HomeMy WebLinkAboutApproval Letter - 500 Boxford St Lot 2 - Correspondence - 500 BOXFORD STREET 1/28/2020 s -
r/
North Andover Health Department
Community and E(omnmir Development Division
October 10, 2018
Michael Donovan Cornelius Donovan
12 Johnson Street 1.2 Trolley Car lane
North Andover, MA 01845 l.,ondonderry, N11 03053
't'homas :Donovan
5000 Wheatridge Drive
F'ucluay-Varina, NC' 27526
Re: Subsurface Sewage Disposal System Plan for 500 Bo ford Street—Lot 2
(Map 105C, loot 42)
`ro Whom 1t May Concern-.
'rhe proposed wastewater system design plan for the above site dated September 26, 2018 and
received on October 5, 2018 has been approved with minor revisit ns from the original approval
from October 7, 2016. 'Fhe location of the leaching,trenches have been slightly shifted to the
west by approximately 1' The design and proposed plans are consistent with the original
approvals and do not need any further sail testing.
The design has been approved for use in the construction of a new orl-site septic system for a 4-
bedroom (maximum of total rooms) home utilizing a gravity leach Field system. This design.
plan approval is valid until October 10, 202.1.
During this time, a licensed septic system installer mcjst obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover.
This approval is also subject to the following co editions:
Page 1 of 2
North.Andover Health Department
120 Main Street
North Andover, MA 01845
.Phone: 978. 88. 54t1 Fax: 978. 88,84'76
500 Boxford Street_ lot 2 October 10, 2018
1 Prior to the issuance of the Disposal Works Construction Permit, the applicant must
submit a foundation as-built at the same scale as the approved plan
2. Prior to the issuance of the Disposal Works Construction Permit, the applicant must
submit the floor plans of the proposed dwelling showing no greater than 4 bedrourns
or a total of 9 rooms.
3. If site conditions are found in the field to be different ftom those indicated on the
design plan and/or soil, evaluation, the originally issued Disposal System Construction
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit (3 10 CMR 15.020(1)).
4. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic systein installer or other representative to ensure that all other state and
municipal requirements are Met. These may include review by the Conservation
Commission, Zoning Board, Planning Board, Building Inspector, plumbing Inspector
wid/or Electrical Inspector, The issuance of a Disposal System Construction Permit
shall not construe and/or iinply compliance with any ofthe aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
ai.necre
Bri J. LaGrasse, CEI IT
Director of Public Health
Encl. ffistallers list
cc: Wi I 11iam
. . McCloud, Andover Consultants
File
..........
Page 2 of 2
North Andover Flealth Department
120 Main Street
North Andover, MA 01845
Phone: 978.688,9540 Fax: 978.688.8476