Loading...
HomeMy WebLinkAboutAnnual Sprinkler Inspection and Test 2019 - Inspection - 795 CHICKERING ROAD 12/13/2019 Printed Date: 12/16/2019 NFPA 25 Inspection Test NFPA 25, Inspection &Ties,t,-Annual -inkler Go. Activity Date:Cogswell Spi. 12/13/19 07:00:100 AM jw Canterbury,St. Activity Number: N 2 1&T-J E Id rige-19-183 4 N, W rcester, MA 016101 Activity Cause: General Phone' 5,08-753-0015 Inspector 1 Name: Mike Baldwin Fax: 5,08-753-5629: Inspector I Phone- Emaik, www.cogswelisp,rinklei,,.com; Status: Testing Completed Business SpOnkier.,System, Occupancy Type: 550 Town of North Andover,-Fire Station I Property 1Jse- 7195 Chickering Road North Andover,, Massachusetts 01845 Phone: 978-688-95901 dub Activities E00i Control Station-I floor-FCS-F'CS-0001 Activity Performed:Floor Control Station Status:Testing Completed Activity Date: 12/1312019 Location:N/A Next Service Type:N/A Date Due:N/A IFire sprinkler test.Checklist Answers 1 Was flcor control station tested? Yes Floor Control Station Cliecklist Answers I Is the Control Valve supervised with a Tamper switch,and did that switch signal the Yes Fire Alarm Control Panel as a supervisorysignal when tested? 2 Is the gauge ors,the floor control station less than 5 yrs old? Yes 3 Has the Flo lw Switch been activated by flowing the Inspector's Test.Connection,and Yes did the switch signal fire alarm at the Fire Alarm Control Panel when tested? 4 What is the maxiiinunitires to,operate the Flow Switch through the Inspector's Test 41 Connection? In seconds) 5 Is the Floor Control Station,Inspectors Test Connection,and associated components Yes free of damage? IFloor Control Station-2nd Floor-FPS-FCS-,0003 Activity Performed:Floor Control Station StatUs:Testing Completed Activity Date:12/13/2,019 Location:N/A Next Service Type:II Date Due:N/A Page 1 of 4 Printed Date: 12/1 /201 Activity umber: N21&T-JEldrige-19-1834 Fire sprinkler test.Checklist Answers I Was floor control station tested? Yes Floor Control Station Checklist Answers 1 Is the Control Valve supervised with a Tamper switch,and chid that switch signal the Yes Fire Alarm Control Panel as a supervisory signal when tested? Is the gauge on the floor control station less than 5 yrs old? Yes Has the Flow Switch been activated by flowing the Inspector's Test Connection,and Yes did the switch signal fire alarm at the Fire Alarm Control Panel when tested? 4 What is the maxinium time to operate the Flaw Switch through the Inspector's Vest 30 Connection?(In seconds) 5 is the Floor Control Stations inspectors Test Connection,and associated components Yes free of damage? _' F oo : o too . at ..As. F � � era# .�' ..��� Activity Performed:Floor control Station Status:Testing Completed Act ivit Date:12113I2019 Location:NIA Next Service Type:NIA Date Due:N/ Fire sprinkler hest,Checklist Answers 1 was floor control station tested? Yes Floor Control Station Checklist Answers 1 Is the Control Valve supervised with a Tamper switch,and did that switch signal the Yes Fire Alan control Panel as a supervisory signal when tested? 2 Is the gauge on the floor control station less than 5 yrs old? lies 3 Has the Flaw Switch been activated by flowing the Inspectors Test connection,and Yes did the switch signal fire alarm at the Fire Alarm Control Panel when tested? 4 what is the maximum time to operate the Flow Switch through the I nspectoes Vest 33 Connection? In seconds) 5 Is the Floor Control Station,Inspectors Test Connection,and associated components Yes free of damage? W s An�tu a Wet System Uhl tlV A . yr 0 : .................................... . Activity Perforated;Wet System-Annual Inspection Status:Testing Completed Activity Gate:1211 312019 Location:NIA Next Service Type:NIA Date Due:N1 Fire sprinkler test Checklist Answers 1 was NFPA 25 testing conducted and completed on this system and its components? Yes Alarm Valve(WET)Checklist Answers 1 Record the supply side water gauge: 95 2 Does the supply side water gauge show normal water pressure? Yes Record the system side water gauge: 10 Does the system side water gauge show norel water pressure? Yes 5 Is the riser check valve free of exterior damage? Yes 6 Are system gauges less than 5 years old` Yes 7 Is this a Riser Check only arrangement,less alarm valve trim?Observation only,NOT yes a deficiency. Main Drain Test Checklist Answers I What is the size of the main drain test connection?(Inches) Page 2 of t Printed Date: 1 11 l 019 Activity Number: 1 T-JE[drige-19-1334 Before performing the main drain test,record the sprinkle'system suppler gauge 9 (Static psi): Record the sprinkler system supply gauge with main drain flowing wide open 90 (Residual psi): 4 Record the supply gauge after the main drain test(Static psi): 95 Has the full flow main drain test with the valve fully open been conducted? Yes Backflow Checklist Answers 1 Is there a backflow preventer on the sprinkler system?-OBSERVATION ONLY,NOT yes Al NFPA DEFICIENCY iF there is a backflow preventer present,was it tested during this activity?Observation no only,NOT a deficiency. Control Valve, &Y,Tamper Switch Checklist Answers 1 Is the control valve in the open position?A NO answer is an NFPA 25 Impairment Yes requiring immediate correction.If closed,follow impairment procedures and conduct a drain test to determine if the valve is open. 2 Is the valved locked and/or a tamper switch on the control valve secured in place and Yes free of damage? 3 Is the valve accessible,free of external leafs with its hand heel in place? Yes 4 Has the control valve been operated through its entire range and returned to its Yes ornial position? 5 Has the tamper swtich been tested and a signal received at the alarm panel? Yes Control Va,B'Fly OR B'Ball,Tamper Switch Checklist Answers I Is the control valve in the open position? If closed,follow impairment procedures and Yes conduct a drain test to determine if the valve is open. Is the valve locked and or and/or tamper switch on the control valve secured in place lies and free of damage? 3 Is the valve accessible,free from external leaks,with handwheel intact,and in place? Yes 4 Has the control valve been operated through its entire range and returned to its Yes normal position? Has the tamper switch been tested and signals received at the FAP,restoring only in Yes the fully open position? Fire Department Connection Checklist Answers 1 Is the fire department connection visible and accessible with couplings and swivels Yes free from damage and rotating freely?A NO answer is an NFPA 25 Impairment and requires immediate correction. 2 Are plugs and caps in plane and free of damage,with ID sign in place? Yes If caps are not in place,is the connection free of debris,with gaskets intact,and NIA interior clapper working properly?A NO answer is an NFPA 25 Impairment and requires immediate correction. 4 Does the check valve appear tight and free of water leafage from the connection? Yes If there is a hall drip installed,does it appear operable? Yes Sprinkler Heads Checklist Answers 1 Is there a spare sprinkler head box present,kept at correct temperature,fully stocked Yes witty spare sprinkle`heads and a wrench for therm? Do sprinklers appear to be free of foreign material buildup,paint,corrosion,and are Yes installed in their correct orientation"?A NO answer is an NFPA 25 Impairment requiring immediate correction. 3 Is storage maintained at a proper distance below sprinklers and are sprinkler spray Yes patterns free of obstruction? 4 Are sprinkler heads less than 50 years old OR have been tested by UL and were Yes found satisfactory? If NOT,sprinklers will require testing or replacing;EXCEPTION: sprinklers manufactured prior to 1920 SHALL be replaced. Are all escutcheons in place? Yes Are quick response sprinkler heads,if present,less than 20 gears old or have been Yes tested by uL and found to be satisfactory? Are dry sprinklers,if present,less than 10 gears old or have been tested by UL and Yes found to be satisfactory? Page 3 of Printed Cate: 11 J o1 Activity Number., I I T-J ldrig ..1 -1 34 Hangers&Seismic Bracing Checklist Answers 1 Are all hangers and seismic braces on exposed piping,as viewed from the floor,in Yes place,secure and tight?Hangers installed in areas that are inaccessible for safety considerations due to process operations shall be inspected during each scheduled shutdown Building Checklist Answers I is the building suftiently heated to maintain a minimum of 40F? NOTE: It is the Yes owners and/or occupants responsibility and not that of Cogswell Sprinkler Co.INC.to assure that all areas of the building are suffcienfly heated to maintain a minimum 40F. Sprinkler Piping Checklist Answers I does all visible piping appear to be in good condition and free of Yes mechanical,excessive corrosion,or active leaks' 2 is sprinkler piping free of external loads? (Signs,mechanical equipment and other Yes items hung from or supported to piping) Alarm Device-Flew Switch-Wet Pipe Checklist Answers I Has the vane type water flaw device been activated by flowing the inspectors test Yes connection? Is the flow switch free of damage and all electrical connections secure? `des Record Time Interval From Initial Water Flow To Activation Of Alarm:(Sec) 2 4 Was a signal received at the alarm panel? Yes The next"N FPA 25 1nspootion&Test-An rr ol"is due on or before: 1 /13/ 0 0 Mike Baldwin Cogswell Sprinkler Co. 22 Canterbury St. Worcester,MassachusettsO 1610 Page 4 of 4