HomeMy WebLinkAboutGLSD Organicas to Energy Project - Legal Notice - 240 CHARLES STREET 3/7/2018 t
CHARLES D. BAKER
GOVERNOR Commonwealth of Massachusetts JOHN C. CHAPMAN
i
UNDERSECRETARY F
Division of Professonal icensure CONSUME'R'AFFAIR$AND
KARYN' E.POLITO BUSINESS REGULATION
LIEUTENANT GOVERNOR BOARD OF STATE, EXAMINERS OF PLUMBERS
AND S FITTERS, CHARLEY BORSTEL
JAY ASS'; COMMISSIONER DIVISIONF
SECRETARY OF'HOUSING AND 10001 Washington Street * Boston a, Massachusetts e 0,2118 PROFESSIONAL LICENSURE
ECONOMIC DEVELOPMENT
MARCH 7, 2018 BOARD, MEETING AGENDIA
A, . AGENDA RE VIEW* By Chairman Joseph McNaniee
WON
9 5 A.M.:IAPPROVAL OF PREVIOUS MEETING MINUTES-.'
• "fie February 7, 2 xecuti e Sessions Minutes
PRODUCTS,
I Shark Energy System,s
This technology that uses waste water to is t domestic water., 'The waste water will pre,heat the
domestic, .ter by means, ofa lileat exiel'ianger. The preheatedter ill teen go to a storage tank which will be
ready "or heating to pro er hot water,t per tUres. There is a dump valve which will go to the tank or t ► the
sanitary t r . T111sis, for mult.1family installationsonly. It pr fl. ersey,
Caa .
DISCUSSION(SI
I) Applicati-on, of C R 5.00 and 8,00in regards to the storage and transport of liquefiled petroleum..
D2) Code Requirements for adult daycarefacilities
D,3) Scheduling date and location for listening sesslon.required "rior t mending 248 CMR, 3.00, to 11.00.
D4) Number ofp mi t equir . for multi-unit buildings
I 5) Upcoming events-P CC ade Show March 1 ', Bay Colony Master Plumber's Association March, 28"'
D16) Proposed policy on gray,water installations
VARIANCE REQUESTS
40, TELEPHONE-. , 2 -3 : 6 - THY : 6 72 -2 9 http-.11www:,mass.gov/dp1
depicted on, the platls was strictly for use by the tenant. The Brookline Board of health has no objections to this
request.
GV-136:1 Greater Lawrence Sanitary District— Noy t,11 AnAdover
The.Petitioner, Paul Dionne is seeking,a post installation variance for a digester gas, pipnig systeni that was
installed without ensui,Ing compliance with the gas code. The Petitioner has, assumed responsibility for all
installed gas, wort and will ensure all necessary reni,,edial corrections are made with consultation of a properly
licensed Massachusetts engineer. As tlu.s, is a gas variance, no board of health petition is required.
GV 7:1, Greater Law e ce Sanitary Distric North An , veir
The Petitioner,, Daniel Flaherty, is seeking relief from NFPA 5.6.2.2.1 as adopted pursuant to 248 CMR 5.05(6).
The Petiti,oner i ndicates that ffigh Density Polyethylene (11I)PE) natural gas iping was installed below grade
P
after the master metier. The existing HDPE iping is rated for 100 PSI and distributes,natural gas at 1.5 PSI to
multiplebujia ings on,campus. The Petitioner requests to use, the,HDPE Piping'below grade rom the points of
connection to existing HDPE piping to the point where it comes, above grade, at w1itch point welded, steel piping
w'11 be us,e:ld,. The Petitioner indicates that this is necessary due to the lack of ava'lab'fity of approved produ
1 1, 1 1 1 cts
to convert from HDPE pipmg to welded, steel, piping suitabl.e for below grade installation. The Peti6wier states
that HDPE piping 'is rated for use 'in. buried applications at a maxinluill, operating pressure of 100 PSI, which
ni,eets the nia p
ximum allowable working ressure of 100 P S11 and 1.5 PSI distribution pr essure requ,ixed, f6a-this
application. As this is a gas, variance, no board of health petition is required,.
FYI. — Board, Delegated Staff Approvals — Board Vote Not Required
.Full operation of tinlisted gas, eq,uipnient
DAGV38 —Hanover Insurance Co.-440 Lincoln St., —Worcester—New gas train boiler#3
DAGV47 —Callaway Golf Ball Operations—425 Meadow St. —Chicopee—Dyne-A-Flame 200 Surface Treater
DA,GV94,—L.J. Lmen, — 7 1, Allen St,. — Springfield Sheet ironing and folding unit
DAGV248 —Yup Coffee Roasters—296 Nonotucic St. —Northampton—Joper BSR 15 Coffee Roaster and
afterburner
EXECUTIVE SESSION
CHARACTER REVIEW(S)
CR I) AB CRC) JE CR3) JH C CF CR5) CH
BOARD WILL CONSIDER ANY MATTERS NOT REASO NAB LYANTICIPATED BY THE CHAIR*
Note.-
Reasonable accommodations, or modifications will be provided to enable, individuals with disabilities to
participate in tleis Plumbing Board, meeting. All requests should be submitted to Cheryl Yebba at
(61 ' - . - 99 no later than, one (1) week prioi* to the scheduled Board Meeting. Whil.e the Board
of Examiners of Plitmbers & Gas, Fitters will attempt to bonor all, requests, those requests received after
that date may not be provided, due to feasibility.
PV-135: WELLNESS IN MOTION— 1620 BEACON STREET - BROOKLINE
The Petitioner Gary Dewotfie 'i's seeking a post installation variance, from 248 CMR, 1,0.10 to allow the
installation Of One "unisex, accessible rest rooni far staff and patients inlieu of the, refit ured two. The office, area
is 1,387 sq. ft., and contains four treatnient roonis,, one acupuncture rooni. and one massage room,., The shower
depicted on the plans was strictly far use, by the tenant. The Brook lip ie Board of health has no objection's to flea
request.
Meeting Notes.* There are htw existing hathroonts.
A inotion j,vas inade toappriove ivith conditiot s bjl Mr. .Daidel Kilburn and's'econded bji Mr Joseph
Waskieiviez.
Condi ,ion(s).,, Change the desiAxnation of the hathroon-l's to, untsex
Res,idt: Una art inlous
G,, , 3 : reater L e ce Sanitary District— North Andovert
The Petitioner Paul Dionne is seeking a post installation variance f6r a digester gas piping system thatwas
4
instatled without ensurin g coin p liance with the gas code. The Pet],ti,o tier has assumed responsibility for,all.
installed gas,work and will ensure all necessary.remedial corrections are niade with consult ati.on of a properly
licensed Massachusetts engineer,. As this is a gas vari,ance, no, board of health petition i's required.
Meeting Notes.- Th is is a 5 psi system. Th e petition er W11 be usiltg th e nt,ethan e,gas to supply a co-gett erato i
Th e piping tt)as titstalled hj,i it n licensed i1i dii),iditals. Boan'-d in ent ber Mr. Joseph Waskie tviez, addressed th e
Boarda,nd st(ded he, has itiorked on this tj7pe of installation in the past with .Mr. Paul Kennedj�that allp
11j"19
tinderground and aboi)e n),as iinderjurisaietion 4248CMR. Eileuthingaboi)e ground it,lill be stainless
steeL Belo ti)grou n d u,411he HD po/Y1,
A inotion, ulas niade to approi)e n4th, conditions b M% Joseph 111"askiewiez and seconded by Aft. john Critz.
Con dition(s)0- luin ei-must take r-esponsibifi f the avistingptp* in-g and beproperly tested.
Unantinotts,
GV-137: Greatel- Lawrence Sanitary District—North Andover
The Petitloneil-5 Daniel Flaherty', 'is seeking relief from NFPA 5.6.22.1, as adopted pursuant to 248 CMR 5.05(6).
TI.e Petitioner indicates that High Density Polyethylene (RODE) natural gas pipi,,ng was installed below grade
after the niaster nieten The exisding HD PE piping is rated for 1.00 PSI and distributes natuxial, gas at 15 PSI to
multiple, buildings on campus. The Petitioner requests to use the HDPE Piping below grade, from the points, of
H
piping point it comes above grade, a which point welded steel.piping
connection to existing DPE to the where t,
W1.11 be 'used. The Petitioner indicates that thi's is necessary due to the lack ofavallability of approved Products
to convert from HDPE piping to welded steel piping suitable for below grade installation. ThePetitioner states
that HDPE piping is r�ated for use, in buried applications at a m axi'llium, operating pressure of 100 PSI, which
meets, the,maximum allowable workin pressure BS
I.and 1,5PSI d'stribution pressure required, for this
g of 100
application. As this is, a,gas variance no board of health petition isrequired.
1feeting Notes'.* The niateria/s ate wilyfir the,nalunil gassystein. The ain, is 15 psi".
A. inotion was iniade,to ajvr-oile bj7 Mr. Waj�ne, Thoinas and seconded by Mi,, Josel)h "laskieiviez,
CO n ditio,I?(S)
Result., Unanif,11011's
FYI — Board Delegated Staff Approvals — Board Vote Not Required
F,ull opej,ation of unlisted gas equipment
DAGV38 —Hanover,Insurance C .- Lincoln St. —Worcester,—New gas train bailer#3
8/212019 Town of North Andover Mail-FW*North,Andover Gas Inspector Meeting
NOR ` DOVER
VAN"
Steve Galinsk,y<sgalinsk,y@noirthandoverma.gov>
............................................
FW: North Andover Gas, Inspector Meeting
1 message
P ............ ........ .................. ........... ................. ............................... ....................... .................................................. ........................... ........................-.—..............
Richard E.Weare <RWeare@g1sd.org> Fri, Aug 2, 20,19 at 101-52 AM
Td., sga lire sky@,,northan �erma.gov" <lsgal'insiky@northandoverma.go,v>,
Cc: "Cheri' R. Cousens" <CCousens@gls,d.org>
Steve:
Please see the el-mall blelow.
If I missed anything from our di's,cuss, Please let me know.
Thanks,foir Inpuitand your time today.
W,R ha d E. 'Mre
Capital Prqjects Manager
Greateir I�awretice;Sanitary District
240 Charles Street
North Andover MA 01845
1761: (9,78)1685-1612
('9178 685-7790,
From.: Richard E. Weare
Sent: Friday, August 2,, 2019 10:150 AM
Tom Spooner, Jay'- Storrs E ward' (Stot"rs,lE,L,@c,dniisi ith.coin)- 'Flaherty, Daniel M.' 'Thomas J. Ko,si'k'
Cc:! Cheri R. Cousens, "Paul Dionne'- Walsh, Michael. (Walsi-iMJ@cdmsrril h,,c. or-n)
Subject:, North Andover Gas Inspector Meleting
All:
Today I met with Steve Galins,ky, N'lorth Andover IPlurnblng/G�as, Inspector, and Idells eid the revised CDM Smith drawings
M-2 -24, showing the engine exhaust piping changes. (see attacheld letter)
I mentiolned that P.J. Donnie would be doing the enigine exhaust rework a,nd ,GLSD has provided achange,orde r to
Methuen ConstrUCtion for P.J. Dionne to do,the rework., 11-ile, stated that he is, prowok with the work. proceeding with P#J.
J
Dionne.
We then discussed 'Items,that he is looking to be resolved, is I have summ,wize:d bielow-
I. Steve needs, P.J�. Dionne to providea revised permit listing the natural gas,work as, being 1,5 psi. (The existing permi,
t,this appil"icat"
lists the pressure as 5 psi.) He said'that.this permit could beapplied for on-Kne. Toln'i, please irnake OU i ion..
fittps://i,pail,.gologle.com/'mail,/`'u/0,?ik=1,51 N 9db9e&view=pt&se arch=iall&perfnth id=thread-f%3,Al 64076734690770521 5&.si rnpl=msg-f%3A 164076734 69 1/2
2019 Town of North Andover Mail-Fes'*North Andover Gas,Inspector Meeting
2 gas,pipinlg testing which, fie agreed wastested at 1010 psi. He said that the natural. S�teve Is ok with the OLItSidle naturall
g i idle the bluilding was, only tested to 5,01 ps"and it needs to be retested'to 10C)ps'l"
as piping Inst i
ul
Lee, Dan or,Tbinij—Gan you verify what the inside the building tiatUral gas pip,ing was tiested at,and provide clopies,of the
report to me?. lfnot tested at, 100 ps,l, it will need to be retested to 100 Psi.
3. Steve,is, looking,for the State to, provide approval of the use of stainless steel schedule 1 C) piping as welIl as,any
requirements, for the gas treatment vessels. Joe Pelulsoat the State Plumbing Board, is,workinig with his Board Chairman
to clarify these items.
After all gas, pliping work.is completed and prior to Steve signing off the building plermit, he will neeld the f6lloiwing..
affidavit from P.J. iDionne slating thal they bull't the work accordiing,to CD1M Sm[th's, plans,and specifications and
affidavit,from C'DM Still-th regarding the project,design.
Tom and J�ay- I have copies,of'revised drawings M-22 and MI-24,for YOU1. Doyou want to pick them up?
14
Richard'E. We'a e
Caplitt,il Prcjects Maiialger
Gremiet LaNvrencle Sanftary District
21,40 Charles Street
No I iMA 01845,
"Fel: (978)685-16,12
Fax:(1978)685-7790
4564 001.pdf
50K,
https://mail,.google.,com/ni,,ail/u/0?ik=,15 9e&view=pt&searcli all&,permthi'd=thr 3Al 6407673469077051215&simpl msg-f�''3AI6407673469- 2/2
1) What is the pressure of the natural gas?
Permit application does not list that it is elevated gas or what the pressure is
DM Smith letter 201 lists the pressure at 2,
Original plan no pressure listed
Original plan with notes list it at 15 PSI
Both plans don not have a ICE stamp
We need a correct plan proper pressures and stamped
2 What is the pressure of the methane gas?
GLSD has stated that the pressure could be as high as 6.9 PSI
Variance letter March 16, 2018 list the pressure at S PSI
Variance granted states that a plumber must take e responsibility of the existing piping and be properly
tested
LSD letter February 23, 2018 indemnifies the plumber?
DM Smith letter February 24, 2018 DM Smith states that the installation is in accordance with the
contract documents?
) Variance Unlisted Equipment March 21, 2018
Installation and testing only and final approval will be by State office after third loamy testing?
4) H2S vessels not tested not in line with code
Do the tanks have MA approval number
Rated for 0.66
Have they been inspected by State
S Plumbing final affidavit December 1. , 201
This is for gas not plumbing
Gas train only should be for the entire installation
States plumbing plans approved by Inspectional Services Department we do not approve plans the
engineer approves the plans and assumes all responsibilities
6) Variance for schedule S stainless?
Do not have a copy of variance decision
7) The final approval on the methane gas and co generators will be by the State as listed in notes
with State Plumbing Inspector
7/812019 ViewPoint Cloud
Gas Permit ,. Add to a projectI Expiration Dat ti
ve
M 9,A A' OML
�� i��rrrrr�t�ltr�trr����p
l
Details
r/�dui/iioa/�f
Submitted on Jun 21,2019,1-655 PM
Attachments 2 fides
Activity Feed
t st activity our Join 21,2019
Applicant'
Douglas Neveu
U
. Location,
24�O CHARLES,STREET,NORTH ANDOVER,MA 01845
TimeIi n e Add New
..... Gas Inspector Review
In Progress
A Permit Fee
�. .� Payment
DoCUrnent
Back to Attachments
1 l2019 1iewPoint Cloud
Workers' Compensation Insurance Affidavit Upload New Version
Click to download
Latest Version
Uploaded .dun 21 t 2019, 1: 3 by Douglass Neveu
Version History
Version ]ate Uploaded
Version Latest ,dun 21st 01 ,1: m Douglas la l e eu s
http ;ll ert nd v rma.viewpointcloud.io/##explore/re rc# 1 1799/attachment/6 699 2l
7/12,12019 Town of North Andover Mail-GLSD CHP Project a Gay System Deleted Information
_
NO",Rj',0",
.
ak
GLSD CFI Project Gas System Related Information
1 message
Richard E,. ere <RWeaIr ,gls . r Wed', Jul 101 2 �� w: �AM
TO. sgalinsky@ wrt e � .g w" sgal'i Is @n i n ma. >
Vic: Paul Dionne 1@ Jdionn .c , ""Cheri R. C s s" <CC s ns gls , rg>
Steve
a
Cheri Cousens andI were able to trallk to, Paul Di is morning after we talked atTown Hall.
Pau] is having1 .k up thee packet,tiodayincludes plans,,, all of thevalriances from the State,, Stiatie approval to
Use l i equipment etc. 1, mentioned this packet of information when we talked this morning. We believe that this
coverspacket ll it erns, thatyou arelooking f6r,except r the State approval of thile,gasblending hicstill
requires,the pro,fessional engineer that designed the system,tio witness 111s testing and provide doCUmentation to the stale
1 d ing board r approval u� �� r ', ill r r l includes
cover, letters,from CDM Smith Engineers that covers,whiat,ls indUded l t. 1 Ihave attached the two
cover letters to this,emiail.
..J. Dionne willyl Sri the full package,to youshortly illl be contacting � 1 with
f0lowing individuals, in attenidance.: Lee Storrs, CDM Smithw of Construction, Dan FlahertySmith's
PlumUng, Engineer, onle or two people " P.J. IDionne and " repiresentafilves. The I t I 'Ie m�eeting
is to review t of dalaprovided uh we befieve will address your concerns and allow1 to sign o`,
the gas porlionof'the BuildingPermit.
Thanks fbr your time this morning.
R/,I c h a,1(1 E. Wea,re
214,,0 Charles Strut
North Andover, MA 01845
Te I: (9 7 1 16 12
a - ' 1
From:, copier [mailto:copier@glsd.,or,g]
Send. Wednesday, July 10, ' :1 5 AM
o: Richard E. W are
Subject; Attached Image
itt w :/ N,1. ogle. om mail/w i"k=l f b iew t r h r t ' t r"+ f%3A163 6 2 , ' 15 5 3 l'r , l f 3 , + 3 ".. 2
7/12/2019 Town of Forth Andover Mail-GLSD CHP Project-Gas System Related Information
.......................................................................................................................................................................... .
4439� 1.pd
1 9
http ,Hmall. gl . /mail/u/ it:C=1 1f d vi =pt& air h=aII permthid=thread-fro I 1 1 impI= g-f°` l i ... 21
19 `rower of Norte Andover Mail-[North ndo r MA)GLSD(Seat Paul Dionne,paul@pjdionne.com
O
,N' ,
11 AN''
OVER
See Gabe s y<s,g lrrisky@n rtl a erm g+ >
[North Andover MA,] GLSD ( by Paul Dionne, pau 1@pj0d ue.0 m
1 message
Contact form ztt North Andover MA <cmsma,iter civi�,cpiusirom> d Jul I t 9:56 AM
Reply- u!l ",j nne.c m,
Hello sgalinsky,
'To" s,galinsky@noirth,andoverma.go,v
Paul Dionne ([),aL11@p jdiionnexon i has seat you a message via your contact form
°t s' i ndo�v r- . V e , c a t t North Andover
H
If you don't wart to receive such -mali you can change your settings at.
Message-
Hi i Steve
We are picking up,a package of documents for GLSD from the n in r today and
wart to schedule a time to submit and review with you.
Please let rye know what works
Thanks
Paul
I
f
tt ./ ee ,rlW + gl , r /r mail/`u ,i I51r � i � t&search ll , rmthi th �y
read �3, fi 63 263,442&simpl=msg-f%3,A1 63 7 w ... 111