Loading...
HomeMy WebLinkAbout1988-12-21 Conservation Commission Minutes l a TOWN OFNORTH ANDOVER, MASgACHtJSETTS OFFICE OF f CONSERVATION COMMI SSIO t4 7y0 Fi 7 H t r ' • w V ,, 3 "SAC i December 21, 1988 Meeting of the NACC Arthur Resca (absent) Present: Deborah Moore Lois Bruinooge (absent) Carl Schoene Irene Mackun, Admin. M. Boudrot, Secretary Bill Sousa South Cross Road - Discussion cu Robert Massi's of R.A.M. Engineering representing the namely Allen ofscia and Joseph Levis, presented their plans for this area. 2,000 sq. feet will be built. The subject of the Order of Conditions will be expiring this January and do we renew? A new Notice of Intent to be subibitted. A site visit will take place. No vote was taken. Lot E Berx Street - Extension of Order of Conditions William Sousa motioned to grant an extension of one (1) year on Lot E Berry Street recordable covenant before granting extension. C. Schoene seoonded, motion carried. A.T. & T. - Discussion on New Project resented this new Project. This will Peter Bajor came before the Commission and p ditions of A.T. & T. No vote was taken. added to the original Order of Con Barden Chemical - Certificate of compliance Borden Chemical William Sousa motioned we issue a Certificate of Compliance on (242_450) , C. Schoene seconded: motion carried. Tucker Farm -Lot 1A - Cert. of Com fiance wetlands to the side of the Thi s area has an erosion control problem. There are ten stating we cannot issue house that are not protected. A letter will. be writ problem should a Certificate of Compliance at this time as the erosion control this solved. C. Schoene motioned that NO Certificate of compliance be issued at control problems have been taken care of. time until the erosion W. Sousa seconded, motion carried. Voute 114 - Request for Determination Continued from 12/7/88 { James Wick of State Purest Realty Trust, came before the Commission and presented plans for the area. This area is .located UJ1 Route 114, Northwest of Harold Parker State Road and across from the Elm Square Industrial Park. It consists of 61 acres .La lot of the area is wet Six hundred flags were placed and it was decided that a "consultant to..the .Comttissfcrt ould check-oytti: these flags. William 1'appen, r ,. Superintendant of Harold Parker State forest an`.abdtt+er attended the meeting. "— Paul"-TarioCmotioned that we continue the public hearing until. January 4, 1989. W. Sousa seconded, motion tarred. An extension was given NACC by Jim Wick. Irene to meet with Jim and discuss the area at length. 1679 Osgood Street -- Request for Determinaiton - Public Ilearin Joe Cushing of Kaminski Assoicates and Phil Lombardo attended the meeting and explained their plans. An intermittent ditch and intermitten stream, with no hydraulic connection under Route 125 to streams and Merrimac River. A site visit will be made and a request for an extension of time was requested and granted. Extended until January 5, 1989. Dorothy Stapelton an abutter explained that her back land does stay wet in the Spring. P. Tariot motioned to close the public hearing on 1679 Osgood Street (Women's Health) c/o Realty 'Trust. Wm. Sousa seconded, motion carried. North Andover Business Park - Willow Street Extension - Public Hearing Continued Tom Neve of Neve Assoicates, and James Bourgeois repredeciting Bayfield Company attended the meeting. Received alternative designs, problems and advantages " of each. Tom will send us a letter indicating that wetlands in vicinity of crossing havejbeen reflagged, the the Commission will visit the site. Order of Conditions will be issued 21 days after receipt of letter. P. Tariot motioned we close the public hearing with the stipulation that we receive a letter from a Botanist. Witt. Sousa seconded, motion carried. Leland Pro erties - Discussion Colin Smith, Attorney and Micky Marcus, botanist attended the meeting. It was noted that t:this project.--. is..s till 'under :appeal, Three years ago the flagging was done by Sanford Ecological. Willie recommended that we decide on these three issues. 1) Is the,-second wetland "finger" a wetland resource area? 2)Are wetland "edges" correct? and 3) Bridge/Limited project? Curt Young who represented the abbutters presented his views of the weland delineation, Decisions: This is a limited oproject. A bridge will be acceptable. Second wetland "finger" is a resource area, in part. - Concept of project - pa.irking lots too close to wetland, w/no buffer zone. :j-Drainage buffer/swale to handle drainage is needed and wetland buffer also needs to be approved. Adjudicatory pre-hearing conference is set for Jan. 4, 1989/ Lois Bruinooge to attend and represent the NACC. Abutter, Steve Connolly requested NACC to fund an outside botanist as a consultant. NACC deciders nnp rn raf a..f.n _n., ' Page --3- i Minutes of Meeting of NACC on December 21, 1988 Fire Department - Third Station Bill Dolan and the Third Fare Station Committee (namely: Dana Fisher and John Maguire) Attended- the -meeting and discussed preliminary ideas for the Fire Station proposed for corner of Ingalls/Salem Streets. Wetlands delineated on site by Normandeau Assoc. , have a preliminary plan. Approx. 2300 sq ft footprint for fire station will be planned. Committee wants input from NACC on best location for station. Irene to review flags in field. Hawkins Lane - Discussion Ray Fraser and Coleman McDonough attended and claimed that they found no/control point to north. Ray and Coleman suggested posting additional securities against modifying culvert. Any additional bond should be posted for: completion of bulvert that meets criteria of affecting flooding of Boston Brook. Wm. Sousa motioned to authorize Irene Mackun to sign off two more lots (Total of 5) C. Schoene seconded, P. Tariot abstained, motion carried. School Site =- Discussion Schematic plans reviewed, proposed school is out of 100 foot buffer zone, no detention ponds presented. This will be discussed at Selectmen's meeting on Janua-ry 5th. 1989. North Andover Business Park - Discussion Order of Conditions expires Dec. 31, 1988 Two replication areas outstanding. Extend for six months pending bond in place and revised wetland replication area and plan received. Mazurenko - Discussion Property has been acquired. Buildings will be demolished next week. Parking lot will be installed the following week. Land management plan approved for submission to D.C.S. P. Tariot motioned to approve the land management proposal as proposed by our able administrator. C. Schoene seconded, motion carried. Order of Conditions Liberty Hills IT (Mostly located in Middleton) Paul Tariot motioned to accept the Orders as amended. Wm. Sousa seconded, motion carried. Meeting adjourned at 12: 15 A.M.