Accepted 12/7/89
Minutes for Meeting of February 2,5,, 1,987
0
Present A. Resca J., Lindon
C. S choene C., Lowery (Absent)
W. cens M., Boudrot, Secretary
L.- Bruinooge,
fontinental Cab,leyisn - Ala Pit H'1,11
An Enforcement Order was 'issued on, this area on December 3 , 1986,
requesting erosion controls be placed and, to attend our next
meeting of December 10, 19860 At thiz meeting we extended the
time to the first of March for a solution to the area' s problem
and 'it was, also noted that there 'is no valid Order of' Condit,"ions
at this time, Daniel Hayes of the law firm of Sweeney and
Sargent, Bill Dunlap., assistant manager of Continental
Cableviision of' New England and F.G. Davies, plant manager of
of
Continental Cablevision I of New England atended. this meleting.
There was much discussion, on siltation at the base, of the road,
catch, basins filled with, siltation, siltation on the road and 'in
the abettors property. It was motioned by A. Res,ca that there be
a three month check-up in this area, that removal of siltation on
the road and 'in the abettors, property. It was motioned by As
R,esca that there ble a three month, check-up 'in this area, that
removal of siltati,on be gin and a deadline for filing a, Notice of
Intent be set at June, 11 19870 B. Mansour seconded, motion
carried
North Andover Business Park - # 19 3
James Bourgeois of Channel Building, attended, the meeting. A,
progress, report was presented and accepted, with a copy to Karen
Nelson. It was established that there, had been a filling, of a
wetland of 4 ,, 57 ,, instead of the 4 . 31 that had been all owed.1
Contact East expansion proposal was discussed. This lot is not
part, of the original subdivision, and cannot be, included 'in the
Order of Conditions for the Bus,iness, Park. W. Vicens, motioned we,
approve the wetland replacement area on Lot E. B. nsour
seconded motion, carried.
McLay's Florist 'billow Tree Mall Flood i8nqProb,1em
Mr. McLay was, present, at this meeting, but no one, represented
American Development. Bob Mansour did some research into this
flooding matter and stated, that, the proposal made 'by American
Development i'sn It going to work. The solut i4on presented to us on
the drawing dated January 1987 regardjLng regrading of this
property was unacceptable as shown., It was decided that a letter
to Doug Liston, the engineer, at American Development that, the
solution presented to us on this drawing on proposed regrading
dated January 19, 1,98,7 , 'i' s unacceptable and a better solution,
should be found., L. Brulnooge seconded,, motion carried. There
is an urgency to this issue as the M'cLay's plants come in the
first, of April; therefore, the Board 'moved to request a new
solution by March 11th. Motion carries,,
Lot 24 - 28 Forest Street - Enforcement Order
8,
J. Linden 'inspected site and recommended erosion control; work,
had stopped, but bond had not been posted. Thad Berry of'
Christiansen Engineering claims he needs a ba,ckhoe to clear the
,area, They are in the process of making wetland crossings for
two common dive .ys. The requests of the NACU are Poisting
1 10
bond, replacing wetlands, erosion control in, driveways in, loam
and see,d,ed,, all in about one month from now I
Lot 15 & 16, Salem Street
Cutting trees to, make driveways witnin a wetland area,, The NACC
W
11 ill get back to the Planni ng r 3
Board regarding this, p 'o ect. No
vote taken,*
Lot 3 LibertyStreet
is
The, broker for the owner attended, the, meeting. Waiting for a
1,
letter and a plan from Republ ic Development; need blueprint of
new location of the house with a revised. d&t1e, No vote taken,.
Deerfield Lane
A, Resca made a et en to authorize the acceptance of the
$ - -I
Deerfield Lane, schedule. C. Schoene seconded, motion carrieu,
Great Pond Road Driyeway -1 Spring site visit.
Lot 3 & 4, Foster Street
Received letter from Ralph Joyce. It basically says the
11 driveways were 'taken, care of. J. i Lndon reviewed the Order of
Conditions, and there, is a question of completion of a wetland
area, Scott Giles had certified this., A. Resca motioned that we
2
Lot 3, & 4 Foster Street Continued. *
turn down the compliance request on Lots 3 & 4 Foster Street, LO
Bruinooge, seconded, motion carried,,, Jack to write letter
regarding the problems with this area,
Orchard Path Estates - Decision
Lots 2 , 4 & 5, Lot, 2, no problem. Lot 4 determination with
conditions that they follow the plan. Separate f illll*.nq for Lot
5,o L,. Bruinoo,ge motioned motioned that negative determinati"on on
Lots 2 , 4 & 5 Orchard Path Estates with Conditions that erosion
control be 'installed and inspected,, J',, Lindon seconded, 'motion
carried, A. Read, abstained.
Yellow Ma,ize
NACC requesting a bond and, the 'information that the Order of
Conditions has been recorded.
Carlton Farms Reguest for Compliance
T. Neve was informed that there would be no Certificate of
Compliance, on this project, before the entire suna,1vision was
straightened out., Lot 2 Johnnycake - site plan revilew. Lot 3
not completed on detention area, Lot 34A appeal had been
settled. A $2, 0 check for bond has been received 2/25/87 .,
Equestrian Estates,
Looking into a letter sent by T. Neve a few weeks ago,
Lindon)
Lot 1 Old Village Lane
Discussion
Lot, 60 Hgymeadow Road
Spring site visit.
Greater Lawrence, Sanitation District
Discussion
Lot 4 Gray Street,
Discussion
Concord Street Violation
Need, 'to write a letter. (W.
3
Meadows Property
Henry to record Order of Conditions, ,, , .Letter to, be sent, to Mr.
i.. Willis Sr. and Meadows on the recording estate .
filing, Fees
Discussion
Lot 1 Bridges - Violation
Large hole. C. Schoene to check into this area for any
0, 1 0 �% I a I
problems. ,. ,. ,.Later found not to be in our 3urisai,ction.
Long Pasture
Need to, review carefully when it, comes 'in because of complicated
It a
wetlands,, C& S 'i
choene 'is abettor abuttor and will not paricipate in
this case,,
33, Vest W�jy
New Owner. ,Slte Visit
Lot BB Middleton Street
W vi ciens motioned to accept the Order of Conditions on Lot BB
M iddleton Street, C. Schoene seconded, motion carr,led,,
Open Space Plan
John Connery putting together all reso�urce materials,' fema maps
etc. , List of "Ideas to be sent out to the committee.
11
Questionaire for recreational, uses., To have public put,
By-Law,
L. Bruinooge working on th"is and will have, more i,n,f ormat 'ion by,
next meeting,