HomeMy WebLinkAboutGLSD Organics to Energy Project - Correspondence - 240 CHARLES STREET 3/21/2018 t.
CRADLES Q. BAKER
�1l�RhIOR o C. AP
MAN
UNDERSECRETARY ECRETARY 3F
Commonwealth of Massachusefts CONSUMER AFFAIRS AND
KA Yt ;POLITO BUSINESS REGULATION
OtUTENANT GOVERNOR Division of Professional Licensure
Washington Street o Boston � Massachusetts • 0211 CHA L S Bo �r L
JAY ASH � COMMISSIONER,DIVI I N OF
SECRETARY OF HOUSING AND PROFESSIONAL LICE SURE.
ECONOMIC DEVELOPMENT
March 21, 2018
Daniel Flaherty (CDM Smith)
240 Charles Street
Forth Andover, MA. 0 1845
Unlisted meat
Re: variance DAGV 150—Greater Lawrence Sardtary District-240 Charles Street—North
Andover
Dear Mr. Flaherty,
The Board of State Examiners of Plumbers n Gas Fitters has granted your request to allowthe
installation and testing of the unlisted gas equipment i G as 'tare/Natural Gas Pilot , at
the above referenced location. Work on this project may commence, subject to the approval of the
Local'Plumbing & Gas Inspector.
l have attached a copy of the outline for the field evaluation test which should he followed.
'rhe unlisted as equipment shall be operated for testing purposes only. During this period of
operation the parties involved shall he responsible for assuring all safety precautions. Final
authorization to allow full operation of the equipment is pending the approval, by this office, of
Third Party testagency report or, Massachusetts Registered Professional Engineer's test report.
Sincerely,
Charles Kilb
Board Counsel
Board of State Examiners of Plumbers & Gas Fitters
•w*r r V%I 10%ik k0". 1^A 4,► 0701 ft^ftVA w V■ 1C4 T1 7017 407 TT1 r1- fA "71'I 1,. o hiin-1/WW _M; _00V1 0
4
s.
Please follow this outline for the Field Evaivation Final Test Report,which shall include:
Name and address of where equipment is installed, along with variance number.
Name, address, and contact in ormatio .of third park certified testing agency or Mlassachusetts
registered engineer.
Date of testing.
Reference the standards and codes to which the equipment is designed.
Description of the gas equipment or product (type, manufacturer, BTU input, nameplate, etc.)
Sequence of operation
Summary of the test results (all gas safeties and related components,venting, etc.)
Confirm that air for combustion and ventilation is adequate.-
Confirm that combustible clearances are correct.
Diagrams, sketches and pictures of gas trains and equipment,
'-Other related p rtlnent information.