HomeMy WebLinkAboutGLSD - Organics to Energy Project - Legal Document - 240 CHARLES STREET 3/21/2018 a
t�
}i
j
,
HA►RLES D. BAKER
GOVERNOR JOHN C,CHAPMAN
UNDERSECRETARY of
Commonwealth of Massachusetts CONSUMER IRS AND
K R H L P LIT - BUSINESS REGULATION
LIkITENA 7 D E N 11 Division Professional- Liconsure _
1000 as i ton Street • Boston • M ss h s tts + 2118COMMISSIONER.R s o sT
EL
J ASH � DIVISION OF
SECRETARY OF HOUSING AND PROFESSIONAL LI ENSURE
ECONOMIC DEVELOPMENT
March 21,2018
Daniel Flaheily (CDM Smith)
240 Chaties Street
North Andover, MA.. 01
Unfisted Equipment
,e: Variance DAGV 1 — Greater Lawrence Sanitary D1 strict-240 Charles Street N r.
Andover
Dear Mr. F a ei y,
The Board of State Examiners of Plumbers axed.Gas Fitters has granted 'your req .e t to aflI w-the
installation and testing of the unlisted gas equipment ent ,Aw Bio Gas Flare/Natural Gas Pilot), at
the above referenced location. Work on this project may eonnnenc ,subject to the approval of the
Local Plumbft& Gas Inspector.
I have attached a copy of the outline for the field evaluation test w e should be followed.
The unlisted gas equipment shall be operated for testing purposes only. fur l , this period o
operation the pails involved shall be responsible for assuring all safety precautions. Final
autborization to allow full operation of the equipment is pcnding the approval,by this office, of a
Third Party test agency report or,Massachusetts Re" tered Professional Engineer's test report.
Sincerely,
Charles Iilb
Board Counsel
Board of State Examiners of Plumbers & Gas Fitters
COO TELEPHONE., 17 727-3074 FAX: 17 7 7- 1 7 TT /TE D: ( 17)727- D http://www.mass.gov/dpi
1 29 1
Date: August 22, 2016
21169
This is an -permit.To learn more,scan this bar barcode or visit nor h n rm . wpoint to , r�#- `r co /211 9
TOWN OF NORTH ANDOVER
PERMIT FOR GAS INSTALLATION
This certifies that Paul J Dionne
has permission for gas installation Provide_-gas piping to 1 water heater and bach-up gas to 2 generators
in the buildings of LAWRENCE CITY OF AIRPORT MMIS
at 240 C ALL S STREET A, North Andover, Dees.
i
1129/20119 ViewPoint Cloudy
Town of North Andover,,
*Gas Permit,• Add to a project
Expiration Date, Active
2110
ROBINSON
Details
Submitted on
Attachments
1 file
Activity Feed
Latest activity on Aug 15,2018
Appicant
1 Thomas K sIk
Location
240 CHARLES STREET,.Unit x NORTH ANDOVER, MA 01845,
Timeline, Add New.
mm... . Permit i Issuance
......................w Issued Aug 22,2 16 at 6:48arn
Gas rrri, Review
Completed Aug 22,2016 at 6:48,am
m.mm mmmm Permit, Fee,
Gas test basernent up on Dill rear old flare by pass ire '1
IIn Progress
Describe where the proposed generator will be located on the property
inside building
htt, s: n r v r . r+ nt l a .i /? l / r / 169/form /
Town of North Andover,MA
Fixtures/Appliances
Fill in all proposed fix es/appli noes, their location, and Now many are to Installed. If the
Item is not found if may be listed under "miscellaneous fixtures/appliances" low. If if is not in
ghat section enter the Item under "other" within this section.
Total Number of Fixtures/Appliances
t
Please add up the total number of fixtures and enter it below
'Total of Appliances/Fixtures,
Miscellaneous Fixtures/Appliances
Please complete all that, apply
Gas Meter arid' Weir Meter Piping Remodeling of'Gas, Pipli g-Commercial
Remodeling ofGay Piping- Residential Swimming Pool Neater Temporary Hamer
1.
hit s://ri,ort,liar i . i+ poiint l .i "/ l', r 1 cor s/ 1 " rr 2/2
1 1
Date. March 20, 21
'q 4 2 7
This is an -permit.To learn more,scan this barcode or visit northandoverma.viewpointcloud.com/#/records/34-327
TOWN OF NORTH ANDOVER
PERMIT FOR GAS INSTALLATION
This certifies that P J Dionne C mpAny
has permission for gas installation METHANE GAS PIPING
in the buildings of GREATER LAWRENCE SANITARY Di T
at 240 CHARL S STREET North Andover, Mass..
Lic. No. 560
12
Town of North Andover,MA
*Gad Permit . Add to a project � 1, Expiration Complete,
.514-52,7
Details
Submitted on Mar 2 ,.28 R-24 AM
Attachments
52 files
Activity,Feed
Latest activity on Aug 01, 201
Applicant
Paul Dionne
catln
2 CHARGES STREET, NORTH ANDOVER,MA 01845,
Timeline Newgr
Gas Ptah Review
Completed Mar 2 , 2 1 :
uw
Permit Fee
I .w-.rv,,, Paid Mar 2 , 1w39 :
m Plermit Issuance
Issued Mar 20,2018 at,1 :3
i
to
this application.
Yes
https,//northanid,overt-na,.,vi'ewpointclou,d.lio/"#,/exp,lore/records/3`4,327/form 1
1/2 9/20 19, ViewPoint Cloud
If yes, Indicate the type of coverage, If' her' s ecify
Town of'NoRh Andover,MA
Liability Insurance Policy
Worker's Compensation Insurance Affidav'ft.
Bu*lld'ers/Contracto,rs/Electr"I'c,ians/Pl'umbers
To be fliled with the perMitting authority
Are you an employer? Select the appropriate,type,. Any applicant,that,selects#1 must also fill out the
section below showing their,workers' compensation policy Information.
1. 1 ami an employer with employees (full andlor part-time)
Type of Project
New Construction
I am an, employer,that, is providing workers' compensation insurance for my
employees. Below i's the policy and "ob site informationd
J
Failure to secure coverage as required under MG> c., 152, 25A is a criminal violation
punishable by a f'ine up to $1,500.00 and/or one-year imprisonment, as we'll as civil planal ties in
the form of'a STOP WORK ORDER and a fine of up to $25 . day against the violator. A
copy of this statement may be forwarded to the, Office of Investigations of the DIA for
*f[cati veir ion.,insurance coverage
Insurance Company Name (Attach a copy of workers" compensation policy declaration page showing
the policy number and expiration date),
c n a insurance
6ittps,://northan,doveri,na.viewpointclioud'.io/#,/explore/records/34327/fo,rm 212
3/19/18 Received a call from Jim Von Plumbers Union Local 12 with a
complaint that non plumbers were working on gas piping. Upon
inspection I did see testing and repairs faking place without plumbers.
CDM Smith engineer did stop all testing he was not aware that all work
had to be by licensed plumbers gas fitters,,
3/26/18 Inspected piping with P J Dione's plumber Mike to go over
what needed to be tested and inspected, walked site along with
Methuen Construction
3/28/18 Inspected underground 12" plastic methane gas line from
digester tank to 5' from entrance of building entrance. Test was set at
60 psi for six hours, test did hold and pass pressure test, material and
fitting connections still need to be qualified. CDM Smith engineering
firm to supply affidavit, asbuilts and pictures of installation. I could not
find tracer tape and warning tape in drench in three locations where the
ground was excavated?