev 5-2007)Contract by and between'town of North Andover and Martinez Road Construction,Inc. Page 8 IN WITNESS WHEREOF the parties have hereto and to two ether identical instruments set forth. their hands the day and year first above written. THE TOWN THE CONTRACTOR uns4m-6 Di is on/Department Head Company Name ov ✓' U� Town Manager Date gnature Date 2 PteA t Print Name ,&Title Federal Identification No.: Ao -&o5va3 APPROVED AS TO FORM: awn Counsel Date CERTIFICATION AS TO AVAILABILITY OF FUNDS: 19 , �a I ZIda J Tow�Acuntant Date (Rev 5_2007)Contract by and between Town of North Andover and Martinez Road Construction,Inc. Wage 9 t g SUPPLEMENT"C" r [] CONSTRUCTION SUPPLEMENT"C" -Applicable to Contracts for the construction of. 1 (1)Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); E (2)Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3)Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) 1. This form supplements the Town of North Andover"Contract and General Conditions"and applies only to contracts for the construction,reconstruction,alteration,remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required)in the form required by the Town and provide an original thereof to the Town prior i to the commencement of performance. 1 3. Equal I 3.1. hi the case of a closed Specification written for a specific item or items to be furnished under the Base Bid,such specifications shall,as applicable,be in compliance with the Massachusetts General Laws, Chapter 30, Section 39M and Chapter 149, Sec.44A et seq. 3.2. Where the name of an item,material or manufacturer is mentioned in the Specifications or on the Drawings,except as above noted,the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not:mentioned by name,but whose product meets the Specifications as to design,utility and quality. Final decision shall rest with the Project Representative as to its acceptability. s governed b General Laws Chapter 30B may not increase the quantity of 4. Change orders to contract v Y P Y q h' goods or services provided by more than twenty-five(25%)per cent, in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obl igations ations of this contract in frill compliance with all of the requirements imp Y imposed b or pursuant to General Laws Chapter 151, Sec. 1,et seq. (Minimum Wage Law)and any executive orders,rules,regulations,and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply Y with the wage rates as detennined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D(Prevailing Wage),as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others,including adjacent property,from injury or loss arising (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 1 and Martinez Road Construction,Inc. f s r EE I is I in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town,or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of federal, State and local laws and codes to prevent accidents or injury to persons on,about or adjacent to the premises where the work is being performed. The Contractor will crect and properly maintain at all times, as required by the conditions and progress of the work,all necessary safeguards for the protection of workers and the public, shall post danger signs warning against the hazards created by such features of construction such as pits,protruding nails,hosts,well holes,elevator hatchways,scaffolding,window openings,stairways and falling materials;and shall designate a responsible member of its organization on the work,whose duty shall be the prevention of accidents. 8. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent,foreman,or assistants are unacceptable to the Town,then upon seven days notice froth the Town,the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work,using its best skill and attention. The Contractor shall carefully study and compare the drawings,specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. U Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly,or fail to perform the contract or any of its provisions,the Town,upon three days written notice,may,without prejudice to any other remedy it may have,make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. a 12. Inspection by the Town's Project Re resentative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to carry out the construction work in accordance with the Contract Documents. During such visits and on the basis of these observations while at i the site,the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, f and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town,which shall be shown to the Contractor,and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 2 and Martinez Road Construction,Inc. 1 k 12.2. In connection with the work,the Project Representative shall not be responsible for construction methods,means,techniques, sequences or procedures employed by the Contractor or the Contractor's safety programs,requirements,regulations,or precautions. 13. Decisions of the Project Representative 13.1. The Project Representative shall,within a reasonable time,make decisions on all clauns of 1 the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision, in matters relating to the project,shall be final, if within the terms of the Contract Documents. 13.3. If,however,the Project Representative fails to render a decision within ten days after the parties have presented their evidence,either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced,such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. E 14.1 Use of Premises by the_Contractor: 14.1, The Contractor shall confine its apparatus,the storage of materials and the operations of 3 its workmen to limits indicated by law, by-laws, permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work"broom-clean", or its equivalent, unless more exactly specified, In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors,as the Town shall determine to be just. 16. Right to Terminate If the Contractor should(1)be adjudged a bankrupt,(2)make a general assignment for the benefit of creditors, (3)have a receiver appointed on account of its insolvency, (4)persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract, (5)fail to make prompt payment to subcontractors or to providers of materials or labor, (6) persistently disregard laws and regulations or lawful directives of the Town, or(7)be guilty of a substantial violation of any provision of the Contract,then the Town may, without prejudice to any other right or remedy and after giving the Contractor(or any surety)seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials,tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover page 3 and Martinez Road Construction,Inc. S S In such cases,the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed s the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. s Notwithstanding any other provision of this Agreement,the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. s 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor, payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall,before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract,divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town, shall be used as a basis for payment,unless it is found to be in error. If applying for payments,the Contractor shall submit a statement based upon this schedule. 18. Withholding of Payments 18.1. The Town may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of i 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 18.1.3. Failure of the Contractor to make payments properly to Subcontractors or for.material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 3 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 4 is and Martinez Roast Construction,Inc. 1 is 1 l I 18.2. Withholding of payments shall be in strict compliance with statutory requirements. ] 19. Claims by Contractor and Liability of Town !' V All claims by the Contractor against the Town shall,unless otherwise provided by law, be initiated by a written claim submitted to the Tow no later than seven(7)calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. k The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed,and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize(1)that the time for completion of this Contract is of the essence, (2)that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract,and(3)the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty,the sum of One Thousand Dollars($1,000) per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct an liquidated damages from money due the Contractor, and if such payment is Y Y q g Y a pY insufficient to cover the liquidated damages, then the Contractor shall a the amount due. q g pay r 21. The Contractors' Mutual Responsibility: 3 Should the Contractor cause damage to any separate subcontractor on the work,the Contractor agrees, upon due notice,to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained,the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom,the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: f 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor,the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 5 and Martinez Road Construction,Inc. j of the other contractor's work as fit and proper for the reception of its work except as to k defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work,the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractor's and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor-Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement,the General Conditions of the Contract,the Supplementary General Conditions,the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws Commonwealth of Massachusetts Chapter 149 Section 44A p p et se q• 25. Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses,recoveries and judgments of every nature and description (including reasonable attorneys' fees) brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors,material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable,regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractor's or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable,the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 6 and Martinez Road Construction,Inc. k, any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain insurance of such character and in such amounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26. The Contractor's Insurance: }. 26.1. The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. CIaims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease,or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.1. Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Re uirements Liability insurance shall include all major divisions and shall be on a comprehensive general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned,Non-owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits,whichever are greater: l ii (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 7 and Martinez Road Construction,Inc. Comprehensive General Liability Insurance (Broad form) Bodily Injury $1,000,000 per person $2,000,000 aggregate Property Damage $1,000,000 per occurrence $2,000,000 aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence GI: Excess Liability(Umbrella) $2,000,000 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled Protective Liability Insurance shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten(10)days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty(30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the"MIIA" or"ACORD"Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer,evidencing in particular those insured,the extent of coverage,the location and operations to which the insurance applies,the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. 27. Protective Liability Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 8 and Martinez Road Construction,Inc. M i 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non-Ownership Liability in connection with the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. : 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability is Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. l 28, Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract, or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information,the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended(as a minimum requirement). 29. Guarantees: 29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this E Contract will be competent to perform the tasks undertaken, that the product of such labor will yield only first-class results,that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials � furnished by the Contractor,he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch,then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient,the Contractor shall be obligated to pay the balance thereof h 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 9 and Martinez Road Construction,Inc. is obligation to correct work is in addition to, and net in substitution of, such guarantees or warranties as may be required in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness our hands and seals hereto: Dated: The Contractor by: V. An on d Si e ore The Town of North Andover by: - 1>1 1 Tow Manager I Dep rtm nt/Divisi ad own Counsel Approved as to Form Tejo cceun ant Certified as to Appropriatio f g (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 10 and Martinez Road Construction,Inc. is THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D.BAKER As determined by the Director under the provisions of the ROSALIN ACOSTA s—e Gorcmnr Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D CKINNEY d KARYN E.POLITO D1YCClOt Lt.Governor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: Raise town-owned roadway structures&castings to proposed new paving grades t i Job Location: Various locations Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number"on all pages of this schedule. ? • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards("DLS")if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects(bid pursuant to G.L.c.149A),the earlier of: (a)the execution date of the GMT Amendment,or(b)the bid for the fast i construction scope of work must be within 90-days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L.c. 149, i §27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 §27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor,a filed sub-bidder,or any sub-contractor. • All apprentices working on the project are required to be registered with the Massachusetts Department of Labor ?' Standards,Division of Apprentice Standards(DLS/DAS). Apprentice must keep his/her apprentice identification card on i his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal,state,local,or private agency must be paid the r journeyworher's rate for the trade. • The wage rates will remain in effect for the duration of the project,except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor, For multi-year CM AT RISK projects,awarding authority must request an annual update no later than two weeks before the anniversary date,determined as the earlier of: (a) the execution date of the GMP Amendment,or(b)the execution date of the first amendment to permit procurement of construction services.Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F"rental of equipment"contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll ;i reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name,address,occupational classification,hours worked,and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. � • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at(617)626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at(617)727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and Issue Date: 02/14/2018 Wage Request Number: 20180214-033 g4g B Classification Effective slate Base Wage Health n Peusio Supplemental fatal Rate Unemplovntent Construction (2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 TEAMSTERS JOINT COUNCIL NO.10 ZONE B 1 (3 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 } TEAMSTERS JOINT COUNCIL NO,10 ZONE B t (4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 TEAMSTERS JOINT COUNCIL NO.10 ZONE B ADS/SUBMERSTBLEPILOT 08/01/2017 $9297 $9.90 $21,15 $0.00 $124.02 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $97.80 $9.90 $21.15 $0,00 $128.85 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 Por apprentice rates see"Apprentice-PILE DRIVER" AIR TRACK OPERATOR 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54,89 LA BORERS-ZONE 2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $3699 $7.70 $13.60 $0.00 $58.29 f 06/01/2020 $37,88 $7.70 $13.60 $0.00 $59.18 ?' i 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 i 06/01/2021 $39.69 $7.70 $13.60 $0.00 $6099 12/01/2021 $40.60 $7.70 $13.60 $0.00 $6190 For apprentice rates see"Apprentice-LABORER" �i ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 12/01/2017 $35.90 $11.50 $7.10 $0.00 $54.50 HEAT&FROST INSULATORS LOCAL 6(BOSTON) 06/01/2018 $36.90 $11.50 $7.10 $0,00 $55.50 12/01/2018 $3790 $11.50 $7.10 $0,00 $56.50 06/01/2019 $38.90 $11.50 $7.10 $0,00 $57.50 12/01/2019 $3990 $11.50 $7.10 $0.00 $58.50 06/01/2020 $4090 $11.50 $7.10 $0.00 $59.50 12/01/2020 $4190 $11.50 $7.10 $0.00 $60.50 ASP14ALT RAKER 12/0 t/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/0t/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" i ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprenfice-OPERATING ENGINEERS" BACKHOEFRONT-END LOADER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERA77NG ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ------------------------------ ------- ---------------- ---- ---- --------------- ----- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 2 of 33 Classification Effective bate Base Wage Health Pension Supplemental Total Rate Unerr► to ment BARCO-TYPE JUMPING TAMPER 1 2/0 112 0 1 7 $33.08 $7.70 $13.60 $0.00 $54.38 r LABORERS-ZONEZ 0610 1/20 1 8 $3392 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58,68 12/01/2020 $38,27 $7.70 $13.60 $0.00 $59,57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-L.ABORLW' BLOCK PAVER,RAMMERI CURB SETTER 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 ' 12/01/2019 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 s 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 5 12/01/2021 $40.60 $7.70 $13,60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" s, BOILERMAKER 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10 BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER-Local 29 Effective Bate- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $27.90 $6.97 $10.54 $0.00 $45.41 2 65 $27.90 $6.97 $10.54 $0.00 $45.41 3 70 $30.04 $6.97 $11.35 $0.00 $48.36 4 75 $32.19 $6.97 $12.16 $0.00 $51.32 5 80 $34.34 $6.97 $12.97 $0.00 $54.28 6 85 $36.48 $6.97 $13,78 $0.00 $57.23 7 90 $39.63 $6,97 $14.59 $0.00 $60.19 8 95 $40.77 $6.97 $15.40 $0.00 $63.14 ..: Notes: f Apprentice to JourneyworIrer Ratio:1 5 ------------------------ --------- ----------g----- g F Issue Bate: 02/14/2018 Wage Request Dumber: 20180214-033 Page 3 of 33 Classification Effective Date Ease Wage Health Pension supplerneutal Total Rate Unew Flo ment G BRICK/STONE/ARTIFICIAL MASONRY(INCL.MASONRY 02/01/2018 $52.06 $10.75 $20.03 $0.00 $82.84 c WATERPROOFING) 08/01/2018 $53.41 $10.75 $20.16 $0.00 $84.32 BRICKLAYERS LOCAL 3(LYNN) 02/01/2019 $54.05 $10.75 $20.16 $0.00 $84.96 i 08/01/2019 $55.40 $10.75 $20.30 $0.00 $86.45 02/01/2020 $56.04 $10.75 $20.30 $0.00 $87.09 08/01/2020 $57.39 $10.75 $20.45 $0.00 $88.59 02/01/2021 $58.03 $10.75 $20.45 $0.00 $89.23 09/01/2021 $59.43 $10.75 $20.61 $0.00 $90.79 02/01/2022 $60.02 $10.75 $20.61 $0.00 $91.38 Apprentice- BRICKIPLASTERICEMENT AL4SON-Local 3 Lynn Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate f 1 50 $26.03 $10.75 $20.03 $0.00 $56.91 € 2 60 $31.24 $10.75 $20.03 $0,00 $62.02 3 70 $36.44 $10.75 $20.03 $0.00 $67.22 4 80 $41.65 $10.75 $20.03 $0.00 $72.43 5 90 $46.85 $10.75 $20.03 $0.00 $77.63 F, Effective Date- 08/Ol/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate %. 1 50 $26.71 $10.75 $20.16 $0.00 $57.62 2 60 $32.05 $10.75 $20.16 $0.00 $62.96 3 70 $37.39 $10.75 $20.16 $0.00 $68.30 f' 4 80 $42.73 $10.75 $20.16 $0.00 $73.64 5 90 $48.07 $10,75 $20.16 $0.00 $78.98 f. . .. Notes:. -... -. . - } . . ..... Apprentice to Journeyworker Ratio:1:5 BULLDOZER/GRADER/SCRAPER 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" CAISSON&UNDERPINNING BOTTOM MAN 12/01/2016 $37.45 $7.60 $14.35 $0.00 $59.40 LABORERS_FOUNDATION AND MARINE For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATION AND AARINE For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING TOP MAN 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATION AND AMME For apprentice rates see"Apprentice-LABORER" -- ------------- ----------------- --------- ------------- --------------- ---------------------- ------ ---- - Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 4 of 33 Supplemental Total Rate Classification Effective Date Base Wage Health Pension Unemployment CARBIDE CORE DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $3392 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 s 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 1 12/01/2020 $39.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice PP rentice rates sec"Apprentice-I A13 O REW CARPENTER 09/01/2017 $39.29 $9.90 $17.50 $0.00 $66.68 CARPENTERS-ZONE 2(Eastern Massachusetts) 03/01/2018 $40.28 $990 $17.50 $0.00 $67.68 09/01/2018 $41.32 $990 $17.50 $0.00 $68.72 03/01/2019 $42.35 $9.90 $17.50 $0.00 $69.75 i Apprentice- CARPENTER-Zone 2 Eastern A fM Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.64 $9.90 $1.73 $0.00 $31.27 2 60 $23.57 $9.90 $1.73 $0.00 $35.20 3 70 $27.50 $9.90 $12.31 $0.00 $49.71 ' 4 75 $29.46 $9.90 $12.31 $0.00 $51.67 5 80 $31.42 $9.90 $14.04 $0.00 $55.36 €. 6 80 $31.42 $990 $14.04 $0,00 $55.36 7 90 $35,35 $9.90 $15.77 $0.00 $61.02 8 90 $35.35 $9.90 $15.77 $0.00 $61.02 j. r. Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.14 $9.90 $1.73 $0.00 $31.77 i! r. 2 60 $24.17 $4.90 $1.73 $0.00 $35.90 3 70 $28.20 $9.90 $12,31 $0.00 $50.41 4 75 $30.21 $9.90 $12.31 $0.00 $52,42 5 80 $32.22 $9.90 $14.04 $0.00 $56.16 6 80 $32.22 $9.90 $14.04 $0.00 $56,16 7 90 $36.25 $9.90 $15.77 $0.00 $61.92 8 90 $36.25 $9.90 $15.77 $0.00 $61.92 Notes: %Indentured After 10/1/17;45/45/55/55/70/70/80/80 l Step 1&2$29.31/3&4$34.9015&6$51.44/7&8$57.09 Apprentice to Journeyworker Ratio:1:5 --------------------------------- ---------------------- ------ --- ---------------- ...... ---------- -------------- ------ Issue Date: 02/14/2019 Wage Request Number: 20180214-033 Page 5 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment CEMENT MASONRY/PLASTERING 01/01/2018 $46.02 $12.35 $22.41 $0.30 $91.08 ' BRICKLAYERS LOCAL 3(LINN) 07/01/2018 $47.41 $12.35 $22.41 $0,30 $82.47 01/01/2019 $49.15 $12.35 $22.41 $0.30 $93.21 07/01/2019 $49.54 $12,35 $22.41 $0.30 $84.60 01/01/2020 $50.29 $12,35 $22.41 $0.30 $85.35 , : Apprentice- CEMENT MASONRYIPLASTERING-Eastern Mass(Lyma) z Effective Date- 01/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate r I 1 50 $23.01 $12.35 $15.41 $0.00 $50.77 x 2 60 $27.61 $12.35 $17,41 $0.30 $57.67 3 65 $29.91 $12.35 $18.41 $0.30 $60.97 4 70 $32.21 $12.35 $19.41 $0.30 $64.27 r, 5 75 $34.52 $12.35 $20.41 $0.30 $67.58 I, 6 80 $36.82 $12.35 $21.41 $0.30 $70.88 7 90 $41.42 $12.35 $22.41 $0.30 $76.48 i Effective Date- 07/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $12.35 $15.41 $0.00 $5I.47 2 60 $28.45 $12.35 $17.41 $0.30 $58.51 3 65 $30.82 $12.35 $18,41 $0.30 $61.88 4 70 $33.19 $12.35 $19.41 $0.30 $65.25 5 75 $35.56 $12.35 $20.41 $0.30 $68.62 6 80 $37.93 $12.35 $21.41 $0.30 $71.99 7 90 $42.67 $12.35 $22.41 $0.30 $77.73 Notes: 1 Steps 3,4 are 500 hrs.All other steps are 1,000 hrs. 1 Apprentice to Journeyworker Ratio:1:3 CHAIN SAW OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-70NE2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56,06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $T70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.69 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES 12/01/2017 $47.63 $10.50 $15.50 $0.00 $73.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING FNGINEERS" COMPRESSOR OPERATOR 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ------------------------ -------- ---------------------------....- -- ---- ---------------------- - ----------------------- Issue Date: 02/14/2018 Wage Request Number: 20 1 902 1 4-03 3 Page 6 of 33 Classification effective Date Base Wage Health Pension Supplemental Total RateUnem to ment ri :y DELEADER(BRIDGE) 01/01/2017 $51.41 $7.85 $16,10 $0.00 $75.36 PAINTERSLOCAL 35-ZONE 2 l s Apprentice- Pr12NTER Local 35 -BRIDGESITANKS Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.71 $7.85 $0.00 $0.00 $33.56 2 55 $29.29 $7.85 $3.66 $0.00 $39.79 3 60 $30.85 $7.85 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45,59 [' 5 70 $35.99 $T85 $14.11 $0.00 $57.95 6 75 $38.56 $7.85 $14.44 $0.00 $60.95 7 80 $41.13 $7.85 $14.77 $0,00 $63.75 8 90 $46,27 $7.85 $15.44 $0.00 $69.56 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1.1 DEMO:ADZEMAN 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 LABORERS-ZONE 2 06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05 12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40,55 $7.70 $14.75 $0,00 $63,00 12/01/2019 $41,55 $7.70 $14.75 $0.00 $64,00 Foi apprentice rates see"Apprentice-LABOERR" DEMO:BACKHOE/LOADER/HAMMER OPERATOR 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONE2 06/01/2019 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" DEMO:BURNERS 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85 LABORERS-ZONE 2 06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80 12/01/2019 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41.30 $7.70 $14,75 $0.00 $63.75 12/01/2019 $42.30 $7.70 $14.75 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:CONCRETE CUTTER/SAWYER I2/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONE2 06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" ---------------------------------------- ---------------------------- ---------- - ------ ---------------------- Issue Date: 0211 4/20 1 8 Wage Request Number: 20 1 802 14-03 3 Page 7 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment DEMO:JACKHAMMER OPERATOR 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85 LABORERS-ZONE 2 06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80 12/01/2018 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41.30 $7.70 $14.75 $0.00 $63.75 12/01/2019 $42.30 $7.70 $14.75 $0.00 $64.75 For apprentice rates see"Apprenlice-LABORER" i, DEMO:WRECKING LABORER 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 €, LABORERS-7.0NE2 06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05 12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00 , 12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 c For apprentice rates see"Apprentice-LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 ' r. OPERATING ENGINEERS LOCAL 4 P For apprentice rates see"Apprentice-OPERATING ENGINEERS" ', DIVER 08/01/2017 $61.98 $9.90 $21.15 $0.00 $93.03 PILEDRIVER LOCAL 56(ZONE!) 09/01/2018 $65.20 $9.90 $21.15 $0.00 $96.25 09/01/2019 $68.52 $9.90 $21.15 $0.00 $99.57 For apprentice rates see"Apprentice-PILE DRIVER' DIVER TENDER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 '' PILE DRIVER LOCAL 56('LONE 1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 08/01/2019 $4894 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER(EFFLUENT) 08/01/2017 $66.41 $9.90 $21.15 $0.00 $97.46 PILEDRIVER LOCAL S6(ZONE 1) 08/01/2018 $69.86 $9.90 $21.15 $0.00 $100.91 08/01/2019 $73.41 $9.90 $21.15 $0.00 $104.46 'I For apprentice rates see"Apprentice-PILE DRIVER" i DIVER/SLURRY(EFFLUENT) 08/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02 PILEDRIVER LOCAL 56(ZONE 1) 08/01/2019 $97.80 $9.90 $21.15 $0.00 $128.85 08/01/2019 $102.79 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" DRAWBRIDGE OPERATOR(Construction) 0910112017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81 A0 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN" ELECTRICIAN 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECI7tICIANSLOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0.00 $91.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 ------ Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 8 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment a Apprentice- ELECTRIC14N--Local 103 1 Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.71 $13.00 $0.59 $0.00 $33.30 2 40 $19.71 $13.00 $0.59 $0.00 $33.30 3 45 $22.18 $13.00 $13.39 $0.00 $48.57 4 45 $22.18 $13.00 $13.39 $0.00 $48.57 f 5 50 $24.64 $13,00 $13.76 $0.00 $51.40 6 55 $27.10 $13.00 $14.12 $0.00 $54.22 7 60 $29.57 $13.00 $14.50 $0.00 $57.07 8 65 $32.03 $13.00 $14.87 $0.00 $59,90 9 70 $34.50 $13.00 $15,25 $0.00 $62.75 i 10 75 $36.96 $13.00 $15.62 $0.00 $65.58 i Effective Date- 03/01/2018 Supplemental � Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $20.06 $13.00 $0.60 $0.00 $33,66 2 40 $20.06 $13.00 $0.60 $0.00 $33.66 3 45 $22.57 $13.00 $13,61 $0.00 $49.18 4 45 $22.57 $13.00 $13.61 $0.00 $49.18 5 50 $25.08 $13.00 $13,99 $0.00 $52.07 6 55 $27.58 $13,00 $14.38 $0.00 $54.96 7 60 $30.09 $13.00 $14.76 $0.00 $57.85 8 65 $32.60 $13.00 $15.15 $0.00 $60.75 9 70 $35.11 $13.00 $15.53 $0.00 $63.64 I0 75 $37.61 $13.00 $15.93 $0.00 $66,54 Notes � App Prior 1/l/03;30/35/40/45/50/55/65/70/75/80 a Apprentice to Journeyworlcer Ratio:2:3*** ELEVATOR CONSTRUCTOR 01/01/2017 $55.86 $15.29 $15.71 $0.00 $86.85 ELEVATOR COMMUCTORSLOCAL 4 ------------- --------- ---------------....-....---------------------------------- ------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 9 of 33 Supplemental T©#al Rate Classification Effective Date Base Wage Health Pension Uncmnlovnaent P t f Apprentice- ELEVATOR CONSTRUCTOR-Local 4 Effective Date- 01/01/2017 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.93 $15.28 $0.00 $0.00 $43.21 2 55 $30.72 $15.28 $15,71 $0.00 $6L71 s 3 65 $36.31 $15,28 $15.71 $0.00 $67.30 4 70 $39.10 $15.28 $15,71 $0.00 $70.09 l' I 5 80 $44.69 $15,28 $15.71 $0,00 $75.68 6' }Notes: Steps 1-2 are 6 mos.;Steps 3-5 are 1 year Apprentice to Journepvorker Ratio:1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2017 $39.10 $15.28 $15.71 $0.00 $70.09 ELEVATOR CONSTRUCTORS LOCAL 4 s For apprentice rates see"Apprentice-ELEVATOR CONSTRUCTOR" s FENCE&GUARD RAIL ERECTOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0,00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 1 2/0 112 0 2 1 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/I-IWY 11/01/2017 $42.88 $10.00 $15.25 $0.00 $68.13 OPERATING FNGINEERS LOCAL,4 05/01/2018 $43.59 $10.00 $15.25 $0.00 $68.84 For app€entice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2017 $44.34 $1D,00 $15.25 $0.00 $69,59 OPERATING ENGINEERS LOCAL 9 05/0 112418 $45.06 $1 O.OD $15.25 $0.00 $70,31 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2017 $22.83 $10.00 $15.25 $0.00 $48.08 OPERATING ENGINEERS LOCAL 4 05/01/2018 $23.26 $10.00 $15.25 $0.00 $48.51 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIRE ALARM INSTALLER 09/01/2017 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.15 $13.00 $17.85 $0,00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $1793 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN" FIRE ALARM REPAIR/MAINTENANCE 09/01/2017 $36.96 $13,00 $15.62 $0.00 $65.58 /COMMISSIONINGELFcTRIC1ANs 03/01/2018 $37.61 $13.00 $1593 $0.00 $66.54 LOCAL.103 09/01/2018 $38.51 $13,00 $1596 $0.00 $67.47 03/01/2019 $39.40 $13.00 $1598 $0.00 $69.38 For apprentice rates see"Apprentice-TELECOMNRJ IICATIONS'I'ECHNiCIAN" .---------­ - -------- ------- --------------- ---------- -------------------- ------------- -------------- .......-------------------- Issue Date: 02/14/2018 Wage Request Number: 20190214-033 Page 10 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate a Unemployment FIREMAN(ASST.ENGINEER) 12/01/2017 $38.57 $10.50 $15.50 $0.00 $64.57 OPERATING ENGINEERS LOCAL 4 e For apprentice rates see"Apprentice-OPERAI ING ENGINEERS" t FLAGGER&SIGNALER 12/01/2017 $21.50 $7.70 $13.60 $0.00 $42.80 x LABORERS-ZONE 2 0610 1/20 1 8 $21.50 $7.70 $13.60 $0.00 $42.80 Y; 12/01/2019 $22.50 $7.70 $13.60 $0.00 $43.80 06/01/2019 $22.50 $7.70 $13.60 $0.00 $43.80 12/01/2019 $23.50 $7.70 $13.60 $0.00 $44.80 06/01/2020 $23.50 $7.70 $13.60 $0.00 $44.90 i 12/01/2020 $24.50 $7.70 $13.60 $0.00 $45.80 06/01/2021 $24.50 $7.70 $13.60 $0.00 $45.80 h 12/01/2021 $24.50 $7.70 $13.60 $0.00 $45.80 For apprentice rates see"Apprentice-LABORER" FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55 FLOORCOVERERS LOCAL 2168 ZONE,I i i Apprentice- FLOORCOVEM?-Local 2168 Zone I Effective Date- 03/01/2016 Supplemental s Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.07 $9.90 $1.79 $0.00 $32.66 2 55 $23.17 $9.80 $1.79 $0.00 $34.76 3 60 $25.28 $9.90 $12.25 $0.00 $47.33 4 65 $27.38 $9.80 $12.25 $0.00 $49.43 5 70 $29.49 $9.80 $14.04 $0.00 $53.33 6 75 $31.60 $9.80 $14.04 $0.00 $55.44 7 80 $33.70 $9.80 $15.83 $0.00 $59.33 8 85 $35.81 $9.80 $15.83 $0.00 $61.44 (Notes: Steps are 750 hrs. %After 09/1/17;45/45/55/55/70/70/80/80(1500lu•Steps) Step 1&2$30.55/3&4$36.49/5&6$53,33/7&8$59.33 A PP_rentiee to.iourne wor,k^er Ratio: I .. y FORK LIFT/CHERRY PICKER 12/01/2017 $46.63 $10,50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GENERATOR/LIGHTINGPLANT/HEATERS 12/01/2017 $31.90 $10.50 $15.50 $0.00 $57.90 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GLAZIER(CLASS PLANK/AIR BARRIER/INTERIOR 01/01/2017 $40.91 $7.85 $16.10 $0.00 $64.86 SYSTEMS) GLAZIERS LOCAL 35(ZONE 2) --------- --- ------------- -- ---- -------------........--- ---- ------------------------ --------- --------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 11 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemolovrnent f Apprentice- GLAZIER-Local 35 Zone 2 Effective Date- 01/01/2017 Supplemental � Step percent Apprentice Base Wage Health Pension Unemployment: Total Rate k 1 50 $20.46 $7.85 $0.00 $0.00 $28.31 2 55 $22.50 $7.85 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26.59 $7,85 $4.32 $0.00 $38.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 i 6 75 $30.68 $7.85 $14.44 $0.00 $52.97 ` 7 80 $32,73 $7.85 $14.77 $0.00 $55.35 f. 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 I. tNotes: ` Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 HOISTING ENGINEER/CRANES/GRADALLS 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINF,F.RS LOCAL 4 Apprentice- OPERATING ENGINEERS-Local 4 Effective Date- 12/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $25.65 $10.50 $0.00 $0.00 $36.15 2 60 $27.98 $10.50 $15.50 $0.00 $53.98 3 65 $30,31 $10.50 $15.50 $0.00 $56.31 4 70 $32.64 $10.50 $15.50 $0.00 $58.64 5 75 $34.97 $10.50 $15.50 $0.00 $60.97 6 80 $37.30 $10.50 $15.50 $0.00 $63.30 j 7 85 $39,64 $10.50 $15.50 $0.00 $65.64 8 90 $41.97 $10.50 $15.50 $0.00 $67.97 !Notes: . � I l l Apprentice to Journeyworke► Ratio:1:6 HVAC(DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SJMETMETAL IPORKERSLOCAL 17-A For apprentice rates see"Apprentice-SHEET METAL WORKER'.' HVAC(ELECTRICAL CONTROLS) 09/0 112 0 1 7 $49.28 $13.00 $17.48 $0.00 $79.76 ELECTRICIANS LOCAL 103 03/01/2018 $50.�5 $13.00 $17.85 $0,00 $81.00 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $I3.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN" HVAC(TESTING AND BALANCING-AIR) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETMETAL{PORKERS LOCAL 17-A ------------ ------------------- --------- ---------------------- -- ...... --------- ..... ------- - -------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 12 of 33 : i Classification Effective Date Base Wage Health Pension Supplemental Total Rate r Unemployment s For apprentice rates see"Apprentice-SHFFT METAL WORKER" 9 p, HVAC(TESTING AND BALANCING-WATER) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTFRS LOCAL 537(Local 138) i For apprentice rates see"Apprentice-PIPEFITTER"or"PLi NMER/PIPERTTER" HVAC MECHANIC 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTF.RS LOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTFR"or"PLi MBER/PIPEFITTER" HYDRAULIC DRILLS 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-7.01VE 2 06/01/2018 $34.42 $7.70 $13,60 $0.06 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38,77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39,69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40,60 $7.70 $13.60 $0.00 $6190 For apprentice rates see"Apprentice-LABORER" INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04 HEAT&FROST INSULATORS LOCAL 6(BOSTON) 09/01/2018 $49.34 $11.75 $14.20 $0.00 $75.29 09/01/2019 $51,84 $11.75 $14.20 $0.00 $77.79 Apprentice- ASBESTOS INSUL,4TOR(Pipes& Tanks)-Local 6 Boston Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment "Total Rate 1 50 $23.55 $11,75 $10.45 $0.00 $45.75 2 60 $28.25 $11.75 $11.20 $0.00 $51.20 is 3 70 $32.96 $11.75 $11.95 $0.00 $56.66 4 80 $37.67 $11.75 $12.70 $0.00 $62.12 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $24.67 $11.75 $10.45 $0.00 $46.87 2 60 $29.60 $11.75 $11.20 $0.00 $52.55 3 70 $34.54 $11.75 $11.95 $0.00 $59.24 4 80 $39.47 $11.75 $12.70 $0.00 $63.92 iNotes: Steps are 1 year Apprentice to Journeyworker Ratio:1:4 IRONWORKER/WELDER 03/16/20I7 $40.24 $7.80 $20.85 $0.00 $69.89 IRONWORKERS LOCAL 7(LAWRENCF AREA) ------------ ---- ---- ---------------- --------- ---------------------- - ---- ------------ ----------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 13 of 33 Classification >;tTecfive bate Base Wage Health Pension SupplementalTotal Rate Tune►nplovment t Apprentice- IRONWORKER-Local 7 La►nrence Effective Date- 03/16/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.14 $T80 $20.95 $0.00 $52,79 2 70 $28,17 $7.80 $20.85 $0.00 $56.82 3 75 $30.18 $7.90 $20,95 $0.00 $58.83 4 80 $32,19 $7.80 $20.85 $0.00 $60.84 g 5 85 $34.20 $7.80 $20,85 $0.00 $62.85 6 90 $36.22 $7.80 $20.85 $0.00 $64.87 e i Notes: € Structural 1:6;Ornamental 1:4 £ 1 Apprentice to Journeyworlcer Ratio: JACKHAMMER&PAVING BREAKER OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 j LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 1210112018 $34.76 $7.70 $13.60 $0.00 $56.06 0 6/0 112 0 1 9 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprcnfice r81CS see."Apprentice-LABORER" LABORER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-7ONL 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 ; 1 2/0 112 0 1 8 $34.51 $7.70 $13.60 $0.00 $55.81 0 6/0 112 0 1 9 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $39.02 $T70 $13.60 $0.00 $59.32 06/01/2021 $39.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.95 $7.70 $13.60 $0.00 $61.15 ----------- ---------------------------- -------- ......... ------------------ Issue Date: 02/14/2019 Wage Request Number: 20180214-033 Page 14 of 33 Classification Effective Date Base Wage Health Pension Supplemental l'otal Rate Unemplovnrent k e Apprentice- Lr1BORER-Zane 2 i Effective Date- 12/01/2017 Supplemental t Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.70 $7.70 $13.60 $0.00 $41.00 1 2 70 $22.98 $7.70 $13.60 $0.00 $44.28 3 80 $26.26 $7.70 $13.60 $0.00 $47.56 4 90 $29.55 $7.70 $13.60 $0.00 $50.85 Effective Date- 06/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.20 $7.70 $13.60 $0.00 $41.50 f, 2 70 $23.57 $7.70 $13.60 $0.00 $44.87 3 80 $26.94 $7.70 $13.60 $0.00 $48.24 E'. 4 90 $30.30 $7.70 $13.60 $0.00 $51.60 Notes. r. I Apprentice to Journe"vorker Ratio:1:5 LABORER:CARPENTER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONF2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 V 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $39.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60,24 3 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61,15 i For apprentice rates see"Apprentice-LABORER" LABORER:CEMENT FINISHER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $39.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39,85 $7.70 $13.60 $0.00 $61.15 Cor apprentice rates see"Apprentice-LABORER" LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2017 $33.03 $7.70 $13.55 $0.00 $54.28 LABORERS-ZONE 2 06/01/2018 $33.97 $7.70 $13.55 $0.00 $55.12 I2/01/2018 $34.71 $7.70 $13.55 $0.00 $55.96 06/01/2019 $35.58 $7.70 $13.55 $0.00 $56.83 12/01/2019 $36.44 $7.70 $13.55 $0.00 $57.69 For apprentice rates see"Apprentice-LABORER" ------------------ ---- -- ------ ------------------- Issue Date: 02/14/2019 Wage Request Number: 20180214-033 Page 15 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment LABORER:MASON TENDER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 f LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 I, 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $T70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" LABORER:MULTI-TRADE TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 1 2/0 112 0 1 8 $34.51 $7.70 $13.60 $D.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $T70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates sec"Apprentice-LABORER" LABORER:TREE REMOVER 12/01/2017 $32.93 $7.70 $13.60 $0.00 $54.13 LABORERS--ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $5497 � 12/01/2018 $34.51 $T70 $13.60 $0.00 $55.81 i 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.69 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 This classification applies to all tree work associated with the removal of standing trees,and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation,maintenance or repair of utility company equipment.For apprentice rates see"Apprentice-LABORER" LASER BEAM OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0,00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0,00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0,00 $58.69 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" - ------------------ ---------- - __----------- ----------- -- ....... --------- ------- --------------------- Issue Date: 0211 4/20 1 8 Wage Request Number: 20180214-033 Page 16 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE&'PILE FINISHERS 02/01/2018 $39.82 $10.75 $18.34 $0.00 $68.9.1 BltlCKLAYERS LOCAL 3-VARBLE&TILE 08/01/2018 $40.90 $10.75 $18.47 $0.00 $70.12 02/01/2019 $41.41 $10.75 $19.47 $0.00 $70.63 08/01/2019 $42.49 $10.75 $18.61 $0.00 $71.85 02/01/2020 $43.00 $10.75 $18.61 $0.00 $72.36 r, 08/01/2020 $44.08 $10.75 $18.76 $0.00 $73.59 02/01/2021 $44.59 $10.75 $18.76 $0.00 $74.10 08/01/2021 $45.71 $10.75 $18.92 $0.00 $75.38 02/01/2022 $46.18 $10.75 $18.92 $0.00 $75.85 Appren6ee- MARBLE& TILE FINISHER-Local 3 Mai-ble& Tile Effective Date- 02/01/2019 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.91 $10.75 $18.34 $0.00 $49.00 2 60 $23.89 $10.75 $18.34 $0.00 $5298 3 70 $27.87 $10.75 $18.34 $0.00 $56.96 4 80 $31.86 $10.75 $18.34 $0.00 $60.95 5 90 $35.84 $10.75 $18.34 $0.00 $64.93 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.45 $10.75 $18.47 $0.00 $49.67 2 60 $24.54 $10.75 $18,47 $0.00 $53.76 3 70 $28.63 $10.75 $19.47 $0.00 $57.85 4 80 $32.72 $10.75 $18.47 $0.00 $61.94 5 90 $36.81 $10.75 $19.47 $0.00 $66.03 . . Notes: ..... Apprentice to.Ionrneyworlcer Ratio:1:3 MARBLE MASONS,TILELAYERS&TERRAZZO MECH 02/01/2018 $52.10 $10.75 $20.03 $0.00 $82.88 BRICKLAMRS LOCAL 3-MARBLE&TILL 08/01/2018 $53,45 $10.75 $20.16 $0.00 $84.36 02/01/2019 $54.07 $10.75 $20.16 $0.00 $84.98 08/01/2019 $55.42 $10.75 $20.30 $0.00 $86.47 02/01/2020 $56.05 $10.75 $20.30 $0.00 $87.10 08/01/2020 $57.40 $10.75 $20.45 $0.00 $88.60 02/01/2021 $58.04 $10.75 $20.45 $0.00 $89.24 08/01/2021 $59.44 $10.75 $20.61 $0.00 $90.80 02/01/2022 $60.01 $10.75 $20.61 $0.00 $91.37 ---------------- ------------------- --- -------------------------------- ------------------------ ------------------ ------ Issue Date: 02/14/2018 Wage Request Number: 20 1 802 1 4-03 3 Page 17 of 33 s classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- MARBLE-TILE-TERRAZZO MECHANIC-Local 3 Marble& Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.05 $10.75 $20.03 $0.00 $56.83 2 60 $31.26 $10.75 $20.03 $0.00 $62.04 3 70 $36.47 $10,75 $20.03 $0.00 $67.25 4 80 $41.68 $10.75 $20.03 $0.00 $72.46 i 5 90 $46.89 $10.75 $20.03 $0.00 $77.67 Effective Date- 08/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.73 $10.75 $20.16 $0.00 $57.64 2 60 $32.07 $10.75 $20.16 $0.00 $62.98 3 70 $37.42 $10.75 $20.16 $0.00 $69.33 4 80 $42.76 $10.75 $20.16 $0.00 $73.67 5 90 $48.11 $10.75 $20.16 $0.00 $79.02 . .... i i Apprentice to Journeyworlcer Ratio:1:5 MECH.SWEEPER OPERATOR(ON CONST.SITES) 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 a For apprentice rates see"Apprentice-UP)RA'I'1NG ENGINEERS" MECHANICS MAINTENANCE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MILLWRIGHT(Zone 2) 10/01/2017 $36.32 $9.90 $18.50 $0.00 $64.72 AffLL FVRIGHTS LOCAL 1121-Zone 2 04/01/2018 $37.17 $9.90 $18.50 $0.00 $65.57 10/01/2018 $38.02 $9.90 $18.50 $0.00 $66.42 04/01/2019 $38.87 $9.90 $18.50 $0.00 $67.27 i ---------------- ------------------- --------------- ----------------------- --- ----------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 18 of 33 Classification Effective Aate Base Wage Health Pension Supplemental Total Rate q Unemployment t Apprentice- MILLWRIGHT-Loca1 11212'one 2 Effective Date- 10/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate s 1 55 $19.98 $9.90 $5.31 $0.00 $35.19 2 65 $23.61 $9.90 $15.13 $0.00 $48.64 3 75 $27.24 $9.90 $16.10 $0.00 $53.24 4 85 $30.87 $9.90 $17.06 $0.00 $57.83 Effective Date- 04/01/2018 5upptcmeniat Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I' f. 1 55 $20.44 $9.90 $5.31 $0,00 $35.65 2 65 $24.16 $9.90 $15.13 $0.00 $49.19 3 75 $27.88 $9.90 $16,10 $0.00 $53.88 4 85 $31.59 $9.90 $17.06 $0.00 $58.55 ... {Notes 1 Steps are 2,000 hours Apprentice to Journeyworker Ratio:1.5 MORTAR MIXER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-7.ONE2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2019 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $59.68 12/01/2020 $39.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40,10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" OILER(OTHER THAN TRUCK CRANES,GRADALLS) 12/01/2017 $23.24 $10.50 $15.50 $0.00 $49.24 OPERATING ENGINEERS LOCAL d For apprentice rates see"Apprentice-OPERATING ENGINEERS" OILER(TRUCK CRANES,GRADALLS) 12/01/2017 $27.40 $10.50 $15.50 $0.00 $53.40 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS' OTHER POWER DRIVEN EQUIPMENT-CLASS II 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PAINTER(BRIDGES/TANKS) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 PAINTERS LOCAL 35-ZONE 2 ------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 19 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovnnent i Y {E Apprentice_ PAINTER Local 35 -BRIDGES/T.9NKS z Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate P 1 50 $25.71 $7.85 $0.00 $0,00 $33.56 2 55 $28.29 $7.85 $3,66 $0.00 $39.79 3 60 $30.85 $7.85 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45.59 5 70 $35.99 $7.85 $14.11 $0.00 $57.95 6 75 $38.56 $7.85 $14.44 $0.00 $60.85 7 80 $41.13 $7.95 $14.77 $0.00 $63.75 8 90 $46.27 $7.85 $15.44 $0,00 $69.56 .Notes: s Steps are 750 hrs. t Apprentice to Journeyworker Ratio:1:1 PAINTER SPRAY OR SANDBLAST,NEW)) 01/01/2017 $42.31 $7.85 $16.10 $0,00 $66.26 € *If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 3s-ZONE2 i i Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-New Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate --- -- 1 50 $21.16 $7.85 $0,00 $0.00 $29.01 r. 2 55 $23.27 $7.85 $3.66 $0.00 $34.78 3 60 $25.39 $7,85 $3.99 $0.00 $37.23 4 65 $27.50 $7.85 $4.32 $0.00 $39.67 5 70 $29.62 $7.85 $14.11 $0.00 $51.58 6 75 $31.73 $7.85 $14.44 $0.00 $54.02 7 80 $33.85 $7.85 $14.77 $0.00 $56.47 �I. 8 90 $38.08 $T85 $15.44 $0.00 $61.37 ...... i. Notes: i Steps are 750 hrs. ., Apprentice to Journeyworker Ratio:I A f. PAINTER(SPRAY OR SANDBLAST,REPAINT) 0110112017 $40.37 $7.85 $16.10 $0.00 $64.32 PAINMRSLOCAL 35-ZONF.2 ----------------------- --------- Y, Issue Date: 02/14/2018 Wage Request Number: 20190214-033 Page 20 of 33 Supplemental Classification Effective Date Base Wage Health Pension Total Rate l Unemplovtneut Apprentice- P-IINTER Local 35 Zone 2-Spray/Sandblast-Repaint i Effective Date- 01/01/2017 Supplemental 1 i Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.19 $7.85 $0.00 $0.00 $28.04 2 55 $22.20 $7.85 $3.66 $0.00 $33.71 3 60 $24.22 $7.85 $3.99 $0.00 $36.06 i 4 65 $26.24 $7.85 $4.32 $0.00 $38.41 5 70 $28.26 $7.85 $14,11 $0.00 $50.22 6 75 $30.28 $7.85 $14.44 $0.00 $52.57 7 80 $32,30 $7.85 $14.77 $0.00 $54.92 ' 8 90 $36.33 $7.85 $15.44 $0.00 $59.62 1 Notes: 1 t t i Steps are 750 hrs. F :E F Apprentice to Journey-worker Ratio:1:1 PAINTER(TRAFFIC MARKINGS) 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 i 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 i 12/01/2021 $39.95 $7.70 $13.60 $0.00 $61.15 For Apprentice rates see"Apprentice-LABORER" PAINTER/TAPER(BRUSH,NEW)* 01/01/2017 $4091 $7.85 $16.10 $0.00 $64.86 j *If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAiNTERS LOCAL 35-ZONE 2 i I I ----------- ------------ -------- - ---------------- -------------------- ----------- ---- ---- Issue Date: 02/14/2018 Wage Request Number: 20 1 802 1 4-03 3 Page 21 of 33 Unemployment Effective Date Base Wag a Health Pension 5nee oyment Total Rate { t s Apprentice- PAINTER-Local 35 Zone 2-BRUSII NEW Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate i 1 50 $20.46 $7.85 $0.00 $0.00 $29.31 2 55 $22.50 $7.85 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26.59 $7.85 $4.32 $0.00 $38.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 6 75 $30.68 $7.85 $I4.44 $0A0 $52.97 7 80 $32,73 $7.85 $14.77 $0.00 $55.35 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 Notes: Steps are 750 hrs. i � F , .. -. Apprentice to Journeyworker Ratio:1.1 PAINTER ITAPER(BRUSH,REPAINT) 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 PAINTERS LOCAL 35-ZONE 2 r. Apprentice- PAINTER Local 35 Zone 2-BRUSH REPAINT Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.49 $7.85 $0.00 $0.00 $27.34 2 55 $21.43 $7.85 $3.66 $0.00 $32.94 3 60 $23.38 $7.85 $3.99 $0.00 $35.22 4 65 $25.33 $7.85 $4.32 $0.00 $37,50 5 70 $27.28 $7.85 $14.11 $0.00 $49.24 i 6 75 $29.23 $7.85 $14.44 $0.00 $51.52 7 80 $31.19 $7.85 $14.77 $0.00 $53.80 8 90 $35.07 $7.85 $15.44 $0.00 $59.36 Notes: Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PANEL.&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEAMSTERS JOINT COUNCIL NO.10 ZONE B PIER AND DOCK CONSTRUCTOR(UNDERPINNING AND 08/01/2017 $44.27 $9.90 $21,15 $0.00 $75.32 DECK) 08/01/20I8 $46.57 $9.90 $21,15 $0.00 $77.62 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" PILE DRIVER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 08/01/2019 $4894 $9.90 $21.15 $0.00 $79.99 ----------- ------------ ----- - ------------------------ - ---------- - ------------------- Issue Date: 02/14/2019 Wage Request Number: 20180214-033 Page 22 of 33 � Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment i Apprentice- PILEDRIVER-Local 56 Zone 1 Effective Date- 08/01/2017 Supplemental x Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $22.14 $9.90 $21.15 $0.00 $53.19 2 60 $26.56 $9.90 $21.15 $0.00 $57.61 G 3 70 $30.99 $9.90 $21.15 $0.00 $62.04 4 75 $33.20 $9.90 $21.15 $0.00 $64.25 5 80 $35.42 $9.90 $21.15 $0.00 $66.47 6 80 $35.42 $9.90 $21.15 $0.00 $66.47 7 90 $39.84 $9.90 $21.15 $0.00 $70.89 8 90 $39.84 $9.90 $21.15 $0.00 $70.89 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate i 1 50 $23.29 $9.90 $21.15 $0.00 $54.34 : E 2 60 $2T94 $9.90 $21.15 $0.00 $58.99 3 70 $32.60 $990 $21.15 $0.00 $63.65 E 4 75 $34.93 $9.90 $21.15 $0.00 $65.98 5 80 $37.26 $9.90 $21.15 $0.00 $68.31 6 80 $37.26 $9.90 $21.15 $0.00 $68.31 7 90 $41.91 $9.90 $21.15 $0.00 $7296 8 90 $41.91 $9.90 $21.15 $0.00 $72.96 Notes: B 4 Apprentice to Journeyworker Ratio:1:5 PIPEFITTER&STEAMFITTER 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPERYTERS LOCAL 537(Local 138) Apprentice- PIPEFITTER Local 537(Local 138) Effective Date- 03/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.54 $9.70 $5.50 $0.00 $34.74 2 45 $21.99 $9.70 $16.14 $0.00 $47.83 3 60 $29,32 $9.70 $16.14 $0.00 $55.16 4 70 $34.20 $9.70 $16.14 $0.00 $60.04 5 80 $39.09 $9.70 $16.14 $0.00 $64.93 : ;Notes: ** 1:3;3:15; 1:10 thereafter I Steps are 1 yr. Refi•ig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Jo..,.... . PP urneyworker Ratio:` --------- -------- --- ---------------- -- -- ------ -------------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 23 of 33 r Classification Effective Date Base Wage Health PensionSupplemental Total Rate Unemployment - PIPELAYER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONF.2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56,06 06/01/2019 $35,63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 t 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 A 12/01/2020 $39.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" PLUMBER 09/01/2017 $49.86 $11.57 $15.26 $0.00 $76.69 PLUMBERS&GASFI7TERS LOCAL 12(Local 138) 03/01/2018 $51,36 $11.57 $15.26 $0.00 $78.19 09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69 03/01/2019 $54.36 $11.57 $15.26 $0.00 $81.19 E, f 09/01/2019 $55.86 $11.57 $15.26 $0.00 $82.69 03/01/2020 $57.36 $11.57 $15.26 $0.00 $84.19 09/01/2020 $58.86 $11.57 $15.26 $0.00 $85.69 03/01/2021 $60.36 $11.57 $15.26 $0.00 $97.19 Apprentice- PL UAMERIGASFI7TER-Local 12(Local 138) Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.45 $11.57 $5.54 $0.00 $34.56 2 40 $19.94 $11.57 $6.29 $0.00 $37.80 3 55 $27.42 $11.57 $8,53 $0.00 $47.52 4 65 $32.41 $11.57 $10.03 $0.00 $54.01 5 75 $37.40 $11.57 $11.52 $0.00 $60.49 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $17.99 $11.57 $5.54 $0.00 $35.09 2 40 $20.54 $11.57 $6.29 $0.00 $38.40 3 55 $28.25 $11.57 $9.53 $0.00 $48.35 4 65 $33.38 $11.57 $10.03 $0.00 $54.98 5 75 $38.52 $11.57 $11.52 $0.00 $61.61 Notes: Steps are 1 yr Step 4 with lic$55,65 Steps with lic$61.89 Apprentice to Journeyworke► Ratio:1.5 PNEUMATIC CONTROLS(TEMP.) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERS LOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTER"or"PLUNMER/PIPEFITTER" ------ - ----- --------- ................. ---- -- --- -------------------- ---------- - ---------- -------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 24 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment a PNEUMATIC DRILL/TOOL OPERATOR 12/01/2017 $33,08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 j 12/01/2019 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 �k 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 C 06/01/2020 $37.38 $7.70 $13.60 $0.00 $59,68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59,57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13,60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" E POWDERMAN&BLASTER 12/01/2017 $33.83 $7.70 $13.60 $0.00 $55.13 LABORERS-ZONE2 06/01/2018 $34.67 $7.70 $13.60 $0.00 $55.97 ' 12/01/2018 $35.51 $7.70 $13.60 $0.00 $56,91 06/01/2019 $36.38 $7.70 $13.60 $0.00 $57.68 12/01/2019 $37.24 $7.70 $13.60 $0.00 $58.54 06/01/2020 $38.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $39.02 $7.70 $13.60 $0.00 $60.32 06/01/2021 $39.94 $7.70 $13.60 $0.00 $61.24 s (2/01/2021 $40.85 $7.70 $13.60 $0.00 $62.15 For appreMicc rates see"Apprentice-LABORER" i POWER SHOVEL/DERRICK/TRENCIENG MACHINE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 j OPERATING ENGINEERS LOCAL 4 I For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(CONCRETE) 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(DEWATERING,OTHER) 12/01/2017 $31,80 $10.50 $15.50 $0.00 $57.90 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" READY-MIX CONCRETE DRIVER 05/0I/2017 $24,21 $8.49 $11.54 $0.00 $44.24 TEAMSTERS LOCAL,42 04/30/2018 $24.21 $8.49 $11.96 $0.00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 0413 0/20 1 9 $24.24 $8.49 $12.92 $0.00 $45.65 RECLAIMERS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" RESIDENTIAL WOOD FRAME(All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51.94 CARPENTERS-ZONE 2(Residential JYood) RESIDENTIAL WOOD FRAME CARPENTER** 1 010 1/20 1 7 $26.25 $7.07 $7.86 $0.00 $41.18 **The Residential Wood Frame Carpenter classification applies 04/01/2018 $26,67 $7.07 $7.86 $0.00 $41.60 only to the construction of new,wood frame residences that do not exceed four stories including the basement.CARPENTERS-ZONE 10/01/2018 $27.09 $7.07 $7.86 $0.00 $42.02 2(Residenlial TYood) 04/01/2019 $27.52 $7.07 $7.86 $0.00 $42.45 10/01/2019 $27.95 $7.07 $7.86 $0.00 $42.88 As of 9/1/09 Carpentry work on woos[-Frame residential WEAUIERIZATION projects shall be paid the RESIDENTIAL.WOOD FRAME CARPENTER rate. ----------- ------- ---------------------------- --------- -------- ----------------- ------ --------------------- Issue Date: 02/14/2018 Wage Request Number: 20 1 902 1 4-033 Page 25 of 33 Classification Effective Date Base Wage tleatth Pension 'Supplemental Total Rate g Unemployment 1 Apprentice- CARPENTER(Residential Woad Frame)-Zone 2 k Effective Date- 10/01/2017 supplementat Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $15.75 $7.07 $0.00 $0.00 $22.82 2 60 $15.75 $7.07 $0.00 $0.00 $22.82 3 65 $17.06 $7.07 $7.86 $0.00 $3199 4 70 $18.38 $7.07 $7.86 $0.00 $33.31 5 75 $19.69 $7.07 $7.86 $0.00 $34.62 r 6 80 $21.00 $7.07 $7.86 $0.00 $35.93 7 85 $22.31 $7.07 $7.86 $0.00 $37.24 8 90 $23.63 $7.07 $7.86 $0,00 $38.56 Effective Date- 04/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.00 $7.07 $0,00 $0.00 $23.07 2 60 $16.00 $7.07 $0.00 $0.00 $23.07 3 65 $17.34 $7.07 $7.86 $0.00 $32.27 4 70 $18.67 $7.07 $7.86 $0.00 $33.60 5 75 $20.00 $7.07 $7.96 $0.00 $34.93 z 6 80 $21.34 $7.07 $7.86 $0.00 $36.27 7 85 $22.67 $7.07 $7.96 $0.00 $37.60 8 90 $24.00 $7.07 $7.86 $0.00 $38.93 I' Notes:' %Indentured After 10/1/17;45/45/55/55/70/70/80/80 Step 1&2$18.88/3&4$26.26/5&6$33.31/7&8$35.93 Apprentice to Journeyworker 12atio:l:5 RIDE-ON MOTORIZED BUGGY OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE2 06/01/2019 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $59.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ROLLER/SPREADER/MULCHING MACHINE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ROOFER(Ine.Roofer Waterproofng&Roofer Damproofg) 02/0 112 0 1 8 $42.36 $11,35 $14.80 $0.00 $69.51 ROOFERSLOCAL 33 08/01/2018 $43.46 $11.35 $14.80 $0.00 $69,61 0210 1/2 0 1 9 $44.61 $11.35 $14.80 $0.00 $70.76 ------------------------ - --------------- ------------- ..... -------- ..... ------------- -------------------------- -- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 26 of 33 Classification Effective Date Base Wage H Supplementalealth Pension Total Rate Unemployment 1 Apprentice- ROOFER_Local 33 .Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension ilnemploynient Total Rate 1 50 $21.18 $11.35 $3.44 $0.00 $35.97 2 60 $25.42 $11.35 $14.80 $0.00 $51.57 3 65 $27.53 $11.35 $14.80 $0.00 $53.68 4 75 $31.77 $11.35 $14.80 $0.00 $57,92 5 85 $36.01 $11.35 $14.80 $0.00 $62.16 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployn►ent Total Rate 1 50 $21.73 $11.35 $3.44 $0.00 $36.52 2 60 $26.09 $11.35 $14.80 $0.00 $52.23 3 65 $28.25 $11.35 $14.80 $0.00 $54.40 4 75 $32.60 $11.35 $14.80 $0.00 $58.75 5 85 $36.94 $11.35 $14,80 $0.00 $63.09 t jNotcs: ** 1:5,2:6-10 the 1:10;Reroofing: 1:4,then 1:1 E Step I is 2000 hrs.;Steps 2-5 are 1000 his. (Hot Pitch Mechanics`receive$1.00 hr.above ROOFER) Apprentice to Journey-worker Ratio:` ROOFER SLATE/TILE/PRECAST CONCRETE 02/01/2018 $42.61 $11,35 $14.80 $0.00 $68.76 ROOFERSLOCAL 33 08/01/2018 $43.71 $11.35 $14.80 $0.00 $69.86 02/01/2019 $44.86 $11.35 $14.80 $0.00 $71.01 !' For apprentice rates see"Apprentice-ROOFER' SHEETMETAL WORKER 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SFIEETMETAL 6VORKFR,S LOCAL 17-A i i' i -------- ------- -------- -------------- --------- .---- Issue Date: 02/14/2018 Wage Request lumber: 20180214-033 Page 27 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total RateUnemplavment Y Apprentice- SHEET METAL WORKER-Local 17-A Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate & i 1 40 $17.64 $12.20 $5.61 $0.00 $35.45 I' i 2 40 $17.64 $12.20 $5.61 $0.00 $35.45 3 45 $19.85 $12.20 $10.85 $1.29 $44.19 4 45 $19.85 $12.20 $10.85 $1.29 $44.19 5 50 $22.06 $12.20 $11.80 $1.39 $47.44 6 50 $22.06 $12.20 $12.05 $1.39 $47.70 7 60 $26.47 $12.20 $13.70 $1.57 $53.94 8 65 $29.67 $12.20 $14.65 $1.67 $57.19 9 75 $33.08 $12.20 $16.56 $1.86 $63.70 10 85 $37.49 $12.20 $17.96 $2.03 $69.68 -_. lNotes: r Steps are 6 mos. Apprentice to Journeyworker Ratio:1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0.00 $39.93 PAINTERS LOCAL 35-ZONE 2 Apprentice- SIGNERECTOR-Local 35 Zone 2 Effective Date- 06/01/2013 supple,nenta4 Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $I8.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21,94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 (Notes: Steps are 4 mos. f Apprentice to Journeyworker Ratio:1.1 SPECIALIZED EARTH MOVING EQUIP<35 TONS 12/01/2016 $32.44 $10.91 $10.99 $0.00 $54.24 TLAhISTE12S JOINT COUNCIL NO.1OZONE B SPECIALIZED EARTH MOVING EQUIP>35 TONS 12/01/2016 $32,73 $10.91 $10.89 $0.00 $54.53 TLAMSTERS JOINT COUNCIL NO.10 ZONE B ------- ------------ ----------- -------- ------------------- -----------------------------....-.. ----------------------- Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 28 of 33 Classification Effective Date Base Wage Health Pension Supplemental i Total Rate Unemployment SPRINKLER FITTER 01/01/2018 $51.33 $9.12 $17.40 $0.00 $77.85 7 SPRINKLER FITTERSLOCAL 550-(Sec7inn ll)Zone 2 03/01/2018 $52.68 $9.12 $17.40 $0.00 $79.20 10/01/2018 $54.03 $9.12 $17.40 $0.00 $80.55 01/01/2019 $54.03 $9.47 $17.60 $0.00 $81.10 03/01/2019 $55.38 $9.47 $17.60 $0.00 $82.45 k .10/01/2019 $56.73 $9.47 $17.60 $0.00 $83.80 03/01/2020 $58.08 $9.47 $17.60 $0.00 $85.15 10/01/2020 $59.43 $9.47 $17.60 $0.00 $86.50 03/01/2021 $60.78 $9.47 $17.60 $0.00 $87.85 s Apprentice- SPRINKLER FITTER-Local 550(Section B)Zone 2 Effective Date- 01/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $17.97 $9.12 $8,90 $0.00 $35.99 2 40 $20,53 $9.12 $8.90 $0.00 $38.55 3 45 $23.10 $9.12 $8,90 $0.00 $41.12 z 4 50 $25.67 $9,12 $8.90 $0.00 $43.69 5 55 $28.23 $9.12 $8.90 $0.00 $46.25 6 60 $30.80 $9,12 $10.40 $0.00 $50.32 7 65 $33,36 $9.12 $I0.40 $0.00 $52.88 8 70 $35.93 $9.12 $10.40 WOO $55.45 9 75 $39.50 $9.12 $10.40 $0,00 $58.02 , 10 80 $41.06 $9,12 $10.40 $0.00 $60.59 Effective Date- 03/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $18.44 $9.12 $8.90 $0.00 $36.46 2 40 $21.07 $9.12 $8.90 $0.00 $39.09 i 3 45 $23.71 $9.12 $8.90 $0.00 $41.73 4 50 $26.34 $9.12 $8.90 $0.00 $44.36 ' 5 55 $28.97 $9.12 $8.90 $0,00 $46.99 f 6 60 $31.61 $9.12 $10.40 $0.00 $51.13 j 7 65 $34.24 $9.12 $10.40 $0.00 $53.76 f 8 70 $36.88 $9.12 $10.40 $0.00 $56.40 9 75 $39.51 $9.12 $10.40 $0.00 $59.03 10 80 $42.14 $9.12 $10.40 $0.00 $61.66 Notes:Apprentice entered prior 9/30/10: 40/45/50/55/60/65/70/75180/85 Steps are 850 hours =A - ..:.: --., _.:: ,., . -.,: . _.... .... . ....... ...... pprentice to Jourme yworker Ratio:1:3 I 1 STEAM BOILER OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates sec"Apprentice-OPERATING ENGINEERS" TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCA1,4 -- - -- -- -- -- -- -----------------------------------____------------------ ------ i Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 29 of 33 ti Supplemental Classification Effective Date Base Wage Health Pension Total Rate Unemployment For apprentice rates see"Apprentice-OPERATING ENGINEFRS" TELECOMMUNICATION`I'ECUMCIAN 09/01/2017 $36.96 $13.00 $15.62 $0.00 $65.58 ELECTRICIANS LOCAL 103 03/01/2018 $37.61 $13.00 $15.93 $0.00 $66.54 09/01/2018 $38.51 $13,0€1 $15.96 $0.00 $67.47 03/01/2019 $39.40 $13.00 $1598 $0.00 $68 38 r Apprentice- TELECOMMUNICATION TECHNICIAN-Local 103 Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $14.79 $13.00 $0.44 $0.00 $28.22 2 40 $14.78 $13.00 $0.44 $0,00 $29.22 3 45 $16.63 $13.00 $12.55 $0,00 $42.18 4 45 $16,63 $13.00 $12.55 $0.00 $42.18 5 50 $18.48 $13.00 $12.82 $0.00 $44.30 6 55 $20.33 $13.00 $13.10 $0.00 $46.43 s 7 60 $22.18 $13.00 $13.39 $0.00 $48.57 8 65 $24.02 $13,00 $13.66 $0.00 $50.68 9 70 $25.87 $13.00 $13.95 $0.00 $52.82 10 75 $27.72 $13.00 $14.22 $0.00 $54.94 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.04 $13.00 $0.45 $0.00 $28.49 2 40 $15.04 $13.00 $0,45 $0.00 $29A9 3 45 $1692 $13.00 $12.74 $0.00 $42.66 4 45 $16.92 $13.00 $12.74 $0.00 $42.66 5 50 $18.91 $13.00 $13.03 $0.00 $44.84 6 55 $20.69 $13.00 $13.32 $0.00 $47.01 7 60 $22.57 $13.00 $13.61 $0.00 $49.18 8 65 $24.45 $13,00 $13.90 $0.00 $51.35 9 70 $26.33 $13.00 $14.19 $0.00 $53.52 10 75 $29.21 $13,00 $14.48 $0.00 $55.69 Notes- TERRAZZO FINISHERS 02/01/2018 $51.00 $10.75 $20.03 $0.00 $91.78 RRICKLAYERSLOCAL 3-MARBLE&TILE 08/01/2018 $52.35 $10.75 $20.16 $0.00 $83.26 02/01/2019 $52.99 $10.75 $20.16 $0.00 $9390 09/01/2019 $54.34 $10.75 $20.30 $0.00 $95.39 02/01/2020 $54.98 $10.75 $20.30 $0.00 $86.03 08/01/2020 $56.33 $10.75 $20.45 $0.00 $87.53 02/01/2021 $56.97 $10.75 $20.45 $0.00 $98.17 08/01/2021 $58.37 $10.75 $20.61 $0.00 $89.73 02/01/2022 $58,96 $10.75 $20.61 $0.00 $90.32 ---------------- --- ------------------- - -----------------------..--------- ------- -------------- ------ Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 30 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment F Apprentice- TERRAZZO FINISHER-Local 3 Marble& Tile G, Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.50 $10.75 $20.03 $0.00 $56.28 2 60 $30.60 $10.75 $20.03 $0.00 $61.38 3 70 $35,70 $10.75 $20.03 $0.00 $66.48 , 4 80 $40.80 $10.75 $20.03 $0.00 $71,58 II 5 90 $4590 $10.75 $20.03 $0.00 $76.68 f l Notes: f. ...... . _. .- . Apprentice to Journeytvorker Ratio:1:3 TEST BORING DRILLER 12/01/2016 $37.70 $7.60 $14.35 $0.00 $59.65 LABORERS-FO UNDA TION AND MARINF, For apprentice rates see"Apprentice-LABORER" TEST BORING DRILLER HELPER 12/01/2016 $36.42 $7.60 $14.35 $0.00 $58.37 LABORERS-FOUNDATIONAND MARINE For apprentice rates see"Apprentice-LABORER" I TEST BORING LABORER 12/01/2016 $36.30 $7.60 $14.35 $0.00 $58.25 LABORERS-FOUNDATION AND MARINE For apprentice rates see"Apprentice-LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" -- ..__ -- -- -- -- ...._. _ --- - -- -- TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.82 TEAMSTERS JOINT COUNCIL NO.1O ZONE B TUNNEL WORK-COMPRESSED AIR 12/01/2016 $48.58 $7.60 $14.75 $0.00 $7093 LABORERS(COMPRESSED AIR) For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-COMPRESSED AIR(HAZ. WASTE) 12/01/2016 $50.58 $7.60 $14.75 $0.00 $7293 LABORERS(COMPRESSED AIR) For apprentice rates see"Apprentice-LABORER" i TUNNEL WORK-FREE AIR 12/01/2016 $40.65 $7.60 $14.75 $0.00 $63.00 LABORERS(FREE AIR TUNNEL) For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-FREE AIR(HAZ.WASTE) 12/01/2016 $42.65 $7.60 $14.75 $0.00 $65.00 LABORERS(FREE All?TUNNEL) For apprentice rates see"Apprentice-LABORER" VAC-HAUL 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54,24 TEAMSTF,RSJOINT COUNCIL NO. 10 ZONE B -- --- --- -------------- ------ --- ..... ------------------ ---- -- ---_----------------------- -- -- ---- -------- Issue Date: 02/14/2018 Waive Request Number: 20180214-033 Page 31 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment WAGON DRILL OPERATOR 12/01/2017 $33.09 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 jl 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 t 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $5693 12/01/2019 $36,49 $7.70 $13.60 $0.00 $57.79 t 06/01/2020 $37,38 $7.70 $13.60 $0,00 $58.69 1 i 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" WASTE WATER PUMP OPERATOR 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" WATER METER INSTALLER 09/01/2017 $49.86 $11.57 $15,26 $0.00 $76.69 PLUMBERS&GASFITTERSLOCAL 12(focal 138) 03/01/2018 $51.36 $11.57 $15.26 $0.00 $79.19 09/01/2018 $52.86 $11.57 $15.26 $0.00 $79.69 $15.26 $0.00 81.19 03/0 1120 1 9 $54.36 $11.57 $ 09/01/2019 $55.86 $l L57 $15.26 $0.00 $82.69 03/01/2020 $57.36 $11.57 $15.26 $0.00 $84.19 09/01/2020 $58.86 $11.57 $15,26 $0.00 $95.69 03/01/2021 $60.36 $11.57 $15.26 $0.00 $87.19 For apprentice rates see"Apprentice-PLUMBER/PIPEFITTER"or"PLUMBER/GASFITTER" Outside Electrical-East CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.91 $0.00 $36.70 OUTSIDE ELECTRICAL IVORKFRS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" -- ----------------.._._.- _ _ ...- _ _.._..._ --- -- ._....... ---- -- CABLEMAN(Underground Ducts&Cables) 09/03/2017 $38.45 $7.75 $9.53 $0.00 $55.73 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN CDL 09/03/2017 $31.66 $7.75 $9,44 $0.00 $48.85 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 I i For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN-Inexperienced(<2000 Hrs) 09/03/2017 $24.89 $7.75 $1.75 $0.00 $34.38 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $38.45 $7.75 $13.61 $0.00 $59.81 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 Fora apprentice rates sce"Apprentice-LINEMAN' PP pp EQUIPMENT OPERATOR Class B CDL 5 $i 0,21 $0.00 51.88 Q { } 09/03/2017 $33.92 $7.7 $ OUTSIDE ELECTRICAL WORKERS-EASTLOCAL 104 For apprentice rates see"Apprentice-LINEMAN" GROUNDMAN 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34.38 OUTSIDEELF.CTRICAL WORKERS-EASTLOCAL 104 For apprentice rates see"Apprentice-LINEMAN' GROUNDMAN-Inexperienced(<2000 Hrs.) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29.71 OUTSIDEELFCTRICAL IVORKERS-EASTLOCAL 104 For apprentice rases see"Apprentice-LINEMAN" JOURNEYMAN LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59 OUTSIDE.ELECTRICAL WORKERS-EASTLOCAL 104 -- ---------- -------------- ------ --- -------- ---------------- ------------ Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Pale 32 of 33 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovinent r l Apprentice- LINEMAN(Outside Electrical)-Easi Local 104 Effective Date- 09/03/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 60 $27.14 $7.75 $3.31 $0.00 $38.20 2 65 $29.40 $7.75 $3.38 $0.00 $40.53 3 70 $31.66 $7.75 $3.45 $0.00 $42.86 i 4 75 $33.92 $7.75 $5.02 $0.00 $46.69 i 5 80 $36.18 $7.75 $5.09 $0.00 $49.02 E 1 6 85 $38.45 $7.75 $5.15 $0.00 $51,35 7 90 $40.71 $7.75 $7.22 $0.00 $55.69 Notes: S Apprentice to Journeyworker Ratio:1:2 TELEDATA CABLE SPLICER 01/01/2016 $28.98 $4.25 $3.12 $0,00 $36.35 OUTSIDE ELECTRICAL WORKERS-EAST LOCAI.104 TELEDATA LINEMAN/E LTIPMENT OPERATOR Q 3.07 0.00 20 6 25 $ $ 34.63 011011 1 $27.31 $4. $ OUTSIDE ELECTRICAL W01ffERS-EAST LOCAL 104 TELEDATA WIREMAN/fNSTALLER/TECHNICIAN 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL,104 ?! j! This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using land or mechanical cutting rnelhods and is not on the ground. This classification does not apply to wholesale tree removal. i TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.87 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 This classification applies only to tree work done:(a)for a utility company,R,E,A,cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or mechanical culling methods and is on the ground. This classification does not apply to wholesale tree removal. Additional Apprentice Information: is Minimum wage rates for apprentices employed on public works projects are listed above as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the M.G.L.c.149,ss.26-27D. Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c.73,ss. I IF-I IL. E All apprentices must he registered with the Division of Apprenticeship Training in accordance with M.G.L.c.23,ss.I I E-I I L, is All steps are six months(1000 hours.) i Ratios are expressed in allowable number ofapprentices to journeymen or fraction thereof,unless otherwise specified. c ** Multiple ratios are listed in the comment field. *** APP to.1M;1:1,2:2,2:3,3:4,4:4,4:5,4c6,5:7,6:7,6:8,6:9,7A0,8:10,8:11,8:12,9:13,I0:13,10:14,etc. **** APP to iM; IA, 1:2,2:3,2:4,3:5,4:6,4:7,5:8,6:9,6:10,7:11,8:12,8:13,9:14, 10:15,l0:lb,etc, Issue Date: 02/14/2018 Wage Request Number: 20180214-033 Page 33 of 33 s i V CERTIFICATIONS w CERTIFICATE OF NON-COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and r submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee,union, club or other organization, entity, or group of individuals. Signature - Date ` ��ho 6 .u 1.S I7 Mo r4 i P d e a ffl i~ 1"Z,- &.d dn5�CJ-w Utz Print Name &Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I 1 Lt crs i , authorized signatory for � GA & 1(, Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes, permit or other fees, reporting of employees and contractors, and withholding and remitting child support, Signature Date Town of North Andover IFB Page 32 of 36 Raising Roadway Structures&Castings 4 i 4 i L CERTIFICATION z LABOR HARMONY AND OSHA TRAINING REQUIREMENTS 5 The undersigned certifies under penalties of perjury that he is able to firrnish labor that can work in harmony with all other elements of labor-employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA-approved construction safety and health course lasting at least ten (10) hours. Signature ._ _ Date �0 9 cv+ne 7_ I'1'?a4nez_ Rua d nskcjt(/x_, //1L. Print Name &Title Company Name Town of North Andover IFB Page 33 of 36 Raising Roadway Structures&Castings CERTIFICATE OF VOTE At a duly authorized meeting the Board of Directors of theLAt_)ez- Pom held on cJ 1-40/8. it was VOTED, THAT tLis e-r— (Name) (Officer) Mar�fner-- of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said and affix its corporate sea] hereto; lftrljne�-, OO and such execution of any contract or obligatioqi,n the name of R on its behalf by such officer under seal of shall be valid and binding upon I hereby certify that I am the clerk of the above named and that Lis )na-rhne�— is the duly elected officer as above of said and that the above vote has not been amended or rescinded and remains in full force and effect as the date of this contract. jqj2 0j8 Z (Date) (Clerk) Town of North Andover IFB Page 34 of 36 Raising Roadway Structures&Castings MARTI-3 0"ID:SJD un DATE(MMIDDNYYY) CERTIFICATE OF LIABILITY INSURANCE 0310612018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON' THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSUIRER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, ...........IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an!endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsoment(s). PRODUCER 978-686-2266 CONTACT Steve Doe N ME: Foster Sullivan Insurance PHONE 978-686,-2266 FAX 978-686-641 0 163 Main St. (AIC,No,Ext): INC,No): North Andover,MA 01845 X-0 Foster Sullivan Insurance LLC ',,,�ei I tIcates @fostersu ivangroup.com il INSURER(S)AFFORDING COVERAGE NAIL INSURERA:ACADIA INSURANCE 25 INSURED Martinez Road Construction Inc INSURER 8:COMMERCE,INSURANCE CO. 34754 142 Clarendon Street Fitchburg, MA 01420-4094 INSURER C:GRANITE STATE 23809 INSURER D: ILL INSURERE; INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER; THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. R—sk ADDLSUBR P POLICY EXP LTR TYPE OF INSURANCE POLICY NUMBER (MNLICY EFF LIMITS SD WVD tDDIYYYY) A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,00(),000 CLAIMS-MADE OCCUR CPA6199610-12 0412512017 04/25/2018 DAMAGE TO RENTED 300,000 ),I x PREMISES fEap-c-cuffmc*). MED EXP An one person) 5,000 PERSONALBADVINJURY $ 1,000,-6-6 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 PR?- LOC 2,000,000 POLICY El T rPRODUCTS-COMPIOP AGG $ OTHER! $ ZMBINED S INGLE LIMIT 1,000,000 B AUTOMOBILE LIABILITY ..,deni) $ ANY AUTO BGHSQP 06123/2017 06/2312018 BODILY INJURY Per persRnj­ OMED F_v_ SCHEDULED AUTOS ONLY AUTOS B=!��INJURY(Per accident) $ �RV6SV6Na rA_dP_1fR_t�AMAGE MRS ONLY $ $ A X UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 2,000,000 EXCESS LIAB CLAIMS-MADE CUA5204628-10 04125/2017 0412512018 AGGREGATE 2,000,000 DED � RETENTION$ $ C WORKERS COMPENSATION X PE R ATUTE FIR OTH- AND EMPLOYERS'LIABILITY YIN WC0136736,78 1212812017 1212812018 ST 500,000 ANY PROPRIETOR/PARTNER/EXECUTIVE N/A EACH ACCIDENT $ goFICE /MEMB ?EXCLUDE[ ndar cry In NW) E.L.DISEASE-EA EMPLOYEE $ 500,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT 0 Is required) policy as rquired by written contract. I lei Hached if more space CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS, Ray Santilli 120 Main Street AUTHORIZED REPRESENTATIVE North Andover, MA 01845 V,�_� ACORD 25(2016/03) @ 1988-2016 ACORD CORPORATION. All rights reserved, The ACORD name and logo are registered marks of ACORD d i PAYMENT BOND i Bond No. 130ACSU0590468 KNOW ALL MEN BY THESE PRESENTS,that we MARTINEZ ROAD CONSTRUCTION, INC. with a place of business at 142 CLARENDON STREET, FITCHBURG, MA 01420 as Principal(the"Principal"),and ALLEGHENY CASUALTY COMPANY a corporation qualified to do business in the Commonwealth of Massachusetts,with a place of business at ONE NEWARK CENTER, 20TH FLOOR, NEWARK, Ni 07102-5207 as Surety (the"Surety"),are held and firmly bound unto the Town of North Andover,Massachusetts as Obligee (the"Obligee"),in the sum of ONE HUNDRED EIGHT THOUSAND AND 00/100 ($108, 000ul m.0 y of the United States of America,to be paid to the Obligee,for which payment,well and truly to be made,we bind ourselves,our respective heirs,executors,administrators,successors and assigns,jointly and severally,firmly by these presents. WHEREAS,the Principal has assumed and made a contract with the Obligee,bearing the date of MARCH 20, 2018 ,for the construction of RAISING ROADWAY STRUCTURES AND CASTINGS, NORTH ANDOVER, MA FOR THE PERIOD OF APRIL 1 , 2018 TO MARCH 31 , 2019 NOW,THE CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all'materials used or employed in said contract and in any and all duly authorized modifications,alterations,extensions of time,changes or additions to said contract that may hereafter be made,notice to the Surety of such modifications, i alterations,extensions of time,changes or additions being hereby waived,the foregoing to include,but not be limited to,any other purposes or items set out in,and to be subject to,the provisions of I Massachusetts General Laws,Chapter 30, Section 39M,and Chapter 149, Section 29 as amended then this obligation shall become null and void;otherwise,it shall remain in fall force and virtue. IN WITNESS 'WHEREFORE,the Principal and Surety have hereto set their hands and seals this 21 ST day of MARCH, 2018 PRINCIPAL SURETY MARTINEZ ROAD CONSTRUCTION, INC. ALLEGHENY CASUALTY COMPANY e and Seal Attome -i act Seal [ [ ]NATICY CANGUPKY /(7 103 PARK STREET PO .PDX 481 itle] [Address] 207 753-7300 Attest: (Phone] END OF PAYMENT BOND 'fq7��3 62 -720,t ZY� RNE T R,, -ATTO -�IOELITYI CO N P INTERNATIONALI NSURANCE M ANY ALLEGHENY ASUALTY CO MPANY ONE NEWARK CENTER 20fH FLOOR NEWAIRK, NEW JERSEY 61-102-5207 KNOW ALL MEN BY THESE PRESENTS, That INTERNATIONAL FIDELITY INSURANCE COMPANY,a corporation organized and existing under the laws of the Slate,of New Jersey, and ALLEGHENY CASUALTY COMPANY a corporation organized and existing under the laws of the State of New Jersey,having their principal office in the City of Newark,New Jersey,do hereby constitute and appoint NANCY L. CASTONGUAY, JOLINE.L. BINETTE, ROBERT E. SHAW, JR., MELANIE A—BONNEVIIE, HEIN RODZEN Lewiston, ME. the true and lawful attorney(s)-in-fact to execute,seal and deliver for and on its behalf as surety,any and all bonds and undertakings,contracts of indemnity and contract or otherwise nd other writin s obligatory in.the nature.thereof, which are or may be allowed,required or permitted by law,statute,rule,regulation, and the execution of such lnstrument(s�iriursuance Of these presents,shall be as binding upon the said INTERNATIONAL FIDELITY INSURANCL COMPANY and ALLEGHENY CASUALTY COMPANY, as fully and amply, to all Intents and. purposes,as if the,same had been duly executed and acknowledged by their regularly elected officers at their�principal offices, This Power of Aftorne is executed .and ma be revoked, pursuant to and by auth I of theB Laws of INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY C MPANY and is granted under and by author f the following resolution adopted by the Board�of Directors COMPANY at a meeting du t�, Directors of ALLEGHENY, ,of INTERNATIONAL FIDELITY INSURANCE, hold on the 20t day of July,20 0 and by the Board of CASUALTY COMPANY at,a meeting duly held on the 15th day of August. 000: RESOLVED,that (1)the President,Vice President,Chief E I xecutive 0 1 ficer or'Secretary of the Corporation orporation shall have the Dover to appoint,.and to revoke the appointments of,Attorneys-in-Fact or agents with power and authority as defined or limited in their respective powers of orney,and to execute on behalf of the Corporation and affix the Corporation's seal thereto,bonds,undertakings, recognizances, contracts of indemn!1W and other written obligations in the nature thereof or related thereto; point and revoke the a0goIntm6n s.of joint-control custo tans;agents reto; and(2)any such Officers of the Coi oration May appoint for acre tance of process,,and Attorneys-in-fAct with authority to execute waivers and consents. on behalf Of It he Cor oration;and J3)the signature of any such Officer of the'Corporation and�the Corporation's seal may be affixed by facsimile.to.any power of attorney or CeTificatidn ven or the execution of any. bond,undertaking,recognizance contract ovindemnity or other written ON allon in the nature thereof or related thereto,such s nature and seals when, p the original.seal of the so used whether heretofore�or 6oreafter being hereby adopted by the or oration as the original signature of such Corporation,to be valid and binding upon the Corporation with the same force and effect as though rhanually affixed." IN WITNESS WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY and ALLEGHENY.CASUALTY COMPANY have each executed and attested these presents on this 31st day of December,2016, Y, cl%SUAL� STATE OF NEW.JERSEY A County of Essex SEAL 1936 1904 ROBERT W.MINSTER: Chief Executive Officer(international Fide n JE insurance Company)and President(Alleg e y Casualty.Company) came the individual who executed the preceding Instrument,to me personally known and,being by me duly On this 34st day of December 2016i before.me mPANY and ALLEGHENY CASUALTY sworn, said he is the therein described and authorized officer of INTERNATIONAL FIDELITY INSURANCE CO, COMPANY; that theseals affixed to said instrument are the Corporate Seals of said Companies;that the said Corporate Seals and,his signature were duly affixed by order of the Boards of Directors of sold Companies . IN TESTIMONY WHEREOF, I have hereunto set mV hand affixed myOfficial Seal, at the City of Newark,New Jersey the day and year irst above written. NOTARY SIB*. :V PUBLIC u • .�, �A ., I : I . A NOTARY PUBLIC OF NEW JERSEY 40 My Commission Expires April 16,201g N F-14 CERTIFICATION I.the undersigned officer of INTERNATIONAL.FIDELITY INSURANCE COMPANY and ALLEGHENY CASUALTY COMPANY dol hereby.certify that have , compared the foregoing copy of the Power of Attorney and affidavit,and the,copy of the Sections of the By-Laws of said Companies as Set forth in said 'POWerofAttorney, with the originals on file in the home office of�said Companies, and that the same are correct transcripts thereof,and of the whole �� of the said originals,and that the said Power of Attorney has not been revoked.Phd is now in full force and effect, INTESTIMONY WHERE9F, I have herauntoset My hand this s qlday of. MH �.O1 81. 7 :M R)A BRANCO,A ss,wtan!, eqre r