HomeMy WebLinkAboutGLSD - Organics to Energy Project - Correspondence - 240 CHARLES STREET 9/11/2019 IR 9/1212019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) R O Steve Galinsky<sgalinsky@northandoverma.gov> a RE: Greater Lawrence Sanitary District-CHP (GLSD) 1 message Flaherty, Daniel M. <flahertydm@cdmsmith.com> Wed, Sep 11, 2019 at 1:52 PM To: Joseph Peluso<joseph.peluso@mass.gov> Cc: "Storrs, Edward" <StorrsEL@cdmsmith.com>, "Richard E. Weare°<RWeare@gisd.org>, "Cheri R. Cousens" <CCousens Isd.or >, °s alinsk northandoverma. ov" <s alinsk northandoverma. ov>, Paul Dionne @9 9 9 Y@ g 9 Y@ g <paul@pjdionne.com>, "tom@pjdionne.com" <tom@pjdionne.com>, "Spooner, Jay" <jspooner@methuen construction.com>, "Mosher, Benjamin" <MosherBR@cdmsmith.com> Mr. Peluso, Please find attached a request for a gas variance for the biogas conditioning system installed at GLSD. A hard copy of V the application, drawings and $86 check for the application fee are being overnighted. If you have any questions feel free to contact me. Daniel Flaherty, RE Mechanical Engineer CDM Smith 75 State Street, Boston, MA 02109 617.452.6312(off) 857.505.1508(cell) cdmsmitfl.com mith IM From: Peluso, Joseph (REG) <joseph.peluso@state.ma.us> Sent: Wednesday, August 21, 2019 11:56 AM To: Flaherty, Daniel M. <flahertydm@cdmsmith.com> ' Cc: Storrs, Edward <StorrsEL@cdmsmith.com>; Richard E. Weare <RWeare@GLSD.org>; Cheri R. Cousens <CCousens@GLSD.org>; sgalinsky@northandoverma.gov Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) https://mail.google.com/mail/u/0?ik=15l f49db9e&view=pt&search=all&permthid=thread-f%3A1641964302229155795&simpl=msg-f%3A16444024988... 1/7 9/12/2019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) a Hello Dan, You will have to apply for a gas variance for the additional unlisted equipment.We will follow the same procedures as we F did with the prior unlisted equipment. Joseph A. Peluso Jr. Board Consultant \ Massachusetts Board of State Examiners of Plumbers and Gas Fitters Joseph.peluso@mass.gov From: Flaherty, Daniel M. <flahertydm a@cdmsmith.com> Sent: Wednesday, August 21, 2019 11:17 AM To: Peluso, Joseph (DPL) <joseph.peluso a@mass.gov> Cc: Storrs, Edward <StorrsEL c@cdmsmith.com>; Richard E. Weare <RWeare r@GLSD.org>; Cheri R. Cousens <CCousens t@x GLSD.org> Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) Hi Joe, The siloxane and H2S scrubbers were not included as an unlisted appliance variance. When we submitted the initial group of variances we thought these components upstream of the meter would be exempt from the plumbing board jurisdiction. However when we received the board's decision that it was not exempt, we believed siloxane and H2S scrubbers were approved as part of the post install variance GV136. We have submitted unlisted appliance variances for the gas train/blending system for an engine generator(GAV130) and waste gas burner(GAV150)only. If we are in error and need to submit a unlisted appliance variance for the H2S and Siloxane scrubber systems please advise, and we will submit immediately. Dan Flaherty From: Peluso, Joseph (REG) <joseph.peluso c@state.ma.us> Sent: Wednesday, August 21, 2019 5:34 AM To: Flaherty, Daniel M. <flahertydm a@cdmsmith.com> Cc: Storrs, Edward <StorrsEL tx cdmsmith.com>; Richard E. Weare <RWeare c@GLSD.org>; Cheri R. Cousens <CCousens c@GLSD.org> Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) Good morning Dan, https://mail.google.com/mail/u/O?ik=l 5l f49d b9e&view=pt&search=all&permthid=thread-fl o3A1641964302229155795&simpl=msg-f%3A16444024988... 217 9/12/2019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CNP(GLSD) You are correct, that is part of your design and would fall under the variance for the unlisted equipment, which has already been granted. Just a point of information, the email that I sent to the inspector(Steve Galinsky)and yourself last week keeps bouncing back regarding Steve receiving it. I will try to reach him by phone today but if you have a chance I suggest you try to reach him also to make sure we are all on the same page so we can finalize this installation. Please keep me informed if there are additional questions and thanks for your assistance. Joseph A. Peluso Jr. Board Consultant Massachusetts Board of State Examiners of Plumbers and Gas Fitters Joseph.peluso@mass.gov From: Flaherty, Daniel M. <flahertydm@cdmsmith.com> Sent: Tuesday, August 20, 2019 4:16 PM To: Peluso, Joseph (DPL) <joseph.peluso@mass.gov> Cc: Storrs, Edward <StorrsEL@cdmsmith.com>; Richard E. Weare <RWeare tx GLSD.org>; Cheri R. Cousens <CCousens@GLSD.org> o; Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) Hi Joe, The siloxane and 1-12S scrubbers are not designed to meet the pressure testing required for piping. They are designed to withstand a pressure test 1.5 times their maximum allowable working pressure and are protected by a pressure relief valve set at their maximum allowable working pressure. If the siloxane and H2S scrubbers were approved as an un-listed appliance would the siloxane and H2S scrubbers still be required to be tested per the requirements below? If they would not be subject to the pipe requirements CDM Smith \ would like to submit an application for a un-listed appliance for each scrubber system. Daniel Flaherty, PE � Mechanical Engineer CDM Smith 75 State Street, Boston, MA 02109 617.452.6312(off) 857.505.1508(cell) cdmsmith.cQm https://mail.google.com/mail/u/0?ik=l51f49db9e&view=pt&search=all&permthid=thread-f°/o3A1641964302229155795&simpl=msg-f%3A16444024988... 3/7 , 9/12/2019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) Smith 'Z CD 1% From: Peluso, Joseph (REG) <joseph.peluso tax state.ma.us> Sent: Tuesday, August 20, 2019 2:17 PM ' To: Flaherty, Daniel M. <flahertydm@cdmsmith.com> Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) � Good afternoon Mr. Flaherty, o Regarding your questions below, I have copied the pertinent sections of the code which indicate the testing requirements. �w 5.6.2.2.1 Welding of Steel and Wrought Iron Pipe. RR a Welding shall not be construed as the practice of gas-fitting, however, a licensed plumber or gas fitter may not utilize welded pipes and fittings unless they conform to the specifications cited in subsections 5.6.2.2 and A.5.5.1 (1). (b) Gas piping systems with pressures under or equal to 70 P.S.I.G shall only be permitted to utilize welded pipes and fittings when: 1. The inspector has performed a visual inspection as to the quality of the weld; and 2. The test pressure used during an Inspection complies with the following: a. a� stems with a maximum operating " Y p g pressure of ten P.S.I.G. or less, shall be tested to a minimum of three P.S.I.G. or ten times the operating pressure, whichever is greater. b. b. Systems with an operating pressure greater than ten P.S.I.G. and less than or equal to 70 P.S.I.G. shall be tested at 100 P.S.I.G. c. The test duration shall be one hour for every 100 feet of pipe, or fraction thereof. The minimum test duration shall be one hour and the maximum test duration shall be 24 hours, irrespective of system �" design. 10 ` (c) Gas piping systems with pressures over 70 P.S.I.G. may only utilize welded pipes and fittings when: httpsJlmail.google.com/mail/u/O?ik=l 51f49db9e&view=pt&search=all&permthid=thread-f%3A1641964302229155795&simpl=msg f°1o3A16444024988._. 4/7 9/12/2019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) B 1. All welds are of full penetration; and 2. The welds are subjected to the following tests: a. a. All welds are subjected to a 100% X-ray or 100% Ultrasonic Examination (UT) test unless they are socket welded; b. b. All socket welded type joints must be subjected to a magnetic particle test or other non- destructive test; C. c. The gas piping system shall be pressure tested to a minimum of 1.25 times the gas piping systems working pressure. However, the test duration must be a minimum of one hour and the test must be witnessed by the Inspector; and, d. d. Any testing company or field agent that provides a (UT) field examination must meet the requirements of 248 CMR 3.04(6). A copy of the testing certification shall be submitted to the Inspector. 3. Repairs that are made to welded joints that fail the X-Ray or (UT) test shall be re-tested and re-certified. For future reference; the failed welded joint that is re-tested shall be identified by stenciling '/z inch high white lettering at the weld location the date of the re-test. 4. The Inspector shall require an affidavit signed by the individual who performed the X-ray or � (UT) examination for the testing agency. The affidavit shall state that all welds meet the requirements of the applicable specifications and tests. 5.08: Modifications to Chapter8, Inspections, Testing and Purging: 2. Gas piping systems that extend from the outlet of the service meter assembly to the closed shutoff valve at each appliance shall satisfy the following: a. withstand a pressure test of not less than six inches of mercury or three PSIG for a period of not less than ten minutes without showing any drop in pressure; b. the pressure shall be measured with a mercury manometer, slope gauge or an equivalent device so calibrated as to read in increments of not less more than 0.1 PSIG; and „ c. Where new branches are installed to an existing gas piping system, the newly installed branch(es) shall be required to be tested in compliance with this section so long as the newly installed branch(es) can be isolated from existing branch(es). Connections between the new piping and the existing piping shall be tested with a noncorrosive leak-detecting fluid or leak detecting methods as authorized by this code. 3. Gas piping i in systems in excess of one million BTU input shall be tested at a pressure not less than ten times the proposed maximum working pressure of the gas system and: a. the test duration shall be not less than one hour per 100 linear feet of piping or a fraction thereof: and: b. The maximum test duration shall not exceed a 24 hour time period irrespective of the piping system design, and: c. The maximum test pressure shall not exceed 100 PSIG. https://mail.google.com/mail/u/0?ik=151 f49db9e&view=pt&search=all&permthid=th read-f°1o3A1641964302229155795&simpl=msg-f%3A16444024988... 5/7 . 911212019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) Joseph A. Peluso Jr. Board Consultant Massachusetts Board of State Examiners of Plumbers and Gas Fitters Joseph.peluso@mass.gov R; S> From: Flaherty, Daniel M. <flahertydm@cdmsmith.com> Sent: Thursday, August 15, 2019 4:00 PM To: Peluso, Joseph (DPL) <joseph.peluso@mass.gov> �< Cc: Storrs, Edward <StorrsEL@cdmsmith.com>; Lemieux, Larry (DPL) <Larry.Lemieux rx mass.gov>; Cheri R. Cousens <CCousens@GLSD.org>; Richard E.Weare <RWeare@GLSD.org>; sgalinsky@northandoverma.gov Subject: RE: Greater Lawrence Sanitary District-CHP (GLSD) Mr. Peluso, Following up on our previous conversations regarding testing of the H2S and siloxane scrubber pressure vessels, I request an email (similar to the one below)stating that the methodology provided below is acceptable to the plumbing board for pressure testing the vessels. I.The pressure vessels are tested at 1.5 times maximum allowable working pressure in the factory. R 2.The pressure vessels are field tested after installation at all welds and connections with a non-corrosive leak detection fluid. Thanks, Dan Flaherty From: Peluso, Joseph (REG) <joseph.peluso@state.ma.us> Sent: Wednesday, August 14, 2019 9:59 AM To: sgalinsky@northandover.com Cc: Flaherty, Daniel M. <flahertydm@cdmsmith.com>; Storrs, Edward <StorrsEL@cdmsmith.com>; Lemieux, Larry (REG) <larry.lemieux@state.ma.us> �: Subject: Re: Greater Lawrence Sanitary District-CHP (GLSD) Dear Mr. Galinsky, On 03/07/18 the Board addressed a Post Installation Gas Variance request for the above referenced location (GV 136). The request was to allow the installation of stainless steel pipe for above ground location of the Bio gas system.The variance was granted and based on the engineers design. The Board has information confirming that the use of 304 schedule 10 stainless steel pipe is installed per the engineers design and is acceptable. ; https://mail.google.com/mail/u/0?ik=151 f49db9e&view=pt&search=all&permthid=thread-f%3Al 641964302229155795&simpl=msg-f%3A16444024988... 6/7 9/12/2019 Town of North Andover Mail-RE:Greater Lawrence Sanitary District-CHP(GLSD) Please contact me if you have additional questions regarding this issue. Joseph A. Peluso Jr. Board Consultant Massachusetts Board of State Examiners of Plumbers and Gas Fitters Joseph,peluso@mass.gov 3 attachments GDMSmith Drawings.pdf 12942K Variance Request Transmittal.pdf 148 K variance-gas-post-installation signed 9.11.19.pdf 226K - ' https://maif.google.com/mail/u/0?ik=151 f49db9e&view=pt&search=all&permthid=thread-f%3A1641964302229155795&sim pl=msg-f°/o3A16444024988... 7/7