HomeMy WebLinkAboutGLSD Organics to Energy Project - Lab Test Results - 240 CHARLES STREET 5/17/2018 8/8/2019, Town of Note Andover MaR-FW.North Andover Gas Inspector Meeting
77
NO� 111, ","'j IV
Steve Glinsygll .y@raeta. >
yV J�uqW rc,Y
FK: North AndovGas Inspector Meeting
1 message,
Richard E.Wea a R ere@� Ys ', rg Fri, Aug 2, 2019 t 10-52 A
eve
M l a see the ema;'lil below,
1
If l missed anything from our discuss, pleas let now.
Thanks,for input and your time today.,
Richard'E. Weare
C� .tal i° e t� gig -
Q tee:-L,awt," e pit .Yistj
410 Charles tree
orth Ati d love r
Tel: (9,78),16,85-1612
7 -7 7 9,
From: Richard E. er
Sent: Friday, August 2, 1 :,5
'Spooner, '; Storrs, Edward ('Sitorrs @cciit srwr l l .cor-r ; 'Flaherty, aniel "Thotinas J. 1 s' '
Coo. Cheri . sees ` aul Dionne'; Walsh, Michael Asti c r Tisriiiit'h,.corii)
Subjects North Andover Gas Inspector Meeting
All-Tblclay I met with Steve Galinsky,, North Andover Plumbing/Gas, Enspector,, and delivered the,revised CD I Smith drawings
-22 and M-24 showing the engine exhaust,p1ping changes. (see:attachled letter)
mentioned that P.J. Dionne,would be ing the engine exhaust rework ar GLSD has provided a change order to
Methuen Construction for,P.J. Dionne to do-the rework. He stated that I'le is, l I,iie woirk proceeding with Pn, l,.
I Dionne.
We then discussed iternsthat he Is looking resolved) Mich I have summarizedbelow:
n . Dionne to provide a revised r slit lis,fing the natuir rki , l existing r It
lists,the, pressure as 5,psi.) He said t,tells,permit could li r -IJr . M rr " please rtiake OUt this applicatiori,
htt,ps�//m�ail.goo,gle,.com/i,nail/u,/O?i -I 51 f49db9e&view=,pt&search=all&permthi'd read-f 6407673469077'05215,&sini,pl=msg-f%3AI6407673,,469
818/2'0 19# Town of Nortti,Andover Mail-FW:North Andover Gas Inspector Meeting
2 Steve is,ok with,the outside, natural gas pliplingtesting which he agreed was tested al 1100 psi. He, said that the natural
gas "lde the building�was only tiested to 50 1)s,i and it.n,,,eeds to 1be, retested to 1010 psi., piping insf
Lee,, IDan or Tom—Can YOU vet,'Ify wliat the Inside the b Ufldillng niatural gas piping was tiestedat and provide copies o,,f the
report to me? 1111-f not tested at 1,00 psi, it wil I need to be iretested �to '100 psi.
3. Stieve is looking for the State,to provide approvial'of the use of'stainliess,steel schedule 10 piping as well as any,
requirements for the gas trealnient vessels,,, Joe PelUso, at the State, Rumbling Board, is working with his Board Chairrnan
to clarify these iterns.
After all gas pipling work is completed and prior to Steve signing off the building permit, he will need the followingil-
4. An affidavit,frorn P.J. Dilonine stating that they built the work acicording to, CDM Smith's, plans and specifications and
affidavit from CDM Smitih regarding the project design,
Tom and Jay: I have copiles,of revised drawings M-212 and M-24 for you. Do,you want to,pick thiern up?
Richard,,E. Wea,re
Capital Prqjiects Mat:iaget-
Greater Lawtviice Sailitary,District
240 Chades Street
N o i-th An d ove r, MA 10 184 5,
Tel: (978)685-1612
Fax- (978)685-7'790
..........
45,64 OOI.pdf
,501<
https://i ,ai1.google.,coni/mail/u,/0" ik=i 51 f view=pt&search-all'&periiit[iid�=thread-f%3Al�64076734,690,7705215&sinipl=ms,g-fO/03AI6407673469, 4 2/2
J4
j„
a i/
Pi a Twit Repoft
Job Natne.- G S
Job uniber'' Date:
A ressM
2 , Charles, Sit Nora Andover
1
J
General Contractor., Methuen Co
Air
Type
of Test:
j
System Tested:
Mural gas Bins underground and ce
Test Data
1 1 �
PSI: E PSI.,
00
S100 tart S
,Comments:
Final-ins,pection oni ai uas. unciergrouna ari aii nat-Mr—al—'
gas piping inside the cogen building
Test Witness,: .rj4 PJ Dianne Company Contact
t
I
Owners e � Inspe c tor
1
I i
J,
I I
i
i
f