Loading...
HomeMy WebLinkAboutApproval Letter - 500 Boxford St Lot 2 - Correspondence - 500 BOXFORD STREET 1/28/2020 s - r/ North Andover Health Department Community and E(omnmir Development Division October 10, 2018 Michael Donovan Cornelius Donovan 12 Johnson Street 1.2 Trolley Car lane North Andover, MA 01845 l.,ondonderry, N11 03053 't'homas :Donovan 5000 Wheatridge Drive F'ucluay-Varina, NC' 27526 Re: Subsurface Sewage Disposal System Plan for 500 Bo ford Street—Lot 2 (Map 105C, loot 42) `ro Whom 1t May Concern-. 'rhe proposed wastewater system design plan for the above site dated September 26, 2018 and received on October 5, 2018 has been approved with minor revisit ns from the original approval from October 7, 2016. 'Fhe location of the leaching,trenches have been slightly shifted to the west by approximately 1' The design and proposed plans are consistent with the original approvals and do not need any further sail testing. The design has been approved for use in the construction of a new orl-site septic system for a 4- bedroom (maximum of total rooms) home utilizing a gravity leach Field system. This design. plan approval is valid until October 10, 202.1. During this time, a licensed septic system installer mcjst obtain a permit and complete this work, and a Certificate of Compliance be endorsed by the installer, designer and the Town of North Andover. This approval is also subject to the following co editions: Page 1 of 2 North.Andover Health Department 120 Main Street North Andover, MA 01845 .Phone: 978. 88. 54t1 Fax: 978. 88,84'76 500 Boxford Street_ lot 2 October 10, 2018 1 Prior to the issuance of the Disposal Works Construction Permit, the applicant must submit a foundation as-built at the same scale as the approved plan 2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must submit the floor plans of the proposed dwelling showing no greater than 4 bedrourns or a total of 9 rooms. 3. If site conditions are found in the field to be different ftom those indicated on the design plan and/or soil, evaluation, the originally issued Disposal System Construction Permit is void, installation shall stop, and the applicant shall reapply for a new Disposal Systems Construction Permit (3 10 CMR 15.020(1)). 4. It is the responsibility of the applicant and/or the applicant's septic system designer, septic systein installer or other representative to ensure that all other state and municipal requirements are Met. These may include review by the Conservation Commission, Zoning Board, Planning Board, Building Inspector, plumbing Inspector wid/or Electrical Inspector, The issuance of a Disposal System Construction Permit shall not construe and/or iinply compliance with any ofthe aforementioned requirements. Please feel free to contact the office with any questions you may have. We look forward to working with you to obtain a wastewater treatment and dispersal system which will be in compliance with all regulations and assure protection of public health and the environment of North Andover. ai.necre Bri J. LaGrasse, CEI IT Director of Public Health Encl. ffistallers list cc: Wi I 11iam . . McCloud, Andover Consultants File .......... Page 2 of 2 North Andover Flealth Department 120 Main Street North Andover, MA 01845 Phone: 978.688,9540 Fax: 978.688.8476