HomeMy WebLinkAbout20160419 Monitoring Reports - Consultant Review - 2302 TURNPIKE STREET 6/6/2016 �
�
�
CNWWAVAT
Project Address Date
independent Monitor Name MoNitoringTnpe/s\
ZCOD8t[UCfi0D
[l StUFDlVV8t8r
Monitor Contact Phone Monitor E-mail /
This Letter ofAgreement is between the the above named independent Monitor and the North Andover Planning
Board for monitoring aan/icaa to be provided at the above mentioned Project Address and in accordance with
the conditions and restrictions stated by the Planning Board in it's Decision dated . o
copy of that[}eo|aioO has been provided to the Independent K8on|tn[ (|n|Un\n of Independent
Monitor) By initialing, the Independent Monitor acknowledges receipt of the Decision and an understanding of
the cond|Uono/rmstdd|onn set bythe North Andover Planning Board.
The Independent Monitor also acknowledges and agrees that he/she is providing monitoring services for the
benefit of the Town of North Andover and in not the project owner or npp|iount, and does not have a financial or
personal interest in the project. Further,the Independent Monitor understands that she/he may not act asthe
project owner's agent, napnaGoDt8t|V8, partner, employee or joint-ve0turnron this project.
The Independent Monitor agrees to immediately report tothe North Andover Planning 800vd' via the Town
Planner, any violations of the terms of the Decision listed above, aa soon aa observed or otherwise become
known tothe Independent Monitor.This report is in addition to regularly scheduled monitoring reports.
The Independent Monitor understands that the failure to perform under this Letter ufAgreement, to the
reasonable ooUohaot|on of the North Andover Planning 8oand, will be grounds for said Independent Monitor to be
excluded in this no|n for any future projects which are within the jurisdiction of the North Andover Planning Board.
Independent Monitor [SigD8fUre] Date
By signing this Letter of Agreement, I indicate that I have read and understand the terms Included herein.
Town Planner [SiQOafUPM] [}8t8
June 22, 2016 WILLIAMS
SPARAGES
[NGINEERS , RIANNERS , SURVEYORS
Jennifer Hughes
Conservation Commission
1600 Osgood Street, Suite 2043 S
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
As you may be aware,our office was hired by the owner of the above referenced property
to serve as their environmental monitor for the project.
On June 17, 2016 we inspected the site following the tree removal effort. We noted
several areas of silt fence that required attention, The contractor was notified and he
immediately addressed the issue and fixed the erosion controls. It is important to note
that no damage to the adjacent resource areas where noted during the inspection. The
damage appears to have been the result of tree limbs falling during the tree removal
effort.
Please find attached photographs that were taken on June 17,2016. If you should have
any questions regarding this information please do not hesitate to contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 9 www.wsengitieers.com
.. ji 'c.�y. �'`�, -u.'; +� � .:-r, �` `x-� ,i--• -.� d � fir',
.c -,,:�' ����tiy+4 .,:� __-� \ ��f`'� �'h�11� .i -;r• °�'. � .a'Y'-.• 'is'r° _.`� a y�,...� s 3� � -�v i� 't ::.._:'� ! � Rr
f� }' }-4.` ^ ".."` 1 !"'' fit, L .i ra :.! -a ` m. ,. i-i5-.. ='A`: 1- .x J t .� v,,.� :'` e>• �['`:
3e cry }7pmc i `., nAll
yes ,•�' T 'Z4' Q�'`
77
NPm
�.
�//,�..,� �• � ^^�^ %^pia �° � z a
� � °°e�, -�°�� ..> ..�i �� ,j } _��.�v..�Yam.-. •s�ID��r`�s m"
j t
jEr` ,, r��i 'i. ^ � :f^1ds'" i ,��w � r ��y "g�a y,•
t
' ? ✓Vf I , ' iink
''' y
1r� F All +
�
+ jA9
,
1 MIT,
A vivo
SM Or-
4V �, 1
Aid
til-
.�, it �.�^a �S'i'^,i f { 1 �°� ✓.� r � �=J�i �� -r 41� � a.; t� t-:�. �.
1"t " iF �{M r}t
* K
we
9
YN"
OWN
+�, "/ �,r���` 7 + •t � l� t,rA � ��'�. / T #fir �f`
kf /
Y
6/22/2016 Town of North Andover Mail-2302 Turnpike Street-Monitoring Report#1
NORTH AN`D,OUER
Massachusetts Rebecca Oldham <roldham@northandoverma.gov>
2302 Turnpike Street - Monitoring Report #1
1 message
Gregory Hochmuth <ghochmuth@wsengineers.com> Wed, Jun 22, 2016 at 9:18 AM
To: "rold ham @northandoverma.gov" <roldham@northandoverma.gov>, Jennifer Hughes <jhughes@northandoverma.gov>,
Heidi Gaffney <hgaffney@northandoverma.gov>
Hi Rebecca, Jennifer& Heidi, Please find attached a monitoring report for the Earth Works, Inc. project at 2302 Turnpike
Street. If you should have any questions regarding this report please do not hesitate to contact me. Take Care, Greg
Greg Hochmuth R.S., P.W.S.
WILLIAMS
SPAIZ.NGES
f�}
�J
189 North Main Street, Suite 101
Middleton, MA 01949
(978) 539-8088 Office
(978) 590-6416 Cell
(978) 539-8200 Fax
www.wsengineers.com
We invite you to follow us on Facebook .facebook.com/wsengineers
2302 Turnpike Street Monitoring Report#1.pdf
1563K
https://m ai l.google.com/mail/?ui=2&i k=ab4f3cb798&view=pt&search=i nbox&th=155784332e443dd7&si m l=155784332e443dd7 1/1
July 15, 2016 WILLIAMSW..,M
C(&� SPARAGES
ENGINEERS . PLANNERS SURVEYORS '...
Jennifer Ilughes
Conservation Commission
1600 Osgood Street, Suite 2043 AS
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On July 15, 2016 we conducted an erosion control inspection at the above referenced
property. We noted an area of the erosion controls that required attention, (see attached
photos). The contractor was on site and he immediately addressed the issue and fixed the
erosion controls. The contractor installed an additional row of trenched silt fencing and a
row of straw bales to help insure protection to the downslope resource areas. There were
no breaches identified and no sediment observed beyond the erosion controls.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 ® Tel; (978) 539-8088 ® www.wsengineers.com
Any
1
J;,,
August 5, 2016 WILLIAMS
SPARAGES
CKINEERS PLANNERS SURAYORS
Jennifer IIughes
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On August 5,2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
In a few areas the erosion controls required attention,however, there were no breaches
observed, (see attached photos). The contractor was notified immediately and informed
us that he would take care of it.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
/(Z:::" �V4A-
Greg Hoelumuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 9 Tel: (978) 539-8088 e www.wsengineers.com
�'-
�
L '
-�
j RGp��� I r'� •I %4y'"t 4j
r.
I i
i
I
tw
Pd �4Z��
,ti v r
E `
z
1,
are
August 18, 2016 -w.,o WILLIAMS
SPARAGES
Jennifer Hughes ENGINEFRS , PLANNERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On August 18, 2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are satisfactory and the slope behind the pond, on the wetland side,
is ready to be hydro seeded. The contractor is holding off on seeding the slope until we
get some rain.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Z/ /�
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 a www•wsengineers.corn
p J
III' I W Jt 'Y � •' +'
tA K
�
10
i
����
�
9 � .
a = '
{
1, 1
rl
liv
,
,'tt
f
l
i S
s r
r
i
✓i a
,
`�1i,
August 12, 2016 WILLIAMS
SPARAGES
Jennifer Hughes ENGINEERS , PEANNERS , SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On August 12,2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
In a few areas the erosion controls required attention,however, there were no breaches
observed,(see attached photos). The contractor was notified immediately and informed
us that he would take care of it.
Even though some of the filter sock is torn it may not need to be replaced. The low point
in the erosion controls has been reinforced with a row of straw bales. The areas where
the filter sock is torn is in upland areas that should not see much stormwater now that the
pond has been roughed in.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
LIK
;A
0NA, Af
w
yam`
{- '
X
. , l
i
I�
4
x
� ���„ � ? � '"'''� • 'tip. �'� ;� �
S
1�
r � i
�,s
I
7
L c
s x` ry
2'
x y
w
� 1 �
y�
3
V Y
f'
t�
� 1
y All
a � F
"
�I
r
"
e.
r �
September 9,2016 .WILLIAMS
W-A & SPARAGES
Jennifer Hughes ENGINEERS . PLANNERS , SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On September 9, 2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
The erosion controls are satisfactory and no breaches were observed. The contractor is
holding off on seeding the slopes until the fall growing season begins.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works,Inc.
189 North Main Street, Suite 101 - Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
t !>r , t±ir"'z l f -.i '� 1•f t l ++ }�,7r�rP 5 r t "
`+ r " •v� '. ^a s ��y{5 t. . ,J� l d��l� �, s r... t - , � >
�' t !, .� Zr�l , �; °� ��� (( � '"t yyx��� �, r 91 '�v'.t ti •s �� f AAA,
J � � ,% + 53 I '�r t � •�' �
A,
`_"4 ' �•� .r i : 3i�'} d � �1 �� � t r.,.l l ��5 t,k�t'� ,' r
t`•^^r^. 3 y, t
1
+ a -. Jt>list
r l` Cot
s f5 q
s 1;+ c.>�tsCl, I�t s �• MAN
1 ti.
------------------
a R t}k�sl.r
1 t
ft�, f
xl°`{xt�ry��' f
tC> A} as i�5 R.
Sf
r<�� �
�s?, s , } .t Atli i •` �J1(r'TI� `��I� POWs.f' Jis
1 �. t `• w � ,t A,1�1 �' 6 a tl.{�dA f +�y3 u ;�;
' 'e' y2 >•_"r,'Rs .atP> 1 i { 7s s i } f§,, + JY
IA
�.y '� 4^i. �p?f¢ ,�.{ 1 "b5,�, 4I+t• yt 6��yj 1 ,1 , ' iJ, � ,�� {�`f
!' 'r ,a � �H�. 7�ef �a Vi t,��� '�, ���� � ti, � }f s s '� +� i-�4�;P Ji° �• ' �r f t t o9s'^� �s�� � '
Ism
t,
i
p T ?� �, Est, r !! 1 n „,,! � }Y.• ''
t �2
5L a � Y ry, �•
4 ! •�`IS" r•00
8 5 �, 1 •s 5 ! p+'.rl /F is, i'f,�'4r r� i r Y% c,�_ 1 !" Ly{�''+1.. Wit
P '�,A st,��.�-: d 1st � � �+� �,�y + k , 4(,I S'`'C� l�e'1-�` g f'r sk s,.r.,�A"4 �,�,t� y,,•
ZI
�• v f 4 � � � � "�"`�:5 F.,rt' � ,s.4 ��,.f mayy. a s IcayA k`�.!� � A N�.ti,
AMR�
�}; +�rR � ', , dGI r� � �„ 3 r a��`�,s,�y,°�lrot•s � s,� ".�1 �4; 1A4'�
C +. ��'gym �` iAw"4� �k+�Yy�yt 1, �� � �:.� � • �`u��� f ����f��� t�ft�t t7�y, �4 S� V`tL
__ ,f�•' } F b �`�",; � S�ti i }+;,,tea `� 1 � 1 ��;i;•��S�s s 1}�i��k r�,�„�54+ .iivy�i w��` '���pF
�n -
j" � ..
n -��
�� _,
_. . - _
�_� � � � �a
�� �' _
'¢�
� ,, � , .
���.. �
'�: - �' �t „t �
1,
°���
r
',. P 4� ��
��,
/' > ��"
� �
r � ".®',�.a�.,
;.a�
� ..`y.
�,��
P .y �.� �
_ ,-` ,�,
�� f°5�� ��^ ,'sue!..
_ t �
� ha t� ��s � � � ��y
� t
��w� °
�5
6'S �., 'f ,b ;,
b ,S N3 'fir" �"'� ,.�' - �' 7$.y
,_F � � I '}� 1.
. i � �- �
t "
k � �t �\ %% I 8 Y i�
September 30,2016
WILLIAMS
W-04 & SPARAGES
ENGINEERS PMNERS SURVEYORS
Jennifer Hughes
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On September 28,2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
With the exception of one area of silt fencing that came un-trenched, the erosion controls
are satisfactory and no breaches were observed. The contractor was made aware of the
area that required attention and it has been repaired.
The infiltration pond and side slopes have been loamed and seeded,(see attached photo).
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works,Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01.949 e Tel: (978) 539-8088 a www.wsengineers.corn
i r
° y iTr a sJ � t
vj
M
-Tit,
At
'F-; Y MAW
A M it 1 �(
L t� Y'k. �y'"�c At r� 3C• "Lv.� A _�Y> '� t ➢� r r: '� � `c� r,
Ogg
l� �ry
Vr �S# i
POO
is
t5 �D��' y%r ' rap '�`, e r , •���f r iti
y` -✓�}, t1 t r
rf `
slrol r ( ,
v ' i N7
r
3 ail
lw'i
W V, �J j3�,:
4
a
r�L7
m{,?
k t
IV�.
J 3 1 �ft �i R�„P'w�•}y0�' ya 4 �,"R '� `i rr r L �u �. ;(( y
MAW 0
1 ~�Z 9°r.fir'yy 1yy S`\,`ay. P�' e \7^..I
"NEW 7 7 :✓ram L a -�n�� �� '
+t }) rY, &p� +I Y '�gtti r
'tRt F
tiv
1 ✓� a.4,°�� �� � 'd+ t i i e( r � + * `�i °+f � y �f �Y,�-f _:x
`*°r ltk r f r' _ P"..In
t.�'''�
t� }` tt��
fix .j r.00,
6t.ti� �. a� 1 e �' . r , � lk-'- - 'r d.i y rf•a r�' ;£s
PRO-
•C�
R + k4x2, t i tvr ! +,p
�,�.a•`zy� r �lti't���.:
i
y a
iil µme, `3 t Y
r
ry
x ;
\ .. ` to 1 `� 1. "--". •Y� Jt,''x1.F
t F� x 1•
54
,, F� � 1 Y
ff A .,4��f�! y
t4 \t
S ry
ri"
�� 14
`y
yr tJ i rR x r
4
October 3, 2016 WILLIAMS
SPARAGES
IC
Jennifer Hughes C ENGINEERS. PLANNERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On October 3, 2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
With the exception of one area of silt fencing that came un-trenched, the erosion controls
are satisfactory and no breaches were observed. The contractor was made aware of the
area that required attention and it has been repaired.
'rhe infiltration pond and side slopes have been loamed and seeded, (see attached photo).
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
J f ,
J ��F�4 •,l g,.,(S
P �
y� f
� r
�� 5�{ � 'lyy•E t�� wY
KF� 3ij n�jc lt, f 1 5't� 2ti
ro;tiieY#rr
r
t Y �
t�U � f� ; � �' ♦ 5f$S�� r'7'fit { �Atli�r
,,f ` fi f ri i fo ♦Wl�
11
:sx � X�� � ,,fit' �br �ii tl.. °'• ,�� ��
k
t
a a ,
Y
}'tj'
f
i
y xYt ,y w
4 i
k
a
q it
I
,x
�i
4 ``
October 24, 2016 WILLIAMS
W-04 & SPARA.GES
Jennifer Hughesc( "NONCERS , PUNNERS , SORAYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On October 24,2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
Over the weekend there was a significant rain event and as a result there are a few areas
along the limit of work line that require attention, (see attached photographs). The
central portion of the erosion controls was compromised and sediment migrated over the
controls.
The contractor was on site this morning and he and I went over the work required to
remove the sediment from the buffer zone and to repair the erosion controls. The
contractor informed me that the repairs would be made right away.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hoehmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 - Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
F� t �':i"kl�'" ��'k+}s a S f�„�er'`'4� � � J� ��+���# X� ---�� • F '�•s F a� i
:;'+7aL
�
� r +{ Aa{l g«AYit ,' r,—„,' ,. ,� is"`� dj✓ f6 x }f'�`j r3"¢" 9E
•4l -„�'� Trt dti X '}u.rKati �,s, c a #} 1
4•a"d�`��„ 1F�et* (} } £.q'�t{4 t•?sr.7#'s�i `�y�` t YtSI/ � �"! {�xS�L
�.y s'c,sit§U��s f ''}�a��►`{ �f�l t '"��trt$
J
r yr t�k 4 s',,' "� r FFfs" "" :♦ `i3 tide" td vs fi
�s`{
�i-5'¢ �`> � T4�`�?•{, F� h�-`�•�+�r ��� °styes, tx� �; t •}� �,±u� r'u, �haV.
f4# ;Xa x of gs ofysi f was
? '� a
WIN
,},,zt-`'€
��� a x �r � }� �r. Yr f i r7rt r a 4 �'�_ti� 3 A -># -; �..• r ray � � r � .�,�,
,'� ��r��, � �, 'r a7 ��i{�+�E ✓,� r �fx�,°�,� ,, `f� i� �. ��,i,�-z1' `� '# }���
MY
K 3 +
�4 ##,�, } � 1 _ t.�• � K i`i:+' � �'{ ra v2 .7} ffb �r� �•*` � r %rC�i�i
liF Z� � i i3 ��•'� �',t fir: Isy�f„T"a�� S• tl#�x :}"
t tf' L
r
n
p
r�3a`
x � ar - t ���T �fi3s $sit #R .>" ,• �t cX } ; `�?�'�L,� �f`". ` ,ry s� aS... %�a�}!"+.�a'
a � � � � €T +��♦i/n wt f r����+,�r� tF .:d �'{�,,y� a!-«a -c�a� �,m#' t t. (f
` •�yl tft¢'SkP+rRm,�T� � it5X�x J" �� � �' XR x�'m�jy���� 1 P j ,,Tu; -�";�
� �.f P�+' 4 a1 +� �!E'r`'�s t; a kl 4t i-k�q�?• `�•� F,'`�t+.�
a ,{ � °�i�t,§ i }�rfj �'f�# �`,�y x �`�{. �;:i� �����4�i�• Y,, �Yr,-., f��,
or i
s�r`�y�� �t�t�i `a��.'€c3. i a"f�
e r 1'h yZs:{FC ! 1- nKxi^' x,yd .Nf.f it .S J. eN
-till? �r"�y�t 'a
t�� t'U?ti (,�k- r`'; t. � Y ti�sr �y��1•Fx��tttitf ✓S t'y,}���2 ?p't
,E� F fi �....�r !kr i�r'��7 i x4�f�r#'x �+. ���``t•�4 a et��t� �;�"���� { ' �'` ��
�t§ < �)r- Y ill,f 'F�� ��,�.�$$,, ,y u.. �T 1st• Y$r`xf x.kx �w3rf.sif�� s 3 �� � { ;.;fir
r ,44� 'Tr'y,� �a0• a�rL,�,�. s r'ti. -., � y r ��� :,�Y� r �a,y x R ai g�.z% y'1 a f.
its;i • ;7y-,�(t, ,4 ht #;bs<.
r
r a Y d1 r t Y tr9ar oil
mot
`- �k°���� � if li `}a F �fi• yj } sk`'z $ .» �t,,a.,x' r i. r F e��. OY�, �r
` rF rP` a }'r'tt + fn�• -`�r. "'xY �'`i � f`'}" e s,
�',� t �
it
a d� y i "P` ���x� �.;rµ T p S,� � � F� •.�� A b.r If r� } 1 '�`'S,;sE i � 1 � '�,...,...u..�
i
November 11, 2016
WILLIAMS
SPARAGES
Jennifer Hughes C( U10WEER5 , FLAMIERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On November 11, 2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
During our Inspection,there was no sign of sedimentation and no risk of breaches were
evident. Also, the central portion of the erosion controls (which were previously
compromised)had been repaired by the contractor and restored to their original integrity.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, M 01949 e Tel: (978) 539-8088 e www.wsengineers.com
;}�{��
'7 t
1 r }
}� rt
%w
\ u�
5 f a1 rlat'VA' y r 1
r
I a
3� A
.> A
t!
E gy9 .. vyyY.�. �•
,
t
i
w
r
a •.
1 '
`e� y
Y
�i
( y
,
November 18,2016
WILLIAMS
W-'"4 SPAR.AGES
Jennifer Hughes C( 'NG1NE(RS . PLANNERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On November 18,2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
The erosion controls are in satisfactory condition and no breaches were evident.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
it
ro
•r..� __ � / r� } Sri t�� � i _ ��f"t'���r��a�i�Y}� +r r �'' �yf��+ ,�r�
J I
a
=5�
I In�"-gm
out Nwvy
-ATT
°
rIS Vr ,I
YXIN..r r
AM
its
Mau I
�+., } �9*&ku '�3�1 � 1'• � '�i rr��t µS, �' �,t �t7�{�"5��- ¢k - }• �t .
4
I
d
�4
x
1�
k +
r
r ,
� t
t
PROJC;-U NUMBLR
_,Vq,vD-33�
November 30, 2016 -W ..4 & WILLIAMS
SI'ARAGES
Jennifer Hughes ENGINEERS PLANNERS SURVEYORS
Conservation Commission
1600 Osgood Sheet, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On November 30,2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
The erosion controls are in satisfactory condition and no breaches were evident.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
i
Greg Hochmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) S39-8088 0 www.wsengineers.com
t
'mow
All
iwz
r
�+i � � z. ,�"�',r�!'«,�` ,f�,�, r��" � -t .��'•`��a I' Ifni` ,,�
_•..rt;e�,.�\ "� '..:�::ti`'n ...i .'� S�y�ty��.�:�.`�i,��:�..{�,".' ,�,t,�r�.+���.,",� ;fM:',�Fx,,,: "„5,�' ,, �.., ..
t
res`<pi
1�
December 9, 2016
WILLIAMS
SPARA.GES
Jennifer Hughes ENGINEERS . ELMMERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On December 9, 2016 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in satisfactory condition and no breaches were evident.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 ® www.wsengineers.com
i
rF, } tt �Q i it iS y ` R xis
1x� C .•L. r a W� dLii L�fxh k 4
� , is`t4i,� '� �• s �� � ��
PU� qs��u�
I tt (( y
x ` ( +q�; 1�''', �*--ram , �`�� �•��� 1�,� 7s���d `si`
a
t
4*��� 1 ��, `✓,tea., _ �1. a ��#� ��'nt'�dui 1 ��4
f
a
r tt
,a
A
,
r
2 `',x a'�.'*'>�j tY ?.. �`a r' _; + ►"�/ r�,y
h� � v'7ri t d 4 v
Nii
,'-
cl
7
t c a'y+ 5 Satri e f4 ,S- ,
i
December 22, 2016 W-4 & WILLIAMS
SPAnAGES
WCOXERS PLANNERS i SURVEYORS
Jennifer Hughes
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On December 22,2016 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
During our inspection we noticed no evident breaches in the erosion control line. We also
noticed the contractor added an additional erosion controls around the outlet pipe of the
stormwater pond.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES,LLC
Greg Hochrnuth,RS, PWS
Erosion Control Monitor "!
cc: Dan Gill,Earth Works, Inc.
189 North Main street, Suite 101 ® Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
F
k
F fk (iT�'.tr It
Y�
1
_ r ��, � •
w t
� F
1 t
i k a4 t }a
Cis
4
t � .'
r
"fy ,
Y
µ
F '
r.
4 j" xi,�.
12/13/2016 Town of North Andover Mail-RE:FW:2302 Turnpike Street-Environmental Monitoring Reports
NORkN ANDOVER
Massachusetts Rebecca Oldham <roldham@northandoverma.gov>
RE: FW: 2302 Turnpike Street - Environmental Monitoring Reports
1 message
Gregory Hochmuth <ghochmuth@wsengineers.com> Mon, Dec 12, 2016 at 3:47 PM
To: Jennifer Hughes <jhughes@northandoverma.gov>
Cc: Danny Gill <earthworks300@msn.com>, David Dell Isola <ddellisola@wsengineers.com>, Heidi Gaffney
<HGaffney@northandoverma.gov>, Rebecca Oldham <roldham@northandoverma.gov>
Hi Jennifer, We have had conversations with the client and he understands that before the pond is put online, and
once the up-gradient subcatchment is stabilized,that he is going to have to clean out the bottom of the pond. The
pond is not finished by any means it just looks like it is because of the grass. Thanks, Greg
From: Jennifer Hughes [mailto:jhughes@northandoverma.gov]
Sent: Monday, December 12, 2016 3:30 PM
To: Gregory Hochmuth
Cc: Danny Gill; David Dell Isola; Heidi Gaffney; Rebecca Oldham
Subject: Re: FW: 2302 Turnpike Street- Environmental Monitoring Reports
I spoke with Usa about this as well. Her concern is that this is an infiltration basin and if it is used as a temporary
sedimentation basin, a few feet of material will need to be removed in the spring and clean material brought in before
final grading. Was the basin already to final grade?
Jennifer A. Hughes
Conservation Administrator
Town of North Andover
120 Main Street
North Andover,MA 01845
Phone 978.688.9530
Fax 978,688,9542
Email jhughes@northandoverrna.gov
Web vvww.northandovernia.gov
t
https:Hm ai 1.google.com/mail/u/O/?ui=2&ik=ab4f3cb798&view=pt&search=i nbox&th=158f4ca4f37ce6l2&sim l=158f4ca4f37ce612 115
12/13/201e Town mNorth Andover Mail'RE:FW:2302 Turnpike Street'Environmental Monitoring Reports
On Mon, Dec 12, 2016ai3:i8PM, Gregory Hoohmuth <ghuuhmuLh@wa engineers.nom> wrote:
Hi Danny, I wanted to check in with you to see if you could take care of a few things at the 2302 Turnpike Site. Heidi
was there last week and noticed a few areas that require attention. She and | discussed those items today. |tisokto
utilize the basin during construction as a first layer of protection during storm events; however,you need to make
sure that the sediment coming out of the outlet is contained within the erosion controls, Ao you can see from her
photos there is a lot of sediment at the outlet pipe and a tear in the erosion controls is allowing sediment to get
through the barrier. I would recommend doing your best to keep the water going into the pond as clean as you can
and patching mp some of the slopes around the pond that are eroding. | realize that because itioonactive
construction site that it is not possible to only allow clean water into the pond but anything you can do to help will
insure that sediment doesn't reach the wetlands. You may also want to beef up the erosion control at the outlet.
With cold weather upon us you should make the corrections this week. Maybe a half ring ofhayba|es at the outlet
pipe will help. Please give noea call if you have any questions. Thanks Greg
From: Heidi Gaffney [08i Ito:hgaffney@northandovenna,gov]
Sent: Monday, December 12, 20162:29PM
To: Gregory Hochmuth
Subject: Re: 230Z Turnpike Street- Environmental Monitoring Reports
8t Greg,I meant to e-mail yououBriduykotvvuuon1vvitbaodgrxiuc. I visited the site ou Thursday the 8Hh and observed u
few things that need tobc addressed. Wanted tn check with youto see what you think sh uld be done. There's some
erosion ut the end of the wall(u stone berm at the top would help)but something should be done\o stop the erosion into
the detention pond. A section of the side slope sloughed off also and at the outlet near the erosion control there is hole in
the silt fence which should be fixed,but there's also a lot of sediment at the outlet pipe...
hmpo://noi|.gmg|e.uomhnai|/uN/?ui=2&ik=ab4f3ob7988wimw=pt&ooamh=iubowSxx=158f4oaw37ooO1o&oim|=158f4oa4f37ooO1u 2/5
12/13/2016 Town of North Andover Mail-RE:FW:2302 Turnpike Street-Environmental Monitoring Reports
1
4 f 1 11 1: 1
a ' f
r
r
4 #7'
r
v ,
v
y
y
r'
https://mail.googl e.com/mail/u/0/?ui=2&i k=ab4f3cb798&view=pt&search=i nbox&th=158f4ca4f37ce612&si m 1=158f4ca4f37ce612 3/5
12/13/2016 Town of North Andover Mail-RE:FW:2302 Turnpike Street-Environmental Monitoring Reports
On Mon, Dec 12, 2016 at 8:37 AM, Gregory Hochmuth < hoch uth wsengineers.cc > wrote:
Good Morning Jennifer, Rebecca and Heidi, Please find attached monitoring reports for 2302 Turnpike Street. If you
have any questions please do not hesitate to contact me. Thanks Greg
Greg Hochmuth R.S., P.W.S.
I/V-4 WILLIAMS
(CC PRAGIES
S
189 North Main Street, Suite 101
Middleton, MA 01949
( 78) 539-8083 Office
78 0-6416 Cell
t 73 '19-8200 Fax
ovvv v,wsengin e s,com
We invite you to follow us on Facebook v;vvvi-aceebook,comi'wsengineers
Heidi Gaffney
Conservation Field Inspector
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 973-688-9530
Fax 973-638-9542
Email hgaftney@n rthandoverma.gov
Web vivvvv,ncrthandcverma.gov,
https:Hmail.google.com/m ai I/u/0/?ui=2&i k=ab4f3cb798&view=pt&search=i nbox&th=158f4ca4f37ce612&si m l=158f4ca4f37ce612 4/5
12/13/2016 Town of North Andover Mail-RE:FW:2302 Turnpike Street-Environmental Monitoring Reports
•.��T'II.ED lea .
All email messages and attached content sent from and to this email account are public records unless qualified as an
exemption under the Massachusetts Public Records haw.
Visit us online at www.northandoverrna.gov.
All email messages and attached content sent from and to this email account are public records unless qualified as an
exemption under the Massachusetts Public Records Law.
Visit us online at www.northandoverma.gov,
https:Hm ai 1.google.com/mail/u/0/?ui=2&i k=ab4f3cb798&view=pt&search=i nbox&th=158f4ca4f37ce612&sim l=15gf4ca4f37ce612 5/5
January 6,2017 WILLIAMS
SPARAGES
Jennifer Hughes ENGINEERS PEANNEAS SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On January 6,2017 we conducted an erosion control inspection at the above referenced
prppprty in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
During our inspection we didn't notice any areas along the erosion control line that
required attention.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES,LLC
Greg Hochmuth,RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
< 4
t
r law NAY, r QA
,
41
t:
r. + 0 t
Up
off
F
now
C pt r J O
a'
VOW y�
/
<
t p�
4
pp AP
y
S"_ {-
f �r
al
�J ii f
. k
r
•r
t } '
ff
till
x
r
i
{ r
1
Rif&
Ira
x 4�
�
s
January 13, 2017 WILLIAMS
SPARAGES
Jennifer Hughes 1NcwcEas , au r+exs SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
RE: 2302 Turnpike Street-DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On January 13, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
During our inspection we'didn't notice any areas along the erosion control line that
required attention.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
A�
Greg Hochmuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 9 Middleton, MA 01949 e Tel; (978) 539-8088 e www.wsengineers.com
rr�•
�k
^iR �
�� ir 3 kv
1.,
t
t LL t
r
5 4 F
w�
�3E
r �
Y
�s 55
x
} s.
6 f 4
J�•
ks
i
l
Y �
x;
I Ii
x� 1
t ft
d
.1.
4 ,
January 20, 2017
WILLIAMS
SPARAGES
Jennifer Hughes C( ENGINEERS . PLANNERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On January 20, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are holding up well and no breaches were observed.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS &SPARAGES, LLC
q4
Greg Hochmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
� f r
f
S r'
�r
t
a r3
F
z� r
Al
" _ p
` ��� � � �� ��� r�` �f� �� ' T .'• a f�f�y 5�i
€ 1'
f
t
f
January 27, 2017 — WILLIAMS
SPARAGES
Jennifer Hughes C(
ENGINEERS YANNlRS • SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
RE: 2302 Turnpike Street- DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On January 25,2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are holding up well and no breaches were observed. We did observe
several areas around the stormwater management features that will require attention this
spring. There was evidence of erosion around the perimeter of the infiltration basin and
rain garden. 'The extra erosion controls that were added at the outlet of the infiltration
pond appear to be catching any sediment that works its way through the outlet control
structure.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
/�� 94p-�--
Greg Ilochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 + Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
3 �
2
t .
t
x e
s
1
Y �' w sY ✓ Via{ ��7 i i�,
't r r .jai
� !.� frr �"� ��€'i�k�}�1 �_ jl �k. �::'���•,S��rl S,{., .,. � »`... `.f�+<7i. kr�r�`j`�
�j
a 4f¢��IErp 4l r> t 2+�� �K '•+� :r *i t.;tfk` � � ' � i�';!` 3��
4 I
tg�F
March 10, 2017
WILLIAMS
SPARAGES
Jennifer Hughes C( ,NGINEERS . EEANNERS , SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On March 10, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls require attention in several locations, (see attached photographs).
The silt fence is sagging and needs to be stood up and reinforced along most of its length
upslope of wetland flags A2—A 10. New silt fence will need to be installed in any areas
that are torn or separated. In addition the mulch sock is barely visible in many locations
and will need to be replaced prior to spring rains. The bio-degradable mulch sock is
typically only good for one winter. We would recommend using either double staked
straw bales or the standard mulch sock in front of the trenched silt fence. We would only
recommend the new mulch sock upslope of wetland flags A3 —A10.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
2M, 'f"
---
(i
%71
t y
nr,
�
'vis_
t?'�ACj
.x
TV
u r
{ � �Y
Ftr�ie
now,
dz:o�.w�,
k,{tr iyr 5
t tt 1 pi?a�°
;t
1 z f fit, l q� I
A— iz Sy'¢�
t✓ ry !'y,•: &r.:.
s }j, .s, �\� �I / ,� ` ". r ,` z t"•4 44t ,� ,5 # �'IR".,�
lug
WOO
r a r1`r4yy ! t
IRS
��i z A, ��+�a + 5v �a����i��<krr�� tp�� 4��'���`4'� �� �i `� �(� ��3�r .�'{j, � �`V ` t�� �/i' ���ts�la�•P.�•
�'r {'�'n '- �h h F',(r• ;c �"'y' ts� J�,�, ,i � � u*'t :y ' ,t+s� (s��& ga+'�,� ;4� � ''r r.�' ., z
MAW
r
+f ps
.71,-
g` f�y'� z yea: ® r fry
Y :: y ' % 'r^ � Tit* PY•i Y}�.�,}.{, ., # t x 4 1t�Prp
st
,!t'h.` s P l„'1 '} 1 i #i ."�4Rt{ U 4 `�L € ➢ „+ r C� t r: 4 rg s! f
K �� �,,.c„ ffiLLL�jc��NJs''3r 4{�gp•'tV+. '1 �g'�.`f ry a� yY vv �F y,. :W.>^.7�,,� � r� �1����. ads �iy'�.
a � {`�� 'f 1 �aJ Ft ( � 31♦r34� �� ".'y-} x mow- � 7J� � a+ ¢,� :'sF{` �,.� l z � .:
fri.' .j �53+ 1Y� `-y 'i,` apt
i.rj„/u"..i� '"Y2"" � ;-} st•iz`, ��l ` C -a ri t
i " +alNe £
� f (g �Ttk' 1 ,:� z .t �§, i .a'tar,iC x a x ;.. ;.+
rt .,i�3(��R i'j`'�+Y�1•�, fr`�. gtl�k a �r si d.
ai~N' t 1 g. $a !
Yq 3 `F 6 i s y a ' z� =" L rs t. 1 aa4}+`j ' �'i��, Y �. e ��..
r'i; v� 1 t1.4� #guff #t t' .r�zj',. 4 r °�al�'r. ! �,. 3 3 { 1
i
cr
d>• `�'7�� � € L+r 9 Bey `��.1 rt y 1 {r i ✓ # s*'-
��c �h� ���y+��` ��e��!}�,y,�(i 4} dl+(N ,�d,t X } ��"•t-•� r-`�lxs..e..� {V�c� �^ �i- t�' >- /..3 °. �i r"{
SM��h�' �1.tS� t{3J
E ,• , f .L-f
•'' � 4 x d r� ,�� S t ;� a A �r 7 � t � r ��
a,
�.�
r A c hir { 1, yr*�
✓�
k
r {��4 P'
iP� tt'� r rt.�1 x('`+� ,fit r "Y"
e �+"fa,,,��{''
.�x� '+.�Yk..k •� f sst .t r t t�z�a� � r
i=rx
,�„"tr �3'4 '�lYr1� �)�,� { ,����a'r }1. �� ems' � �§'4 0>•4 �$�� � -s''4"i A�t
' '`-zt -.'°'.'t+' i� `( i a i ,!3r F •"�1�'' 1.t
��&+lf
� .,,�' \ty, � z� ,•6'Y i �r a .r .k, d :r' Grp r �"� d Y
't`� �'"�� ,� � ���d et`�iry J�.• �.� ,�� � ,ztF 'g _"'..��_�- s i t i t�% t y { � F`
g�r j j y � }Y# top"a 1 le
z k �k* fxyj
"k
't�5Y fit`tz 4f16sy��l a".
t l i j
March 27, 2017 WILLIAMS
C(
Jennifer Hughes SPARAGESEtIGWEERS PIANNEAS SUNYEVORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845 S
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On March 23, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The client has added additional erosion controls and reinforced the silt fence as
recommended in the previous monitoring report upslope of the A-Series wetland. A new
row of staked straw bales were installed in front of the original erosion control line.
The contractor intends to stabilize the slope above the erosion controls as soon as the
growing season begins.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineet-s.com
`„ � '" Y
� .�F �� �
_"' �„ � �
�.
}1....... �' Z � .. a
�Y
� �v. �
5 � � � /
�, n
x ?-�
"�- ,„� � f
?? 4���
�� � ���
..
c�
e .ui^,,. �_ ,. i
x
%N�'
�.r,-' �,
�r
E _ r
y
��
?� t
��
�iV
i� � i
x5
„� ����'
! � ����
`�
� r ''
a
�F �
� �
a �.
*� a
�� '�
�. �
April 10, 2017
Jennifer Hughes WILLIAMSSPARAGES
Conservation Commission MWERS . PLANNERS . SURVEYORS
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham S
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP Pile Number 242-1671
Environmental Monitoring Report
Dear.Jennifer and Rebecca,
On April 10,2017 we conducted an erosion control inspection at the above referenced property in
accordance with the requirements set forth in the Order of Conditions and Planning Board
decision.
There were two substantial rain events last week which resulted in some erosion on the steep
slope to the north of the existing building. The contractor had already reinforced the erosion
controls at the bottom of the slope prior to the storm events, however, he had to add additional
straw bales in two locations that were accepting the majority of the stormwater. Some silt was
observed on the leaves on the wetland side of the erosion controls in these two locations,
however,the standing water in the wetland was not turbid and there did not appear to be any
impact to the resource area.
The contractor also placed additional straw bales in areas that stormwater was concentrating in an
attempt to slow the velocity of the stormwater before it reaches the unvegetated slopes.
The contractor plans to address the slope now that we are into the growing season and will more
than likely use jute netting or something similar to hold the slope in place until it fills in with
grass.
If you should have any questions regarding this information please do not hesitate to contact our
office.
Sincerely,
WILLIAMS&SPARAGES, LLC
Greg Hochtnuth, RS,PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 * Middleton, MA 01949 ® Tel: (978) 539-8088 0 wwwmsengineers.com
1�
de
Ty-
!a ��s
J—�.+
; 1 z
'Aft Ar 4 }
L Is J
°! en
* ° tYwa r4tir /t s a�
� u 3 �
,�-r ,
41
,� S 44 y d
-74
r
ff
'u �f`,�}
ON
i h 1. ,Xd /`S ►'�.. i 'F`
;� e � i S�} � K,,tt��S�':r ,yt::•tl `sy, t,6i �, r .yd #r
31
ve
�i i a`
i .r ,
14
#4 G
�w IN
Y+ 'MAI
NOW
Ji
KA
,i Yk
kW
i
t.?I
� r
u
�.
A rk%
711,
e.
r,
�rr
v
�' II
s
y �k
4�
>t "
f"
April 28,2017 WILLIAMS
SPARAGES
Jennifer Hughes CC ENGINEERS PEANNERS SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On April 28,2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in good shape and no breaches were observed. The
reinforcements that the contractor installed are holding up well and helping to protect the
resource areas during major storm events.
The contractor will be loaming and seeding the trouble areas on the slopes in the next
week or so.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
A�,-p4z—z;'�
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 + www.wsengineers.com
do 3
e
i F
v
ti
„x
x r
t
z
t
E
a f
ey<<
V
q- ,
e `{
�4 w
x
r ,r
to �. V'yr
a
x
i
�u r i
May 19, 2017 WILLIAMS
SPARAGES
Jennifer Hughes ENGINEERS . PUWNERS , SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
4600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On May 19, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
During the prior week the site experienced some above average rain events and the
erosion controls held up well. The slope to the north of the building is holding and the
contractor anticipates re-seeding the area soon.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
�, 5�3�'� t �`�l.. �� `�'� ,+,.�e•�`4 ,r of �� �r '!`< .; V�Y i1{—.a `r 5 ��{�
- X0
~•»�i�y'''"' i itl �� i )���°,� ��( � � si+9� i �;���� � �� 1 f i t7+��� � �{IJp,:� �. ���
Awy
1 f .
r t .A
4'1'
1qt ryr2 `*r1.
0 t
WIN
5 i - ot�o
ARA
401C
t e �/, �,, .•"``'' `�";: ' � r�+l`.'.fib it.: } 1.
kr f t
I 1
t{y r�
1
S f
JV
i C
a{i
June 2, 2017 WILLIAMS
SPARAGES
Jemlifer Hughes /ENGINEERS . PLANNERS . SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street - DEP File Number 242-1671
Enviromnental Monitoring Report
Dear Jennifer and Rebecca,
On June 2, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
Overall the site looked good. The contractor made some minor repairs to the erosion
controls since the last inspection and no breaches were observed. The slope below the
building is filling in nicely and I expect complete stabilization in that area in the next
couple of weeks.
The foundation for the main building is in and the contractor intends to start constructing
the building over the next few weeks. While I was on site this morning,the steel for the
building had just arrived.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
,1,t, 244A-
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
T
a
µ
June 12, 2017 W-41 & WILLIAMS
CSPARAGES
Jennifer Hughes eieu�ecas . e MPIERS . SURMOas
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP rile Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On June 7,2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in good shape and no repairs are recommended at this time.
The construction of the main building is underway and will continue over the next couple
of weeks. Now that the foundation is backfilled there will no longer be any need to de-
water.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
k {
Y t
I
z
asb l
y
� r
f
� x
r
� 4y4 raa��
. die
� �" � mn ,�� � k � lk'•*
k,
r
r
r
Y �
s
July 7, 2017 WILLIAMS
SPARAGES
Jennifer Hughes C( ENgNEEAS PtNlNEAS ,SURVEYORS
Conservation Commission
120 Main Street
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover,MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On July 7, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in good shape and no repairs are recommended at this time.
The construction of the main building is still the focus and will continue over the next
several weeks. If you should have any questions regarding this information please do not
hesitate to contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 ® Tel: (978) 539-8088 e www.wsengineers.com
-
T
. ";..,`tii. '' -.�`:`.r•' .<;:y,` 1 ' ' �Y -i:-°'J�'r�,}..,.ysg
t �,. .� ,Y �i �� e ��� ,b9 § n•••��� s q i3` y ,—tr`r' `a,f,.!' ,1��->„'t � �g;1„t�z a, ��?fjN n 'd ,�y
��� '� �; � �i' t yy I °� 9 ya at i '•ire "„ —'� s—� r" c ��,+!��+�. ���y
14,
s N
71'
04
ill
u
z
e � y
- I
r
s
5)F a
5.;
t n '
f ty
a
June 27, 2017 WILLIAMS
SPARAGES
Jennifer Hughes CC ENGINEERS PLANNERS i SURVEYORS
Conservation Commission
1600 Osgood Street, Suite 2043
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On June 26, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in good shape and no repairs are recommended at this time. We
did, however notice that the back right corner of the building is dumping a substantial
volume of water during large storm events and it appears to be contributing to the erosion
on the slope to the right of the building. We discussed with the contractor and he is going
to come up with a solution.
The construction of the main building is still the focus and will continue over the next
couple of weeks. If you should have any questions regarding this information please do not
hesitate to contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 ® Tel: (978) 539-•8088 ® www.wsengineers.com
pp v�
W,
{ X
p X S
41
( �.//
r}, Td c } A',
c
k
Ji
4
P
,`'`{
4
+a,
'
y� `k. }yti Ai
� n 'x" tit
A
1 ..f AS yI,.
i rv'y'i1 s
r b t 6 p
7T
7:
0
JR,
_ s
1 }0, 0 4
1
tit
t �
r
M � �
July 14, 2017 WILLIAMS
SPAR AGES
Jennifer Hughes CC ENGINEERS . PLANNERS .SURVEYORS
Conservation Commission
120 Main Street
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On July 14, 2017 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in good shape and no repairs are recommended at this time. The
slope below the right rear corner of the building continues to be an issue. It appears that
the source of the erosion is a combination of the right gutter not being finished and the
outlet of the subsurface downspout collection system. We look forward to discussing this
issue with you at the site visit scheduled for next Tuesday, July 18, at 11:00am.
The construction of the main building is still the focus and will continue over the next
several weeks. If you should have any questions regarding this information please do not
hesitate to contact our office.
Sincerely,
WILLIAMS & SPARAGES,LLC
AI?4441110--
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 9 Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
aY � *� �' ia�# Y {r•3�i,�j S, ,i, —r, x Y e �`'� _�_'_..�S,a� r, ��i I.
Y`e�`ntO
�...L.,_e..'x.�_,
,y, 1} i-: a }Ya�
�w \.'.ys, e ""� �a 1{t(s� 9�.fi� ,�,5 a �G"a%""ti•� s 'y''= a�s,=�' s'".mot =�
aid Sq��r
APIN �sfa� f A
.. �z}'f
f t' dMg �y #t 7�#14/w t ,� �<�7djt 1G9 4thf%e�j+iY F,�
s .. Ira�P �� ,r(Fl Sar Fv1�
ir t°s"a ��r.aST 1 t ,p %r� �}�� 1 !�� al" x o'er
..,r' '`, ,�� jj�ii�%il+s �� F?f'a 4a•'�"a. '�* P i � ��' �''�` a'•' p�+ "?�'='�!'
.A
t
• ' ^a r� Y 41 r
T.
Ow
r �3j ► �l
75
` r earjr�j1. ysYj
`Harr 1 �i 4'c S r "q,ra D
lr
yv
Is M j 51W%7r
d Yk�i I
i
Sj'�
±" �t��S�: �.
A„a y .1rV Ya� ''
`� ( , a •.. " A p R aft s..%i �00
A' ,
k
'�.,�,r
�N
14
� Y y
%,rg` is �'.� �� T, r �,� f � f� ✓n .+"� T'
r
M r
�4t
y }1
August 16,2017 WILLIAMS
SPARAGES
Jennifer Hughes [NGINEERS PLANNERS SURVEYORS
Conservation Commission
120 Main Street
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On August 8 &August 16, 2017 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Plarming Board decision.
The erosion controls are in good shape and no repairs are recommended at this time. As
discussed,the contractor separated the downspouts from the subsurface drain and the
downspouts now splash down on rip-rap. The downspouts still need to be extended down
to the stone surface and the contractor intends on doing so when the next delivery shows
up from the building company. As you can see from the photographs the grass is starting
to sprout in the rear of the building.
The construction of the main building is still the focus and will continue over the next
several weeks. If you should have any questions regarding this information please do not
hesitate to contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works,Inc.
189 North Main Street, Suite 101 • Middleton, MA 01949 • Tel: (978) 539-8088 • www.wsengineers.com
r4
r ri
.X
c
111 ,
ar�
tf"
y g
r
{QMm
el
All
Y .: 'jaWTV
iF
Vwww
/ ✓ r, f # ;
„
h' ,
9 � � � w
XV
fro
AGI
51
t i '` �• art �t4'. � �, y r v� F r i�
{ 1,. tF
AF.
�
.��• t��a k g} .:./r��t � ���+ �� '; � a f l �i r��{FjF�tti� r a��� ��
� 1 f
t
f ft�v, f ) tfsc cv
u
r
y� �y h
September 1, 2017 WILLIAMS
SPARAGES
Jennifer Hughes CC ENGINEERS , PUNNERS SURVEYORS
Conservation Commission
120 Main Street
North Andover,MA 01845
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On August 25 & September 1,2017 we conducted an erosion control inspection at the
above referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
There have not been many rain events over the last two weeks and no repairs are
recommended at this time.
The construction of the main building is still the focus and will continue over the next
several weeks. If you should have any questions regarding this information please do not
hesitate to contact our office.
Sincerely,
WILLIA/M�S�& SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill,Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 9 Tel: (978) 539-8088 ® www.wsengineers.com
y � F
R
IFT
we i � n (
VAR
�.� �
h
zf v
Vw,5
Qw
r
' a c
or p M1h`.: } tit --•r" r ' + =::� .i, ,
Ow
r -+� ;ems �, r `+o �:�J-.�•;m 4� �-, � sn
Fit4 ♦ �tt' � ear�/ �
too
1160
tit
v
v
r
a ¢
s ! t
}.
e{
43
a i 4 r fa f S f fi
•{ h, ty`a#-,t'"b .:y "r 5 °� a t,1{'�y Y5J'�'�`�'.(`
Not
W
twN
4 ,
a���
list low; "As
t
• � f
a 71
e
September 15, 2017 W--4 & WILLIAMS
SPARAGES
Jennifer Hughes CC ENGINEERS FIN,NERS SURVEYORS
Conservation Commission
120 Main Street
North Andover,MA 01845 S
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover,MA 01845
RE: 2302 Turnpike Street-DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On September 8 & September 15,2017 we conducted an erosion control inspection at the
above referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
Overall the site is in good shape. The contractor is working on stabilizing the slope
behind the building. There are a couple of areas where the slope has failed and the
contractor is going to address. The photographs make it look worse than it actually is.
The erosion controls are doing their job and the contractor is aware of the situation.
If you should have any questions regarding this information please do not hesitate to contact our
office.
Sincerely,
WILLIAMS &SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
ae
z z5: a4
f F
F
a i �• I
f
$� 4
T
L
r
A
4
r4
11 d
iT{
t
e.
r ,
4
iry t
�j ICI
� I
Ii I
� � l
1
�I
n
1
f
September 29,2017 WILLIAMS
SPARAGES
Jennifer Hughes ENGINEERS PLANNERS SURVEYORS
Conservation Commission
120 Main Street
North Andover, MA 01845
Rebecca Oldham
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Rebecca,
On September 29, 2017 we conducted an erosion control inspection at the above
referenced property in accordance with the requirements set forth in the Order of
Conditions and Planning Board decision.
The contractor is still working on stabilizing the slope behind the rear of the building. It
is much better than before but there are still a few trouble spots. In addition we asked the
contractor to do a better job trenching in his siltation controls. Since discussing this with
the contactor he has made the necessary repairs.
If you should have any questions regarding this information please do not hesitate to contact our
office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 ® Tel: (978) 539-8088 ® www.wsengineers.com
M
h7yF 5
Y
� t
i
f t
�ww
k
k
r�P
k t�5 � r s�• �5�13)1
� �� t �� ✓ �J� �i F V1 � �y1vF
t g
,'fir s 1
t}� X
tLl Al
{ Q
" fix' >act � �i 1V�ti} � � •- �' ;� '
T
t ..
1/
February 12, 2018 W-4 WILLIAMS
SPARAGES
Jennifer HughesENGINEERS PLANNERS SURVEYORS
Conservation Commission
120 Main Street
North Andover, MA 01845 S
,lean Enright
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Jean,
On February 12, 2018 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision,
Overall the erosion controls are in good shape, ]'here are two areas that will require
at this spring when the growing season starts, The first is below the right corner of
the building below the corner downspout and the other is behind the building where
stormwater eroded the slope before the seed mix could take, The contractor is aware of
these areas and will address when the weather allows, 'There is no immediate threat to
the wetlands as a result of these areas.
We discussed your last inspection with our client and he will address the trash issue as
well as the snow stockpiling. The hole you observed was from the installation of some
electrical conduit. There was also some material deposited on the slope of the infiltration
basin as a result of the installation of the security gate.
If you should have any questions regarding this information please do not hesitate to contact our
office.
Sincerely,
WILLIAMS &SPARAGES, LLC
Greg Hochmuth,RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc,
189 North Main Street, Suite 101 9 Middleton, MA 01949 9 Tel: (978) 539-8088 0 www.wsengineers.com
s I
Ili
j f
"37
III
r
a
§q/
r
4 _
March 28, 2018 WILLIAMS
Jennifer Hughes & SPARAGES
Conservation Commission euiNEEas PIANNEaS suavEroas
120 Main Street
North Andover, MA 01845
Jean Enright
Conservation Commission
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street - DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Jean,
On March 28, 2018 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
A large portion of the property is still under snow cover. Tile erosion controls are in
satisfactory shape and no repairs are required at this time. Once the growing season
begins the property owner intends on stabilizing two areas on the slope behind the
building that eroded last fall. The two areas do not pose a threat to the resource area at
this time.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 e Tel: (978) 539-8088 e www.wsengineers.com
t
G-
...rt.rV fr t 1
1 }'
v ts
7 r
' A, ,ems' j p•3�4 � Y�• �� —
5k .y
v , �x tea
r
° 9
44
;"-
et S a
f es r a.� � n �V4ry'fyn ' " + �' d� 4`. a ,A
fl
X�tt llv t /) -' c, '�3ra t�i►' r as_.
"� 0 s 'P"r � (•g'1 3 M
2
April 11, 2018 WILLIAMS-w—.4 n
Jennifer Hughes SPARAGES
Conservation Commission ENGINEERS PLANNERS SURVEYORS
120 Main Street
North Andover, MA 01845 S
Jean Enright & Monica Gregoire
Planning Board
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street - DEP File Number 242-1671
Environmental Monitoring Report
Dear Jennifer and Jean,
On April 10, 2018 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in satisfactory shape and no repairs are required at this time.
Once the growing season begins the property owner intends on stabilizing two areas on
the slope behind the building that eroded last fall. ,The two areas do not pose a threat to
the resource area at this time.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Greg Hochmuth, RS, PWS
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 e Middleton, MA 01949 * Tel: (978) 539-8088 e www.wsengineers.com
1• �• y f F r � "1b�a � �Ca t�ti #' ^,y ;i �t 7 r ' f�,j sk
'at rF { 4fj :" 1 "MAY.' Z
t how,
S�r (
}1
t"/�y"�� +���rl ♦ 1 { ''�?(�y/'I'i 1 +�»� �1
1".Si"- �"' i yy+' y�/� (• � ���f�;i '4"��y�{�/��"_�' / � � 1�s �laa 5���y 1��� ,� a ! ,
r { y
y}
`sy(
m�
�:� � �"1 1 1�.u✓ � r a.!y t`;ba.
� t.�x" 4•r)m A f i '�
l I �t�1,�F�lLjj{+f•�1� P�i�•�i���
• y yy ff,• � F i J,j � ( a �¢
X z 'dry nV P 1cm /51"nY 4 „-1
7�)i raw I(,1� �qy��,,•,. �. ?,d�' Cr]' -� z;i�s � m �m`•YS A°�y '.t� +� r},t �'m.a�� ,°� '
r <� h�".}�� n -0� iS ti.�J�' k4' �' ��yr4`� � � :�:z"s�e r• �'t � � ;s`� th• m4
`�,+Y� ` '{�! ri� � � t✓;�y � t63�� ` _ � a'i �+ � a " + ��, y�i.�'����s�. !'� r�r a'+`_
Pu 9 S t r� r k ti airy �t� � 5 r p J V ?a
� i f°fflir �F�[� t�fm l��r`l'71�r(S� :i �� {T7 ft5 ,, r' �•"'" S '3i f iF�`,+ 3 r t � "��,e x� � ',
of! to
Dz i s �c
"Jqa�,r ` r iV c ;,
�- t,(/"� � �1r����.t�1"�rf�� ��r (�,y' ram' " s x �� s� 7"y i{1��t �� �t•1�'�� y��i'a7� ��m�� ` ff 4.,.
+1 `4'"� !� '4 d� [•. ITS `Y x '' A t #5tt,,'{»+� .�' � i'
��1 t"jp � �`�( w y � t,"�';'a >y n Ai �;� 1 A- �f��'��y F 7�•- a t
yr ' tEli �
- t` m" .• 4 ..� ��,. � � yi f
��3�" Xy r.�-r � ^,s.�,•,�'� ��, rs« ; tr�r " 'jvm "� ay•��1�j�z'
l r }�4G � Jm + � 43 � �y�"s3�" �� ,r r : t' t { �.E i , •� �q-�
{
My
4 R
r
FJi� { / Too
i• -`"
�- ��� 5��`����� �Yt Ya�"'i,��� �-'� 3} �� � �' "_'l'• _=-•' " � '1r a 1 at i1�y !'i"a"i� Pas e,l.
•" � .�. x i�� t R r � ��E y tf'. ..wui a � ..� a 't y"3' rg d7 v a
ar E MR-n-l ` sf4 :.�'7" 1, 5f•€ ��ti' t�/ i✓ t f 5r t J t•'t "
� - � J a ^.a'f,� y ^'s�r..zSv- t + �
� � � r•"4 r,. "�� .r r �� ����?i ��� -{ id t� ,ai%' '.�' t � " ���. " i i yr f '
1 r a v•r
Wi
§' A � ,. k 'A `4y�CY �Slp� "a �i%Y{ � ��y„g�d`•� i �_,
r�
s �
r �
,n
5
.�y
,
9 Wo
S •SS11`�
�rA`, tt 5 # •,�� !f)" y1r da {� t ";? {.. ,,�,, ✓ ����� 'S hi t " �A1 l.,a�m; � � rr� �/( d
7 !4 tei{`[��
l j�'fq�
�t �'"*'� aa f' 4
t$ ly T a SAt !tr Y r '9 ta�J f�,*(i ..t T m e r S•r i'K m>� Sf # j. �,�?,, "� '" �yt '-f � �# t �r t C�a °1 � r
ref s n � i sky ; t rrt�tci of , art, �r `
-r �a} ,•`
"WX•r��tz k rt�, !fit 4 nti ( y �?f"A ti,.,- :
" s e ax N.. r a i�w"a s' �' r sF d •'ts i > f�. `� t
dtr v � My" >s 4{ c r a�1i{Y f�" i" 'f� 4°'� at�i
t
1°r f IvIvO J i� �i i tf 7 tom§"ii F" 1R r+Y/.i , " f� " m.7 u��t
:.Y
� lr rK'Y t :i ��t l h7 r Y t�# Ydt ai ,�'r. rl Y+�
WI' •«.
r�-• €t� �,n. ;' t 999 `�' .. � � t Est✓1"i 1 �3a"t y PPP,,P,m o �
.:-::� il����sy�,R� 'j�� "� �A��y�'ok r 5 t�" } t t,�i�t• '" „� �"� a�"!s!. �'�it"`�43 " � a � t� =f r� s�i��'zr�i �v�'k�
. ,, 3 ¢ t w i,. t� " r� ay.X� � ti !tmt � � ,��{�.+�r"zr t�� t � ,�•_ - � i
i '�S i a i
" "'/ #C Its 4 �S ��.f'Si� lQ S• '"` � �f P�M.1 �," X 4; } !t'$�f� 1� " ,r " { .( 8 t,�,{! M•�
I dg�7 '� Ott b � i si�� � � t�� c '.t -� �"•"�. fi"F.wr a t. r'��Pi J yp t f i�.�'�at (yx
. �-`, � '���It ��ita;A t�}t�i.;l� j �l � }'�ty,��T`! �� '_•� � , { T tr 11�1" {�a�� � 't,�:3��` :+�'� 1 �i1`r
a
� r
�i�' "Y 6 f � � ,t` � •_ �°� v''�, d¢ r , � Y �r �q t }g �,y ,y� x t � �'�� r} '
Y A a f P
$�$•� a�4�m�#�: i� ��} fs � a�C �, r Chi ,= �� "�� Pf 'f� �� i`�t{{�ti,�`��r�j�f�'"i � '':-�i� p�",af}� 1 �¢i #
Y�( .s ��� .� �- t' 1 1Y` }��+� a .• 1{ fir{
5x Twood
`'� i a !� ,: ,�.�4' ',. i ,i".0 Bti.:a .` 't A,c.'�.` 1 h fa• .1! " =n,, `{r .7
May 24, 2018 WILLIAMS
Savannah McInvale W-4 & SPARAGES
Conservation Commission ENGINE[RS MANNERS t SURVEYORS
120 Main Street
North Andover, MA 01845
Monica Gregoire
Planning Board
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Savannah and Monica,
On May 24, 2018 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in satisfactory shape and no repairs are required at this time.
The contractor intends to clean out the ponds and patch up the slope behind the building
in the near future.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLIAMS & SPARAGES, LLC
Thorsen Akerley, R.S.
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA 01949 e Tel: (978) 539-8088 ® www.wsengineers.com
: u°< �'
��
�� �
'r
kY c��',
,,
�.
� - '
,�
� �,
r f. _�,*.�. � i �. �, � ,.
rt r ,� �.
-,<,y.
=.� � -z, � _.,,,-�r
x
I f��
g t 14 i
I �y
f � � � ��
�j � ' A
n n
'4
k
n.
v'
r.
��.
6 3+�_
�.r{�
� ��
y � -
`�;
�'
;,.. ��
:� i
'�2�
V
June 6, 2018
' WILLIAMSSavannah McInvale SPARAGES
Conservation Commission ENGWE[S PANNERS SURVEYORS
120 Main Street
North Andover, MA 01845
Monica Gregoire
Planning Board
120 Main Street
North Andover, MA 01845
RE: 2302 Turnpike Street- DEP File Number 242-1671
Environmental Monitoring Report
Dear Savannah and Monica,
On June 6, 2018 we conducted an erosion control inspection at the above referenced
property in accordance with the requirements set forth in the Order of Conditions and
Planning Board decision.
The erosion controls are in satisfactory shape and no repairs are required at this time.
Our office will be meeting with Mr. Gill this coming week to discuss and go over the
work that needs to be done including cleaning out the retention areas behind the parking
lot and repairing the side slope.
If you should have any questions regarding this information please do not hesitate to
contact our office.
Sincerely,
WILLI,APAS & SPARAGES, LLC
14- ok
Thorsen Akerley, R.S.
Erosion Control Monitor
cc: Dan Gill, Earth Works, Inc.
189 North Main Street, Suite 101 ® Middleton, MA•01949 e Tel: (978) 539-8088 ® www.wsengineers.com
�y fj� `' �� I h�4I��I��, �III I �� � �yy�d��a� m 6 t��{'��� ' � °,�.
- � � I �Ifd 'If�u 1� _�€.
� i ui
YfJJ
x
� r
a:
_�
t5 � � zi i� III I
y
,e ICI I
„y �� '��I, III I I I ,�„ ^� ,5 �.;'
,< -T.
j � �
�,� ,r Y � V
;� ����
� yY� ��V III � III Y �5 � "i" .#� � Y
l �
II � �
a
"fir"" - '.
�� !� ���: � �_ � {) �a �� 4i�s��y��49C?a"�'.
C L t �V "IJ � w b tlll
n$4.� I� �11 VI
1or,�'�i A I III 6 {#�.
W� � J
f� I �
�J'.
� .F 6 ",:,,;.
�� 'F-#
+.e„��.�
� e��
t" ?^ � h"
z'
r'
�E Y��
��.
,� .;`
,.
i
, .
�� �, K � '
�� ��
�� _ _ r.. �� � _ ��>
The Morin-Cameron
Nil 181 1 "v
Engineers a Surveyors
Environmental Consultants•Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morincameron.com
978-777-8586
FAX 978-774-3488
Erosion Control Site Inspection Report
General Information
Project Name: Muffin Realty Trust—351 Willow Street
DEP File No.: MA DEP#242-1639 Location: North Andover, MA
Date of Inspection: October 24,2016 Start/End Time: 8:25 AM -8:45 AM
Inspector's Name(s): Will Schkuta
Inspector's Title(s): Environmental Inspector
Inspector's Contact The Morin-Cameron Group, Inc.
Information 66 Elm Street
Danvers, MA 01923
978-777-8586
Describe present phase Parking lot construction,Wall construction
of construction
Type of Inspection:
❑ Regular ❑ Pre-storm event ❑ During storm event ® Post-storm event
Weather Information
Has it rained since the last inspection?
®Yes ❑No
Precipitation Amount Measured at Lawrence Airport between October 21 —October 23 = 3.12 inches
Weather at time of this inspection? 51°,Clear
Do you suspect that discharges may have occurred since the last inspection?
❑Yes ® No
Are there any discharges at the time of inspection?
❑Yes ® No
Site-specific BMPs
BMP Installed Date for corrective
BMP Description and Operating Corrective Action Needed action/responsible
Properly? person
Silt Fence/Silt Sock ®Yes 0 No N/A N/A
The
Morin-Cameron
Engineers®Surveyors
Environmental Consultants®Land Use Planners
66 Elm Street
Danvers,MA 01923
www.morineameron.com
978-777-8586
FAX 978-774.3488
Overall Site Issues
Corrective Action Date for corrective
BMP/Activity Implemented? Maintained? Needed action/responsible
person
Are all slopes and disturbed
areas not actively being ®Yes❑ No ®Yes❑ No N/A N/A
worked property stabilized?
Are natural resource areas
(e.g.,streams,wetlands,
mature trees,etc.) protected ®Yes❑ No ®Yes❑ No N/A N/A
with barriers or similar
B M Ps?
Are perimeter controls and
sediment barriers
adequately installed (keyed ®Yes❑ No ®Yes❑ No N/A N/A
into substrate)and
maintained?
Is there evidence of
sediment being tracked into ❑Yes ® No ®Yes❑ No N/A N/A
the street?
Is trash/litter from work
areas collected and placed ®Yes❑ No ®Yes❑ No N/A N/A
in covered dumpsters?
Are vehicle and equipment
fueling,cleaning,and
maintenance areas free of ®Yes ❑ No ®Yes❑ No N/A N/A
spills, leaks,or any other
deleterious material?
Additional Comments
a Minor washout into the rear loading area was actively being swept during the time of inspection.
Certification statement:
The undersigned has inspected the site and has informed the site contractor of responsibilities for repairing and maintaining
the erosion control system.
Print name: ti
Signature:
Date:October 24,2016