Sequence of Construction
6/3/16-6/4/16—Erosion Control according to order of conditions.
6/6/16-6/20/16—Tree clearing
6/20/16-6/27/16—Stump removal.
6/27/16-7/11/16—Excavate, stripping organics and top and sub soil.
7/11/16-10/10/16—Trucking in large import of structural materials. Duration of 3 months depending on
availabilities of materials.
10/10/16-10/31/16—Excavate foundation.
11/1/16-11/30/16—Form and pour foundation.
12/1/16-12/17/16—Backfill foundation.
12/19/16-3/20/17—Erect steel building.
3/20/17-5/8/17—Install all utilities, including 4"forced main. Sewer and water. Fire suppression.
5/8/17-6/19/17—Storm water management and drainage. Detention ponds.
6/19/17-7/3/17—Gravel parking lot.
7/3/17-7/10/17—Binder coat of asphalt.
7/10/17-8/7/17—Landscaping.
8/7/17-8/31/17—Final odds/ends. Inspection sign-offs.
Estimated Construction Timeline
NOTE: Estimated timeline,weather depending, as well as depending on other subcontractors provided
by CMC Design.
9/8/16-9/9/16 : Erosion control installed.
9/13/14—9/14/16 :Pre-Construction meeting expected to be scheduled.
9/15/16 or 9/16/16—9/26/16 :Begin tree work.
9/27/16 or 9/28/16—10/31/16 :Excavation for parking lot and detention pond.
11/1/16—11/30/16 :Start building work.
Invoice
July 30, 2018
Summary: SERVICE
����rS 6"�lllS 159165
P.O. Box 298 Wilmington, MA. 01887 Invoice#: ROB
Office 781-272-3100 Tech:
Fax 781-272-2999 Due Date: 8/14/2018
www.waynesdrains.com Job Date: 7/30/2018
Job Name:
Bill To: Earthworks?
Earthworks? 2302 Turnpike Street
PO Box 565 North Andover,MA 01845
North Andover,MA 01845
978-265-7320 DAN
978-265-7320 DAN Hrs/Qty Price Amount
�Itemade Description
- —
,actor and dispose of (4) catch basins around property 1000.00 1000.00
1.00
VACTOR AND DISPOSE CATCH BASINS
Total
Subtotal
$1,000.00
1000.00
e as specified Payment to be made within thirty days from job date.A late fee of twenty five dollars will be applied after
supplier, All work to be completed in a
thirty days,Any returned payments vvi ll be charge a thirty dollars service charge along wit any
anteed to b
collection fees.
manlner according tor
p standard practicesfied by supp'
VISIT OUR WEBSITE AT WWW,WAYNESDRAINS.COM
Terms: Net 30 days
THANK YOU FOR YOUR BUSINESS