Loading...
HomeMy WebLinkAboutContract #: 1075 - From: 05-18-2018 To: 06-30-2018 - Johnson Controls, Inc - Facilities i TOWN OF NORTH ANDOVER CONTRACT CONTRACT 4 p 1 DATE: This Contract is entered into on, or as of, this date by and between the Town of North Andover (the "Town"), and Contractor: Johnson Controls, Inc. s Address: 39 Salem Street Lynnfield, MA 01940 Telephone Number: 781-223-1508 Fax Number: 781-245-9561 1. This is a Contract for the procurement of the following: Furnish and install a new air conditioning system for the ballroom at the Stevens Estate in accordance with the Invitation for Bids dated April 4, 2018 2. The Contract price to be paid to the Contractor by the Town of North Andover is: $31,350.00 3. Payment will be made as follows: l Upon completion of work and receipt of invoice (net 30) 4. Definitions 4.1 Acceptance: All Contracts require proper acceptance of the described goods or j services by the Town of North Andover. Proper acceptance shall be understood to include inspection of goods and certification of acceptable performance for services by authorized representatives of the Town to insure that the goods or services are complete and are as specified in the Contract. (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls,Inc. Page 1 4.2 Contract Documents: All documents relative to the Contract including (where used) Instructions to Bidders, Proposal Form, General Conditions, Supplementary General Conditions, General Specifications, Other Specifications included in Project Manual, Drawings, and all Addenda issued during the bidding period. The Contract documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the document is to include all labor and materials, equipment and transportation necessary for the proper performance of the Contract. 4.3 The Contractor: The "other party" to any Contract with the Town. This term shall (as the sense and particular Contract so require) include Vendor, Contractor, Engineer, or other label used to identify the other party in the particular Contract. Use of the term "Contractor" shall be understood to refer to any other such label used. 4.4 Date of Substantial Performance: The date when the work is sufficiently complete, the services are performed, or the goods delivered, in accordance with Contract documents, as modified by approved Amendments and Change Orders. 4.5 Goods: Goods, Supplies or Materials. 4.6 SubContractor: Those having a direct Contract with the Contractor. The term includes one who furnished material worked to a special design according to the Drawings or Specifications of this work, but does not include one who merely furnishes material not so worked. 4.7 Work: The services or materials contracted for, or both. i 5. Term of Contract and Time for Performance This Contract shall be fully performed by the Contractor in accordance with the provisions of the Contract Documents on or before June 30, 2018, unless extended pursuant to a provision for extension contained in the Contract documents at the sole discretion of the Town, and not subject to assent by the Contractor, and subject to the availability and appropriation of funds as certified by the Town Accountant. The time limits stated in the Contract documents are of the essence of the Contract. 6. Subject to Appropriation Notwithstanding anything in the Contract documents to the contrary, any and all payments which the Town is required to make under this Contract shall be subject to appropriation or other availability of funds as certified by the Town Accountant. In the absence of appropriation, this Contract shall be immediately terminated without liability for damages, penalties or other charges. 7. Permits and Approvals . Permits, Licenses, Approvals and all other legal or administrative prerequisites to its performance of the Contract shall be secured and paid for by the Contractor. (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls, Inc. Page 2 i 8. Termination and Default 8.1 Without Cause. The Town may terminate this Contract on seven (7) calendar days notice when in the best interests of the Town by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. Upon termination without cause, Contractor will be paid for services rendered to the date of termination. 8.2 For Cause. If the Contractor is determined by the Town to be in default of any term or condition of this Contract, the Town may terminate this Contract on seven (7) days notice by providing notice to the Contractor, which shall be in writing and shall be deemed delivered and received when given in person to the Contractor, or when received by fax, express mail, certified mail return receipt requested, regular mail postage prepaid or delivered by any other appropriate method evidencing actual receipt by the Contractor. 8.3 Default. The following shall constitute events of a default under the Contract: 1) any material misrepresentation made by the Contractor to the Town; 2) any failure to perform any of its obligations under this Contract including, but not limited to the following: (i) failure to commence performance of this Contract at the time specified in this Contract due to a reason or circumstance within the Contractor's reasonable control, (ii) failure to perform this Contract with sufficient personnel and equipment or with sufficient material to ensure the completion of this Contract within the specified time due to a reason or circumstance within the Contractor's reasonable control, (iii) failure to perform this Contract in a manner reasonably satisfactory to the Town, (iv) failure to promptly re-perform within a reasonable time the services that were rejected by the Town as unsatisfactory, or erroneous, (v) discontinuance of the services for reasons not beyond the Contractor's reasonable control, (vi) failure to comply with a material term of this Contract, including, but not limited to, the provision of insurance and non-discrimination, (vii) any other acts specifically and expressly stated in this Contract as constituting a basis for termination of this Contact, and (viii) failure to comply with any and all requirements of state law and/or regulations, and Town bylaw and/or regulations: 9. The Contractor's Breach and the Town's Remedies Failure of the Contractor to comply with any of the terms or conditions of this Contract shall be deemed a material breach of this Contract, and the Town of North Andover shall have all the rights and remedies provided in the Contract documents, the right to cancel, terminate, or . ...:......... suspend the Contract in whole or in part, the right to maintain any and all actions at law or in equity or other proceedings with respect to a breach of this Contract, including damages an specific performance, and the right to select among the remedies available to it by all of the above. From any sums due to the Contractor for services, the Town may keep the whole or any part of the amount for expenses, losses and damages incurred by the Town as a consequence of (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls,Inc. Page 3 i procuring services as a result of any failure, omission or mistake of the Contractor in providing ) services as provided in this Contract. 10. Statutory Compliance 10.1 This Contract will be construed and governed by the provisions of applicable federal, state and local laws and regulations; and wherever any provision of the Contract or Contract documents shall conflict with any provision or requirement of federal, state or local law or regulation, then the provisions of law and regulation shall control. Where applicable to the Contract, the provisions of the General Laws are incorporated by reference into this Contract, including, but not limited to, the following: General Laws Chapter 30B---Procurement of Goods and Services. General Laws Chapter 30, Sec. 39, et seq: - Public Works Contracts. General Laws Chapter 149, Section 44A, et seq: Public Buildings Contracts. 10.2 Wherever applicable law mandates the inclusion of any term and provision into a municipal contract, this Section shall be understood to import such term or provision into this Contract. To whatever extent any provision of this Contract shall be inconsistent with any law or regulation limiting the power or liability of cities and towns, such law or regulation shall control. 10.3 The Contractor shall give all notices and comply with all laws and regulations bearing on the performance of the Contract. If the Contractor performs the Contract in violation of any applicable law or regulation, the Contractor shall bear all costs arising therefrom. 10.4 The Contractor shall keep itself fully informed of all existing and future State and National Laws and Municipal By-laws and Regulations and of all orders and decrees of any bodies or tribunals having jurisdiction in any manner affecting those engaged or employed in the work, of the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or Contract for this work in violation of any such law, by-law, regulation, order or decree, it shall forthwith report the same in writing to the Town. It shall, at all times, rtsclf observe and comply with all such existing and future laws, by-laws, regulations, orders and decrees; and shall protect and indemnify the Town of North Andover, and its duly appointed agents against any claim or liability arising from or based on any violation whether by him or its agents, employees or subcontractors of any such law, by-law, regulation or decree. 11. Conflict of Interest Both the Town and the Contractor acknowledge the provisions of the State Conflict of Interest Law (General Laws Chapter 268A), and this Contract expressly prohibits any activity which shall constitute a violation of that law. The Contractor shall be deemed to have investigated the application of M.G.L. c. 268A to the performance of this Contract; and by executing the Contract documents the Contractor certifies to the Town that neither it nor its agents, employees, or subcontractors are thereby in violation of General Laws Chapter 268A. (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls,Inc. Page 4 i 12. Certification of Tax Compliance This Contract must include a certification of tax compliance by the Contractor, as required by General Laws Chapter 62C, Section 49A (Requirement of Tax Compliance by All Contractors Providing Goods, Services, or Real Estate Space to the Commonwealth or Subdivision). 13. Discrimination The Contractor will carry out the obligations of this Contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151B (Law Against Discrimination) and any executive orders, rules, regulations, and requirements of the Commonwealth of Massachusetts as they may from time to time be amended. 14. Assignment Assignment of this Contract is prohibited, unless and only to the extent that assignment is provided for expressly in the Contract documents. 15. Condition of Enforceability Against the Town This Contract is only binding upon, and enforceable against, the Town if. (1) the Contract is signed by the Town Manager or its designee; and (2) endorsed with approval by the Town Accountant as to appropriation or availability of funds; and (3) endorsed with approval by the Town Counsel as to form. 16. Corporate Contractor If the Contractor is a corporation, it shall endorse upon this Contract (or attach hereto) its Clerk's Certificate certifying the corporate capacity and authority of the party signing this Contract for the corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in full force and effect as of the date the Contract is executed by the Contractor. This Contract shall not be enforceable against the Town of North Andover unless and until the Contractor complies with this section. The Contractor, if a foreign corporation, shall comply with the provisions of the General Laws, Chapter 181, Sections 3 and 5, and any Acts and Amendments thereof, and in addition thereto, relating to the appointment of the Commissioner of Corporations as its attorney, shall file with the Commissioner of Corporations a Power of Attorney and duly authenticated copies of its Charter or Certificate of Incorporation; and said Contractor shall comply with all the laws of the Commonwealth. 17. Liability of Public Officials To the frill extent permitted by law, no official, employee, agent or representative of the Town of North Andover shall be individually or personally liable on any obligation of the Town under this Contract. (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls,Inc. Page 5 18. Indemnification The Contractor shall indemnify, defend and save harmless the Town, the Town's officers, agents and employees, from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, costs, expenses, recoveries and judgments of every nature and description (including reasonable attorneys' fees) that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors, material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any party indemnified hereunder. The Contractor further agrees to reimburse the Town for damage to its property caused by the Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective, or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance shall in no way limit the scope of the Contractor's indemnification under this contract. 19. Workers Compensation Insurance The Contractor shall provide by insurance for the payment of compensation and the furnishing of other benefits under Chapter 152 of the General Laws of Massachusetts (The Worker's Compensation Act) to all employees of the Contractor who are subject to the provisions of Chapter 152 of the General Laws of Massachusetts. Failure to provide and continue in force such insurance during the period of this Contract shall be deemed a material breach of this Contract, shall operate as an immediate tern-tination thereof, and Contractor shall indemnify the Town for all losses, claims, and actions resulting from the failure to provide the insurance required by this Article. The Contractor shall furnish to the Town evidence of such insurance prior to the execution of this Contract before the same shall be binding on the parties thereto, except if specifically waived by the Town. 20. Documents, Materials Etc. Any materials, reports, information, data, etc. given to or prepared or assembled by the Contractor under this Contract are to be kept confidential and shall not be made available to any individual or organization by the Contractor (except agents, servants, or employees of the Contractor) without the prior written approval of the Town, except as otherwise required by law. The Contractor shall comply with the provisions Chapter 66A of the General Laws of Massachusetts_as it relates to public _documents, and all other_state and federal laws and regulations relating to confidentiality, security, privacy and use of confidential data. Any materials produced in whole or in part under this Contract shall not be subject to copyright, except by the Town, in the United States or any other country. The Town shall have unrestricted authority to, without payment of any royalty, commission, or additional fee of any type or nature, (Rev 5-2007)Contract by and between Town of Noah Andover and Johnson Controls,Inc. Page 6 publicly disclose, reproduce, distribute and otherwise use, and authorize others to use, in whole or in part, any reports, data or other materials prepared under this Contract. All data, reports, programs, software, equipment, furnishings, and any other documentation or product paid for by the Town shall vest in the Town at the termination of this Contract. The Contractor shall at all times, during or after termination of this Contract, obtain the prior written approval of the Town before making any statement bearing on the work performed or data collected under this Contract to the press or issues any material for publication through any medium. 21. Audit Inspection and Recordkee in At any time during normal business hours, and as often as the Town may deem it reasonably necessary, there shall be available in the office of the Contractor for the purpose of audit, examination, and/or to make excerpts or transcript all records, contracts, invoices, materials, payrolls, records of personnel, conditions of employment and other data relating to all matters covered by this Agreement. 22. Pam The Town agrees to make all reasonable efforts to pay to the Contractor the sum set forth in the Contractor's bid or proposal within thirty (30) days of receipt of an invoice detailing the work completed and acceptance from the Town of the work completed. 23. Waiver and Amendment Amendments, or waivers of any additional term, condition, covenant, duty or obligation contained in this Contract may be made only by written amendment executed by all signatories to the original Agreement, prior to the effective date of the amendment. To the extent allowed by law, any conditions, duties, and obligations contained in this Contract may be waived only by written:Agreement by both parties. Forbearance or indulgence in any form or manner by a party shall not be construed as a waiver, .. ..................... .. nor in any manner limit the legal or equitable remedies available to that party. No waiver by either party of any default or breach shall constitute a waiver of any subsequent default or breach of a similar or different matter. 24. Forum and Choice of Law This Contract and any performance herein shall be governed by and be construed in accordance with the laws of the .Commonwealth. Any and all proceedings or actions relating to subject matter herein shall be brought and maintained in the courts of the Commonwealth or the federal district court sitting in the Commonwealth, which shall have exclusive jurisdiction thereof. This paragraph shall not be construed to limit any other legal rights of the parties. (Rev 5-2007)Contract by and between Town of North Andover and Johnson Controls,Inc. Page 7 25. Notices Any notice permitted or required under the provisions of this Contract to be given or served by either of the parties hereto upon the other party hereto shall be in writing and signed in the name or on the behalf of the party giving or serving the same. Notice shall be deemed to have been received at the time of actual service or three (3) business days after the date of a certified or registered mailing properly addressed. Notice to the Contractor shall be deemed sufficient if sent to the address set forth in the Contract and to the Town of North Andover by being sent to the Town Manager, Town Hall, 120 Main Street,North Andover, Massachusetts 01845. 26. Binding on Successors This Contract shall be binding upon the Contractor, its assigns, transferees, and/or successors in interest (and where not corporate, the heirs and estate of the Contractor). 27. Complete Contract This instrument, together with its endorsed supplements, and the other components of the contract documents, constitutes the entire contract between the parties, with no agreements other than those incorporated herein. 28. Supplemental Conditions The foregoing provisions apply to all contracts to which the Town of North Andover shall be a party. One of the following "Supplements" must be "checked" as applicable to this Contract, shall be attached hereto, and shall in any event apply as the nature of the Contract requires. The Supplement contains additional terms governing the Contract: ] GOODS SUPPLEMENT "G" - Applicable to Contracts for the procurement of Goods (governed by the provisions of General Laws Chapter 30B) ] SERVICES SUPPLEMENT"S" - Applicable to Contracts for the procurement of Services (governed by the provisions of General Laws Chapter 30B) X ] CONSTRUCTION SUPPLEMENT"C" - Applicable to Contracts for Construction (Rev 5-2007)Contract by and between'Town of North Andover and Johnson Controls,lnc. Page 8 IN WITNESS WHEREOF the Parties have hereto and to two other identical instruments set forth their hands the day and year first above written, THE TOWN THE CONTRACTOR �4� Divisi eP •ttxent.Head Company Name bate M i nature Dati T nManager g e Print Name & Titles Federal Identification M APPROVED AS TO FORM: own Counsel Date CERTIFICATION AS TO AVAILABILITY"OF FUNDS: Town.Ac untanr Date Pa c 9 (Rev S 2�IIl?)Contract by and between Town of North Andover and Johnson Cnntrals,Inc. g SUPPLEMENT"C" [] CONSTRUCTION SUPPLEMENT"C"-Applicable to Contracts for the construction of: (1)Public Buildings and Public Works (governed by the provisions of General Laws Chapter 30B); (2)Public Buildings (governed by the provisions of General Laws Chapter 149,§ 44A, et seq.); and (3)Public Works (governed by the provisions of General Laws Chapter 30, §39M, et seq) l. This form supplements the Town of North Andover"Contract and General Conditions"and applies only to contracts for the construction,reconstruction, alteration,remodeling or repair of public works or public buildings. 2. Wherever the law requires one contracting with a city or town to be bonded,such obligation shall be understood to be a term and condition of this Contract. The Contractor agrees to secure such bond (where required)in the form required by the Town and provide an original thereof to the Town prior to the commencement of performance. 3. Equal 3.1. In the case of closed Specification written for a specific item or items to be furnished under the Base Bid,such specifications shall,as applicable,be in compliance with the Massachusetts General Laws,Chapter 30, Section 39M and Chapter 149, See.44A et seq. 3.2. Where the name of an item, material or manufacturer is mentioned in the Specifications or on the Drawings,except as above noted,the intent is to establish a standard and in no way should be construed to exclude any item or manufacturer not mentioned by name,but whose product meets the Specifications as to design,utility and quality. Final decision shall rest with the Project Representative as to its acceptability. 4. Change orders to contracts governed by General Laws Chapter 30B may not increase the quantity of goods or services provided by more than twenty-five(25%)per cent,in compliance with Sec. 13 of Chapter 30B. 5. The Contractor will carry out the obligations of this contract in full compliance with all of the requirements imposed by or pursuant to General Laws Chapter 151,Sec. 1,et seq. (Minimum Wage Law)and any executive orders,rules,regulations,and requirements.of the Commonwealth of Massachusetts as they may from time to time be amended. The Contractor will at all times comply with the wage rates as determined by the Commissioner of the Department of Labor and Industries, under the provisions of General Laws Chapter 149, Sections 26 and 27D(Prevailing Wage),as shall be in force and as amended. 6. The Contractor shall continuously maintain adequate protection of all work from damage and shall protect the property of the Town and others, including adjacent property,from injury or loss arising (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page t and Johnson Controls,Inc. in connection with the Contract. The Contractor shall make good any such damage, injury or loss, except as may be directly due to errors in the Contract Documents or caused by agents or employees of the Town,or due to causes beyond the Contractor's control and not the Contractor's fault or negligence. 7. The Contractor shall take all necessary precautions for the safety of employees on the work, and shall comply with all applicable provisions of Federal, State and local laws and codes to prevent accidents or injury to persons on,about or adjacent to the premises where the work is being performed. The Contractor will erect and properly maintain at all times,as required by the conditions and progress of the work, all necessary safeguards for the protection of workers and the public,shall post danger signs warning against the hazards created by such features of construction such as pits, protruding nails,hosts,well holes,elevator hatchways,scaffolding,window openings, stairways and falling materials;and shall designate a responsible member of its organization on the work,whose duty shall be the prevention of accidents. 8. The Town shall at all times have access to the work wherever it is in preparation or progress and the Contractor shall provide suitable accommodations for such access. 9. The Contractor shall appoint a competent superintendent and foreman and any necessary assistants, all of whom shall be satisfactory to the Town. If the Town in its sole discretion determines that the construction superintendent,foreman,or assistants are unacceptable to the Town,then upon seven days notice from the Town,the Contractor shall replace such person or persons with people acceptable to the Town. 10. The Contractor shall give efficient supervision to the work,using its best skill and attention. The Contractor shall carefully study and compare the drawings, specifications and other instructions and shall at once report to the Town any error, inconsistency or omission which shall be discovered. Included in this responsibility shall be supervision of all work performed by subcontractors on the work. 11. If the Contractor should neglect to prosecute the work properly, or fail to perform the contract or any of its provisions,the Town,upon three days written notice,may,without prejudice to any other remedy it may have,make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. 12. Inspection by the Town's Project Representative 12.1. The Town shall have the right to designate a Project Representative who may make periodic visits to the site to familiarize the Town generally with the progress and quality of the work, and to determine in general if the work is proceeding in accordance with the Contract Documents. The Project Representative will not be required to mare exhaustive or continuous on-site inspections to check the quality or quantity of the work, and will not be responsible for the Contractor's failure to cant'out the construction work in accordance with the Contract Documents._During such visits and on the basis of these observations while at the site,the Project Representative will keep the Town informed on the progress of the work, will endeavor to guard the Town against defects and deficiencies in the work of contractors, and may condemn structural work as failing to conform to the Contract Documents. The Project Representative shall have authority to act on behalf of the Town only to the extent expressly delegated by the Town,which shall be shown to the Contractor,and shall have authority to stop the work whenever such stoppage may reasonably be necessary to insure the proper execution of the Contract. (Rev 5-2007)Supplement"C"to Contract between the`I own of North Andover Page 2 and Johnson Controls,Inc. 12.2. In connection with the work,the Project Representative shall not be responsible for construction methods,means,techniques,sequences or procedures employed by the Contractor or the Contractor's safety programs,requirements,regulations,or precautions. 13, Decisions of the Project Representative 13.1. The Project Representative shall,within a reasonable time,make decisions on all claims of the Town or the Contractor and on all other matters relating to the execution and progress of the structural work or the interpretation of the Contract Documents. 13.2. The Project Representative's decision,in matters relating to the project,shall be final, if within the terms of the Contract Documents. 13.3. If,however,the Project Representative fails to render a decision within ten days after the parties have presented their evidence, either party may then avail itself of the remedies provided in this contract or available to it by law. If the Project Representative renders a decision after such remedies have commenced,such decision may be entered as evidence but shall not disturb or interrupt such proceedings except where such decision is acceptable to the parties concerned. 14.1 Use of Premises by the Contractor: 14.1. The Contractor shall confine its apparatus,the storage of materials and the operations of its workmen to limits indicated by law, by-laws,permits or directions of the Town and shall not unreasonably encumber the premises with its materials. 14.2. The Contractor shall not load or permit any part of the structure to be loaded with a weight that will endanger its safety. 15. Maintenance of Premises: The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its employees or work, and at the completion of the work it shall remove all its rubbish from and about the work site and all its tools, scaffolding and surplus materials and shall leave its work"broom-clean", or its equivalent, unless more exactly specified. In case of dispute, the Town may remove the rubbish and charge the cost to the several contractors, as the Town shall determine to be just. 16, Right to Terminate If the Contractor should(1)be adjudged a bankrupt, (2) make a general assignment for the benefit of creditors, (3)have a receiver appointed on account of its insolvency, (4) persistently or repeatedly refuse or fail to supply enough personnel and resources to perform the contract,(5)fail to make prompt payment to subcontractors or to providers of materials or labor, (6)persistently disregard laws and regulations or lawful directives of the Town, or(7) be guilty of a substantial violation of any provision of the Contract,then the Town may,without prejudice to any other right or remedy and after giving the Contractor(or any surety) seven days written notice, terminate the contract and the employment of the Contractor and take possession of the premises and of all materials,tools and appliances thereon and finish the work by whatever method it deems appropriate. (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 3 and Johnson Controls,Inc. . i In such cases,the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid amount owed to the Contractor for work already completed shall exceed the expense of finishing the work, including compensation for additional architectural, managerial, legal and administrative services, such excess shall be paid to the Contractor. If such expenses shall exceed such unpaid balances,the Contractor shall pay the difference to the Town. The Contractor shall not be relieved of liability to the Town by virtue of any termination of this contract, and any claim for damages against the Contractor relating to the Contractor's performance under this contract shall survive any termination hereunder. Notwithstanding any other provision of this Agreement,the Town reserves the right at any time in its absolute discretion to suspend or terminate this Agreement in whole or in part for its convenience upon seven days written notice to the Contractor. The Town shall incur no liability by reason of such termination except for the obligation to pay compensation for all work performed by the Contractor and accepted by the Town to the termination date. 17. Progress Payments: 17.1. The Contractor shall submit to the Town an itemized Application for Payment, supported to the extent required by the Town by invoices or other vouchers, showing payments for materials and labor,payments to Subcontractors and such other evidence of the Contractor's right to payment. 17.2. The Contractor shall,before the first application, submit to the Town a schedule of values of the various parts of the work, including quantities aggregating the total sum of the Contract,divided so as to facilitate payments to Subcontractors, made out in such form as the Town and the Contractor may agree upon, and, if required, supported by such evidence as to its correctness. This schedule, when approved by the Town,shall be used as a basis for payment,unless it is found to be in error. If applying for payments, the Contractor shall submit a statement based upon this schedule. 18. Withholding of Pa rnents 18.1. The Town may withhold or, on account of subsequently discovered evidence,nullify the whole or part of any payment to such extent as may be necessary in its reasonable opinion to protect the Town of North Andover from loss on account of: 18.1.1. Defective work not remedied. 18.1.2. Claims filed or reasonable evidence indicating probable filing of claims. 19.1.3. Failure of the Contractor to make payments properly to Subcontractors or for material or labor. 18.1.4. A reasonable doubt that the Contract can be completed for the balance then unpaid. 18.1.5. Damage to another contractor. 18.1.6. Delays resulting in liquidated damages. (Rev 5-2007)Supplement"C"to Contract between the'Town of North Andover Page 4 and Johnson Controls,Inc. 1 18.2. Withholding of payments shall be in strict compliance with statutory requirements. 19. Claims by Contractor and Liability of Town All claims by the Contractor against the Town shall, unless otherwise provided by law, be initiated by a written claim submitted to the Town no later than seven(7)calendar days after the event or the first appearance of the circumstances causing the claim. The claim shall set forth in detail all known facts and circumstances supporting the claim. The Contractor shall continue its performance under this contract regardless of the submission or existence of any claims. The limit of liability of the Town under this Agreement is limited to the compensation provided herein for work actually performed, and shall in no event include liability for delays or for incidental, special or consequential damages or lost profits or for damages or loss from causes beyond the Town's reasonable control. 20. Liquidated Damages: Because both parties recognize(1)that the time for completion of this Contract is of the essence, (2)that the Town will suffer loss if the work is not completed within the contract time specified, plus any extension thereof allowed in accordance with the provisions of this contract, and(3)the delays, expense and difficulties involved in a legal proceeding to determine the actual loss suffered by the Town if the work is not completed in time, it is agreed that the Contractor will pay the Town as liquidated damages representing an estimate of delay damages, not as a penalty,the sum of One Thousand Dollars($1,000)per day for each calendar day of delay until the work is completed, whether the work is completed by the Contractor or some other person. The Town's right to impose liquidated damages shall in no way prohibit or restrict the Town's right to bring a legal action for damages in lieu of or in addition to its option to impose liquidated damages. The Town may deduct any liquidated damages from money due the Contractor, and if such payment is insufficient to cover the liquidated damages,then the Contractor shall pay the amount due. 21. The Contractors' Mutual Responsibility: Should the Contractor-cause damage to any separate subcontractor on the work,the Contractor agrees, upon due notice,to settle with such contractor by agreement, or by recourse to remedies provided by law or by the provisions of the contract. If such separate contractor sues the Town on account of any damage alleged to have been sustained,the Town shall notify the Contractor, who shall defend such proceedings at the Town's expense and, if any judgment against the Town arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Town. 22. Separate Contracts: 22.1. The Town reserves the right to let other Contracts in connection with this work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate its work with theirs. 22.2. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor,the Contractor shall inspect and promptly report to the Town any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 5 and Johnson Controls,Inc. of the other contractor's work as fit and proper for the reception of its work except as to defects which may develop in the other contractor's work after the execution of its work. 22.3. To insure the proper execution of its subsequent work,the Contractor shall measure work already in place and shall at once report to the Town any discrepancy between the executed work and the Drawings. 23. Subcontracts: 23.1. All Subcontracts shall be awarded in conformity with the requirements of the General Laws, Commonwealth of Massachusetts, Chapter 149, Sections 44A to 44L, inclusive. 23.2. The Contractor agrees that it is as fully responsible to the Town for the acts and omissions of its Subcontractors and of persons either directly or indirectly employed by them, as it is for the acts and omissions of persons directly employed by it. 23.3. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the Town. 24. Contractor-Subcontractor Relations: The Contractor agrees to bind every Subcontractor and every Subcontractor agrees to be bound by the terms of the Agreement,the General Conditions of the Contract,the Supplementary General Conditions,the Drawings and Specifications, as far as applicable to its work, including the provisions of the General Laws, Commonwealth of Massachusetts, Chapter 149, Section 44A, et seq. 25, Indemnification: 25.1. The Contractor shall indemnify, defend and save harmless the Town, its officers, agents and employees from and against any and all damages, liabilities, actions, suits, proceedings, claims, demands, losses, recoveries and judgments of every nature and description(including reasonable attorneys' fees)brought or recovered against them that may arise in whole or in part out of or in connection with the work being performed or to be performed, or out of any act or omission by the Contractor, its employees, agents, subcontractors,material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by any patty indemnified hereunder.The Contractor further agrees to reimburse the Town for damage to its property caused by Contractor, its employees, agents, subcontractors or material men, and anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, including damages caused by his, its or their use of faulty, defective or unsuitable material or equipment, unless the damage is caused by the Town's gross negligence or willful misconduct. The existence of insurance_shall in no way limit the scope of the Contractor's indemnification under this Contract. 25.2. In any and all claims against the Town or any of their agents or employees by any employee of the Contractor, any Subcontractor,anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable,the indemnification obligation under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or (Rev 5-2007)Supplement"C"to Contract between the Town or North Andover Page 6 and Johnson Controls,Inc. i any Subcontractor under Workmen's Compensation Acts, disability benefit acts or other employee benefit acts. 25.3. The intent of the Specifications regarding insurance is to specify minimum coverage and minimum limits of liability acceptable under the Contract. However, it shall be the Contractor's responsibility to purchase and maintain Insurance of such character and in such arnounts as will adequately protect it and the Town from and against all claims, damages, losses and expenses resulting from exposure to any casualty liability in the performance of the Work. 26, The Contractor's Insurance: 26.1, The Contractor shall purchase and maintain such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them or by anyone for whose acts any of them may be liable. 26.1.1. Claims under Worker's Compensation, disability benefit and other similar employee benefit acts; 26.1.2. Claims for damages because of bodily injury, occupational sickness or disease,or death of its employees, and claims insured by usual personal injury liability coverage; 26.1.3. Claims for damage because of bodily injury, sickness or disease, or death of any person other than its employees, and claims insured by usual personal liability coverage; 26.1.4. Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 26.2. The insurance required by the above shall be written for not less than the following minimum limits of liability: 26.2.L Worker's Compensation Insurance Requirements Workers' Compensation coverage as required by the laws of the Commonwealth of Massachusetts. 26.2.2. Liability Insurance Requirements Liability insurance shall include all major divisions and shall be on a comprehensive ... general basis including Premises and Operations, Owners and Contractor's Protective, Products and Completed Operations, and Owned,Non-owned and Hired Motor Vehicles. All such insurance shall be written for not less than any limits of liability required by law, unless otherwise provided in the contract documents, or the following limits, whichever- are greater: (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 7 and Johnson Controls,Inc. i Comprehensive General Liability Insurance (Broad Form) Bodily Injury $1,000,000 per person $2,000,000 aggregate Property Damage $1,000,000 per occurrence $2,000,000 aggregate Automobile Liability Insurance $500,000 per person $1,000,000 per occurrence Excess Liability(Umbrella) $2,000,000 26.3. The above insurance policies shall also be subject to the following requirements: 26.3.1. Insurance coverage for the Contractor's Comprehensive General Liability, as hereinafter specified under Paragraph entitled "Protective Liability Insurance" shall be written by one and the same insurance company to avoid the expense of duplicate and/or overlapping coverage and to facilitate and expedite the settlement of claims. 26.3.2. Certificates of Insurance acceptable to the Town shall be addressed to and filed with the Town prior to commencement of the work. Renewal certificates shall be addressed to and filed with the Town at least ten(10)days prior to the expiration date of required policies. 26.3.3. No insurance coverage shall be subject to cancellation without at least thirty (30) days prior written notice forwarded by registered or certified mail to the Town. The Town shall also be notified of the attachment of any restrictive amendments to the policies. 26.3.4. All Certificates of Insurance shall be on the"MIIA"or"ACORD" Certificate of Insurance form, shall contain true transcripts from the policies, authenticated by the proper officer of the Insurer•,evidencing in particular those insured,the extent of coverage,the location and operations to which the insurance applies,the expiration date and the above-mentioned notice clauses. 26.3.5. All premium costs shall be included in the Contractor's bid. 26.3.6. All insurance shall be written on an occurrence basis. Coverage shall be maintained without interruption from date of the Contract until date of final payment and termination of any coverage required to be maintained after payment. - 27. Protective Liabilfty Insurance: 27.1. The Contractor shall purchase and maintain such insurance as described in the preceding paragraph as will protect the Town from claims which may arise from operations under the Contract, including operations performed for the named insureds by independent contractors and general inspection thereof by the named insureds. (Rev 5-2007)Supplement"C"to Contract between the'Town of North Andover Page 8 and Johnson Controls,Inc. i 27.2. The Contractor shall also purchase and maintain such insurance as will protect the Town against Automobile Non-Ownership Liability in connection with the Contractor's operations under the Contract,whether such operations be by itself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 27.3. The limits of liability for coverage required under the preceding paragraphs shall be as specified under the provisions hereof governing the Contractor's General Liability Policy. 27.4. The Town shall be named as an additional insured on the above referenced liability Policies, and the Contractor's insurance shall be the primary coverage. The cost of such insurance, including required endorsements and amendments, shall be the sole responsibility of the Contractor. 28. Liens: Neither the Final Payment nor any part of the retained percentage shall become due until the Contractor, if required, shall deliver to the Town a complete release of all liens arising out of the Contract,or receipts in full in lieu thereof and, if required in either case, an affidavit that as far as it has knowledge or information, the releases and receipts include all the labor and material for which a lien could be filed. The Contractor shall comply with all statutory provisions of the General Laws of the Commonwealth of Massachusetts with regard to liens, Chapter 254 and 149 as amended (as a minimum requirement). 29. Guarantees: 29.1. The Contractor guarantees and warrants to the Town that all labor furnished under this Contract will be competent to perform the tasks undertaken,that the product of such labor will yield only first-class results,that materials and equipment furnished will be of good quality and new unless otherwise permitted by this Contract, and that the Work will be of good quality, free from faults and defects and in strict conformance with this Contract. All Work not conforming to these requirements may be considered defective. 29.2. If at any time any part of the work constructed under the terms of this contract shall in the opinion of the Town Manager require repairing due to defective work or materials furnished by the Contractor, he may notify the Contractor in writing to make the required repairs. If the Contractor shall neglect to start such repairs within ten days of the date of giving it notice thereof and to complete the same to the satisfaction of the Town Manager with reasonable dispatch,then the latter may employ other persons to make such repairs. The Town shall charge the expense thereof to the Contractor and may use any moneys still retained to pay for the same, and if such sum is insufficient,the Contractor shall be obligated to pay the balance thereof. 29.3. All guarantees and warranties required in the various Sections of the Specifications which originate with a Subcontractor or Manufacturer must be delivered to the Town before final payment to the Contractor may be made for the amount of that subtrade or for the phase of work to which the guarantee or warranty relates. The failure to deliver a required guarantee or warranty shall be held to constitute a failure of the Subcontractor to fully complete his work in accordance with the Contract Documents. The Contractor's (Rev 5-2007)Supplement"C"to Contract between the Town of North Andover Page 9 and Johnson Controls,Inc. P obligation to correct work is it) addition to, and not in substitution of, such guarantees or warranties as may be requited in the various Sections of the Specifications. This Agreement is intended to take effect as a sealed instrument. Witness out hands and seats hereto: Dated: i.. z. The Contractor by Authorized Signature The Town of North Andover by: Tow anager Departm t/ivision Head Town CounselApp oved as to Form d Town countant Certified as to Appropriation (Rev 5-2007)Supplement"C"to Contrae(between the Town of North Andover Page 10 and Johnson Controls,Inc. THE COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT V4*�x) DEPARTMENT OF LABOR STANDARDS Prevailing Wage Rates CHARLES D.BAKER As determined by the Director under the provisions of the RosALIN ACOSTA ❑overnor Secretary Massachusetts General Laws,Chapter 149,Sections 26 to 27H WILLIAM D MCKTNNEY KARYN E.POLITO Uimcmr Lt.Governor Awarding Authority: Town of North Andover Contract Number: City/Town: NORTH ANDOVER Description of Work: The Stevens Estate-Replace the existing AC system;demolition of existing component(s)installation of new AC equipment modify existing/new ductwork duct insulation controls electrical power wiring Job Location: 723 Osgood Street North Andover,MA Information about Prevailing Wage Schedules for Awarding Authorities and Contractors • This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the "Wage Request Number"on all pages of this schedule. • An Awarding Authority must request an updated wage schedule from the Department of Labor Standards("DLS")if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects(bid pursuant to G.L.c.149A),the earlier of (a)the execution date of the GMP Amendment,or(b)the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date. • The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L, c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 §27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor,a filed sub-bidder, or any sub-contractor. • All apprentices working on the project are required to be registered with the Massachusetts Department of Labor Standards,Division of Apprentice Standards(DLS/DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal,state,local,or private agency must be paid the journeyworker's rate for the trade. • The wage rates will remain in effect for the duration of the project,except in the case of multi-year public construction projects. For construction projects lasting longer than one year,awarding authorities must request an updated wage schedule. Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor.For multi-year CM AT RISK projects,awarding authority must request an annual update no later than two weeks before the anniversary date,determined as the earlier of: (a) the execution date of the GMP Amendment,or(b)the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities,and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F"rental of equipment"contracts. • Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee's name,address,occupational classification,hours worked,and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw. • Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at(617)626-6953. • Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor Division of the office of the Attorney General at(617)727-3465. • Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Classification Effective Bate Base Wage Health pension Supplemental Total Rate Unemployment Construction (2 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.15 $10.91 $10.89 $0.00 $53.95 TEAMSTERSJOINT COUNCIL NO. 16 ZONE B (3 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.22 $10.91 $10.89 $0.00 $54.02 TEAkISTERSJOINT COUNCIL NO. 10 ZONE B (4&5 AXLE)DRIVER-EQUIPMENT 12/01/2016 $32.34 $10.91 $10.89 $0.00 $54.14 TEAMSTERS JOINT COUNCIL NO.10.ZONE B ADS/SUBMERSIBLE PILOT 08/01/2017 $92.97 $9.90 $21.15 $0,00 $124.02 PILE DRIVER LOCAI.56(ZONE I) 08/01/2018 $97.80 $9.90 $21.15 $0,00 $128.85 09/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" AIR TRACK OPERATOR 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE 2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0,00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0,00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0,00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61,90 For apprentice rates see"Apprentice-LABORER" ASBESTOS REMOVER-PIPE/MECH.EQUIPT. 12/01/2017 $35.90 $11.50 $7.10 $0.00 $54.50 HEAT&FROST INSULATORS LOCAL 6(BOSTON) 06/01/2018 $36.90 $11.50 $7.10 $0.00 $55.50 12/01/2018 $37.90 $I1.50 $7.10 $0.00 $56.50 06/01/2019 $38.90 $11.50 $7.10 $0.00 $57.50 12/01/2019 $3990 $11.50 $7.10 $0.00 $58.50 06/01/2020 $4090 $11.50 $7.10 $0.00 $59.50 12/01/2020 $4190 $11.50 $7.10 $0.00 $60.50 ASPHALT RAKER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE2 06/01/2018 $33,92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" BACKHOETRONT-END LOADER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ------------- ------------------ -------------- ........- -- ------------ ...... ------------- ---------- ...... Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 2 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment BARCO-TYPE JUMPING TAMPER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONF 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.39 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0,00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-TABORER" BLOCK PAVER,RAMMER/CURB SETTER 12/01/2017 $33,58 $7.70 $13.60 $0.00 $54.89 LABORERS-ZONE2 06/01/2018 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35,26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13.60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $39.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39.69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" BOILER MAKER 01/01/2017 $42.92 $6.97 $16.21 $0.00 $66.10 BOILERMAKERS LOCAL 29 Apprentice- BOILERMAKER-Local 29 Effective Date- 01/01/2017 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 65 $27.90 $6.97 $10.54 $0.00 $45.41 2 65 $27.90 $6.97 $10.54 $0.00 $45.41 3 70 $30.04 $697 $11.35 $0.00 $48.36 4 75 $32.19 $6.97 $12.16 $0.00 $51.32 5 80 $34.34 $6.97 $12.97 $0.00 $54.28 6 85 $36.48 $6.97 $13.78 $0.00 $57.23 7 90 $38.63 $6.97 $14.59 $0.00 $60.19 8 95 $40.77 $697 $15.40 $0.00 $63.14 yNotes- I � Apprentice to Jourueyworker Ratio:1:5 ---------- ---------------- ------- ---- --------------------------------- --- ........ ----------- ....... ---- - --------- -------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 3 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment- BRICK/STONE/ARTIFICIAL MASONRY(INCL.MASONRY 02/01/2018 $52.06 $10.75 $20.03 $0.00 $92.84 WATERPROOFING) BRICKLA YERS LOCAL 3(LYNN) 08/01/2018 $53.41 $10.75 $20.16 $0.00 $84.32 02/01/2019 $54.05 $10.75 $20.16 $0.00 $84.96 08/01/2019 $55.40 $10.75 $20.30 $0.00 $86.45 02/01/2020 $56.04 $10.75 $20.30 $0.00 $87.09 08/01/2020 $57.39 $10.75 $20.45 $0.00 $88.59 02/01/2021 $58.03 $10.75 $20.45 $0.00 $89.23 08/01/2021 $59.43 $10.75 $20.61 $0.00 $90.79 02/01/2022 $60.02 $10.75 $20.61 $0.00 $91.38 Apprentice- BRICK/PLASTEPICEMENT h14SON-Local 3 Lynn Effective Date- 02/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.03 $10.75 $20.03 $0.00 $56.81 2 60 $31.24 $10.75 $20.03 $0.00 $62.02 3 70 $36.44 $10.75 $20.03 $0.00 $67.22 4 80 $41.65 $10.75 $20.03 $0.00 $72.43 5 90 $46.85 $10.75 $20.03 $0.00 $77.63 Effective Date- 09/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.71 $10.75 $20.16 $0.00 $57.62 2 60 $32.05 $10.75 $20.16 $0.00 $62.96 3 70 S37.39 $10.75 $20.16 $0.00 $68.30 4 80 $42.73 $10.75 $20.16 $0.00 $73.64 5 90 $48.07 $10.75 $20.16 $0.00 $78.98 Notes: f Apprentice to Journey-worker Ratio.1:5 BULLDOZER/GRADER/SCRAPER 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates sec"Apprentice-OPERATING ENGINEERS" CAISSON&UNDERPINNING BOTTOM MAN 12/01/2017 $38.60 $7.70 $14.95 $0.00 $61.25 LABORERS-FOUNDATION AND MARINE 06/0 112 0 1 8 $39.55 $7.70 $14.95 $0.00 $62.20 12/01/20I8 $40.50 $7.70 $14.95 $0.00 $63.15 06/01/20I9 $41.50 $7.70 $14.95 $0.00 $64.15 12/01/2019 $42.50 $7.70 $14.95 $0.00 $65.15 06/01/2020 $43.49 $7.70 $1495 $0.00 $66.14 12/01/2020 $44.47 $7.70 $14.95 $0.00 $67.12 06/01/2021 $45.49 $7.70 $14.95 $0.00 $68.14 12/01/2021 $46.50 $7.70 $14.95 $0.00 $69.15 For apprentice rates see"Apprentice-LABORER" -------------------- -------------------------------------------------- ------------- ----------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 4 of 35 Classification Effective Date Base Wage Health Pension Supplemental Totat Rate Unemployment CAISSON&UNDERPINNING LABORER 12/01/2017 $37.45 $T70 $1495 $0.00 $60.10 LABORERS-FOUNDATION AND MARINE 06/01/2018 $38.40 $7.70 $1495 $0.00 $61.05 12/01/2018 $39.35 $7.70 $1495 $0.00 $62.00 06/01/2019 $40.35 $7.70 $1495 $0.00 $63.00 12/01/2019 $41.35 $7.70 $14.95 $0.00 $64.00 06/01/2020 $42.34 $7.70 $14.95 $0.00 $64.99 12/01/2020 $43.32 $7.70 $14.95 $0.00 $65.97 06/01/2021 $44.34 $7.70 $14.95 $0.00 $66.99 12/01/2021 $45.35 $7.70 $14.95 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" CAISSON&UNDERPINNING TOP MAN 12/01/2017 $37.45 $7.70 $14.95 $0.00 $60.10 LABORERS-FOUNDATION AND AlARINF. 06/01/2018 $38.40 $7.70 $14.95 $0.00 $61.05 12/01/2018 $39.35 $7.70 $14.95 $0.00 $62.00 06/01/2019 $40.35 $7.70 $14.95 $0.00 $63.00 12/01/2019 $41.35 $7.70 $14.95 $0.00 $64.00 06/01/2020 $42.34 $7.70 $14.95 $0.00 $64.99 12/01/2020 $43.32 $7.70 $14.95 $0.00 $6597 06/01/2021 $44.34 $7.70 $14.95 $0.00 $66.99 12/01/2021 $45.35 $7.70 $14.95 $0.00 $68.00 For apprentice rates see"Apprentice-LABORER" CARBIDE CORE DRILL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2019 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $5693 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.69 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" CARPENTER 03/01/2018 $40.29 $990 $17.50 $0.00 $67.68 CARPENTERS-ZONE 2(EasternMassachmelts) 09/01/2018 $41.32 $990 $17.50 $0.00 $68.72 03/01/2019 $42.35 $990 $17.50 $0.00 $69.75 ------------------------ ----------- ------------- --------------- ----------------- ...... --------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 5 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovment Apprentice- CARPENTER-Zone 2 Eastern MA Effective Date- 03/01/2018 Supplemental Step percent. Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.14 $9.90 $1.73 $0.00 $31.77 2 60 $24.17 $990 $1.73 $0.00 $35.80 3 70 $28.20 $9.90 $12.31 $0.00 $50.41 4 75 $30.21 $990 $12.31 $0.00 $52.42 5 80 $32.22 $9.90 $14.04 $0.00 $56.16 6 80 $32.22 $9.90 $14,04 $0.00 $56.16 7 90 $36.25 $9.90 $15.77 $0.00 $61.92 8 90 $36.25 $9.90 $15.77 $0.00 $61.92 Effective Date- 09/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.66 $9.90 $1.73 $0.00 $32,29 2 60 $24.79 $990 $1.73 $0.00 $36.42 3 70 $28.92 $9.90 $12.31 $0.00 $51.13 4 75 $30.99 $9.90 $12.31 $0.00 $53.20 5 80 $33.06 $9.90 $14.04 $0.00 $57.00 6 80 $33.06 $9.90 $14.04 $0,00 $57.00 7 90 $37.19 $9.90 $15.77 $0.00 $62.96 8 90 $37.19 $9.90 $15.77 $0.00 $62.86 Notes: 9 %Indentured After 10/1/17;45/45/55/55/70/70/80/80 11 Step 1&2$29.76/3&4$35.45/5&6$52.14/7&8$57.89 Apprentice to Journepvorker Ratro:1:5 CARPENTER WOOD FRAME 10/01/2017 $26.25 $7.07 $7.86 $0.00 $41.18 CARPENTERS-ZONE 2(Mood Frame) 04/01/2018 $26.67 $7.07 $7.86 $0.00 $41.60 10/01/2019 $27.09 $7,07 $7.86 $0.00 $42.02 04/01/2019 $27.52 $7.07 $7.86 $0.00 $42.45 10/01/2019 $27.95 $7.07 $7.86 $0.00 $42.88 As of 9/1109 Carpentry work on wood-frame WEATHERizKrION projects shall he paid the WOOD FRAME CARPENTER rate. ----------------- ------------------------------------ -- -- -------------------------- -------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 6 of 35 Classification Effective Dale Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- CARPENTER(Wood Frame)-Zone 2 Effective Date- 10/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 60 $15.75 $7.07 $0,00 $0.00 $22.82 2 60 $15.75 $7.07 $0.00 $0.00 $22,82 3 65 $17.06 $7.07 $7.86 $0,00 $31.99 4 70 $18.38 $7.07 $7.86 $0.00 $33.31 5 75 $19.69 $7.07 $7.86 $0,00 $34.62 6 80 $21.00 $7.07 $7.86 $0.00 $35.93 7 85 $22.31 $7.07 $7.86 $0.00 $37.24 8 90 $23.63 $7.07 $7.86 $0.00 $38,56 Effective Date- 04/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $16.00 $7.07 $0.00 $0.00 $23.07 2 60 $16.00 $7.07 $0.00 $0.00 $23.07 3 65 $17.34 $7.07 $7.86 $0.00 $32.27 4 70 $18.67 $7.07 $7.86 $0.00 $33.60 5 75 $20.00 $7.07 $7.86 $0.00 $34.93 6 80 $21.34 $7.07 $7.86 $0.00 $36.27 7 85 $22.67 $7.07 $7.86 $0.00 $37.60 8 90 $24.00 $7.07 $7.86 $0.00 $38.93 Notes: I %Indentured After 10/1/17;45/45/55/55/70/70/80/80 Step 1&2$18.88/3&4$26.26/5&6$33.31/7&8$35.93 Apprentice to Journeyworker Ratio:1:5 CARPENTER WOOD FRAME(All Other Work) 06/01/2016 $25.32 $9.80 $16.82 $0.00 $51,94 CARPENTERS-ZONE 2(Wood Frame) CEMENT MASONRY/PLASTERING 01/01/2018 $46.02 $12.35 $22.41 $0.30 $81.08 BRrcKbiYERSMD AL3(LYNN) 07/01/2018 $47.41 $12.35 $22.41 $0.30 $82.47 01/01/2019 $48.15 $12.35 $22.41 $0.30 $83.21 07/01/2019 $49.54 $12.35 $22.41 $0.30 $84.60 01/01/2020 $50.29 $12.35 $22.41 $0.30 $85.35 Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 7 of 35 Supplemental Classification Effective Date Base Wage Health Pension Total Rate Unemployment Apprentice- CEMENT MASONRY/PLASTERING-Eastern Mass(Lynn) Effective Date- 01/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $23.01 $12.35 $15.41 $0.00 $50.77 2 60 $27.61 $12.35 $17.41 $0.30 $57.67 3 65 $29.91 $12.35 $18.41 $0.30 $60.97 4 70 $32.21 $12.35 $19.41 $0.30 $64.27 5 75 $34.52 $12.35 $20.41 $0.30 $67.58 6 80 $36.82 $12.35 $21.41 $0.30 $70.88 7 90 $41.42 $12.35 $22.41 $0.30 $76.48 Effective Date- 07/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.71 $12.35 $15.41 $0.00 $51.47 2 60 $28.45 $12.35 $17.41 $0.30 $58.51 3 65 $30.82 $12.35 $18.41 $0.30 $61.98 4 70 $33.19 $12.35 $19.41 $0.30 $65.25 5 75 $35.56 $12.35 $20.41 $0.30 $69.62 6 80 $3793 $12.35 $21.41 $0.30 $71.99 7 90 $42.67 $12.35 $22.41 $0.30 $77.73 Notes: Steps 3,4 are 500 Im.All other steps are 1,000 hrs. l Apprentice to Journeyworlcer Ratio:1:3 CHAIN SAW OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0,00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0,00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0,00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0,00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' CLAM SHELLS/SLURRY BUCKETS/HEA➢INCr MACHINES 12/01/2017 $47.63 $10.50 $15.50 $0.00 $73.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" COMPRESSOR OPERATOR 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERA TING ENGINE'ERSLOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" DELEADER(BRIDGE) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 PAINTERS LOCAL 35-ZONE 2 ---------------- ---------- --- ---------------- ---------- ------------------------------- ------- ---- ------------------- Issue Date: 03/13/2019 Wage Request Number: 20180313-007 Page 8 of 35 Classification Effective Date Base Wage Health Pension Supplemental 'Total Rate Unemployoleut Apprentice- PAINTER Local 35 _BRIDGESITANKS Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $25.71 $7.85 $0.00 $0.00 $33.56 2 55 $28.28 $7.85 $3.66 $0.00 $39.79 3 60 $30.85 $7.85 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45.59 5 70 $35.99 $7.85 $14.11 $0.00 $57.95 6 75 $39.56 $7.85 $14.44 $0.00 $60.85 7 80 $41.13 $7.85 $14.77 $0.00 $63.75 8 90 $46.27 $7.95 $15.44 $0.00 $69.56 Notes. 1 Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 DEMO:ADZEMAN 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 LABORERS-ZONE2 06/01/2018 $38.60 $7.70 $14,75 $0.00 $61.05 12/01/2019 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40.55 $7.70 $14.75 $0.00 $63.00 12/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DEMO:BACKHOE/LOADER/HAMMER OPERATOR 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONL:2 06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates see"Apprentice-LABORER" DEMO:BURNERS 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.85 LABORERS-ZONE 2 06/01/2018 $39,35 $7.70 $14.75 $0.00 $61.80 12/01/2018 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41.30 $7.70 $14.75 $0.00 $63.75 12/01/2019 .$42.30 $7.70 $14.75 $0.00 $64.75 For apprentice rates see"Apprentice-LABORER" DEMO:CONCRETE CUTTER/SAWYER 12/01/2017 $38.65 $7.70 $14.75 $0.00 $61.10 LABORERS-ZONE 2 06/01/2018 $39.60 $7.70 $14.75 $0.00 $62.05 12/01/2018 $40.55 $7.70 $14.75 $0.00 $63.00 06/01/2019 $41.55 $7.70 $14.75 $0.00 $64.00 12/01/2019 $42.55 $7.70 $14.75 $0.00 $65.00 For apprentice rates sce"Apprentice-LABORER" DEMO:JACKHAMMER OPERATOR 12/01/2017 $38.40 $7.70 $14.75 $0.00 $60.95 LABORERS-ZONE 2 06/01/2018 $39.35 $7.70 $14.75 $0.00 $61.80 12/01/2018 $40.30 $7.70 $14.75 $0.00 $62.75 06/01/2019 $41,30 $7.70 $14.75 $0.00 $63.75 12/01/2019 $42.30 $7,70 $14.75 $0.00 $64.75 ------------ ------------------- -------- -------------- ------------------------------------------------------------- --------------..----- Issue Date: 03/13/2019 Wage Request Number: 20180313-007 Page 9 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see"Apprentice-LABORER" DEMO:WRECKING LABORER 12/01/2017 $37.65 $7.70 $14.75 $0.00 $60.10 LABORERS-ZONE 1 06/01/2018 $38.60 $7.70 $14.75 $0.00 $61.05 12/01/2018 $39.55 $7.70 $14.75 $0.00 $62.00 06/01/2019 $40,55 $7.70 $14.75 $0.00 $63.00 12/01/2019 $41.55 $7.70 $14,75 $0.00 $64.00 For apprentice rates see"Apprentice-LABORER" DIRECTIONAL DRILL MACHINE OPERATOR 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINL"ERS" DIVER 08/01/2017 $6198 $9.90 $21.15 $0.00 $93.03 PILEDRIVER LOCAL 56(ZONE 1) 0 810 1/20 1 8 $65.20 $990 $21.15 $0.00 $96.25 08/01/2019 $69.52 $9.90 $21.15 $0.00 $99.57 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 08/01/2019 $49.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" DIVER TENDER(EFFLUENT) 08/01/2017 $66.41 $9.90 $21.15 $0.00 $97.46 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $69.86 $9.90 $21,15 $0,00 $106.91 08/01/2019 $73.41 $9.90 $21.15 $0.00 $104.46 For apprentice rates see"Apprentice-PILE DRIVER" DIVER/SLURRY(EFFLUENT) 08/01/2017 $92.97 $9.90 $21.15 $0.00 $124.02 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $97.80 $9.90 $21.15 $0.00 $128.85 08/01/2019 $102.78 $9.90 $21.15 $0.00 $133.83 For apprentice rates see"Apprentice-PILE DRIVER" --- _ Coustructton DRAWBRIDGE.OPERATOR (Construction) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81,00 ELECTRICIANS LOCAL 103 09/01/2018 $51,34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $93.46 For apprentice rates see"Apprentice-ELECTRICIAN" ELECTRICIAN 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 ELECTRICIANSLOCAL 103 09/01/2018 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 ----------------------- ---------------------------------------------..--------------------------------------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 10 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate tlnelnploVlilent Apprentice- ELECTRICIAN-Local 103 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total hate 1 40 $20.06 $13.00 $0.60 $0.00 $33.66 2 40 $20.06 $13.00 $0.60 $0.00 $33.66 3 45 $22.57 $13.00 $13.61 $0.00 $49.18 4 45 $22.57 $13.00 $13.61 $0.00 $49,18 5 50 $25,08 $13.00 $13.99 $0.00 $52.07 6 55 $27.58 $13.00 $14.38 $0.00 $54.96 7 60 $30.09 $13.00 $14.76 $0.00 $57.85 8 65 $32.60 $13.00 $15.15 $0.00 $60.75 9 70 $35.11 $13.00 $15.53 $0.00 $63.64 10 75 $37,61 $13.00 $15.93 $0.00 $66.54 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $20.54 $13.00 $0.62 $0.00 $34.16 2 40 $20.54 $13.00 $0.62 $0.00 $34.16 3 45 $23.10 $13.00 $13.62 $0.00 $49,72 4 45 $23.10 $13.00 $13.62 $0.00 $49.72 5 50 $25.67 $13.00 $14.01 $0.00 $52,68 6 55 $29,24 $13.00 $14.40 $0.00 $55.64 7 60 $30.80 $13,00 $14.78 $0.00 $58,58 8 65 $33,37 $13.00 $15.17 $0.00 $61.54 9 70 $35.94 $13.00 $15.56 $0.00 $64.50 10 75 $38.51 $13.00 $15.96 $0.00 $67.47 Notes: App prior 1/1103;30/35/40/45/50/55 165/7075/80 Apprentice to Journeyworker Ratio:2:3*xx ELEVATOR CONSTRUCTOR 01/01/2017 $55.86 $15.28 $15.71 $0.00 $96.85 ELEVATOR CONSTRUCTORS LOCAL 4 -- ---- --------------------------- ------ ------ ------------- ........------- --- ----------------------- .......... Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 11 of 35 Classification Effective Date Base Wage Health Pension Supplemental 'Total Rate Unemolov►neat Apprentice- ELEVATOR CONSTRUCTOR-Local 4 Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $27.93 $15.29 $0.00 $0.00 $43.21 2 55 $30.72 $15.28 $15.71 $0.00 $61.71 3 65 $36.31 $15.28 $15.71 $0.00 $67.30 4 70 $39.10 $15.28 $15.71 $0.00 $70.09 5 80 $44.69 $15,28 $15.71 $0.00 $75.68 -.... Notes: Steps I-2 are 6 mos.;Steps 3-5 are 1 year Apprentice ". ., ...-. ... _,.. . ._, .. ..,. . �_ ., .. _. .. .. .-...., . �,,, . ,...... .._. . pp to Jou rneyworker Ratio:1:1 ELEVATOR CONSTRUCTOR HELPER 01/01/2017 $39.10 $15.28 $I5.71 $0.00 $70.09 ELEVATOR CONSTRUCTORS LOCAL 4 For apprentice rates see"Apprentice-ELEVATOR CONSTRUCTOR" FENCE&GUARD RAIL ERECTOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/41/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $3827 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 Far apprentice rates see"Apprentice-LABORER" FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY 11/01/2017 $42.88 $10,00 $15.25 $0.00 $68.13 OPERATING ENGINEERSLOCAL 4 05/01/2018 $43.59 $10.00 $15.25 $0.00 $68,84 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENGYARTY CHIEF-BLDG,SITE,HVY/HWY 11/01/2017 $44.34 $10.00 $15.25 $0.00 $69.59 OPERATING ENGINEERS LOCAL 4 05/01/2018 $45.06 $10.00 $15.25 $0.00 $70.31 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIELD ENG,ROD PERSON-BLDG,SITE,HVY/HWY 11/01/2017 $22.93 $10.00 $15,25 $0.00 $48.08 OPERATING ENGINEERS LOCAL 4 05/01/2018 $23.26 $10.00 $15.25 $0.00 $48.51 For apprentice rates see"Apprentice-OPERATING ENGINEERS" FIRE ALARM INSTALLER 03/01/2018 $50.15 $13,00 $17.85 $0.00 $81.00 ELECTRICIANSLOCAL 103 09/01/2018 $51.34 $13.d0 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $17.93 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN' FIRE ALARM REPAIR/MAINTENANCE 03/01/2018 $37,61 $13.00 $15.93 $0.00 $66.54 /COMMISSIONING ELECTIUCIANS 09/01/2018 $38,51 $13.00 $15.96 $0.00 $67.47 LOCAL 103 03/01/2019 $39,40 $13.00 $15.98 $0.00 $68.38 For apprentice rates see"Apprentice-TELECOMMUNICATIONS TECHNICIAN` FIREMAN(ASST.ENGINEER) 12/01/2017 $38.57 $10.50 $15.50 $0.00 $64.57 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" ------------- ---- ---- ------------------------ ------- - ...........................------------------ Issue Date: 03/13/2018 Wage Request Number: 20190313-007 Page 12 of 35 Classifications Effective Date Base Wage Health Pettsion Supplemental Total Rate Unemployment FLAGGER&SIGNALER 12/01/2017 $21.50 $7.70 $13.60 $0.00 $42.80 LABORERS-ZONE 2 06/01/2018 $21.50 $7.70 $13.60 $0.00 $42.80 12/01/2018 $22.50 $7.70 $13.60 $0.00 $43.80 06/01/2019 $22.50 $7.70 $13.60 $0.00 $43.80 12/01/2019 $23.50 $7.70 $13.60 $0.00 $44.80 06/01/2020 $23.50 $7.70 $13.60 $0.00 $44.80 12/01/2020 $24.50 $7.70 $13.60 $0.00 $45,80 0 610 1/2 02 1 $24.50 $7.70 $13.60 $0.00 $45,80 12/01/2021 $24.50 $7.70 $13.60 $0.00 $45.90 For apprentice rates see"Apprentice-LABORER" FLOORCOVERER 03/01/2016 $42.13 $9.80 $17.62 $0.00 $69.55 FL OORCOVERERSLOCAL 2168 ZONE I Apprentice- FLOORCOVERER-Local 2168 Zone I Effective Date- 03/01/2016 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.07 $9,80 $1.79 $0.00 $32.66 2 55 $23.17 $9.80 $1.79 $0.00 $34.76 3 60 $25.28 $9,80 $12.25 $0.00 $47.33 4 65 $27.38 $9.80 $12.25 $0.00 $49.43 5 70 $29.49 $9.80 $14.04 $0.00 $53.33 6 75 $31.60 $9.80 $14.04 $0.00 $55.44 7 80 $33.70 $9.80 $15,83 $0.00 $59.33 8 85 $35.81 $9.90 $15.83 $0.00 $61.44 ........ . ... . . , Notes Steps are 750 Fus. %After 09/l/17;45/45/55/55/70170/80/80(I500hr Steps) Step 1&2$30.55/3&4$36.49/5&6$53.33I7&8$59.33 Apprentice to Jotrney►vorlcer Rafio:l.l FORK LIFT/CHERRY PICKER 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GENERATOR/LIGHTINGPLANTMEATERS 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" GLAZIER(CLASS PLANK/AIRBARRIER/INTERIOR 01/01/2017 $40.91 $7.85 $16,10 $0.00 $64.86 SYSTEMS) GLAZIERS LOCAL 35(ZONE 2) --------------------------- ----------------- --------- ----------------- -- ....................... ----------------------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 13 of 35 Supplemental Classification Effective Date Base Wage health Pension Total Rate Unemplovmeut Apprentice- GLAZIER-Local 35 Zone 2 Effective Bate- 01/01/2017 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $7.85 $0.00 $0.00 $29.31 2 55 $22.50 $7.85 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26,59 $7.85 $4.32 $0.00 $39.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 6 75 $30.68 $7.85 $14.44 $0.00 $52.97 7 80 $32.73 $7.85 $14.77 $0.00 $55.35 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 _ r �Nates:. _ Steps are 750 hrs. Apprentice to Journe worker Ratio -. .. :1:1 .HOISTING ENGMEER/CRANES/GRADALLS 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERSLOCAL 4 Apprentice- OPERATING ENGINEERS-Local 4 Effective Date- 12/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $25.65 $10.50 $0.00 $Uo $36.15 2 60 $27.98 $10.50 $15.50 $0.00 $53.98 3 65 $30.31 $10.50 $15.50 $0.00 $56.31 4 70 $32.64 $10,50 $15.50 $0.00 $58.64 5 75 $34.97 $10.50 $15.50 $0.00 $60.97 6 80 $37.30 $10.50 $15.50 $0.00 $63.30 7 85 $39,64 $10.50 $15.50 $0.00 $65.64 8 90 $41.97 $10.50 $15.50 $0.00 $67.97 .......... [Notes: Apprentice to Journeyworker Ratio:1:6 HVAC(DUCTWORK) 02/01/2018 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETA ETAL EVORKLRS LOCAL 17-A For apprentice rates see"Apprentice-SHEET METAL WORKER" HVAC(ELECTRICAL CONTROLS) 03/01/2018 $50.15 $13.00 $17.85 $0.00 $81.00 ELECTRICIANS LOCAL 103 0910 112 0 1 8 $51.34 $13.00 $17.89 $0.00 $82.23 03/01/2019 $52.53 $13.00 $1793 $0.00 $83.46 For apprentice rates see"Apprentice-ELECTRICIAN" HVAC(TESTING AND BALANCING-AIR) 0210 1/20 1 9 $44.11 $12,20 $24.12 $2.41 $82,84 SHEETMETAL WORKERSLOCAL 17-A For apprentice rates see"Apprentice-SIV r METAL WORKER" - -------------------------- -------------------------------------- -------------------------- -----------------------I----------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 14 of 35 Classification Effective Date Base Wage Health Pension S►►pplementaI 'total Rate Unemployment I VAC(TESTING AND BALANCING-WATER) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEFI77ERS LOCAL 537(Local 138) For apprentice rates see"Apprentice-PIPEFITTER"or"PLi NIBERIMPEFITTEW HVAC MECHANIC 03/01/2017 $49.86 $9.70 $16.14 $0.00 $74.70 PIPEFITTERS LOCAL 537(Local 13S) For apprentice rates see"Apprentice-PIPEFITTrW or"PLUMBERIPIPEFMEW HYDRAULIC DRILLS 12/01/2017 $33.58 $7.70 $13.60 $0.00 $54.88 LABORERS-ZONE1 0610 1/20 1 8 $34.42 $7.70 $13.60 $0.00 $55.72 12/01/2018 $35.26 $7.70 $13.60 $0.00 $56.56 06/01/2019 $36.13 $7.70 $13,60 $0.00 $57.43 12/01/2019 $36.99 $7.70 $13.60 $0.00 $58.29 06/01/2020 $37.88 $7.70 $13.60 $0.00 $59.18 12/01/2020 $38.77 $7.70 $13.60 $0.00 $60.07 06/01/2021 $39,69 $7.70 $13.60 $0.00 $60.99 12/01/2021 $40.60 $7.70 $13.60 $0.00 $61.90 For apprentice rates see"Apprentice-LABORER" INSULATOR(PIPES&TANKS) 09/01/2017 $47.09 $11.75 $14.20 $0.00 $73.04 HEAT&FROST INSULATORSLOCAL 6(BOSTON) 09/01/2018 $49.34 $11.75 $14.20 $0.00 $75.29 09/01/2019 $51.84 $11.75 $14.20 $0.00 $77.79 Apprentice- ASBESTOS INSUI ATOR(Pipes& Tanks)-Local 6 Boston Effective Date- 09/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $23.55 $11.75 $10.45 $0.00 $45.75 2 60 $28.25 $11.75 $11.20 $0.00 $51.20 3 70 $32.96 $11.75 $1195 $0.00 $56.66 4 80 $37.67 $11.75 $12.70 $0.00 $62.12 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $24.67 $11.75 $10.45 $0.00 $46.87 2 60 $29.60 $11.75 $11.20 $0.00 $52.55 3 70 $34.54 $11.75 $11.95 $0.00 $58.24 4 80 $39.47 $11.75 $12.70 $0.00 $63.92 -_ . .. ._. ............... Notes: Steps are 1 year Apprentice to Journeyworlcer Ratio.l:4 IRONWORKER(WELDER 03/16/2017 $40.24 $7.80 $20.85 $0.00 $68.89 IRONWORKERS LOCAL 7(LAWRENCEAREA) - ------------------------------ ------------------------------------ ----------------- -------------- ---------------------- ------ Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 15 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- IRONWORKER-Local 7 Laivre►rce Effective Date- 03/16/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $24.14 $7.90 $20.85 $0.00 $52.79 2 70 $28.17 $7.80 $20.85 $0.00 $56.82 3 75 $30.18 $7.80 $20.85 $0.00 $58.83 4 80 $32.19 $7.80 $20.95 $0.00 $60.84 5 85 $34.20 $7.80 $20.85 $0.00 $62.85 6 90 $36.22 $7,80 $20.85 $0.00 $64.97 Notes: Structural 1:6;Ornamental 1.4 z Apprentice to Journepvorker Ratio: JACKHAMMER&PAVTNG BREAKER OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE l 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates sec"Apprentice-LABORER" LABORER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.66 $0,00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0,00 $56.69 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $3894 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 ----------------- ------ -- ----------------- ------------------- ----------------------------- ----_---------------- Issue Date: 03/13/2018 Wage Request Number: 201 803 1 3-007 Page 16 of 35 Classification Effective Date Base'Wage Health Pension Supplemental Total Rate Ltnentnlovment Apprentice- LABORER-Zone 2 Effective Date- 12/01/2017 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $19.70 $7.70 $13.60 $0.00 $41.00 2 70 $22.98 $7.70 $13.60 $0.00 $44.28 3 80 $26.26 $7.70 $13.60 $0.00 $47.56 4 90 $29.55 $7.70 $13.60 $0.00 $50.85 Effective Date- 06/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $20.20 $7.70 $13.60 $0.00 $41.50 2 70 $23.57 $7.70 $13.60 $0.00 $44.87 3 80 $26.94 $7.70 $13.60 $0.00 $48.24 4 90 $30.30 $7.70 $13.60 $0.00 $51.60 _- Notes Apprentice to Journeytvorker Ratio:1:5 LABORER:CARPENTER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.39 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57,54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:CEMENT FINISHER TENDER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33,67 $7.70 $13.60 $0.00 $54.97 12/01/2019 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.39 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates sce"Apprentice-LABORER" LABORER:HAZARDOUS WASTE/ASBESTOS REMOVER 12/01/2017 $33.03 $7.70 $13.55 $0.00 $54.28 LABORERS-ZONE 2 06/01/2019 $33.87 $7.70 $13.55 $0.00 $55.12 12/01/2019 $34.71 $7.70 $13.55 $0.00 $55.96 06/01/2019 $35.59 $7.70 $13.55 $0.00 $56.83 12/01/2019 $36.44 $7.70 $13.55 $0.00 $57.69 For apprentice rates see"Apprentice-LABORER" - ----- - ---- --------------------- -- ------- ------------------ .......------ fssae Date: 03/13/2018 Wage Request Number: 20180313-007 Page 17 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployuteut LABORER:MASON TENDER 12/01/2017 $33.08 $7.70 $13,60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0,00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13,60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' LABORER:MULTI-TRADE TENDER 12/01/2017 $32.83 $7.70 $I3.60 $0.00 $54.13 LABORERS-ZONE z 06/01/2018 $33.67 $7.70 $13.60 $0.00 $5497 12/01/2019 $34.51 $7.70 $13.60 $0.00 $55,81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 0 6/0 1 12 02 0 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For apprentice rates see"Apprentice-LABORER" LABORER:TREE REMOVER 12/01/2017 $32.83 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 06/01/2018 $33,67 $7.70 $13.60 $0.00 $54.97 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.39 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36,24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $58.43 12/01/2020 $38.02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 This classification applies to all tree work associated with the removal of standing trees,and trimming and removal of branches and limbs when the work is not done for a utility company for the purpose of operation,maintenance or repair of utility company equipment.For apprentice rates see"Apprentice-LABORER" LASER BEAM OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0,00 $54.38 LAB ORE,RS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13,60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13,60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' ----------------- ----------- ------------------- -------------- ----------------------------------.. -------------- -------------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 18 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment MARBLE&TILEFMSHERS 02/01/2019 $39.82 $10.75 $18.34 $0.00 $68.91 BRICKLAYERS LOCAL 3-MARBLF&TILL 08I01/2018 $4090 $10.75 $18.47 $0.00 $70,l2 02/01/2019 $41.41 $10.75 $18A7 $0.00 $70.63 08/01/2019 $42.49 $10.75 $18.61 $0.00 $71.85 02/01/2020 $43.00 $10.75 $18.61 $0.00 $72.36 08/01/2020 $44.08 $10.75 $18.76 $0.00 $73.59 02/01/2021 $44.59 $10,75 $18.76 $0.00 $74.10 08/01/2021 $45.71 $10.75 $1892 $0,00 $75.38 02/01/2022 $46.18 $10.75 $19.92 $0.00 $75.85 Apprentice- AMRBLE& TILE FINISHER-Local 3 Marble&Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.91 $10.75 $18.34 $0.00 $49.00 2 60 $23.89 $10.75 $18.34 $0.00 $5298 3 70 $27.87 $10.75 $18.34 $0.00 $56.96 4 80 $31.96 $10.75 $18.34 $0.00 $6095 5 90 $35.84 $10.75 $19.34 $0.00 $64.93 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.45 $10.75 $18.47 $0.00 $49.67 2 60 $24,54 $10.75 $19.47 $0.00 $53.76 3 70 $28.63 $10.75 $18,47 $0.00 $57.85 4 80 $32.72 $10.75 $18.47 $0.00 $61.94 5 90 $36.81 $10.75 $18.47 $0.00 $66.03 Notes: I i q Apprentice to Journeyworker Ratio.1:3 MARBLE MASONS,TILELAYERS&TERRAZZO MECH 02/01/2018 $52.10 $10.75 $20.03 $0.00 $82.98 BRICKLAYERS LOCAL 3-MARBLE&TILE 08/01/2018 $53.45 $10.75 $20.16 $0.00 $84.36 02/01/2019 $54.07 $10.75 $20.16 $0.00 $84.98 08/01/2019 $55.42 $10.75 $20.30 $0.00 $86.47 02/01/2020 $56.05 $10.75 $20.30 $0.00 $87.10 08/01/2020 $57.40 $10.75 $20.45 $0.00 $88.60 02/01/2021 $58,04 $10.75 $20.45 $0,00 $89.24 08/01/2021 $59.44 $10.75 $20.61 $0,00 $90.80 02/01/2022 $60.01 $10.75 $20.61 $0.00 $91.37 ---------------- --- -------- -------------------------- ------------- ------- ------------------ ----------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 19 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemptoyment Apprentice- MARBLE-TILE-TERRAZZO t IJECMANIC-Local 3 Marble& Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.05 $10.75 $20.03 $0.00 $56.93 2 60 $31.26 $10.75 $20.03 $0.00 $62.04 3 70 $36.47 $10,75 $20.03 $0.00 $67.25 4 80 $41.68 $10.75 $20.03 $0.00 $72.46 5 90 $46.89 $10.75 $20.03 $0.00 $77.67 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $26.73 $10.75 $20,l b $0.00 $57.64 2 60 $32.07 $10.75 $20.16 $0.00 $62.98 3 70 $37.42 $10.75 $20.16 $0.00 $68.33 4 80 $42.76 $10.75 $20.16 $0.00 $73.67 5 90 $48.11 $10.75 $20.16 $0.00 $79.02 Notes: Apprentice to,Tourneyevorker Ratio:1:5 MECH.SWEEPER OPERATOR(ON CONST. SITES) 12/01/2017 $46.17 $10,50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERM ING ENGINEERS" ._ ....... _ ... .. MECHANICS MAINTENANCE. 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" MILLWRIGHT(Zone 2) 1 0/0 112 0 1 7 $36.32 $9.90 $18.50 $0.00 $64.72 Iv11LL FFRIGHTS LOCAL 1121-Zone 2 04/01/2018 $37.l 7 $9.90 $18.50 $0.00 $65.57 10/01/2018 $38.02 $9.90 $18.50 $0.00 $66.42 04/01/2019 $38.97 $990 $18.50 $0.00 $67.27 ------------------------- --------- ---------------------------- ---------------------- -------------------------------- Issue Date: 0311 3/20 1 9 Wage Request Number: 20180313-007 Page 20 of 35 Classification Effective Date Base Wage Health Pension Supplemental 'Total Rate Unemployment Apprentice- MILLWRIGHT-Local 1121 Zone 2 Effective Date- 10/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 55 $19.98 $9.90 $5.31 $0.00 $35.19 2 65 $23.61 $990 $15.13 $0.00 $49.64 3 75 $27.24 $9.90 $16.10 $0.00 $53.24 4 85 $30.87 $9.90 $17.06 $0.00 $57.83 Effective Date- 04/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 55 $20.44 $9.90 $5.31 $0.00 $35.65 2 65 $24.16 $9.90 $15.13 $0.00 $49.19 3 75 $27.88 $9.90 $16.10 $0.00 $53.88 4 85 $31.59 $%90 $17.06 $0.00 $58.55 Notes: I Steps are 2,000 hours s Apprentice to Journeyrvorker Ratio:1:5 MORTAR MIXER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE 2 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55,22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" OILER(OTIIER THAN TRUCK CRANES,GRADALLS) 12/01/2017 $23.24 $10.50 $15.50 $0.00 $49.24 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OILER(TRUCK CRANES,GRADALLS) 12/01/2017 $27A0 $10.50 $15.50 $0.00 $53.40 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" OTHER POWER DRIVEN EQUIPMENT-CLASS 11 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PAINTER(BRIDGES/TANKS) 01/01/2017 $51.41 $7.85 $16.10 $0.00 $75.36 PAINTERS LOCAL 35-701VE 2 -- -------------------------- ------------------------------ --------- ------------------------------ ------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 21 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice_ PAINTER Local 35 -BRIDGES/TANKS Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $25.71 $7.85 $0.00 $0,00 $33.56 2 55 $28.28 $7.85 $3.66 $0.00 $39.79 3 60 $30.85 $7.95 $3.99 $0.00 $42.69 4 65 $33.42 $7.85 $4.32 $0.00 $45.59 5 70 $35.99 $7.95 $14.11 $0.00 $57.95 6 75 $38.56 $7.85 $14.44 $0.00 $60.85 7 80 $41.13 $7.85 $14.77 $0.00 $63.75 8 90 $46.27 $7.85 $15.44 $0.00 $69.56 Notes: e Steps are 750 hrs. r Apprentice to Journeyworker Ratio.1:1 PAINTER(SPRAY OR SANDBLAST,NEW)* 01/01/2017 $42.31 $7.85 $16.10 $0.00 $66.26 *If 30%or more of surfaces to be painted are new construction, NEW paint Late shall be Used.PAINTERS LOCAL 35-ZONE 2 Apprentice- PAINTER Local 35 Zone 2-Spray/Sandblast-New Effective Date- 01/01/2017 snpptemcn£al Step percent Apprentice Base Wage Health Pension Unemployment Total Rate -- 1 50 $21.16 $7.85 $0.00 $0.00 $29.01 2 55 $23.27 $7.85 $3.66 $0.00 $34.78 3 60 $25.39 $7.85 $3.99 $0.00 $37.23 4 65 $27.50 $7.85 $4.32 $0.00 $39.67 5 70 $29.62 $7.85 $14.11 $0.00 $51.59 6 75 $31.73 $7.85 $14.44 $0.00 $54.02 7 80 $33.85 $7.95 $14.77 $0.00 $56.47 8 90 $38.08 $7.85 S15.44 $0.00 $61.37 Notes: f Steps are 750 hrs. Apprentice to Journeyworker Ratio:1:1 PAINTER(SPRAY OR SANDBLAST,REPAINT) 01/01/2017 $40.37 $7.85 $16.10 $0.00 $64.32 PAINTERSLOCAL 35-ZONE 2 ..- - -------------- ------------- ------------ ----------- ----------------- ------------ ---------------------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 22 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- PAINTER Local 35 Zone 2-SpraylSandhlast-Repaint Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemptoyment Total Rate 1 50 $20.19 $7.85 $0,00 $0.00 $28.04 2 55 $22.20 $7.95 $3.66 $0.00 $33.71 3 60 $24.22 $7.85 $3.99 $0.00 $36.06 4 65 $26.24 $7.85 $4.32 $0.00 $38.41 5 70 $28.26 $7.85 $14.11 $0.00 $50.22 6 75 $30.28 $7.85 $14.44 $0.00 $52.57 7 80 $32.30 $7.85 $14.77 $0.00 $5492 8 90 $36.33 $7.85 $15.44 $0.00 $59.62 iNotes: Steps are 750 hrs. s Apprentice to Jou„r- .-.ney worker Ratio.l.l PAINTER(TRAFFIC MARKINGS) 12/01/2017 $32.93 $7.70 $13.60 $0.00 $54.13 LABORERS-ZONE 2 06/01/2018 $33.67 $7,70 $13.60 $0.00 $5497 12/01/2018 $34.51 $7.70 $13.60 $0.00 $55.81 06/01/2019 $35.38 $7.70 $13.60 $0.00 $56.68 12/01/2019 $36.24 $7.70 $13.60 $0.00 $57.54 06/01/2020 $37.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $38,02 $7.70 $13.60 $0.00 $59.32 06/01/2021 $38.94 $7.70 $13.60 $0.00 $60.24 12/01/2021 $39.85 $7.70 $13.60 $0.00 $61.15 For Apprentice rates see"Apprentice-LABORER" PAINTER/TAPER(BRUSH,NEW)* 01/01/2017 $40.91 $7.95 $16.10 $0.00 $64.86 *If 30%or more of surfaces to be painted are new construction, NEW paint rate shall be used.PAINTERS LOCAL 35-ZONE 2 ---------------- ----------- -------------- ----- ------- ----------------- ...... --------------------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 23 of 35 Classification Effective Date Base Wage Health Pension Sapplemental Total Rate Unemployment Apprentice- PAINTER-Local 35 Zone 2-BRUSHNEW Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $20.46 $7.85 $0.00 $0.00 $28.31 2 55 $22.50 $7.95 $3.66 $0.00 $34.01 3 60 $24.55 $7.85 $3.99 $0.00 $36.39 4 65 $26.59 $7.95 $4.32 $0.00 $38.76 5 70 $28.64 $7.85 $14.11 $0.00 $50.60 6 75 $30.68 $7.85 $14.44 $0.00 $52.97 7 80 $32.73 $7.85 $14.77 $0.00 $55.35 8 90 $36.82 $7.85 $15.44 $0.00 $60.11 �. ... Notes: Steps are 750 hrs. .. ._ .rt., ... . l Apprentice to Journeyworker Ratio:1:1 PAINTER/TAPER(BRUSH,REPAINT) 01/01/2017 $38.97 $7.85 $16.10 $0.00 $62.92 PAINTERS LOCAL 35-ZONE 2 Apprentice- PAINTER Local 35 Zone 2-BRUSHREPAINT Effective Date- 01/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $19.49 $7.85 $0.00 $0.00 $27.34 2 55 $21.43 $7.85 $3.66 $0.00 $32.94 3 60 $23.38 $7.85 $3.99 $0.00 $35.22 4 65 $25.33 $7.85 $4.32 $0.00 $37.50 5 70 $27.28 $7.85 $14.11 $0.00 $49.24 6 75 $29.23 $7.85 $14.44 $0.00 $51.52 7 80 $31.18 $7.85 $14.77 $0.00 $53.80 8 90 $35.07 $7.85 $15.44 $0.00 $58.36 Notes: ' Steps are 750 hrs. Apprentice to Journeywor� ker Ratio:l.l PANEL&PICKUP TRUCKS DRIVER 12/01/2012 $30.28 $9.07 $8.00 $0.00 $47.35 TEA NISTERSJOINT COUNCIL NO.10 ZONE B PIER AND DOCK CONSTRUCTOR(UNDERPINNING AND 08/01/2017 $44.27 $9.90 $21.15 $0.00 $75.32 DECK) 08/01/2018 $46.57 $9.90 $21.15 $0.00 $77.62 PILE DRIVER LOCAL 54(ZONE I) 08/01/2019 $48.94 $9.90 $21.15 $0.00 $79.99 For apprentice rates see"Apprentice-PILE DRIVER" PILE DRIVER 08/01/2017 $44.27 $990 $21.15 $0.00 $75.32 PILE DRIVER LOCAL 56(ZONE 1) 08/01/2018 $46.57 $9.40 $21.15 $0.00 $77.62 08/01/2019 $48.94 $990 $21.15 $0.00 $79.99 --------------- -------- --------- - -------- ----------------_..- ----- ----------- -------------- ......- ------ ------------ Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 24 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate unemployment Apprentice- PILE DRIVER-Local 56 Zone 1 Effective Date- 08/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $22.14 $9.90 $21.15 $0.00 $53.19 2 60 $26.56 $9.90 $21.15 $0.00 $57.61 3 70 $3099 $9.90 $21.15 $0.00 $62.04 4 75 $33.20 $9.90 $21.15 $0.00 $64.25 5 80 $35.42 $9.90 $21.15 $0.00 $66.47 6 80 $35.42 $9.90 $21.15 $0.00 $66.47 7 90 $39.84 $9.90 $21.15 $0.00 $70.89 8 90 $39.84 $9.90 $21.15 $0.00 $70.89 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $23.29 $9.90 $21.15 $0.00 $54,34 2 60 $27.94 $9.90 $21.15 $0.00 $58.99 3 70 $32.60 $9.90 $21.15 $0.00 $63.65 4 75 $34.93 $9.90 $21.15 $0.00 $65.98 5 80 $37.26 $9.90 $21.15 $0.00 $68.31 6 80 $37.26 $9,90 $21.15 $0.00 $68.31 7 90 $41.91 $9.90 $21.15 $0.00 $72.96 8 90 $41.91 $990 $21.15 $0.00 $72.96 Notes: Apprentice to Journeyworker Ratio:1:5 PIPEFITTER&STEAMFITTER 03/01/2017 $49.96 $9.70 $16.14 $0.00 $74.70 PIPEFITTERSLOCAL 537(Local 138) Apprentice- PIPEFITTER Local 537(Local 138) Effective Date- 03/01/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $19.54 $9.70 $5.50 $0.00 $34.74 2 45 $21.99 $9.70 $16.14 $0.00 $47.83 3 60 $29.32 $9.70 $16.14 $0.00 $55.16 4 70 $34.20 $9.70 $16.14 $0.00 $60.04 5 80 $39.09 $9.70 $16.14 $0.00 $64.93 Notes: g ** 1 3 3:15; 1:10 thereafter/Steps are 1 yr. ' Refrig/AC Mechanic**1:1;1:2;2:4;3:6;4:8;5:10;6:12;7:14;8:17;9:20;10:23(Max) Apprentice to Journeywoa-ker Ratio:"" ----------------------------- -------- --------------------------------- ---------------- ------------------------------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 25 of 35 Classification Effective Date Base Wage Itealtb Pension Supplemental Total Rate Unemployment PIPELAYER 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 j LABORERS-ZONE 2 06/01/2018 $33.92 $7,70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 I2/01/2020 $39.27 $7.70 $13.60 $0.00 $59,57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 i 12/01/2021 $40.10 $T70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" PLUMBER 03/01/2018 $50,61 $11.57 $15.76 $0.00 $77,94 PLUMBERS&GASNYTERS LOCAL 12(Local 133) 09/01/2018 $52.11 $11.57 $15.76 $0.00 $79.44 03/01/2019 $53.61 $11.57 $15.76 $0.00 $90,94 09/01/2019 $55.11 $11,57 $15.76 $0.00 $82.44 03/01/2020 $56.61 $11.57 $15.76 $0.00 $83.94 09/01/2020 $58.11 $11.57 $15.76 $0.00 $85.44 03/01/2021 $59.61 $11.57 $15.76 $0.00 $86.94 Apprentice- PLUMBERIGASHTTER-Local 12(Local 138) Effective Date- 03/01/2019 supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $17.71 $11.57 $5.72 $0,00 $35.00 2 40 $20.24 $11.57 $6.49 $0.00 $38.30 3 55 $27.94 $11.57 $8.81 $0.00 $48.22 4 65 $32.90 $11.57 $10,36 $0.00 $54.83 5 75 $37.96 $11.57 $11.90 $0.00 $61.43 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 35 $18.24 $11.57 $5.72 $0.00 $35.53 2 40 $20.84 $11.57 $6.49 $0.00 $38.90 3 55 $28.66 $11.57 $8.82 $0.00 $49.05 4 65 $33.87 $11.57 $10.36 $0.00 $55.80 5 75 $39.08 $11.57 $11,90 $0.00 $62.55 � Steps are 1 yr k t Step 4 with lic$58.15,Step5 with lic$64.74 Apprentice to Journeyworker Ratio:1:5 PNEUMATIC CONTROLS(TEMP.) 03/01/2017 $48.86 $9.70 $16.14 $0.00 $74.70 PIPEPITTERSLOCAL 537(Local 138) For apprentice rages see"Apprentice-PIPEFITi-ER"or"PLUMBERIPIPEFITTER" ------------ ------- ----- ----------------- -- -- -- ----------------------- ....... --------- ------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 26 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment PNEUMATIC DRILL/TOOL OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE z 06/01/2018 $33.92 $7.70 $13.60 $0.00 $55,22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER' POWDERMAN&BLASTER 12/01/2017 $33.83 $7.70 $13.60 $0.00 $55.13 LABORERS-70NE2 06/01/2018 $34.67 $7.70 $13,60 $0.00 $55.97 12/01/2018 $35.51 $7.70 $13.60 $0.00 $56.81 06/01/2019 $36.38 $7.70 $13.60 $0.00 $57.68 12/01/2019 $37.24 $7.70 $13.60 $0.00 $58.54 06/01/2020 $38.13 $7.70 $13.60 $0.00 $59.43 12/01/2020 $39.02 $7.70 $13.60 $0.00 $60.32 06/01/2021 $39.94 $7.70 $13.60 $0.00 $61.24 12/01/2021 $40.85 $7.70 $13.60 $0.00 $62.15 For apprentice rates see"Apprentice-LABORER" POWER SHOVEL/DERRICK/TRENCI-IING MACHINE 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" PUMP OPERATOR(CONCRETE) 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice riles see"Apprentice-OPERATTNG ENGINEERS" PUMP OPERATOR(DEWATERING,OTHER) 12/01/2017 $31.80 $10.50 $15.50 $0.00 $57.80 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" READY-MTX CONCRETE DRIVER 05/01/2017 $24.21 $8.49 $11.54 $0.00 $44.24 TEAMSTERS LOCAL 42 04/30/2018 $24.21 $8.49 $11.96 $0,00 $44.66 05/01/2018 $24.24 $8.49 $12.46 $0.00 $45.19 04/30/2019 $24.24 $8.49 $12.92 $0.00 $45.65 RECLAIMERS 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" RIDE-ON MOTORIZED BUGGY OPERATOR 12/01/2017 $33.08 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONE2 06/01/2018 $33,92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $38.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7,70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" ROLLER/SPREADER/MUI.CHING MACHINE 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 ----------------------------- -------- ---------------------------- --------------- ---------------.............. --------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 27 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment For apprentice rates see"Apprentice-OPERATING ENGINEERS" ROOFER(Ine.Roofer Waterproofng&Roofer•Damproofg) 02/01/2018 $42.36 $11.35 $14.80 $0.00 $68.51 ROOFERS LOCAL 33 08/01/2018 $43.46 $11.35 $14,80 $0.00 $69.61 02/01/2019 $44.61 $11.35 $14.90 $0.00 $70.76 Apprentice- ROOFER-Local 33 Effective Date- 02/01/2018 S►nppiennental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 50 $21.18 $11.35 $3.44 $0.00 $35.97 2 60 $25.42 $11.35 $14.80 $0.00 $51.57 3 65 $27.53 $11.35 $14.90 $0.00 $53.68 4 75 $31.77 $11.35 $14.90 $0.00 $57,92 5 85 $36.01 $11.35 $14.80 $0.00 $62.16 Effective Date- 08/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $21.73 $11.35 $3.44 $0.00 $36.52 2 60 $26.08 $11.35 $14.80 $0.00 $52.23 3 65 $28.25 $11.35 $14.80 $0.00 $54.40 4 75 $32.60 $11.35 $14.80 $0.00 $58.75 5 85 $36.94 $11.35 $14.80 $0.00 $63.09 Notes: St1:5, : 10,the 0 hrs1:S0 Reroofing: ing: 1:. , he ..... , ._ :4,then 1:1 t p p 00 hrs. 1 (Hot Pitch Meelianics'receive$1.00 hr.above ROOFER) Apprentice to Journeyworlter Ratio:** ROOFER SLATE/TILE/PRECAST CONCRETE 02/01/2018 $42.61 $11.35 $14.80 $0.00 $68.76 ROOFERS LOCAL 33 08/01/2018 $43,71 $11.35 $I4,80 $0A0 $69.86 02/01/2019 $44.86 $11.35 $14.90 $0.00 $71.01 For apprentice rates see"Apprentice-ROOFER" SHEETMETAL WORKER 02/01/2019 $44.11 $12.20 $24.12 $2.41 $82.84 SHEETA ETAL IVORKERS LOCAL 17-A ----------------- -- ----------------------------- -------- -------------------- ------------------------------ -------- Issue Date: 03/13/2018 Wage Request Number: 20190313-007 Page 28 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemplovinent Apprentice- SIIEETMET4L WORKER-Local 17-A Effective Date- 02/01/2018 supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $17.64 $12.20 $5.61 $0.00 $35.45 2 40 $17.64 $12.20 $5.61 $0.00 $35.45 3 45 $19.85 $12.20 $10.85 $1.29 $44,19 4 45 $19.85 $12.20 $10.85 $1.29 $44.19 5 50 $22.06 $12.20 $11.80 $1.38 $47.44 6 50 $22.06 $12.20 $12.05 $1.39 $47.70 7 60 $26.47 $12.20 $13.70 $1.57 $53.94 8 65 $28.67 $12.20 $14.65 $1.67 $57.19 9 75 $33.08 $12.20 $16.56 $1.86 $63.70 10 85 $37.49 $12.20 $17.96 $2.03 $69,68 'Notes: � Steps are 6 mos. Apprentice to Journeywvorker Ratio:1:4 SIGN ERECTOR 06/01/2013 $25.81 $7.07 $7.05 $0,00 $39.93 PAINTERS LOCAL 35-ZONE Z Apprentice- SIGNERECTOR-Local 35 Zone 2 Effectiv c Date- 06/01/2013 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate I 50 $12.91 $7.07 $0.00 $0.00 $19.98 2 55 $14.20 $7.07 $2.45 $0.00 $23.72 3 60 $15.49 $7.07 $2.45 $0.00 $25.01 4 65 $16.78 $7.07 $2.45 $0.00 $26.30 5 70 $18.07 $7.07 $7.05 $0.00 $32.19 6 75 $19.36 $7.07 $7.05 $0.00 $33.48 7 80 $20.65 $7.07 $7.05 $0.00 $34.77 8 85 $21.94 $7.07 $7.05 $0.00 $36.06 9 90 $23.23 $7.07 $7.05 $0.00 $37.35 -._._ . . Notes: Steps are 4 mos. Apprentice to Journeyworker Ratio:1:1 SPECIALIZED EARTH MOVING EQUIP<35 TONS 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 TEAA,fSTE'RS JOINT COUNCIL NO.10 ZONE B SPECIALIZED EARTH MOVING EQUIP>35 TONS 12/01/2016 $32.73 $10.91 $10.99 $0.00 $54.53 TEAMSTERS JOINT COUNCIL NO.10 ZONE B --- --------------------- -----­------------------- ----------- ...... ------------ ....... ---------- - -------------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 29 of 35 1 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Une►n 10 ment SPRINKLER.FITTER 03/01/2018 $52.00 $9.12 $18,15 $0.00 $79.27 SPRINKLER FITTERS LOCAL 550-(Seefion R)Zone 2 10/01/2018 $53.35 $9.12 $18.15 $0.00 $80.62 01/01/2019 $53.35 $9.47 $18.35 $0.00 $81.17 03/01/2019 $54.70 $9.47 $18.35 $0.00 $82.52 I0/01/2019 $56.05 $9.47 $18.35 $0.00 $83.87 i 03/01/2020 $57.40 $9.47 $18.35 $0.00 $85.22 10/01/2020 $58.75 $9.47 $18.35 $0.00 $86,57 03/01/2021 $60.10 $9.47 $18.35 $0.00 $87.92 Apprentice- SPRINKLER FITTER-Local 550(Section B)Zone 2 Effective Date- 03/01/2019 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $18.20 $9.12 $8.90 $0.00 $36.22 2 40 $20.80 $9.12 $9,90 $0.00 $38.82 3 45 $23.40 $9.12 $8.90 $0.00 $41.42 4 50 $26.00 $9.12 $8.90 $0.00 $44.02 5 55 $28.60 $9.12 $8.90 $0.00 $46.62 6 60 $31.20 $9.12 $10.40 $0.00 $50.72 7 65 $33.80 $9.12 $10.40 $0.00 $53.32 8 70 $36.40 $9.12 $10.40 $0.00 $55.92 9 75 $39.00 $9.12 $10.40 $0.00 $58.52 10 80 $41.60 $9.12 $10.40 $0.00 $61.12 Effective Date- 10/01./2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 35 $18.67 $9.12 $8.90 $0.00 $36,69 2 40 $21.34 $9.12 $8.90 $0.00 $39.36 3 45 $24.01 $9.12 $8.90 $0.00 $42,03 4 50 $26,68 $9.12 $8.90 $0.00 $44.70 5 55 $29.34 $9.12 $8.90 $0.00 $47.36 6 60 $32.01 $9.12 $10.40 $0.00 $51.53 7 65 $34.68 $9.12 $10,40 $0.00 $54.20 8 70 $37.35 $9.12 $10.40 $0.00 $56.87 9 75 $40.01 $9.12 $10.40 $0.00 $59.53 10 80 $42.69 $9.12 $10.40 $0.00 $62.20 (Notes:Apprentice entered prior 9/30/10: 40I45/5 0/5 5/60/65/70/75/80/8 5 Steps are 850 hours Apprentice to Journeyworlcer Ratio:l:3 STEAM BOILER OPERATOR 12/01/2017 $46.17 $10,50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPFRATING ENGINEERS" TAMPERS,SELF-PROPELLED OR TRACTOR DRAWN 12/01/2017 $46.17 $10.50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 Eor apprentice rates see"Apprentice-OPERATING ENGINEERS" -- ­-- ----------- ------------------- --------- -----------------­­­----------------------------- ------------- ---------- Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 30 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total state Unemployment TELECOMMUNICATION TECHNICIAN 03/01/2018 $37.61 $13.00 $15.93 $0.00 $66.54 ELECTRICIANS LOCA1.103 09/01/2018 $38.51 $13.00 $15.96 $0.00 $67.47 03/01/2019 $39.40 $13.00 $15.98 $0.00 $68.38 Apprentice- TELECOAIMCINICATIONTECHNICIAN-Local 103 Effective Date- 03/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.04 $13.00 $0.45 $0.00 $28.49 2 40 $15.04 $13.00 $0.45 $0.00 $28.49 3 45 $16.92 $13.00 $12.74 $0.00 $42.66 4 45 $16.92 $13.00 $12.74 $0.00 $42.66 5 50 $19.81 $13.00 $13.03 $0.00 $44.84 6 55 $20.69 $13.00 $13.32 $0.00 $47.01 7 60 $22.57 $13.00 $13.61 $0.00 $49.18 8 65 $24.45 $13.00 $13.90 $0.00 $51.35 9 70 $26.33 $13.00 $14.19 $0.00 $53.52 10 75 $28.21 $13.00 $14.48 $0.00 $55.69 Effective Date- 09/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 40 $15.40 $13.00 $0.46 $0.00 $28.86 2 40 $15.40 $13.00 $0.46 $0.00 $28.86 3 45 $17.33 $13.00 $12.75 $0.00 $43.08 4 45 $17.33 $13.00 $12.75 $0.00 $43.08 5 50 $19.26 $13.00 $13.05 $0.00 $45.31 6 55 $21.18 $13.00 $13.34 $0.00 $47.52 7 60 $23.11 $13.00 $13.62 $0.00 $49.73 8 65 $25.03 $13.00 $13.92 $0.00 $51.95 9 70 $26.96 $13.00 $14.21 $0.00 $54.17 10 75 $29.88 $13.00 $14.50 $0.00 $56.38 Notes: Apprentice to Journeyworker Ratio.1.1 TERRAZZO FINISHERS 02/01/2019 $51.00 $10.75 $20.03 $0.00 $81.78 BRICKLAYERSLOCAL 3-A-MRBLE&TILE 08/01/2018 $52.35 $10.75 $20.16 $0.00 $83.26 02/01/2019 $52.99 $10.75 $20.16 $0.00 $83.90 08/01/2019 $54.34 $10.75 $20.30 $0.00 $85.39 02/01/2020 $54.99 $10.75 $20.30 $0.00 $86.03 08/01/2020 $56.33 $10.75 $20.45 $0.00 $87.53 02/01/2021 $56.97 $10.75 $20.45 $0.00 $89.17 08/01/2021 $58.37 $10.75 $20.61 $0.00 $89.73 02/01/2022 $58.96 $10.75 $20.61 $0.00 $90.32 --------------------------------------------------------------......------------- ------- -- -- --- ....................... Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 31 of 35 I Classification Effective Date Base Wage Health Pension supplemental Total Rate TlnemploYment Apprentice- TERRf1ZZO FINISHER-Local 3 Marble&Tile Effective Date- 02/01/2018 Supplemental Step percent Apprentice Base Wage Health Pension unemployment Total Rate 1 50 $25.50 $10.75 $20.03 $0.00 $56,28 2 60 $30.60 $10.75 $20.03 $0.00 $61.38 3 70 $35.70 $10.75 $20.03 $0.00 $66.48 4 80 $40.80 $10.75 $20.03 $0.00 $71.58 5 90 $45.90 $10.75 $20.03 $0.00 $76.68 Notes. i} 1 � Apprentice to Journeywor Ice r Ratio:1 3 TEST BORING DRILLER 12/01/2017 $38.85 $7.70 $14.95 $0.00 $61.50 LABORERS-FOUNDATIONAND MARINE 06/01/2018 $39.80 $7.70 $14.95 $0.00 $62,45 12/01/2018 $40.75 $7.70 $14.95 $0.00 $63.40 06/01/2019 $41.75 $7.70 $14.95 $0.00 $64.40 12/01/2019 $42.75 $7.70 $14.95 $0.00 $65.40 06/01/2020 $43.74 $7.70 $14.95 $0.00 $66.39 12/01/2020 $44.72 $7.70 $14.95 $0.00 $67.37 06/01/2021 $45.74 $7.70 $14.95 $0.00 $68.39 12/01/2021 $46.75 $7.70 $14.95 $0,00 $69.40 For apprentice rates see"Apprentice-LABORER" TEs,r BORING DRILLER HEL.PFR 12/01/2017 $37.57 $7.70 $14.95 $0.00 $60.22 LABORERS-FOUNDATION AND MARINE 06/01/2018 $38.52 $7.70 $14.95 $0.00 $61,17 12/01/2018 $39.47 $7.70 $14.95 $0.00 $62.12 06/01/2019 $40.47 $7.70 $14,95 $0.00 $63.12 12/01/2019 $41.47 $7.70 $14,95 $0.00 $64.12 06/01/2020 $42.46 $T70 $14,95 $0.00 $65.11 12/01/2020 $43.44 $7.70 $14.95 $0.00 $66.09 06/01/2021 $44.46 $7.70 $14.95 $0.00 $67.11 12/01/2021 $45.47 $7.70 $14.95 $0.00 $68.12 For apprentice rates see"Apprentice-LABORER" TEST BORING LABORER 12/01/2017 $37.45 $7.70 $1495 $0.00 $60.10 LABORERS-FOUNDATIONAND MARINE 06/01/2018 $38.40 $7.70 $1495 $0.00 $61.05 12/01/2018 $39.35 $7.70 $14.95 $0.00 $62.00 06/01/2019 $40.35 $7.70 $14.95 $0.00 $63.00 12/01/2019 $41.35 $7.70 $1495 $0.00 $64.00 06/01/2020 $42.34 $7.70 $14,95 $0.00 $64.99 12/01/2020 $43.32 $7.70 $14.95 $0.00 $65.97 06/01/2021 $44.34 $7.70 $14.95 $0.00 $66.99 12/01/2021 $45.35 $7.70 $14.95 $0,00 $69.00 For apprentice rates see"Apprentice-LABORER" TRACTORS/PORTABLE STEAM GENERATORS 12/01/2017 $46.17 $10,50 $15.50 $0.00 $72.17 OPERATING ENGINEERS LOCAL 4 --------------- --------- -------- ----------------------- ....... --------- ----------------- ................ Issue Date: 03/13/2018 Wage Request Number: 20 1 803 1 3-007 Page 32 of 35 Classification Effective Date Base Wage Health Pension Supplemental 'Total Rate Unernplovnient For apprentice rates see"Apprentice-OPERATING ENGINEERS" TRAILERS FOR EARTH MOVING EQUIPMENT 12/01/2016 $33.02 $10.91 $10.89 $0.00 $54.92 TEAMSTERS JOINT COUNCIL NO.10 ZONE B TUNNEL WORK-COMPRESSED AIR 12/01/2017 $49.73 $7.70 $15.35 $0.00 $72.78 LABORERS(COMPRESSED AIR) 06/01/2018 $50.68 $7.70 $15.35 $0.00 $73.73 12/01/2018 $51.63 $7.70 $15.35 $0.00 $74.69 06/01/2019 $52.63 $7.70 $15.35 $0.00 $75.69 12/01/2019 $53.63 $7.70 $15.35 $0.00 $76,68 06/01/2020 $54.62 $7.70 $15.35 $0.00 $77.67 12/01/2020 $55.60 $7.70 $15.35 $0.00 $78.65 06/01/2021 $56.62 $7.70 $15.35 $0.00 $79.67 12/01/2021 $57.63 $7.70 $15.35 $0.00 $80.68 For apprentice rates see"Apprentice-LABORrW' TUNNEL WORK-COMPRESSED AIR(HAZ.WASTE) 12/01/2017 $51.73 $7.70 $15.35 $0.00 $74,78 LABORERS(COMPRESSED AIR) 06/01/2018 $52.68 $7.70 $15.35 $0.00 $75.73 12/01/2018 $53.63 $7.70 $15.35 $0.00 $76.68 06/01/2019 $54.63 $7.70 $15.35 $0.00 $77.68 12/01/2019 $55.63 $7.70 $15,35 $0.00 $78.68 06/01/2020 $56.62 $7.70 $15.35 $0.00 $79.67 12/01/2020 $57.60 $7.70 $15.35 $0.00 $80.65 06/01/2021 $58.62 $7.70 $15.35 $0.00 $81.67 12/01/2021 $59.63 $7.70 $15.35 $0.00 $82.68 For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-FREE AIR 12/01/2017 $41.80 $7.70 $15.35 $0.00 $64.95 LABORERS(FREE AIR TUNNEL) 06/01/2018 $42.75 $7.70 $15.35 $0.00 $65.80 12/01/2018 $43.70 $7.70 $15.35 $0.00 $66.75 06/01/2019 $44.70 $7.70 $15.35 $0.00 $67.75 12/01/2019 $45.70 $7.70 $15.35 $0.00 $68.75 06/01/2020 $46.69 $7.70 $15.35 $0.00 $69.74 12/01/2020 $47.67 $7.70 $15.35 $0.00 $70.72 06/01/2021 $48.69 $7.70 $15.35 $0.00 $71.74 12/01/2021 $49.70 $7.70 $15.35 $0.00 $72.75 For apprentice rates see"Apprentice-LABORER" TUNNEL WORK-FREE AIR(HAZ.WASTE) 12/01/2017 $43.80 $7.70 $15.35 $0.00 $66.95 LABORERS(FREE AIR TUNNEL) 06/01/2018 $44.75 $7.70 $15.35 $0.00 $67.80 12/01/2018 $45.70 $7.70 $15.35 $0.00 $68.75 06/01/2019 $46.70 $7.70 $15.35 $0.00 $69.75 12/01/2019 $47.70 $7.70 $15.35 $0.00 $70.75 0 6/0 112 0 20 $48.69 $7.70 $15.35 $0.00 $71.74 12/01/2020 $49.67 $7.70 $15,35 $0.00 $72.72 06/01/2021 $50.69 $7.70 $15.35 $0.00 $73.74 12/01/2021 $51.70 $7.70 $15.35 $0.00 $74.75 For apprentice rates see"Apprentice-LABORER" VAC-HAUL 12/01/2016 $32.44 $10.91 $10.89 $0.00 $54.24 TEAMSTERS JOINT COUNCIL NO. IO ZONE B --------------- -------------------------- --------------------------------- -- ------- --------------------------------------- --------- Issue Date: 0311 3/20 1 8 Wage Request Number: 20 1 903 1 3-007 Page 33 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemylovment WAGON DRILL OPERATOR 12/01/2017 $33.09 $7.70 $13.60 $0.00 $54.38 LABORERS-ZONF.2 06/0E/2018 $33.92 $7.70 $13.60 $0.00 $55.22 12/01/2018 $34.76 $7.70 $13.60 $0.00 $56.06 06/01/2019 $35.63 $7.70 $13.60 $0.00 $56.93 12/01/2019 $36.49 $7.70 $13.60 $0.00 $57.79 06/01/2020 $37.38 $7.70 $13.60 $0.00 $58.68 12/01/2020 $39.27 $7.70 $13.60 $0.00 $59.57 06/01/2021 $39.19 $7.70 $13.60 $0.00 $60.49 12/01/2021 $40.10 $7.70 $13.60 $0.00 $61.40 For apprentice rates see"Apprentice-LABORER" WASTE WATER PUMP OPERATOR 12/01/2017 $46.63 $10.50 $15.50 $0.00 $72.63 OPERATING ENGINEERS LOCAL 4 For apprentice rates see"Apprentice-OPERATING ENGINEERS" WATER METER INSTALLER 03/01/2018 $50.61 $11,57 $15.76 $0.00 $77.94 PL UMBERS&GASPITTERS LOCAL 12(Local 138) 09/01/2018 $52.11 $E1,57 $15.76 $0.00 $79.44 03/01/2019 $53.61 $11.57 $15.76 $0.00 $80.94 09/01/2019 $55.11 $11.57 $15.76 $0.00 $82.44 03/01/2020 $56.61 $11.57 $15.76 $0.00 $83.94 09/01/2020 $58.11 $11.57 $15.76 $0.00 $85.44 03/01/2021 $59.61 $11.57 $15.76 $0.00 $86.94 For apprentice rates see"Apprentice-PLUMBER/PIPEEI'rTER"or"PLUMBER/GASFITFER" Outside Electrical-bast CABLE TECHNICIAN(Power Zone) 09/03/2017 $27.14 $7.75 $1.81 $0.00 $36.70 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" CABLEMAN(Underground Ducts&Cables) 09/03/2017 $38.45 $7.75 $9.53 $0.00 $55.73 OU7SIDE ELECTRICAL WOIZKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN CDL 09/03/2017 $31.66 $7.75 $9.44 $0.00 $48.85 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" DRIVER/GROUNDMAN-Inexperienced(<2000 Hrs) 09/03/2017 $24.88 $7.75 $1.75 $0.00 $34,38 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" EQUIPMENT OPERATOR(Class A CDL) 09/03/2017 $38.45 $7.75 $13.61 $0.00 $59.81 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" EQUIPMENT OPERATOR(Class B CDL) 09/03/2017 $33.92 $7.75 $10.21 $0.00 $51.98 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN" GROUNDMAN 09/03/2017 $24.88 $7,75 $1.75 $0.00 $34,38 OUTSIDE ELECTRICAL WORKERS-EASTLOCAL 104 For apprentice rates see"Appren€ice-LINEMAN" GROUNDMAN-Inexperienced(<2000 Hrs,) 09/03/2017 $20.35 $7.75 $1.61 $0.00 $29.71 OUTSIDE F.LFCTRICAL WORKERS-EAST LOCAL 104 For apprentice rates see"Apprentice-LINEMAN' JOURNEYMAN LINEMAN 09/03/2017 $45.23 $7.75 $16.61 $0.00 $69.59 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 ---------- ----------- --------------------- --------------­------- ......- ----------- ----------------- ..........-------------------- Issue Date: 03/13/2018 Wage Request Number: 20180313-007 Page 34 of 35 Classification Effective Date Base Wage Health Pension Supplemental Total Rate Unemployment Apprentice- LIN—rAMN(Outside Elech•ical)-East Loca1104 Effective Date- 09/03/2017 Supplemental Step percent Apprentice Base Wage Health Pension Unemployment Total Rate 1 60 $27.14 $7.75 $3.31 $0.00 $38.20 2 65 $29.40 $7.75 $3.38 $0.00 $40.53 3 70 $31,66 $7.75 $3.45 $0.00 $42.86 4 75 $33.92 $7.75 $5.02 $0.00 $46.69 5 80 $36.19 $7.75 $5.09 $0.00 $49.02 6 85 $38.45 $7.75 $5.15 $0.00 $51.35 7 90 $40.71 $7.75 $7.22 $0.00 $55.69 ..... _ Notes: pp entice to Journeyworker Ratio:1.2 TELEDATA CABLE SPLICER 01/01/2016 $29.98 $4.25 $3.12 $0.00 $36.35 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TELEDATA LINEMAN/EQUIPMENT OPERATOR 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 TELEDATA WIREMAN/INSTALLER/TECHMCIAN 01/01/2016 $27.31 $4.25 $3.07 $0.00 $34.63 OUTSIDE ELECTRICAL,WORKERS-EAST LOCAL 104 TREE TRIMMER 01/31/2016 $18.51 $3.55 $0.00 $0.00 $22.06 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing(lie utility company's equipment,and(c)by a person who is using hand or mechanical culling methods and its not oil the ground. This classification does not apply to wholesale tree removal. TREE TRIMMER GROUNDMAN 01/31/2016 $16.32 $3.55 $0.00 $0.00 $19.97 OUTSIDE ELECTRICAL WORKERS-EAST LOCAL 104 This classification applies only to tree work done:(a)for a utility company,R.E.A.cooperative,or railroad or coal mining company,and(b)for the purpose of operating,maintaining,or repairing the utility company's equipment,and(c)by a person who is using hand or mechanical cutting methods and is on the ground. This classification does not apply to wholesale tree removal. Additional Apprentice Information: Minimum wage rates for apprentices employed on public works projects are Listed above as a percentage of the pre-determined hourly wage rate established by the Commissioner under the provisions of the M.G.L.c.149,ss.26-271), Apprentice ratios are established by the Division of Apprenticeship Training pursuant to M.G.L. c.23,ss.11 E-I IL. All apprentices must be registered with the Division of Apprenticeship Training in accordance with M.G.L.c.23,ss.I IE-I I L. All steps are six months(1000 hours.) Ratios are expressed in allowable number of apprentices to journeymen or fraction thereof,unless otherwise specified. ** Multiple ratios are listed in the comment field. *** APP to JM; 1:1,2:2,2:3,3:4,4:4,4:5,4:6,5:7,6:7,6:8,6:9,7:10,8:10,8:11,8:12,9:13,10:13,10:14,etc. **** APP to JM; 1:1,1:2,2:3,2:4,3:5,4:6,4:7,5:8,6:9,6:10,7:11,8:12,8:13,9:14,10:15,10:16,etc. ----------------- ------------- -------------------------- ---- ----------------- Issue Date: 03/13/2019 Wage Request Number: 20180313-007 Page 35 of 35 CERTIFICATIONS CERTIFICATE OF NON-COLLUSION The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word "person" shall mean natural person, business, partnership, corporation, committee, union, club or other organization, entity, or group of individuals. Signatt Date 4/23/2018 Gerald Spencer, Branch Service Manager Johnson Controls, Inc. Print Name&Title Company Name CERTIFICATE OF TAX COMPLIANCE Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A (b), I Gerald Spencer , authorized signatory for Johnson Controls, Inc. Name of individual Name of contractor do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of North Andover, relating to taxes,permit or other fees, reporting of employees and contractors,and withholding and remitting child support. _-Z 4/23/2018 Signature Date Town of North Andover TFB Page 34 of 38 Replace Air Conditioning System,Stevens Estate(Ballroom) CERTIFICATION LABOR HARMONY AND OSHA TRAINING REQUIREMENTS The undersigned certifies under penalties of perjury that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed at the work and that all employees to be employed at the worksite and in the work will have completed an OSHA- approved construction safety and health course lasting at least ten (10)hours. Signature Date 4/23/2018 Gerald Spencer, Branch Service Manager Johnson Controls, Inc. Print Name &Title Company Name Town of North Andover lFB Page 35 of 38 Replace Air Conditioning System,Stevens Estate(Ballroom) CERTIFICATE OF VOTE PLEASES SEE M-TAt'HED DELFGATION 017 ,-"1UTIJORH'Y At a duly authorized meeting the Board of Directors of the held on it was VOTED, THAT (Name) (Officer) of be and hereby is authorized to execute contracts and bonds in the name and on behalf of said , and affix its corporate seal hereto; and such execution of any contract or obligation in the name of on its behalf by such officer under seal of ,shall be valid and binding upon f hereby certify that t am the cleric of the above named and that is the duly elected officer as above of said and that the above vote has not been anuended or rescinded and remains in full force and effect as the date of this contract. (Date) (Clerk) Town of North Andover 11B Page 36 of 38 Replace Air Conditioning System, Stevens Estate(Ballroom) Johnson * Controls DELEGATION OF AUTHORITY CERT"IIFI+CATE The undersigned, Vice President and President, Building; 'Solutions, North America, pursuant to the authority vested in hire by: (i) a Sub-Delegation of Authority from Johnson Controls,:Inc., a Wisconsin corporation ("Johnson.Controls"), dated June 6,2017, (ii)an Incumbency Certificate and Delegation of Authority from the general partner of StrnplexGrinnell LP, a Delaware limited partnership ("SirnplexGrinnell"), dated June 8, 2017, and (iii) a Written Consent in Lieu of Special Meeting of the Management Board from Tyco Integrated'Security LLC,a Delaware limited liability company("TIS"), dated June 8,2017,hereby authorizes: Gerald J. Spencer Branch Service Manager (the "Delegate") to perform, on behalf of each of Johnson Controls, SinrplexGrinnell and.TIS, the acts described below: To execute and deliver any and all contracts for the performance of work, sale of goods, and furnishing of services, and any other instruments in connection therewith and in the ordinary course of business and in accordance with the current Global.Approval Authority Matrix. This authority does not extend to: a. further sub-delegation of the above acts absent necessary approvals in writing; b. the execution of surety, performance or bid bonds; C. the signing of any notes, contracts, or any other agreement to borrow money in the name of Johnson Controls, SimplexGrinnell, or TIS, or any form of guaranty for the payment or performance of obligations of any subsidiary, affiliate, or joint venture of Johnson Controls, Simplex.Grinnell,or TIS;or d. the signing, on behalf of Johnson Controls, Simplex.Grinnell, or TI'S, of any deeds, abstracts, offers to purchase or any other instruments pertaining to the purchase or sale of real property. Any actions taken by such Delegate within the scope of acts authorized herein taken between the date of expiration of any prior delegation of authority and the date hereof are hereby ratified, confirmed and approved as the acts and deeds of Johnson Controls, SirnplexGrinnell,or TIS.. This authority shall remain in full force and effect through October 19,2018. Signed at Milwaukee, Wisconsin, this 20111 day of October,2017. Johnson Controls, Inc., SirnplexGrinnell LP, and Tyco Integrated Security LLC ATTESTS: Rodney N. Pushing Matthew R.A.Heiman, ,s.Wsta rt Secretary Dice Pr esiclent and Pr•esiclent Johnson Controls, Inc. Building S©hitions, Nor°h America el-fiC4 Robert C.Maxie,Secr•etaq ShnplexGrinnell LP and Tyco Integrated Security LLC A� � MrooYl") CERTIFICATE OF LIABILITY' IINSURANCEDaar3©zm ilie THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE,OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Marsh USA Inc. _ FAx 411 F.Wisconsin Avenue PHONE AdO Na Ext ..._ ...., (AIC No): �.._.. Suite ukee EMAIL (_1., _. Milwaukee,WI 53202 AncRESs:: Attn:JCI.Cedrequestd@marsh.com "" -..... NAIL# tNSBt?ER S AFFORDING COVERAGE CN10 1 230596--5-1 7-1 8' INSURER A:Old Republic Insurance Company r, 24147 INSURED INSURER B:ACE Property.and Casually Insuranoe Company r„ 20699 Johnson Controls,Inc. Tyco International Holding S.a.r.l. INSURER c:...._.... Sim INs IexGrinnell LP _ URER D: (see attached Acord 101) 5757 North Green Bay Avenue INSURER E Milwaukee,WI 53209 INSURER F COVERAGES CERTIFICATE NUMBER: CHI-008960252-01 REVISION(NUMBER: 2 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR.THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ...... ..,_._... _AD_DL 5'UBR .......... ...._ POLICY EFF POLICY EXP...,_. ....I INSi2 TYRE OF INSURANCE 'LIMITS LTR I SD VJVD POLICY NUMBER MMIDDdYYY'Y MMlDONYYYY A X COMMERCIAL GENERAL LIABILITY MWZY 310897 10JO112017 1010112018 P_ACH OCCURRENCE $ 10,000,000 DAMAGE TO RENTEi'1 .......... CLAIMS-MADE F_X1 OCCUR PREMISES(Ea occurrence) .._,,, 10,000,000 _....X Contractual Liability MED EXP(Any one person) $ 60,000 �.." �... �X XCU Included PERSONAL&ADV INJURY ,$ 10,000,000„ GENT AGGREGATE LIMIT APPLIES PER; GENERALAGGREGATE $ 30,000,000 X POLICY ECT PRO LOG PRODUCTS-COMPFOP AGG $ INC IN GEN AGG J OTHER: $ A AUTOMOSILE!LIABILITY MWT9310896(Excludes New Hamp) 101(1112017 10101./2018 COMBINED SINGLE LIMIT $ 7,500,000 Ea accident A X ANY AUTO MWT8310898 fthary NH$250k) 1010112017 10/01/2018 BODILY INJURY(Per person) $ A OWNED SCHEDULED MWTB310899(Excess NH$7.25mm) 1010112017 1010112018 BODILY INJURY(Per accident) $ AUTOS ONLY ,...-. AUTOS HIRED NON-OWNED PROPERTY AMAGE ...... AUTOS ONLY AUTOS ONLY Excess NH Auto is Follow Form Per accident $ to Primary NH Auto $ X UMBRELLA LIAR X OCCUR G28162509 002 10112017 1010112018 EACH OCCURRENCE $ 5,000,000 X EXCESS LIAR CLAIMS-MADE AGGREGATE $... 5,000,000 DED RETENTION$ $ A WORKERS COMPENSATION MWC 310893 00(AOS-see page 2) 10f0112017 1010112018 X STATUTE aRrH- AND EMPLOYERS'LIABILITY .5, A Y a N MWXS 310894(OH&WA) 1010112017 1010112018 E.L.EACH ACCIDENT $ 5,000,000 ANYPROPRIETO WPARTNERfEXECWTI VE OFFICERIMEMBEREXCLUE NIA . -.. (Mandatory in NH). E.L.DISEASE,-EA EMPLOYEE $ 5,000,000 It as,describe under 5,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATtONS t LOCATIONS d VEHICLES(ACORD 101„Additional Remarks Schedule,maybe attached if more space is recluiredl 'I Project Address:723 Osgood Street North Andover,MA 01845 Town of North Andover is included as additional'insured per the attached. See attached Acord 101 for additional Information including Additional Insured,Prmary/Non-contributory,Waiver of Subrogation and Notice of Cancellation provisions, CERTIFICATE HOLDER CANCELLATION Town of North Andover SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 120 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN North Andover,MA OIB45 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh USA Inc. ManashlMukherjee 0.ry,c17cs1.: ttni� ca O 1988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(201.6M) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: CN101230596 LOC#t Milwaukee AC" ADDITIONAL REMARKS SCHEDULE Page 2 of 2 1. AGENCY NAMED INSURED Marsh USA Inc. Johnson Centrals,Inc. Tyco international Holding S.0.0, Poll NUMBER SimplexGrinnell LP {sue attached Aoord 101) 5757 North Green Bay Avenue CARRIER NAiC CODE Milwaukee,WI 53209 EFFECTIVE PATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance WORKERS COMPENSATION: Workers Compensation"AOS°Policy includes coverage for employees from the following States WHILE WORKING IN ANY STATE:AK,AL,AR,AZ,CA,CO,CT,DC,BE,FL,GA, HI,IA,ID,IT,IN,KS,KY,LA,MA,MD,ME,MI,MN,MO,MS,MT,NC,NE,NH,NJ,NM,NV,NY,OK,OR,PA,RI,SC,SD,Ti TX,UT,VA,VT,WI,&WV. PRIMARY COVERAGE: The General Liability and Automobile Liability policies are primary and not excess of or contributing with other insurance or self-insurance,where required by written lease or written contract.For General Liability,this applies to both ongoing and completed operations. WAIVER OF SUBROGATION: The General Liability,Automobile Liability,Workers'Compensation and Employers Liability policies include a Waiver of Subrogation in favor of the certhelder and any other person or organization,BUT ONLY to the extent required by written contract. ADDITIONAL INSURED-AUTOMOBILE LIABILITY: The Automobile Liability policy,if required by written contract,includes coverage for Additional Insureds as required by such written convect. ADDITIONAL INSURED-GENERAL LIABILITY: For General Liability,if required by written contract,the following are included as additional insureds,as required pursuant to a written contract wilt a named insured,per attached Policy Endorsements A2 and A2A:THE CERTIFICATE HOLDER LISTED ON THIS CERTIFICATE OF LIABILITY INSURANCE,AND EACH OTHER PERSON OR ORGANIZATION REQUIRED TO BE INCLUDED AS AN ADDITIONAL INSURED PURSUANT TO A WRITTEN CONTRACT WITH THE NAMED INSURED. ONGOING OPERATIONS AND COMPLETED OPERATIONS INSURANCE: The General Liability Insurance includes insurance for ongoing operations and completed operations. LIMIT OF LIABILITY: The Liability Limit that applies is the amount indicated on the face of this Ce tificate of Liability Insurance,or the minimum Liability limit that is required by the written contract, whichever is less. If there is no contract then the Liability Limit is limited to$1,000,000. UMBRELLAIEXCESS LIABILITY: If the prmary insurance policies noted on the face of this Certificate of Liability Insurance sell*the combination of mioimum primary limits and minimum Umbrella/Excess Liability limits required by the written contract,the UmbrellalExcess Liability limits shown on the face of this Certificate of Liability Insurance do not apply. NOTICE OF CANCF"TION TO CERTIFICATE HOLDERS: Should any of the above described policies be cancelled,other than for non-payment,before the expiration date thereof,30 days advice of cancellation wi4 be delivered to certificate holders in accordance with the policy endorsements. NAMED INSURED: Insureds include:Air Distribution Technologies IP,LLC;Air System Components,Inc.;Carter Brothers,LLC;GEM Access Systems,Inc.;Central CPVC Corporation;Central Sprinkler LLC;Chagdn H.Q.Venture Ltd;Chemguard,Inc.;Connect 24 Wireless Communications Inc.;Digital Security Controls,Inc.;Eastern Sheet Metal,Inc.;Elpas,Inc.;Exacq Technologies,Inc.;FBN Transportation,Inc.;Grinnell LLC,Hart&Cooley Trucking Company;Hart&Cooley,Inc.;Hoz-Tank Fabricators,Inc.;IMECO LLC;Integrated Systems and Power,Inc.;Interstate Battery System Intemalonal,Inc.;Johnson Controls(Suisse)SA;Johnson Controls Advanced Power Solutions,LLC;Johnson Controls Air Conditioning and Refrigeration,Inc.;Johnson Controls APS Production,Inc.;Johnson Controls Battery Group,Inc.;Johnson Controls Building Automation Systems,LLC;Johnson Controls Engineering,LLC;Johnson Controls Federal Systems,Inc.;Johnson Controls Federal SystemsNersar,LLC;Johnson Controls Fire Protection LP;Johnson Controls Foundation, Inc.;Johnson Controls Government Systems LLC;Johnson Controls Navy Systems,LLC;Johnson Controls Security Solutions LLC;Koch Filler Corporation;Master Protection LP dlbla FireMaster;Qolsys,Inc.;Retail Expert,Inc.;Ruskin Company;Ruskin Rooftop Systems,Inc.;Ruskin Service Company;Selkirk Corporation;Senelco Iberia,Inc.;Sensormatic AsialPacihc,Inc.;Sensormalic Electronics(Puerto Rico)LLC;Sensormatic Electronics,LLC;Sensormatic International,Inc.;ShopperTrak International Investment LLC; ShopperTrak RCT Corporation;Shurjoint America,Inc.;Tyco Cares Foundation;Tyco Fire&Security LLC;Tyco Fire Products LP;Tyco Integrated Security LLC;Tyco International Management Company,LLC;Visonic Inc.;WillFire HO,LLC;York International(SA),Inc.;and York International Corporation ACORD 101 (2008101) O 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS -SCHEDULED PERSON OR ORGANIZATION - ENDORSEMENT A2 Named Insured Endorsement Number Johnson Controls,Tnc.,T co lntemational Holding S.a.r.l. Palicy Prefix Policy Number Policy Period Effective Date of Endorsement 1vffzY 310897 10/01/17 to 10b1/19 10/01/2017 Issued By Old Republic Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s)Or Organization(s): If required by contract,the person or organization fisted on the certificate of insurance as additional insured,and each other person or organization required to be included as an additional insured pursuant to a contract with a named insured. Location(s)Of Covered Operations: As required by contract. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II - Who is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury"caused solely by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. B. With respect to the insurance afforded to these additional insureds,the following additional exclusions apply: This insurance does not apply to"bodily injury"or"property damage"occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of"your work' out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. G L 289 001 1012 MWZY310897 Johnson Controls,Inc.Tyco International Holding 1010112017-1010112018 IL 14 (12I66) OLD REPUBLIC INSURANCE COMPANY ADDITIONAL INSURED -OWNERS, LESSEES OR CONTRACTORS -COMPLETED OPERATIONS - ENDORSEMENT A2A Named Insured Endorsement Number Johnson Controls,Inc.,Tyco International HoldingS.ax.l. Policy Prefix Policy Number Policy Period Effective Date of Endorsement IvfWZY 310897 10/01/17-to 10/01/18 10/01/2017 Issued By Old Republic Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s)Or Organization(s): If required by contract,the person or organization listed on the certificate of insurance as additional insured,and each other person or organization required to be included as an additional insured pursuant to a contract with a named insured. Location And Description Of Completed Operations: As required by contract. Information required to complete this Schedule, if not shown above, will be shown in the Declarations, Section li - Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury or property damage" caused solely by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products-completed operations hazard". GL 289 002 1012 MtN,ZY 310897 Johnson Controls,Inc.Tyco International Holding 1010112017-1010112018 PAYMEWBOND Bond No. 015202686 KNOW ALL MEN BY THESF PRESENTS, that eve Johnson Controls, inc. with a place of business at—.39 Salem Street, Lynnfield, MA 01940 as Principal(the"Principal"), and Liberty Mutual Insurance Company corporation qualificd to do bushicss in the Commonivealth of Massachusetts, with a place of business at 175 Berkeley Street, Boston, MA 02116 as Surety (the"Sivety"),are field and firmly bound unto the Town of North Andover, Massachusetts as Obligee ($15,675.00) (tlie"Obligee"), iii the stitiiof Fifteen Thousand Six Hundred Seventy Five and 00/100 Dollars lawful money of tile United States of America, to be paid to the Obligee,for which payment, well and truly to be made, we bind ourselves,our respective heirs,executors,administrators, successors and assigns,jointly and severally, firmly by thew presents. WHEREAS,the Principal leas assinnedand made a contract with the Obligee,bearing the date,of _ApdaA., 2018 for the construction of Air-conditioning replacement at Stevens Estate Ballroom. NOW,THF CONDITIONS of this obligation are such that if the Principal and all subcontractors under said contract shall pay for all labor performed or furnished and for all materials used or employed in said contract and in any and all duly authorized modifications,alterations, extensions of time,Changes or additions to said contract that may hereafter be made, notice to the Surety of such modifications, alterations,extensions of tilne,changes or additions being hereby waived,the foregoing to include, but not be limited to, any other purposes or itenis set out in, and to be subject to,the provisions of Massachusetts General Laws,Chapter 30, Section 39M, and Chapter 149, Section 29,as amended then this obligation shall become null and void;otherwise, it shall remain in full force and virtue. IN WITNESS WHEREFORE,the Principal and Surety have hereto set their hands and seals this 30th _day of April, 2018 PRINCIPAL SURETY Johnson, Controls, Inc. Liberty Mutual Insurance Company_,_.,, 041 'JNanie and Seat] —',—.­,FA:t-torney-i it-fac ] Joshua,Sanford t Jest 175 Berkeley Preet Donna Planeta,Attorney-in-Fact Boston, MA 02116 [Address] 617-3,57-9500 Attest: [I'llone] Samuel E. Begun, WithOss Attest: 4Bethan Stevens�n wtiness END OF PAYMENT BOND Johnson Controls 5757 N,Green Bay Avenue Milwaukee,W1 5320,9 414-524-1200 Controls DELEGATION OF AUTHOR TV The undersigned, President of Johnson Controls, Inc., a Wisconsin corporation (the "Company"), pursuant to the authority vested in him by a certain resolution adopted by the Board of Directors of the Company on October 25,2016,hereby authorizes: Donna Plancta,Assistant Client Services Specialist Willis of New York,Ind. 10 State Home Sqtiare,Floor 11. Hartford,CT,06103 to perform,on behalf of the Company,the acts described below: To execute, seal and deliver, as attorney-in-fact for the Company, surety bonds forwarded to Willis of New York, Inc. by the Company that do not exceed Two Million Dollars ($2,000,000.00) that are necessary and proper in carrying on the business,of the Company. This authority shall rernain in full force and effect for one(1)year fi-ont the date of issue unless earlier revoked in writing by the Company President or any Vice President. Signed at Milwaukee,Wisconsin,this 17 day of August 20 17. George R, liver,President Attest: ............ .....................................___............____......._'_............. ................ THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No. 8035191 Liberty Mutual Insurance Company The Ohio Casualty insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS:That The 01110 Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the'Companies'),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Savkham Chanthasone;Danielle D.Johnson;Aiza Lopez;Michelle Anne Mcmahon;Aimee R.Perondino;Brian Peters;Noah.William Pierce;Doinna M. Planeta;Joshua Sanford all of the city of Hartford state of CT each individually if there be more than one named,its true and lawful attorney-in-fact to make,execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons, IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and[lie corporate seals of the Companies have been affixed thereto this 12th dayof March 2018 S (n The Ohio Casualty Insurance Company W Liberty Mutual Insurance Company 9 1991 West merican Insurance Company X_ (n (D By: David M.Carey Assistant Secretary STATE OF PENNSYLVANIA ss COUNTY OF MONTGOMERY :a 03 0 W = On 12th day March 2018 M CD ,before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance U (D Company,The Ohio Casualty Company, and West American insurance Company, and that he,as such, being authorized so to do, execute the foregoing instrument for the purposes >,O) UJ 0.2 thereincontained by signing on behalf of the corporations by himself as a duly authorized officer. WV E to > IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written. 0 CL P COMMONWEALTH OF PENNSYLVANIA I Noiariai[Snal O. Teresa Pasinla,Notary Pt bim By: (D OF upper meriDn Twp,,Montgomery County Teresa Pastella,Notary Public QJ 0 My Commission Expirns March 28,2021 1 0 YIN 0 MoinbQrr PCfln5yly"fflo' Or 0 2 E (L M 0 M This Power of Attorney is made and executed pursua'F­—and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual (1)CD 6 Insurance Company,and West American Insurance Company which,resolutions are now in full force and effect reading as follows: 7-0 4� tm m 0 ARTICLE IV—OFFICERS—Section 12.Power of Attorney.Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President,and subject 0 4) to such limitation as the Chairman or the President stay prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal, >4 O.S acknowledge and deliver as surely any and all undertakings,bonds,recognizances and other surety obligations. Such attorneys-in-fact,subject to the limitations set forth in their respective E powers of attorney,shall have full power to bind!the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so —M a) L_ executed,such instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attorney-in-fact under > the provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. "a =ra = r U W ARTICLE XIII—Execution of Contracts—SECTION 5.Surety Bonds and Undertakings.Any officer of the Company authorized for that purpose in writing by the chairman or the president, OP E> and subject to such limitations as the chairman or the president may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute, cm 41 0 O seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations, Such attorneys-in-fact subject to the limitations set forth in their O on Z U respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so 0 U executed such instruments shall be as binding as if signed by the president and attested by the secretary. o 9 Certificate of Designation—The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attomeys-m- fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other Surety obligations. Authorization—By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed, 1, Renee C. Llewellyn, the undersigned, Assistant Secrelary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and has not been revoked. ypwinii IN TESTIMONY WHEREOF,i have hereunto set my hand and affixed the seals of said Companies this A day of (\.n ,,t L 12 19 By* Renee C.Uew ,lssistant Secretary 0 284 of 750 LMS12B73022017