Loading...
HomeMy WebLinkAbout- Permits #242-1428 - 8-100 Compass Point Road 9/27/2012 i f i i n i Massachusetts Department nvironmental Protection Provided by M ssDE ; Bureau of Resource r tecti -Wetlands MassDEP File W2 -1 428 A Form 5 - er C d g City/Town:NORTH ANDOVER Massacliusetts Wetlands roteeti n .et M.G.L.e. 13 1, 40 r A. u General Information . Conservation Commission NORTH ANDOVER 2,Issuance, a. F 00C b.F Amended 00C 3.Al: t Details .First Nam,e. PRIBRU b.Last dame t-LINGO. Nl .Organization ONE HUNDRE D FOURTEEN TRUST d.Mailing Adds 51 MOUNT JOY DRIVE C.Cityfrown TEWKSBURY f.Stag .Zip Code 01876 .Property Owner .First Name .Last Name HIINGORANI. e,.Organization ONE HUNDRE�D FOURTEEN TRUST d.MaiIu Address 5 1 JOY DRIVE e.City)Town TEWKSBURY .State , .Zip Code 0,t 876 5.Project Location. ,.Street Address LOT 4N-A TURNPIKE ROUT: t 1 b,.Cityffown NORTIJ AND OVER c.Zip Code 0 1845 d„Assessors Map/Plat# 106D e.P reel , t f. title 42.63,42IN g.Longitude "t. " 2 � " .Property recorded at the Registry of Deed for: .Cbunty b.C rti sate c.Booty d.Page NORTHERN ESSEX 12184 7.Dates .Date N t filed.- t ,,Date Public Heanng Ct s d- 12 2 t e.Date Of Issuance: 7/ 1 Approved Plans,and Other Documents .Plan n Title: .Plan Prepared .Plan s n d tin d : d.Reprised Final Date: e.Scale: r SfIEET S I­2 , B. Findings 1Xmidings ptirsuant,to the Massachusetts Wetlands Protection Act Page t of 10 ELECTRONIC COPY Provided by MassDEP: Massachusetts Department of Environmej,ltal Protection Bureau of Resource Protection-Wetlands MassDEP File P'.242-1428 ions Ito eDEP Transaction#:'505815 )NTA Form 5 - Order of'Condl' City/TownNORTHANDOVER Massachusetts,Wetlands,Protection Act M.G.L.c. 13 1,§40, Following the review of the the above-referenced Notice of Intent and based on the infonnation provided mi this,application and presented at the public hearing,this Commi'ssion fids that the areas in which workis proposed'is slignifiemit to the,following interests of the Wetlands Protection Act. Check all that apply: c.ry Prevention of Pollution a. 1�;-''Publie.W—a'ter'S,upply b. r Land Contai 'nin g Shellfish E, rT Protection of'Wildlife Habitat d. F Private Water'supply e., F Fisheries g. F Ground Water Supply h. 17 Storm.Damage Proventioll i. F Flood Control 2.Commission hereby fmds the project as proposed,is:-, Approved subject to,: •a F'T�he following conditions which tire necess,aryin accordance with the perfortnace n standards set fbith in the wetlands regulations,. . This Comm ission.orders that all work shall be perfornied in accordance with the Notice of Intent refcreniced above,the following General Conditions,and any other special conditions attached to this Order.To the extent that the following conditions,modify or d!ff-er from the plans,specifications,or other,proposals submitted with the Notice of lnten these conditions shall control.. Denied because: b.[7 The proposed work cannot be conditioned to meet the perfonnanon standards set forth in the wetland regulations.Ther,efore, work on this project may not go forward unless and until a new Notice of Intenti's submitted,which provides measures which are adequate to protect Hilterests of the Act,and a final Order of'Conditions is issued.A description of the perforinance standards which the proposed work cannot meet 11s,attached to this Order. ect of'the work on the hiterests c.F i,rh,e infortnation submittedby the applicant is not,sufficieritto describe the site,the work or the oft" identified,in the W t1ands Protection Act,Therefore,work on this,project may not go,forward unless and until,a revised Notice of Intent is submitted which provides sufficient infonnation and includes measures which are adequate to protect the interests,of the, Act)mid a final Order ofCondition s is issued.A description of the specific infer ination w1fleh is laelding and,why It is necessaryis attached to this Order as per 310 CNM m 10.05(6)(0- I r Buffer Zone Tpacts:Shortest distance bew teen limit of prpject disturbance and the Nvetlarid.resource area specified in 310MM10.02(i)(a). a.linear feet Inlanid'Resource Area Im paets-.(IFor Approvals Only)' Resource Area Proposed Permitted Proposed Permitted Alteration Alteration. Replacement Replacement 4. rBank &linear feet b.linear feet c.linear feet d.linear feet ,5.F B ordering Vegetated Wetland 290 290 1272 1272 a.square feet b.,square feet c.square feet d.square feet 6. r'Land u:rider Waterbodles,and Waterways a.square feet b.square,feet e,.square feet d.,square ft:et c.c/y dredged f Uy dredged T r-Borderhig Land&ibjed to Flooding a.squar feet b.square feet c.square feet d,square feet Page 2 of 10*ELECTRONIC COPY � � n ip me Protection Provided `: Mas§DEP File 4 2 -1,428 OrderBureau of Resource,Protection-Wetlands el, 'Transaction U.-505 815 Condition Massachusetts Wetlands Protection Act.G. .C. 1,3 f, Cubic Feet,Flood Storage .cubic feet f cubicfeet g.cubic feet K cubic feet .f—isolated Land Subject to Flood Mig .square feet 1.square feet Cubic Feet Flo o d Storage ------------ feet . 1 i feet .cubicfeet f�cubic feet c.cubic.r Riverfront Area total sq.feet b.total:, .feet .square,feet d.square feet . ears feet f square feet f Sq ft between 1 -20 .sqpare feet h,square feet ResourceCoastal Resource Area Impacts: Proposed Permitted Proposed Perinitted Alteration Replacernexit Replacement 1 .r Designated Port Area Indicate size under Land Under the ,below 11.F Land Under time Ocean ... .square feet b.square feet .c/y dredged d.c/y dredged Indicate size under Coastal Beaches and/or Coastal Dimes below 12. Barrier Beaches 13. _ Coastal . r feet . pare feet c., nourishment .cl noon n � t 1 .,F Coastal Dungy a,square feet b.square!feet c.c/y nourislunient d.c/y noudslunent i 15.F,Coastal Banks a.I feet b.linear feet 1 1 .T7 Rocky 1tll Sores, t .square feet b.square 1 .1,Salt Marshes _ a.square,feet b.square feet c.square feet d.square feet 18.F Land Under Salt Ponds fit � t .square � .cly dredTed .cly dredged 19.F Land,Containing Shellfish r feet . . pare,feet . c,square feet ,. feet Page 1 ELEC .R COPY Provided by MassI)EP" Massachusetts DepartMent of Env'-ronmental Protection I MassDEP File 1h242-1428 Bureau.of Resource Protection-Wetlands eDEP Transaction#.-505815 i MTA Form,5 -Order of Cond i tons City[rown:NORTH ANDOVE R Mass achusetts Wetlands Protection-Act M.G.L.C. Indicate Size under Coastal Banks,Inland Bank,Land Under the 20.,r"'Fish,Rum Ocean,aridlor inland Land Under Waterbodles and Watenvays, above c.c/Y dredged d.Uy dredged 2 L[71 Land Subj ed to Coastal Store.Flowage 11------- a.,square feet b.square feet '22, 17 Restoratimi/Enhancement,(For Appr val.s Only) 11 es tage,that h&s been If the project is for the,purpose of restormig or enhancing,a wetland resource area in additio r to th quare foo entered In Section B.51.c&d or B.17-c&d above,,please entered the additional amount here. a.squaxe feret of'BVW b,square feet of Salt Marsh 23. r- Streams Crossing(s) If the project involves,Stream Crossings,please,enter the number of new streaan crossuigs/numbler of replacement stream crossings. a.number ofnew strearn cross,Ings, b.number of replacement strearn crossings *I I Cond'flons Under MasSachusetts Wetlands Proteetton Act C. Genera i i The Nlowing,conditions are only applicable pproved projects comply i I I statutes and other regulatory measures,shall be deemed, I Failure to comp with all conditions stated hereir�and with all related s cause to revoke,or modifythis Order. rize any i,nj air 2. The Order does-notr grant any property rights or any exclusive privileges;it does not autho iy to,private property or invasion of private rights. son of the Ilecessity of complying,with all other applicable,federal, 3. This Order does not reli1 eve di.e perrnittee or any other per state,or local statutes,ordinances,)bylaws,or regulati ons., ing 4. The wort authorized hereunder shall be completed within three years fore the date of this Order unless either of the followi apply: a.the work is a maintenance dredging project as provided for in the Act;or K the time.for completlion has been extended to a sp�ecifted date more than three years,but less,than,five years,,from the date of issuance.If this Order mo is intended to be valid forre than three,years,the drctirn n-to period extension date and the special stances warranting the extended,ti" are set forth as a special condition i i in thi rder,., s,0 5. " leis Order may be extended by the issuing authority for one or more periods of tip to three yews each upon appl"cation,to the e expiration,date of the Order. is,suing authority at least 30 days prior to th 6. If this Order constitutes an Amended Order of Conditions,this Amended Order of Conditions does not exceed the issuec ri n Wal dateoftheo 19 i al Order ofConditions. 1 this project shall be clean fill.Any fill shall contain no trash,refuse,r6bish,or debris,micluding 7. Any fill,used in connection with i 1P ires,ashes,refrigerators,motor vehicles,or pmts of but not Iftnited.to l�urnbe�r,bdicks,plaster,wire,lath,paper,cardboard,pl e,t any of the foregoing. eat pe,riods from Us Order have elapsed,or.if such an appeal has bee�n taken:, 8. This Order is not al until all admm' I'istrative app Until all proceedings before the DepwInment have been completed. 9. No work shall be undertaken unti I the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the,d i sti ict n which the land is located,within the chain of title of the affected,property,In the case,of recorded,land, Page 4 of 10*ELECTRONIC COPY r v Pr MassachusettsDepartmento En it nm enta � � t 1dd MaEP' Bureau e urce rOt .� 6D PTransi " 5 815 " AOVER -'order of Conditions C t► " wrr* O 131� §40 U Wetlands protection Act, B. w Massach Registry's Grantor index under t1i p on Which the t1 Find order shall alLeal Court registered land, rtai rat �� � t �� ��,��� w rat ru '" ��a11 � proposed work i t done. �"t��� ��� � the proposed work,� d+�rrw� recording rr '�arrr�at��r� , Certificate�a 'itl the owner P ch form must b,e stamped by the,Regime of D effiso wl trr r t n Comm,C ,i nor n the fog at the end this Order, prig to t er ent R work.., .., sign,10. A splayed not'less then feet, :r tll three square feet sip bearing the words, Massachusetts Department " t� �rrmr�ta1 P"rottr�"" or" assEP" t d t issue a Su ers d l Order,the Conservation Commission 11. Where Department"aEnvironmental r" ,beforerigs Mass DE sha l be party t all a proceedings ,. p1 t r r1 described r rrr,, he 11ant l�a1t submitRequest �.°Gnat "Compliance g 8A)to the Conservation COmmisstion. t+ the plans and special w The nor saI immission ial conditions referenced this order. 1* It to qu, of the Conservation CO I app teal in ire 1 w Any charge t the pla .s identified in Condition 1 " newtl � Intent. Er tl wh tl r d hang 1 s� "' cant u to rr u � filing the,right t " �w . ►atro�rr G1ssr�rr the rrt Err �r�r�-� r�ta�l 'r�tt1r�� this, subject15. The Agent or members � � Grdr a:t r�ena,�1 h,� r t �ea� at � li" wrth t1�wcor�drtrr�s st�at+� �r.tl� t enter and apt tl ta" the rrsratrrrr�1sro Department Order,� � requirethe submittal, data d�rnd evaluation. necessary by sir in��rrtr+�1 " property suh t t this order d 16. Th'Is Order r rrdit ins shall apply t n successor�interest or successor, t and contractor r other r person p r rmin i rk conditioned this Order. w d"ant t Bordering ta�td Wetland,the boundary of the, 7. Prig t the work,and if the,project involves work, o by rd stakes or �, � place,the wetland rrtl are used° ► r shall rrrrld the it prop " to fCom fiance has been issued'l the,Conservation Commission"w J boundary markers shall e " taro d untrl Certificate " " a n�t1 disturbed arm have been rlti stab" with � tatiorr r : . 11 sedimentation barriers shall 1naintain food r body.During orrstrn�tinn,the applicant r r arcs" t t sediments deposited td or,water other basis and shall remove accumulated,d s+ediments�needed.,The,applicant " w darn designees all insp t erosion w that� at the.site ar�d ha1i '� ir� nd�ati notify� Conservation 'ball i drat l control any e s� problems r��s� "„ 1 a filar d pre ent1 or��rois It dnecessaryw " to require a�ddrtr uunaI er p' y� Gorr rssr n, reserves ark unless ai'other i i it o work line has been approved this Order., �rift Sedi�xl nt tron barriers rs shall e i�rt of ,pE G NTT NOTICE G STORM CONTROLMassachusettsr subject to the StOnnwater Standards. 19. ` rl associated with the oJ water Standards,then the project is subject to the d� � enrrrd bons I the work 1s subject to Storm. + r�str , tion acid redevelopment, opment, �l n 1e��errted accordance rn voar ,lr eludr site pre parat on,land disturhar icep a) AJI and sedlruertatiorr enz�re and appleahe, e with the construction period pollution prevention and area tart Discharge 1imina�tinn System C+� etion General Storrnwater pollution.Prevention Plan required the patron " er tabor d pollution control rn nres and aired h ,Storm%eater Standard period�rsron,sedc e�~rnit , rep and .��r�strrret�or� �.management practices remain, place until tl e site 1s fully stabili d. " stared ed to thepost-coristructron stor v ter' unless and until a Registered storrrvater rrrnnr may he discharged Professional Engineer provides Certification t%at r. n metier, er nd� rr removed or �� be removed " w construction period t+nded to converted,to post eorstr. +�trorr date certain spe+rred the Certification.Per eons p operation 'r ttrm�vater�atter�aiatror�,r� � and/or trea:tr ►ent,the co ver ion is n1io�v d the ss 'EP`Ito water that the�B� "� " my � has prperl cleaned�►r prepared per post construction oera��etior IW w w ." " l 'Handbook sp�ee 'r�atrons w diem ' let d�a�.ztet control structures; �, " ur1tfinal ineludni removal `��construction etrnr period pp si�arral n rr�r�,art. the site' u11 stahrii d3 h. BMP plans are included,signed and stamped a Registered Profs g' per r ntrernen s o Stor tnNvater any w discharges to the stormwater management system have been removed,a P rirert Page ELECTRONIC Copy i ided by M sDEP: Mass achusetts Department of Environmental P r otection F rovi as urea R ree Protect -Wetlands, MassDEP File#:242-1428 )WA Form.5-Order ofConditions City/Town.-NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L.c, 131,§40 Bu.of csouion eDEP Transaction#:505815 Standard 10;IV,.all past-eery stniction storinwater,BMPs areistalled in accordance with the plans(including all planting plans)approvedby the issuiauthority,and have been"inspected to ensure that flicy are not darnaged and that they are'111 ing proper workhig condition;v.wry vegetation associated with'plost-constniction BN4Ps'is suitably establi w shed to ithstand erosion. c) The landowner is responsible for BMP maintenance until the issuing,authofitylis notified that another,party has le, alty assumed, ibl I ity for BMP maintenance.Prior to requesting a Certificate of Compliance,or Partial Certificate of Compliance,the responsi 11 res onst p ible,party(defined in General Condition 19(c))shall execute and submit to the issuing audionity an Operation and Mahitenance Compliance Statement("O&M Statement!')for the Stormwater BMPs identifying the party responsible for implementing the storm water B�MP Operation mid Maintenance Plan("O&M Plan")and certifying the following-Ii.)the O&M Plan is complete and will be ftnplemented upon receipt of'the Certificate of Compliance,and ii.)the fliture responsible parties shall be notified hi NVniting oftlieir orlon, legal responsibility to operate and maintain the stomiw,ater management BMPs and implement the Stormwater,Pollution Prevention Plan. d) Post-con ruction pollution prevention and source control shall lie implemented in accordance with the long-terni pollution prevention plan section of the approved,Storinwater Report and,if appficable,the Stoniiwater Pollution Prevention Plan I required,by the National PollutatitDis,cliargeEl�i,m'iafion,System Multi-Sector General'P ermit. 6) Unless and until another party accepts responsibility,the lwidowjirr,or ow,ner of any drainage easement assumes ,responsibility Bor maintaining each BMP'.To overcome this presumption,the landowner of the property must,submit to the issuing authority a legally bmiding agreement of record,acceptable to the issuing authority,evidencing that,another entity has accepted res onsibility fbT maintaining the B'MP and that the proposed responsible party shall be tivaled as a penniffee for p 1 1, 3 purposes of i plementi through 19(k)with respect to that BW.Any failure of the im ing the requirements of Conditions 19(0' proposed responsible party to it the requirements of Conditions 19(0 dirough 19(1 wi.di respect to that BMP shall b,e a violation of the Order ofConditions or,Certificate of Compliance.In the case of stormwater BW,, ,s that are servmig more than one lot,the legally binding agreement shall also Identify the lots that will be serviced by the storm water BMPs.A plan and easement deed that grants the,respon,sible pail access to perform the required operation and maintenance must be submitted aloe with the legallybindmig agreement. The responsible party shall operate and maintain all stormwater BNVs in accordance with the design plans,the O&M Plan> and the requirements of the Massachusetts Ste grater Handbook. ,g) 'The responsible party shall: L Maintaftn an operation and maintenance log for the last three�(3)consecutive calendar years,of WiSpections,repairs, ge disposal sal.the Maintenance and/or replacement of the stormwater mana ment systern,or any,part thereof,and dis os I(for di log shall indicate the type of material,and the disposal location),- 2.Make the maintenance log available to MassDEP and the Conservation Commission("Coinmissilon")upon request.and 3.Allow meiiibers and agents of the MassDEP and the Commission to enter and inspect Ole site to evaluate and ensure that the responsible party is inn compliance with the requirements for each BMP established in the O&M Plan appro veld by the issuing audiority. h) All sediment or other contaminants removed from stounwater BMPs shall.be disposed of in,accordance with all applicable Federal,state,and local laws and regulations. Illicit discharges to the storinwater management system as defined in 3 10 C,MR 10,04 are pro.hibited. 7 in, e i itt n j The stoma cater manageni�ent systernapproved i the Order of Conditions shall not be,changed without the prior wr ,e approval of'the i ssuing audiod(y. k), .yeas designated,as qualif ijl pervious areas for,ffic purpose of the Low,Impact Site Design Credit as defined*in the 9 MassDEP StonnNvater Handbook,Volume 3,Chapter 1,Low Impact Development Site Design Credits)shall not be altered wi I fliout the,prier written approval of'the issuing,authority. Access for maintenance,repair,a' and/or replacement of BMPs shall not bic withheld.Any fencing constructed around P storm%vater,BMPs shall miclude,access gates and shall be,at least six miches above grade to,allow for wildlife passage. Special,Con dlitlionS: SEE ATTACBED., Page 6 of 1,0*ELECTRONIC COPY r t, r 1 � i F 'MassachusettsDepartment En i nini l: "ote do PyOvI m� � � Bureau o Re �rProtection,-Wetlands Mass 'Fil -t 2 F' ri 5-Order of Conditions Massachusetts Wetlands Protection Act M.G.L.c. 13 t, y a i t Page 7 of 10 ELECTRONIC COPY Massachusetts Department of Eiivironmental Protection Provided by MassDEP: Bureau of,Resource,Protection-Wetlands MassDEP File M-242-1428 e lDEP Transaction#-505815 )WA Form 5- Order of Conditions yJr0NVn -I ANDOVE R M I assachusetts Wetlands Protection Act M.G.L.c, 13 1,§40 Cit :NO R:1 1 a # D. Findings Under Municipal Wetlands Bylaw or Ordinance I- Is a mumicipal wetlands bylaw or ordinance applicable? Yes F No, 2. The Conservation Commission hereby(check one that applies): IM, NEES the pr rk which cannot be,condi t[oned to IP meet the standards set f6rdi Mi a munici al ordinance orbylaNy i 51=1fical"IY4. 1,Municipal Ordinance or Bylaw 2.Citation Therefore,work on diis project may not go,forward unless and until a revised'Nofice of flitentis submitted which provides measures which are adequate to inert those standards,and a trial Order or,Conditionsis issued.Which are necessary to comply with a rn,uniclpal ordinance or bylaw: APPROVES the proposed,Nvork,subject to the following additional conditions. NORTHAND OVER , L Municipal Ordinance or Bylaw WETLANDS 2.Citation, CHAPTER 178, PROTECTION BYLAW 3. The Commission orders tat all work shall be perfon-ned,'in accord,ance with the followi coed itio ns and with the Notice of U19 Intent referenced above,To the extent that,the following conditions modify or differ Roin die plans'.specifications,or other proposals submitted with the Notice of Intent,the conditions shall control. The special cand itilons relating to municipal ordinance or bylaw are as follows,: SEE ATTACFMD. Page 8,of 1,0 *ELECTRONIC COPY w Eu a t n i 1 Protection M'assDEP File w 2-1 28 Bureau of ResourceProtection-Wetlands e Transaction : 5 15 �'.�.Form Ord ' n owANDOVE R � �:NOR � Massacliuset,ts Wetlands Protection act . .L.,c.131, E. Signatures This Ordunless Conditions,Oth 2 /2,010 Order Pursuant,to General Condition#4.If this is an Amended f Original Order ru r expires the same date as the original Order conditi �s. µ " Order must sip Pipe indicate the number ofmembers N I I � � � 2.Ntumh r of Signers also must be mailed ddb �� Order �� �rt `ii� u1(return receipt r�,u� st r deliveredto the applicant. copy� t � or hand delivered t thesame tie to theappropriate Department v r u�uut PrOte t'OR Regional Mice, � i tronicali ,and the propel r,if different fron,aPPli ant w f S atmes t Uy certified v ,return receipt requested,on f by hare.delivery on -711141 Date Date F. Appeals The appI-M,t,Ole owner,any person aggrieved b this Order,any owrier of land u land sit t this,Orrr,or any try Which such land is located,are e note their right to request the appropriate M�1 resets tr rii or �� i1i � r the u• r Conditions. 'h request must made cer� Regional gi i t issue, Su p � i*ng fee and a completed st " � �e�t i tie u�sinittai Form,, .s provided ith the appropriate 310,CMR i . within tern business days from the date of issuance e this Order. cue the request est s f � delivery to the Conservation Commission and t the a pii t,i s.e is u� tappellant. sit �� r .:�i r� � w r associated with, this appeal will required to demonstrate prior Any appellantsseeking to p i tii departments Supers r � � � u�s� r issi ru "�written,information to participation the r vi w ofthisproject.Previous p rticip do , rout �e � �� � in' r� tt,o rug guest rse rr,er ire the Conservation Comm,Issio prior t the c1es+ 'the public he to thic,Dep artment prier,to 1 ssu ance of a Supers Supersed Ling Order.. objections to the Order which is being p not Tile request shall state ei, ri r�e�sei w appealed the Order � w � terests�i e�ti the Massachusetts�eti . � s Protection het ���, .13�,� �,� as e�tr ��zte t the protection. �rusute�t nth the eti� s regulat ions 1 C 10.00). tine e t rut that the Order is based on municipal ordinance rbylaw, I and not on the Massachusetts Wetlands "ru to flon,het or regulations,the Department has e pip ii to a ris ietiOn. 'age 9 of tO ELECTRONIC COPY Massachusetts Department of'Eiivlronmental h-otection Provided,by MassDEP: Bureau of'Resource Protection-Wetlands MassDEP File 40-242-1428 *at ti 4 "A Form,5 -Order of'Condinons City[rown:NORTH ANDOVER Massachusetts Wetlands Protection Act M.G.L,c. 13 1,§40 eDEP Transac ion#-505815 G. Recording Information This Order of Conditions must be recorded Hil,the Registry of Deeds or the Land Court for the district in w1itich the land is located, i6tin thecha n of title of the affected property.In the case of recorded land the Final Order,shall also be noted,in the Registry's Grantor Index under the name of the owner of the,land subject to the Order.In the case of registered land,,this,Order shall also be noted on the Land Court Certificate of Title of the owner of the,land subject to the Order of Conditions.The.recording information on this.page shall be submitted to ffie Conservation Corgi uTuission fisted below. NORTH A. OVER. Conservation dornnilsslon Detach on dotted line,,have stamped by the Registry of Deeds and submit to,the Conservation,Commission. ........... ..........-.............k-........... ........... ........... To: NOWMANDOVER Conservation Commission Please be advised that the Order of Conditions for the Project at-, LOT 4N-A TURNPIKE(ROUTE 114) 242-1428 Project Location MassDEP File Number Has been recorded at the Registry of'Deeds of-, County Book. Page for: Property Ownel PRIBHUHINGORANI mid has been,noted in the chair of title off`the aflected property in*, Book Page In accordance with the Order of Conditionsissued on: Date If recorded land,the itistrment number identifyflilg this transaction is: Instrument Number If registered land,the document nuniber identifying this tiwsaction is*, Do cement Nu nil ler Signature of Applicant Rev,,4/1/2010 Page 10 of 10 ELECTRONIC COPY DEP FILE 4 242-1428(AMENDED) PROJECT OVERIj VIEW f. The applicant, One Hundred Fourteen Trust, f fled a Notice of Intent and supporting site plans with the, North, Andover Conservation Department on, May 14, 2008 for the construction of a 49, unit condominium complex includin roadways,, utilities stormwater 9 management structures and associated grading within Isolated. Vegetated. Wetland (local jurisdiction), Buffer Zone to,Ephemeral Pools and,Ephemeral, Pool Habitat(local Jurisdiction'), and Buffer Zone to Bordering Vegetated, Wetland (BVW). Buffer Zone mitigation 'is also proposed. The project site lies entirely within Priority and Estimated, Habitat of the Blau ding's Turtle (Eiiiydoidea blar riding ii). An ORAD was issued on May 25, 2006 for the Jurisdictional wetland resource areas,witbin t,he subject site(242-1350). Orders of Conditions, were issued for two addi'tional projiects on the property DEP File Nos. 2 2-959 and 242-1283. No work was started on either Order. ri The Notice of Intent for th 49 uIll't condominium complex was submitted as part of a, comprehensive permit a, tion filed with the Zoning Board of Appeals ('ZBA), pursuant ppiica I to G.L c. 40B. to construct an affordable housing project at the property located off Turnpike Street to be called, "Merrimac Condominiums (the "Development"), Pursuant to this statute the applicant originally proposed to construct n"nety-f* e (95) condom* If I IV 11111UM dweRing units. As, proposed., the development would be located on a site of approximately 14.77 +,/- acres,of land being Map 106D,'Lots 63,75, 74,and 44 to be re-divided' 4 parcels, Lot 4N-A consisting of 10.8 acres ofland.with frontage on Turnpike Street(Rt. 114). Lot 1N'-A consisting of 1.9 acres ofland with frontage onBerry Street, Lot 2N-A consisting of 1.10, acres of land with, fro� age on Berry street, and, lot 3N-A consisting of 1.0 acres, of land also write frontage on Berry Street. since me a pican t's original proposal to construct ninety-five (95) units, the applicant had P reduced the number of units to, fifty-two 5 me rshi dwllingunits nsist'ng of I three (3) single-family homes and forty-nine (49) condomin s, with associated infrastructure and improvements during the ZBA. public meetings. The, ZBA 'issued a, Findings and a Deci",sion on the application of One Hundred and Fourteen Trust for Comprehensive Plermit at the September 11, 2007 public meeting. An "Insubstantial, Modification of Finding and Decision" was made at the November 13, 2 ubl ic meeting. 'Findings, The North Andover Zoning Board of Appeals (ZBA) approved the pr 'ect as a oJ Comprehensive Permit under Chapter 40B of the Massachusetts General Laws,. The Definitive Subdivision Plan for the project was, endorsed by the ZBA on September 11, 2,007.Subsequently, an"Insubstantial Modification ofFinding and Decision" was made at the November 13, 2007 public meeting. 01 An Order of Resource Area Del at was issued on May,25, 2006 under DEP File #242- 1425. 01 'The NCC engaged Lisa hggy'leston to review stormwater management,on the sit'le. 242-1428,lot 4n-a turnpike st,nierrimac conclominiums Amended NACC 9/18/2012 DEP FILE#242-142 8(AME4 NDED) * Publ ic hearings were held on the follow"Ing dates: May 28,2008, October 8, 2008, November 5. 2008, August 12, 2009,,March 10,2,010, April 28,2010, May 191, 2010,June 9, 2010,June 23,2010,July 14, 2010 and July 21,20,10. The applicant requestec I various continuances,throughout the process. * At the October,8,2,008 meeting the NACC discussed concerns about wetland alteration, due to over story clearing of the site resulting in changes to wetland character istiCs including,shading/temperature,vegetation, wildlife'habitat,and water quality. * At the October 8,20,08 meeting and at subsequent meetings,the NACC expressed concern about underground stormwater structures,that could potentially change groundwater h �ology and,Possibly deprive the vernal,, is of water. * At the March'10,2 eeting the Patrick Garner, the applicant's representative.,presents the-use of porous pavement to address the NACC's concerns,about changes 'in site hydrology. * In'June 2010 the applicant,began monitoring the two cerfif l*ed vernal pools on the property. A control pool was identified on town land off of Berry Street. A monitoring gauge will be,installed and, the additional pool will be monitored, * The public hearing was closed on July 21,20,10. * On Septeniter 12,2012,the ACC held a public hearing and voted to amend the Order of Conditions as proposect in the record documents referenced herein. I'd Tire or e Nth,Andover Consery nu ation Co -nission (1-iereafter the "'NACC" hereby fi*nds that the following conditions, are,necessary, in accordance with the Performance Standards set forth in the State and Local as applicable) Regulations to protect those interests noted above. The NACC orders that all work shall be performed in accordance with said conditions and with the Notice of Intent referenced below,. To the extent that the,followinR conditions mo ify or differ from the pla tions or other-2roposals subt-nitted with the Notice of Inten the conditions shall control. ,E=GEDNE,RAL CONDITIONS OEM 20. The pro-poseld work includes: The construction of pervious,asphalt residential roadways and associated 'infrastructure to access 49 townhouse style units, stormwater management structures, and resource area and buffer zone ini t igat"Ion/restoration" portions of which are within Bordering and Isolated.Vegetated Wetland (BVW& lVW) and the,associated '100-foot buffer zones,and the offer on to Ephemeral Pools. The project will permanently alter 290 square feet of Bordering and 5,693 square feet of Isolated Vegetated 'Wetland. 1,272 s.f. of Bordering Vegetated Wetland replacement i's proposed. The project has been,amended to include two car garagesfor 26 of the total 49 proposed units with expanded 16-tolot wide porous pavement driveways. 21. The work shall conform to the foliowing: Applicant: Pribhu,Hingorani One Hundred Fourteen Trust 242-1428,1 tot 4n.-a tUrnpike st,niernmac condomin'turns Amended 2 NACC 9/18120 1�2 w DEP E 4 242—1428, (AMENDED) 5Mount Joy Drive Tewksbury, MA 0,1876 Property Owner,: Same �Notice of Intent filed by: Patrick Garner Patrick C Garner Co.,Inc. 9 Whitney Street Northboro, MA 01532 Date: May 12,,2008 Received,: May 14, 2008 Site Plans prepared byPatrick C Gamer Co.,Inc. 109 Whitney Street Steeped yPatrick C. Garner, ,Professional Land Surveyor and Kanyl ,, P.E. Record Plans: "Merrimac Condominiums, North,Andover, ass." and "49-C a,p. 40B Residences, North Andover, Magi's.,",Sheets 2 (Inc. A- ,last revised.June 30,2010, (Sheets,4, 2 August 27,2012 (Besets -3, 5 and 6);September 10, 2012(Sheets 7-10). Sheet I of 20 Overall, Boundary Sheet Index Plan Sheet 2 of 20 Building .yet Plan Sheet 3Building Layout Plan Sheet 4 of 20 Existing Topography Sheet 5 of 20 Final Grading Flee Sheet 6 of 20 Final Grading Flee Sheet 7 of 20 Drainage &Util. Plan, Beset 9 of 20 LandscapingPlan Sheet of 20 LandscapingPlan Sheet 11 of 20 Prie Development Watersheds Sheet 12 of 20 Post- opment 'atersh,ed Beset .3 of 20 Road Flee &Profile SheetProfile. Sheet 15 '2 '' Details Sheet Beset .6 of 20 Details Sheet Sheet 17 20 Details Sheet, Sheet 18 of'20 Conservation Plan Sheet 19 of'20 Conservation Plan. Sheet 20 of 20 Phasing&Erosion Control Plan 2 2-1 2 ,lot 4n-a turnpike st,ire rit inin inis Amended 3 NACC 1 91 1 1 DEP FILE 9 242—1428,(AMENDED) Sheet 20A Phase 1 Sheet 20B Phase 2 Sheet 20C Phase 3 Sheet 20D Phase 4 Record Documents.- Hydrological Study Merrimac Condominiums Route 114, North Andover Prepared by.- Kanayo Vela.,P.E. Date: April 28,2008, Revised September 22, 21008 and June 30, 2010 Wetland Restoration, Merrimac CondominiUms Prepared by Patrick C., Garner Company,,Inc. Date: May 8,, 2008 Revised: May 27,2010 Operation&Maintenance Report Merrimac, Condominiums Route 114 Nordi Andover'. Massachusetts Prepared by., Patrick C. Garner Company, Inc. Date.- May 8, 201,01 Last Revised:July 15, 2,010 Invasive Plant Control Guide Merrimac Ciondom'iniums North Andover, Mass,. Prepared by: Patrick C. Garner'Company, Inc. Dated May 25, 2010 Revised May 27, 2010, sion, of Fisheries &Wildlife NHESP Vernal Pool Ce rtification Forms and Maps, Certified Vernal Pool: 41045 and 4056 Date Certif'led 2006-06-19 Letter From: Thornas French,Ph.D., Assistant Director Dated June 20, 2006 Letter from Patrick Garner Re-, Revisions, Merrimac Condominlums Dated August 27, 2012 Peer Review Letters Emails from Lisa D. Eggleston,,P.E. 242-1428,lot 4n-a turnpike st,n'ierrunac condomini'Llms Amend 4 NACC 9/181/20 12 DEP FILE#242—1428 (AME NDED) (Stori-nwater) Eggleston Envi'ronmental, Dated: August 18,20,08., February 3, 2010; May,28, 2010/ June 4, 20�10-June 23,2010-July 1 ,2010 Subject: Merrimac Condos Letter from Lisa.D. Eggleston, P.E. Eggleston Environt-nental Dated: October 6, 2,008 and July 14,20101 RE: Stoxmwater Management Review and Storm water Technical Review, Merrimac Condominlum,,Ss, Route 114 Letterfrom Patrick Garner Pattack C. Garner Company, Inc. Dated July 120,10 Re: Response to Joint Peer Rev iew comments,trom Lisa Eggleston, (Eggleston.Environmental)June 23 2010, and from Joe Pe,zn.ola (Hancock Engineering) June 22,2010 Merrimac Condominiums, N., Andover Email from Lisa D. Eggleston, P.E. Subject: Merrimac Condos, Dated: September ", 2012 Letter from Patrick Garner Rie-.1 Revisions, Merrimac Condominiums Dated: 11 Sept 2012 Email from Eve Schluter Subject-. RE: Revised Plans- North Andover (NH ESP 07- 21329) Other Record Documents: Water Quality Test Data for 2 Vernal Pools an Control Pool) Prepared by: Patrick C1. Garner Company, Inc. 22. The term"Applicant" as used Inthis,Order of Conditions shall refer to the owner, any successor in interest or suc�cessor in control ofthe property refe�renced In the Notice of Intent, suppor Or ACC pin docurnents and phis der of Conditions. 'The N shall be tie w d 6 0 0 *1 h"n 30 days of all tr er ansfs of tale of any port*on of property that takes place in riting wit I prior to the issuance of a Certificate of Compliance. 242-1428,�lot 4n-a turnpike st,merritnac condoininlums Ain ded 5 NACC 9/18/2012 DEP FILE#242—1428 (AMEi NDE D) "J 23. The conditions of this decision shall apply to, and be bincti ng,upon, the applicant, owner, its employees and all successors and, assigns in interest,or control. These obligations shall be express d in covenants in all deeds to succeeding owners of portions of the property. 24. Failure to,comply with all cond it"Ions stated herein,and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order., 25. This Order does not grant any property rights or any exclusive priviieges', it does,not authorize any injury to private property or invasion of property rights. However, the, NACC, agent of the NACC or: the Department of Environmental Protection(DEP) reserves the right to enter and inspect the property at all reasonable 'times unfil -a Certifficate ofCompliance is issued,, to evaluate compliance with this,Order of Conditi"ons, 0, Ar the Act (310 CMR 10.0�0) and associated regulations, and may require any intormation, measurements, photographs, observations,, and/or materials, or may requ ire the submittal of an for necessary y data or inform deemed nessary by the NACC for that ev ation. Further,,work shall be halted on the site 'if the NACC, agent or DES"determines that any of the,workis no tin compilance with this Order of Conditions. Wo�rk shall not resume until the NACC i's satisfied that the work will comply and has so n f l*ed,the apphicantin writing. 26. This Order does not relieve the perm ittee or any ottier person of the necessity of complying with all other applicable federal, state or local statutes,, ordinances,by-laws or regulations. 27'. The work authorized hereunder shal,l be co mpleted,within three years from the date of' this, order. 28., This Order may be extended by the issuing authority for one but not more than two periods of up to one year each upon application to the issuing authority at least thirtv 6 days �(30) prior to,the expiration date,of th Order (Refer to Cliapter 178.6 Nort1l ?kIldover Wetlaiids Pr t ylazu acrid Sectiott 83 oftlie North Aitdover Wetlaitd. Regi.datiolls). 29. The NACC reserves,the right to amend this Order of Conditions after a legally advertised ,e public hearing if plans or,ci"rcumstances are changed or if new conditions or im I ormation so,warrant. 3 . Whe're, the Department of Environmental Protection (DES") i's requested to make a determination and to issue a Sty.perseding Order,the Conservation Commission shall be a 0 party to all agency p'roceeci I ings and hearings before the Department. 31. Any future, project which proposes a,wetland crossing in order to access certain portions of the p,roperty will not be qualified as a limlited project roadway under 310 CMR, 10.53(e). 32,. 'the following,wetland resource are are affected by the proposed work: Borderi,ng Vegetated'Wetland (BVW), Isolated Vegetated Wetland (I VW-local Jurisdiction.only), 242-4428,lot -a turnpike st,niernmac condominhinis Ametided, 16 NACC 9/18/2012 y% FILE 41242 1428 (AMENDED) Buffer Zone to BVW and Buffer Zone to Ephemeral Pools. These resource areas are s n i 1 fficlant to the interests of the Act as noted above and therein. The applicant hasnot ig attempted to overcome the presumption of signiticance of'this :�elsolurce area to the identified interests. 313. The NACC agrees with the applicants delineation olt the,wetlail-Ld resource area as approved in the Order of Resource, Area Dell'neation 'Issued on 5/25/06,-under DEP File #242-1350. 34. The NACC finds,that the 'intensive use of the upland areas and buffer zone proposed on this site will use further alteration of the wetland resource areas. In order to prevent any alteration of wetland resource areas a minima m Nio-Dis,turbance Zone of'v,ar widths shall b st t lished from the edge of the adjacent wetland resource area as depicted on the plans of record,referenced herein,. The Conservation Administrator and/or other agents, of the NACC do,not have the authority to waive these setbacks as established by the approved plans, F-7 35. Portions of the future No-Disturbance /--.olne/Buffer Zone temporarily disturbed during construction shall be planted in accordance with the approved "Conservation Plan" (sheelts 18 &19 of 20)referenced herein and permanently maintained. The area shall also be,monitored and maintainect in accordance,wilth,the "'Invasive Plant Control Guide" referenced herein. Fencing bletween units and the buffer zone mitigation./No-Disturbance Zonle shall be 'Installed prior to unit occupancy., 36. The NACC approves the proposed wetland.crossing and associated resource area alteration (Tilling of Isolated Vegetated Wetland-5,693 s,.f. and Bordering Vegetated Wetland-290 s.f.,) provided that mitigation for this disturbance 'is clonducted in accordance with the approved"Wetland Restoration Guide' and approved plans referenced herein., 37. The NACC f ids the appl icant's proposal for'l,272 sq. ft'. of welt,land repl ication and site wide,buffer zone mitigratilon.to,be adequate as proposed iin the Conservation Pla heets 18 and 19 of 20). Success of the replication area shlall'be measured in accordance with the record documents and the Massachusetts InlandWetland Repli cats on Guidelines, March 2002. 38. The wetland.replication and,buffer zone mitigation areas all be performed 'in accordance with the plans refe renced,herein and.' accordance with the following spleci I at conditions: The wetland rephication area all ble constructed and planted.pri"or to the start of unit construction. The boundaries of the,proposed,wetland replication and upland restoraftion areas shall, be staked. These stakes shall remain in place until wietland vegetation has become fully established-, 242-1.428,lot 4ln-a turnpike st,111CITimac condominiUllis Amendied 7 'N ►CC 9/18/2012 DEP,FILE 4 242— 1428(AMENDED) * Silt fence shallbe *installed between the edge fthe proposed replicat ion/restorat*ion areas ,and the edge of existing wetland prior:to the start of excavation; * The wetland replication areas shall be graded to 'its predetermined,surface elevation, The exposed substrate shall be protected against erosion-until,re-establishment ofwetla,nd vegetation Occurs*, * The entire wetland replication area shall be surrounded by erosion controls to prevent A i erosion until it is,fully stabilized. 39. A qua tif'led wetland scientis t- shall monitor the restoration areas for TWO consecutive e s ' er:for two years),following construction of said growing sason (May and Oct ob restoration areas. At the end.of each seasonal inspection,, a,progress report and photographs shall be prepared and submitted to the Conservation Department that A describes, the survivability',health and vigor of the restoration areas., A total of FOUR separate monitoring reports shall,be submitted over atwo-year period. If at the end of the first grow ins g season, over all.success of restorat lion activ ities 'is not achieved,, the NACC reserves the rights to require,additional rniffigation measures. Mitigation and replication shall be deemed successful when at least 75% of the surface,of the replacement area is established�ithindigenous species. 40. T rtifled vernal pools exist on the property within 50-feet of construction activity. These pools and.a control pool. on Town of N'orthAndover land off of Berry Ste t shall be monitored per the protocol,proposed,by the Applicant 'in"Water Quality Test Data,for 2 Vernal Pools and Control Pool)" approved and referenced herein., This monitoring shall be conducted during the construction, perioct anct tor a minimum of three years subsequent to the issuance of a Certificiate ofCornpliance. This monitoring,shall includie collection and analysi's of surface water samples,from the on-site and the control vernal pools both monthly and immediately following seasonal snow melt. The parameters that will be,recorded include: water/air temperature, % salinity,, pH, dissolved oxygen and during construction, turbildil"ty. In addition,four standardized D-net samples (location.and technique to be providedley appicant),will be surveyed for amphibian larvae and macro- invertebrates, The ampbibians will be counted and identilfied to the species,level, Sightings of any other vertebrates will be noted and reported, The macroinvertebrates will be counted and identified to the family level. D-net samp1ing shall begin upon snow melt in the spring and continue as long as,water remains in the pool during the vernal pool breeding season., Any changes 'in vegetation composition or structure 'in or around the vernal pool shall be noted and,,reported. A photograpbic record shall be provided with the reports, Reports shall be submitted to the Conservation Department on a monthly basis. In July of each year, the applicant shall submit a written report cornparing the measured water quality and depth of the on,-Site vernal p ls with,that of the reference vernal pool. The Applicant shall forthwit"n propose corrective measures cis appropriate to rectify any abnori-nal,changes, in water quality, water levels or species composition.,This condition.shall survive,the Order of Conditions,but shall be reconsidered three year after the *issuance of a Certificate of Con-tpliance. 242-142,83 lot 4n-a tumpike st,mein ma condoininiums,Amended 8 NACC 9/18/2012 y I 4f J DEP FILE 4 242 1 2 (AMENDED) 41. Th s document a 1, be included in all construction contracts, subcontracts,and specifications eating with the work proposed and shall apers d any conflicting contract requirements. The applicant shall assure�that all contractors, subcontractors'. and other personnel performing the permitfi,ng work are fully aware I f the permits terms and l t ns. Thereafter the contra held t y �*ablefor any violation of this Order resulting from failure to comply with its conditions. 42. The Mast r 'Deed,shall contain a restriction rohiDiting the seal coating or paving f porouspavement surfaces and requiring maintenance f porous pavement surfaces throughout,the developmetat in accordance with the per and Maintenance Plan approved herein. A copy of the recorded deed shall be provided to the NACC upon the f irst sale. 3. The owners of the p.01 ct and their successors .title agree that the Order does not in a tlf s szlt t� � ti tl �� � e stem and that said Town shall not be liable for any damage the event of fa.flux . By acceptance f this Order,tlhe owners agree to indemnify and hold harmless to the and lts residents for any damage attributable l to alteratilons,undertaken on this ��� rty, pursuant to the Order. Issuance of these Conditions does not in any way imply or certify that the site or downstream,areas will not be subject-to flooding,g, storm.damage any then form of water damage., PRIOR TO CONSTRUCTION 44. No workshall be undertaken until, all administrative appeal periods from this Order have elapsed or, if such.an appeal has been,filed,until all proceedings before the I a t ent r Court have been completed. 5.,This Order shall be recorded by the applicant at the Registry of Deeds,immediately att r the expiration of all appeal periods. No work shall be undertakencant"l the F1*na1 Order has been recorded in the Registry of Deeds or the Land Court for the distiw t 'in which the . land is located, within the chain f title of the affected property. In the case ofrecorded land, the Final Order shall also be noted in the Registry's Grantor index under the name f the r of the land upon which the p�olposed work is to be done. in the case of registered land,the Final Order shall also be Ltd on the Land ICourt Certifficate of Title f the owner, of the land upon which the proposed workis to be done. The recording information shall be submitted to the North Andover Conservation mission on the, form at tli,,e end of this Order prior to commencement of the,work. Any Order not recOrdedby the applicant before'work commences,may''be reco,rded,by the AC t the applicant's expense., 6. A sign shall be displayed at the site not less than two square feet or more 'than th,re square feet in size blearli the words "Massachusetts E ,File Number 24,2-1 8."' 91 8 1 DEP FILE H 242—1428 (AMENDED) 47. Prior to the commencement ofany work,the applicant shall update and su bmit to the Conservation Department a PDES Construction Storin Water Pollution Pre.venti'on Plan (SWPPP) prepared in accordance with EPA Gmdance., 48. Any changes lire the submitted plans caused by the appli'cant, another Board's deci'sioln, or resulting from this Order of Conditions must be submitted to the NACC for 10,� 0, 1 1 -flf"cant, the approval prior to implementation. If the NACC finds said changes to be s"gi 1 1 NACC wilt all for another public hearing (at th xpense of'the applicant). Within 21 days of the close of said public hearing the NACC will slue an,amended or new Order of' Con.ditions. Any errors found in the plans or information submitted by the,applicant shall be considered as changes. No work shall begin on a, project until written approval has been granted by the NACC. 49. It is the responsibility of the applicant, owner,and/or succe ,or(s,) to ensure,that all 6 conditions of this Order of"Conditions are complied with. The project engineer and contractors are to be provided with a copy this Order Condit ins and referenced documents before commence ment of construction. 50. Prior to any work commencing on site, the applicant shall,submit to the NACC for approval,a detailed sequence of construction,, inctuding a, dated timetable for the construction of compensation and retention areas,,installation of sedimentation/erosion control devices, roadway infrastructure,, phasing associated,with.the development'. the construction of the associated st army watern management structures,landscaping activities, 11 and required mitigation/restoration areas. This timetable must continue to be updated, monthly throughout the project. I 51. Wetland flagging,/staling shall be checked prior to start of construction and shall. be re- established where missing. All wetland,flagging/staking shall remain visible and enumerated per the approved plan(s) throughout the life of the project and until, a Certificate of Compliance i's issued so that erosion control m easures,can be,properly placed and.wetland Impacts can be monitored. The proposed.limit of work shall be shall be clearly marked with erosion controls or temporary fencing and,shall be confirmed by the NACC. Such barriers shall be checked and replaced as,necessary and shall.be maintained until all con structionis, complete. Workers should be 'informed that no use of machinery,storage of machinery or materials,stockpiling of soil,or construction activity is to occur beyond this line at any time. 52. All eros ion controls used on site shall be weed-free to prevent the spread of invasive plant material. The erosion control barrier will be properly installed and placed,as,shown on the plans aPprovedarid. referenced herein and shall be inspected and approved by the, NACC or its agent pr1oi.7 to the start of construction and shall remain intact until all disturbed areas,have been permanently stabilized to, prevent,erosion. All erosion prevention and,sedimentation protection measures found, necessary during construction shall be implemented, at the�Itrection of the NACC or its agent. The NACC reserves the ct ri" impose additional conditions on portions of this pr "e ct to,miti at any impas ght to ' 01 242-1428�lot 4n­a tumpike sty merrimac condoinini"Ainis Amended, 10 NACC 9/18/2012 r P F 1428(AMENDED), which could result from site erosion, or any noticeable degradation of surface water arty discharging from the site. For example, installation of erosion control measures may be required in areas not shown on the plans referenced n this Order of Conditions. Should such installation be required by the NACC, they easel be nstalled within 48 hours, of the Cnmissis mist. 51, The,applicant shall on hand at tree start of any soil disturbance,re oval or stockpiling, a minimum of 150,feet of silt fence, nd are adequate supply of emergency erosion cr tr l cl , n, crushed store,silt sacks,flock backs,jute matting r any. otter erosion controls the applicant proposes,to use as part the Erosion and Sedimentation Control Plan. Said supplies stall be used ordy,for the control of emergency erosion problems and s,hallriot be used for,the normal control of erosion. Hay males brought ught .-sit shall be certified weed fees or salt marsh hay bales. 54. A check payable to, the Town of Norte Andover share be provided it the snit of $83,0100 prior to the start ofconstruction for Passes , and . Prior to the start of' constructionon,Ferries 3 and 4 are additional checkstale be submitted,for$30,000. The initial$83,0001 is broken rs down,,into the following categories: " r ►us Asphalt Roadway fr str t r - $50,000, Infiltration Units -$7,500 (178 units), Buildings - 5, 5 units),Wetland Replication-zP4,000 (1,272 si.), Buffer Zone Mitigation$6,500 (4, 7 . . the,subsea e: t$30,000 f+ r Phases 3 and 4 is fors 'I din -$30, units), i'ch,shirr be in all respects at sfact ry to Town Coons r,'Town Treasurer, n the NACC, and Starr e posted with the North Andover Town'treasurer that the NACC before conu-nencement of worn. Said deposit 'mone 'shall be conditioned on the completion of all conditions ,Smarr be signed by a party or parts satisfactory t ►tree ACC, anct i own Counsel, and shall,be released. after completion ofthe project,,provided that provisions,,satisfactory to the N CC, have been made for performance of any conditions tit are of continuing nature. The applicant may propose a mom tart'release schedule keyed to completion of specitic portions of the project for the 'NACC's review and approval,. This condition s issued under the authority of the local ByLaw. 55.The applicant Smarr designate a Wetland Scientist or otter vlr r ntal r l*, r al as approved y the ACC or its agent, as an"Erosion Control Monitor" to oversee any er r envy laicemer t of'controls and regular inspection or replacement dr rt ti : control devices (Credentials said Erosion Control Monitor share be submitted in writing for review .nct suDsegrrer t approval by the NA CC). The name and phone number the erosion, ntr wr ra r it y must �r i �t the � art that s person has t e contacted, dire to an emergency at the site, during any 2 -ra rer period,including weekends. The Environmental Professional Will immediately notify the Conservation agent of iar y matter that requires attention by the Commission.or the agent. The erosion control monitor will he required to inspect all erosion control devices and, oversee cleaning and, the,proper disposal of waste products. Cleaning shall include removal of any entrapped silt. 242-1428,lot 4,n-a turnpike in rrimac condonliniums Amended NACC 9/18/2012 DEP HLE4 242-1428 (AMENDE 0) 56. At least once during each week which construction act ivities occurs on-site and for as ,long thereafter as ground remains unstabilized, the applicant shall submit a written, report from the "Erosion Control Monitor" to the NACC cert tying that, to the best of his/ner knowledge and belief based on a careful site inspection, all work is being performed 'in compliance with this Order of Conditions and that approved setbacks are being adhered to�. In addition, tie report shall �.il what work has been.donie in or near resource areas,and what work is anti c ipated to be done,over the next period. The erosion,,, control monitor must visually 'inspect all,sefflmentation/erosion control measures and assume,responsibility for flieir maintenance on a weekly basis and,that they are functioning as intended. In addition, all wetland resource areas must be visually inspected,for siltation, turbidity, and/or other water qualityimpacts. The Erosion Control Monitor sha l'I be on site during and./o r fol lowing a major storm event of "1/2 'Inch of rain or greater (24 hour event) to ensure that soils remain stable, and erosion controls are adequate and secure. 57. Prior to construction (or when suitable locations can'be confirmed with the Conservation Department),, t1ie applicant shall permanently mark the edge of the, approved, "No- Disturb,Areas" identified on the approved plans,with signs or markers spaced everdy every 25 feet incorporating the following text: "Pr t act etland Resource Area" and ,associated rules, (1 square is ign to every 3 circular signs'). Thi's will designate the ir sensitivity and assure no further 'Inadvertent encroaclmient into the wetland. These permanent markers are subject to review and approval by the,NACC. The appl i cant shall instruct all agents to explain.these markers to buyers/lessees/landscapers and all persons taking over the property from the applicant. These markers shall remain posted and be replaced as necessary n perpe+ tuity. 58. Prior to the start of unit construction, a Registered,Land Surveyor (R.L.S.) shall stake the foundation locations within the 100-foot buffer zone. These measurements will be verif 1'ed.in the f feld by -the,Conservation Department. 59.The applicant and/or the legal owner of that portion of land upon which these Orders, of' Conditions have been placed shall provide to the,NACC for to transferring, or assigning any portion of said and to another party,such as a Management Company, Condominium/Homeowner's Association or in.cuvidual,subject to said Orders of Conditions, the"Compliance Certification Form"" Affidavit (attached h erein) signed, tinder the pains and penalties of perjury, stating that said applicant has read these Orders I . . 41 of Conditions,anct is in compliance with each and every condition,. If portions,of said land 1 0 are transferred, to different parties,suich as individual unit owners,, each party is subject to, tiI',i k lf�� s ondition. This, document shall apply to each of the conditions referen herein and shall be provided to the Conservation Department at least five (5) business days,prior,to the closing of'said land transaction. 60. Once these above mentioned pre-construction requirements are,complete,, he applicant shall contact the Conservation Office prior to site preparation or construction and shall 41 arrang e an on-site conference with an NACC representative,coritractor,en!gineer, 242-1,428,lot 4n-a turnpike st,merrimae condonmikinis Amended 12 NACC 9/18120,12 DEP FILE#242 1428 (AMEMM D), wetland scientist and the applicant to ensure that all ofthe Conditions of thi's Order are understood. This Order shall lie included in all construction contracts,, subcontracts,and specitications dealing with the work roposed and shall supersede any conflicting p contract,requirements. The applicant shall assure that all contractors,, subcontractors and other personnel performing the permitted work are fully are of the permit's terms and conditions. Thereafter, the contractor will be held Jointly liable for any vioiation of tbis Order of Conditions resulting from failure to comply with, its conditions. The applicant or contractor shall notlf the NACC 'in writing of the identity of he on-site construction Y supervisor hired,to coordinate construction.and to ensure compliance with this Order. A reasonable period of time shall be provided as notice of the pre-construction,meeting (erg. 72 hours). IMMUNE S TORMWATER MANAGEMENT CONDITIONS, NEW ZTOIR ........ ......... 61. All, construction and post-construction stogy mwater Management systems shall be constructed in accordance with. the approved construction sequence,, supplorting documents and plans, (Sheet 20 and 20A-D) submitted with the Notice, of Intent this, Order of Con clitions,, and the approved, Stormwater Pollution, Prevention and Operation and Maintenance Report referenced herein. 62. Permanent and temporary stormwater structures shall be constructed and functioning as part of the initial pr 'ect phase as detailed in the Erosion Control &Storm Water Pollution 01 Prevention Plan (Sheets 20 and 20A-D), immediately following clearing and rough grading of the site, to serve as siltation control during construction. Runoff from the site shall.be directed towards these basins. Stormwaterl structures "in the initlial phases shall,be cleaned and maintained as future phases are initiated. 63. All stormwate,r blest management practices shall be maintained, as specified in the Long- Term. Pollution Prevention and Operations & Mai an Report submitted with the Notice of Intent and incorporated in the Order olf Conditions. The approved, Operation & Maintenance Report 'is fully binding upon the applicant and/or owners, successors,, agents,, associations,heirs,and assigns and must be adhered o,in perpetuity. 64. Evidence of maintenance of the stormwtiter management system shall be provided. to the NACC on an annual basis by a Registered Professional Civil Engi neer certifying 'that the drainage system is working as designed and shall include any maintenance invoices for cleaning and repairs. The, first report shall be submitted to, the NACC as soon as the first stormwater structure goes on-line and reports must continue to be submitted in perpetuity. Comp 'ante with t'he designed storrnwater management system and, 1 1 issuance of a, associated stormwater management conditions shall be sat*,s,f'ed prior to the Certificate of Compliance,. 65. Ternporary and/or permanent basins and swales being usect i or sea imentation dewatering during construction shall,be cleaned of sediment when levels exceed six (6) 2424428,lot 4n­a turnplike st,merrinlac condominiums Aniended, 13, NACC 9/18/,20,12 DEP FILE #242-1428 (AMENDED) inches* The basins shall be cleaned,of sediment and the infiltration capacity fully restored prior to final,grading and construction of perm anent stormwater structures. 66. Porous pavement is proposed throughout the site and shall be tested post-construction to, ensure that construction activities,have not damaged its functionality, A testing protocol shall be submitted to the Conservati"on Department for approval prior to the start,of construction. The protocol shall be designed in,accordance with the UNH Stormwater Center's October 2009 "UNHSC Design Specificat'Ions,for PorousAsphalt Pave nt and, Infiltrat ion, "Beds" 67. There shall be,no increase in to post development discharges from the storm.drainage system or any other chang�es in post development condit'ions that alter the post 1 1 1 - development watershed,boundaries as currently depi cted,in t'he,Notice of Intent and approved by this,Order of Conditions, 68. Water quality down gradient of BVW shall,not differ signifficantly following completion of the,proilect from the pre-development conditions. There shall be noseldimentation into wetlands or water bodies,from discharge pipes or surface run off'le,avl*n,g the site. 69. Prior to the issuance of the Certificate of Compliance,the applicant shall be,responsible for cl I ean'n g all.stormwat'er st-ructuresin accordance with the approved Operation& Mai ntenanceReport attached herein and the associated storniwater management conditions mandated herein. 70. The applicants, owners, and their successors and assignees,shall maintain all culverts,, catch basins, outlet structures, subsurface infiltration/storage areas,and other elements of the drainage system including porous,asphalt roadways and driveways,unless putinto, an easement to the Town of North Andoverin order to avoid blockages and siltation which might cause failure of flute system and/or detrimental,impacts,to on,-site or off-site resource areas, and shall maintain the integrity of vegetative cover on the site,. Maintenance shall,be don in accordance with the approved Operation& Maintenance Be et attached and referenced,herein. [:D:U:RING CONSTRUCTION 71. Construction sequencing shall be followed throughout all has of construction as detailed in,the Phasing and Erosion Control, Plan (Sheet 20 and 20A-D) and In the Operation and Maintenance Report, thereby minimizing any unnecessary impacts to the wetland resource areas. 72. Accepted. engineering and construction standards and procedures shall be followed in the coinpletion of the project., 242-1.428,lot 4n-a U11-11pike st3 inernmac con(lominitims Amended 14 NACC 9/18/2 0,12 w P FILE 4 242 1,428 (AMENDE D) 73. The Contractor will tees all steps necessary ,control dust onsite so that adverse effects on adjacent resource areas and r habitat (including vernal pool habitat), not occur. Dust Conti-of shall e linstituted in accordance with the approved S PPP required ' Condition # 7 above. 7 , Inmiedilately upon completion h Pease 1.roadway, and prior to further construction activities associated with the site, the applicant shall complete a plan prepared a Registered Professional Land Surveyor of theCommonwealth R.P. .S which accurately depicts the roadway location and i "s proximity to wetland resource ar as approved under this Order of Condition& Said plan shall be submitted he Conservation Administrator:for approval,. 5. Iminediately upon completion of each dwelling ndat n and prior to further 1 construction activities associated h the site, the, applicant all complete a plan prepared by a Registered r s 1 na1 Land Surveyor the C on .P.L.S. which accurately depicts h nda location aid ' proximity's wetland resource areas as approved under this Order ofConditions., Said plan shallbe submitted to the Conservation Administrator for approval 76. Confirmatory test pits will be conducted at the locations,of proposed roof infiltration ,systems S2,S9 and S24 (Phase 1),S29 and SM (Phase 2)1,S48 and S5/6 (Phase 3), and S16 and S26, (Phase 4),as well as at least flees locations not previously tested within the footprint Con-tpass Point prior he installation in,,in,f iltration structures (porous pavement and Culteci i ��� i � i or verify depth , groundwater and soil type s i :bi i ty for infiltrationAfthese conditions are not consistent with design assumptions the applicant mustsubmit revised plans,for t1ie,installation of these infiltration,sty uc tures to the NACC pr ior to theInstallation,of the infiltrat ion units. 7. Porous pavementshall be c ru e n accordance with.theUNH Stormwater Center's October 2009 "'UNHSC Design Specif icationsfor Porous Asphalt Pavement and I i,filtr on Beds" including all materials testing requi,re nts ref,er ed therei n. Materials used in the roadway sub-base should lie veri fed by an independent laboratory. /m 78. During he installation and construction infl"Itration structures (porous asphalt and C � 1 ki w s � s � Vim' Engineer shallconduct periodic inspections as n cessaryto certify that base materials,, installation depth, invert ,verb ns amount f cover,, aspl alt layer and all other,details proposed for installation of C 1 ec 280 dry wells and porous asphalt are consistent with design plans and specifications. ri he certification shall be,in the form of a stain as-built plan and letter certifying comphancerior tothe issuance of a Certificate of Compl iance., 9. Crushed stone construction entrances shall be designated each access location.as shown e approved plans referenced herein tominimize soil/material tracking n the roadways and paved surfaces. hese entrances shall be rely rced and.cleane necessary th g the duration of construction. 2 2-1428,lot 4n.-a turnpike s,iiierriina.leco.ndomi,iiiiiins Amended 1.5 N CC /1 1 DEP rJ ILE#242-1.428 (AMENDED,) 80., To the maximum extent possible, construction traffic shall remain on designated constructio n access roadways deta on Sheets 20 and 20A-D of the approved plans, referenced herein., Ifadditional construction access ways re requ ired they shall be located to maximize the distance from wetland resource areas, and avoid compacting soils, in locations designated for i"i-ifiltration units, Changes in construction access shall be presented to the Conservation Departnient prior to implementation. 81. Erosion control devices shall be inspected regularly-� any entrapped slit,shall be removed f to an area outsicle of the buffer zone and wetland resource areas' erosion controls shall be re placed as necessary. The areas of constructionshall remain i n stable condition at-the 'close of each is truc till onday'. All erosion controls shall be in place throughout the, duration of any construction on site or uffless, authorized by the Conservation personnel,. 82,. The NACC finds that physical.barders,are necessary in severa.i.,locations to prevent future 4 inadvertent encroachment into the wetland resource areas. 'rherefore, the insta' I'lation of post and rail fencing as depicted on the herein,referenced an is required prior to,unit occupation. 83. All existing and proposed catch basins and oil traps on the site or on the streets adjacent to,-the project shall be,protected by Silt Sacks,to prevent sediment from entering the drainage system. Silt Sacks shall be maintained and regularly cleaned of sediments until all areas,associated with the work permitted, by this Order have been,permanently stabilized and the NACC and/or Conservation Department has,formally approved their removal. 84. The sewer lines on tne site,where they cross wetland resource areas, shall be tested for water tightness in accordance with North Andover DPW standards. 85. Approved de-watering activities shall,be supervised and witnessed by the designated I I erosion,control monitor. This designee must oe on-site at all times while,dewateri*',ng is occurring. De-wat ring activities shall be conducted as shown,on theapproved ,plans, and shall be monitored daily by the erosion,control monitor to ensure that sediment laden. water is appropriately settled prior to discharge toward the wetland resource areas. No discharge water , allowed directly i nto an area subject to Jurisdiction of the Wetlands Protection Act, If emergency de-watering requirements arilse,,the applicant shall submit a contingency plan to the NACC or its administrator for approval,which,providesfor the pum,ped water to be, contained in a settling basin, to reduce turbidity pri'or to discharge into a resource area. 86. Associated pavement and roadways,shall be maintained. as detalled in the Operation& Maintenance Report or as d1h'-ected by the Erosion Control monitor, the Site Supervisor, Project Manager, or Conservation staff for as long as the,site remains exposed, and un- stabilized. 242-1428,lot 4n-aturnpike st,meniunn condominiums Amended 16 NACC 9/18/20,12 YI DEP FILE#242, 14,28 (AMENDED) 87'. After land development construction 'is,complete,,,the contractor shall test the efficacy of the porous asphalt by implementing the testing protocol required by Condition#66, and make any repairs necessary, to ensure the porous pavement "is fully functional., 88. Any fill used in connection with this project shall be clean f'111, containing no trash riefuse, rubbish or debris,including but not limited to lumber bricks,plaster,wire,lath, paper, cardboard,pipe, fires, ashes,, refrigerators, motor vehicles or parts on any of the foregoing. 89'. All exposed soil finish grade surfaces shall,be immediately landscaped and sty,b"I'zed, or loamed, seeded.and i-nulched, with a layer of mulch hay. All, disturbed areas must be, graded,foamed and seeded prior to November1st of each year. Outside of the growing season exposed soil finish grade surfaces shall be stabilized with Jute,matting or by other means, approved by the NACC until climate conditions allow for seeding. During construction, any area of exposed soils that will be left idle for more,than 30 days shallbe stabilized with.a layer of mulch hay, or other means approved by the NACC 90. No re-grading either temporary or permanent in the buffer zone shall have a slope steeper than 2,,J (horizontal-,,vertical). Slopes of steeper grade shall be rip-rapped to provide permartent stabilization. 91. Construction equipment/vehicles shall not be staged overnight within,100 feet of a wietland resource area,. 92. There,shall .o stockpiling of soil or other materials within fifty (50) feet of any resource area.Soils or other materials shall be stockpiled in locations approved by this . t t 'thin.the designated areas,as,shown on the approved plans,referenced herein. Any or wi 1. approved temporary stockpile areas shall be adequately surrounded by er sion controls to prevent,MI'gration of soils, off-site, 91 Washing of concrete trucks and other construct ionvehicles shall be done in designated areas as approved by the Conservation Department. A detail of the proposed location and design of the truck washing area, shall be submitted to the Conservation Department prior to the start of construction. 94., All waste generated by,or associated with,,fl-te,construction activity shall be contained within the limit of work,and away from any wetland resource area. There shall be no bu,rying of spent construction materials, or disposal of waste on the site,by any the means. The applicant shall maintain dumpsters (or other suitable means) at the site for the storage and removal of such spent construction materials off-slite. However,no trash dam stern will be allowed within 50" of areas subject,to,protection under theAct or local ByLaw. Portable toilets shall also be located more, than 50' ,from weitla,nd resource areas,. 9,51. During and after work on this project,, there shall be no discharge or spillage of fuel, or other pollutants into any wetland resource area. if tees a spill or discharge of any 2424428,lot -a turnpike s,t,merrimac condorn'Inlunis A.mended 17 NACC 9/18/2012 DE E 1428 (AMENDED) pollutant during any phase of construction the NACC shall be notif ied by the applicant, w'the I in one (1) business day. No construction vehicles are to be stored within 100 feet of 0, well and resource areas,and no vehicle refueling, equipment lubrication or maintenance to'be done wfthin 100 feet of a resource area. .............. FAFTER CO,NSTRUCITION soma 96., No underground storage of fuel oils shall be allowed on any lot within one-hundred (100) feet ofany wetland resource area. This condition shall survive this,Order of Conditions n 4 and shall run with the title of op the property. Th i's codition I's 'issued under the authority of the TowlYs Wetland'P rot ection, Bylaw. 97. Prior to th,e issuance of'a Certificate of Complia nce, the applicant must,subi-nit proof of contract to the Conservation Departmentin the form of a written and,signed document from the ass ignee(s) responsible for conducting the per etual site mainte nance in p accordance with the Operation&Maintenance Report and perpetual conditions mandated lin this Order. In addition to this contract, the applicant shall submit an Aff idavit friom the assignee (s) acknowledging the Operation & Maintenance responsibilities of the stoirmwater management systemsin accordance with the approved Operation& Maintenance Plan and other perpetual conditions mandated influs Order. The Conservation Department shall be notified in writing of changes to the pers,on(s,) responsible for the,long-term Operation,and Maintenal-Lce Report. 98. No road salt,sod ium chloride, or other de-icing chemicals sbal l be used on paved surfaces,and any arrangement for snow reniova.1 sball,so stipulate due to the importance of the site and wetlands. In addition, permanent s:igns; designating""No-Salt Zone," and "'No-Snow Stockpiling Zones" shall be displayed in prominent locations along the No- Disturbance Zone as approved by, the Conservation Departil-lent. Designated snow stockpile areas and.proper plowing of porous asphalt areas shall be utilized per the approved ,plans and documents,�referenced hereiffi. 99. Fertilizers utilized for landscaping and hawn carle shall.be,slow release,low-nitrogen types (< 5%),and shall not be used within 25 feet of a riesource area. Pesticides and herbicides, shall not be used within 100 feet of a wetland resource area., This condition shall survive this Order of Conditions and shall run with the title of the property, This condition is issued under,the authority of the Town's Wetland Protecfion ByLaw and shall remain in perpetuity,, 100. There shall,be,no dumping of leaves,, grass chpp brush, or other debris 'Into a, ings wetland resource area or within 25,feet of a wetland.resource area.. This condition, shall Yemain in perpetuity'. Upon completion of construction and grading,all disturbed areas located outside resource areas shall, be,stabilized permanently against erosi"on,. This all be done by 242-1428,�lot -a turnpike st,niernmac condominiums Amended 18 NA,CC 9/18/2042 DEP E#242­1428 (AMENDED) loaming and seeding according to NRCS standards., Stabilization,will be considered complete once fill vegetative cover has been,achieved. 102. Upon approved site stabinzation by Conservation staff, the erosion controls hall be removed and properly disposed f and,all exposed unvegetated areas shall be seeded. . U on completion pled f the ct the applicant t shall submit the following owin t the Conservation Cornmis,sion as part of a request for a Certificate of Compliance: a. WPA r A - ""Request for a Certificate f Compp1 nee. 1 . A letter from the applicants requesting Certificate of Compl"l nce, c. The name and address of the current landowner. d. Signed,statements from the individual property ners shall be,submitted with the request for a Certif icate of Compliance indic ,tl that they read and, understood the recorded Order of Conditions prior to purchasing their property. e., The name and address of the inc-iividual/trust or corporation to whom the compliance is to be granted. . The street ddree and assessor's map � cell, �..� 1 � r the � ect. . The D P file number. b. A written statement from a Registered Professional Civil Engineer of the Commonwealth certifying that the work has been conducted as,shown on.the tan(s) and documents referenced ati e, and as conditioned by the C fission and that the raina e systems bav n installed and are,functioning accorcting t the approved plan.. .. Allinspection reports required during construction.have been submitted. Maintenance co ,tracts n place. 1 . An"As-Built" plan preparedand signed and stamped by a Registered Prof , i a1. Civil Engineer d/or Registered Professional Land Surveyor) the Commonwealth,,for the public record his plan will include "As-B , lt" post-development elevations of all drainage &stormwater management structures, including invert elevations,constructed.within 100 feet of any wetland resource area.. NOTE: If portions of the stormwater systems exist partially within the Buffer Zone than the entilre structure must e depicted to accurately verify y compliance. Post construction topography includ ing all elevations, d grades of all,filled r altered,wetland resource areas including the encompassing buffer,zone. Distancesfrom structures to wetland resource areas. Structures include (lout. are 1* of limited. ncii n units,se tic systems, additions,fences,s1 ed �, stone walls, pools, retaining walls, subsurface,utilities and. decks. . line h n I the limit 01" r and the extent of existing erosion con,trol devices. "Work" includes disturbance of soils or-vegetation. f 2,424428, lot 4.ii-a turnpike ,inerri i,a (Iom�in'lt ms,Anwnded 19 N C l 1 DEP FILE,#242— 1,428(AMENDED) Location of all subsurface utilities entering the property. Deviations from the approved plan shalt be noted and explanation for the deviation,provided. 104. The following speci,ai conditions shall survive the 'issuance of a Certif icate of 0 Compliance (COC)for this project: A No- isturbanc�e Zone shall be established from t1le edge of adjacent wetland resource areas, as approved under DEP# 242-1428. Future work within 100" of existing wetland resource are will require a separate filing with the NACC. The Conservation Administratorand/or other agents of the N'ACC do not have the authority towive the setbacks as established under this Order-, Maintenance of porous paven-tent(Condition#42) Resource Area Markers (Condition#57). Vernal"Pool Monitoring,(Condition Maintenance of porous pavement and all culverts,, collections basins, traps, outlet structures, subsurface, storage, areas,, and other elements of the drainage system,, urdess, put into an easement to the on of North Andover, in order to avoid blockages and siltatloo, which might cause failure of' the system and/or detrimental impacts to on-site or off-side resource areas (Condition#70); Discharge or spillage of pollutants (Condition# 95)1,- Prohibition ofunderground fuels (Condition#96); Limitations on 'the use of fertilizers, herbicides, road salts, de-icing cornpounds and pesticides (Conditions#98 & #99); 1 4'.0 )> Prohil DItIon. of dumping of leaves, grass clippings, 'brush, or, other debri's (Condition#100); )> The approved avid attached "Operation and Maintenance Report" shall be adhered to. No additional. filings will be required to, conduct maintenance of the above referenced system and plan (Condition#63), 242-14282 lot 4n-a turnpikie s,t,meffifnaC condominiurns Amended 20 NAcc 9/18/2012 DEPHLE #242 1,428 (AMENDED) APPENDIX A-AFFIDAVIT on oath do hereby depose and state: (authorized agent applicant,and/or current owner) (PLEASE CHECK AT LEAST ONE'BLOCIO, 1., 1,a-i'n the of p o sit Ii o n with applicant) (applIcant name or company name) the applicant upo n whom Order of Conditions havebeen placed upon by (DEP orNACC nionber) the North Andover Conservation Cwllmisslon. &/or 2. 1 am the of (position with owner) (o�wner name) the owner upon whose land Order of Conditions have,been placed u by (DE um er P or NACC nb ) P the North Andover Conservation Commission, & 3. 1 hereby aff irm.and acknowledge that I have received said Order of'Conditions and have read the same and,understand each (DEP File#) and every condition which has been set forth in said Order of Conditions. & 4. 1 hereby affirm and acknowledge that on this day of 19 1 Mi spected said property together with any and all improvements which have been made to the same and,hereby certify that each and every condition set forth.it Order of Conditions, I are presently 111 compliance, (DEP File#) 5. 1 hereb y affirm and acknowledge that this document will,be relied upon by the North Andover Conservation Commission asxvell as any potential buyers of said.property Nvb ich is subject to said Order of Conditions al (DEP File fl Signed tinder the pains and penalties of perjury this day of (Signature-authorized agent of applicant or owner) 242-1428)lot 411-a ttimpike st,merrimac can,doi-ni'tihmis Aineiided. 21 NACC 9/18/2012