Loading...
HomeMy WebLinkAboutGLSD - Organics to Energy Project - Correspondence - 240 CHARLES STREET 3/27/2018 To: Jay Spooner ospooner@methuenconstruction.com); Richard E.Weare Cc: Irish, Joel R.; McCarthy, Mathew C. _ Subject: Flare Variance Attachments: DAGV 150 Install and Test_201803210632 - Flare Variance.pdf; Flare Factory Safety Testing Results.pdf Jay, Attached is the plumbing board variance for the flare as an Unlisted Equipment. This variance requires a 3rd party certified testing agency or Massachusetts registered engineer witness and submit a testing report for the equipment prior to start up. Can you reach out to Varec again regarding providing the " Field Evaluation Final Test Report" noted in the attached variance. It would appear that performing the "Flare Factory Safety Test" on site witnessed by either a 3`d party or Mass P.E.familiar with fuel gas train design a could satisfy the Board's testing requirement. Thanks, Lee Storrs CDM Smith 75 State Street,Suite 7011 Boston, MA 021091 Tf F: 617.452.6725 1 storrsel(@cdmsmith.com I \\cdmsmith.com a Iw4 A- s 1 �.<.