Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20160105 Application/WSP - Application - 254 GREAT POND ROAD 11/13/2015
Print Form ✓ov E1 yam.. x 2015 SIG V € t' tf e D`z pa f PLANNING DEPART MENT t'�,� i t.iw ? Community Development Division_LSped al Permit— Watershed Permit Application Please typo or print clearly. 1.Petitioner: Thomas and Nicole Friel Petitioner's Address: 254 Great Pond Road, North Andover, MA 01845 Telephone number: 617-548-3724 2.Owners of the Land: Same As Petitioner Address: 254 Great Pond Road North Andover, MA 01845 Number of years of ownership: < 1 month 3.Year lot was created:2010 4. Is the lot currently on septic o,-sewer? If on sewer,please provide date the sewer connection was completed:On Sewer...connected in 2006 5.Description of Proposed Project: Owner is proposing to add a single story 22'x 23'addition within the 250 foot"Non-Disturbance" buffer zone, but outside the 150 foot"Conservation" buffer zone. The owner is also seeking to construct a deck to connect the addition the existing deck. 6.Description of Premises:Sloping developed lot improved with a single family house 7.Address of Property Being Affected:254 Great Pond Road Zoning District: R1 Assessors Map:37A Lot :6 Registry of Deeds:Book#: Pending _Page :Pending 8.Existing Lot: Lot Area(Sq.Ft): 89,627 Building Height:<35 feet Street Frontage:510.38 Side Setbacks:> 30 feet Front Setback:26.4 feet Rear Setback:' 30 feet Floor Area Ratio:n/a Lot Coverage:n/a 9.Proposed Lot(if applicable): Lot Area(Sq.Ft): Building Height: Street Frontage: Side Setbacks: Page 1 of 2 1600 Osgood Street,North Andover,BIdg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web vrvrwv.towvnofiiarihandovor.coin Edited 8/6/07 Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: 10.Required Lot(as required by Zoning Bylaw): Lot Area(Sq.Ft):87,120 Building Height:35 foot max Street Frontage: 175 feet Side Setbacks:30 feet Front Setback:30 feet Rear Setback:30 feet Floor Area Ratio: n/a Lot Coverage:n/a 11.Existing Building(if applicable): Ground Floor(Sq.Ft.): #of Floors:2 Total Sq.Ft.:4,449 Height: < 35 feet Use:Single Family Type of Construction:Wood Frame 12.Proposed Building: Ground Floor(Sq.Ft.): #of Floors: 1 Total Sq.Ft.506 Height: <24 feet Use:Single Family Type of Construction:Wood Frame 13.Has there been a previous application for a Special Permit from the Planning Board on these premises?No If so,when and for what type of construction? 14.Section of Zoning Bylaw that Special Permit Is Being Requested 4.136(3)(c)(ii)(6) 15.Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form, which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application. The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to comply with application requirements, as cited herein and in the Planning Board Rules and Regulations may result in a dismissal by the Planning Board of this application as incomplete. Petitioner's Signature: ! ry Lt Print or type name here: is,I riel Owner's Signature: Print or type name here: Wicole Friel - 61 16.Please list title of plans and documents you will be attaching to this application. Site Plan of Land prepared by Sullivan Engineering Group, LLC; Drywell Sizing(HydroCAD); Page 2 of 2 1600 Osgood Street,North Andover,Bldg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978.688.9535 Fax 978.688.9542 Web_www.townofnorthanalovar.€one Edited 8/6/07 Sullivan Engineering Group, LLC Civil Engineers & Land Development Consultants Watershed Special Permit Application 254 Great Pond Road, North Andover To: North Andover Planning Board From: Jack Sullivan,P.E. Date: November 11,2015 Subject: 254 Great Pond Road—Written Support for Project Planning Board Members: The following written summary is prepared on behalf of the owner/applicant,Thomas and Nicole Friel,in support of constructing a 22' x 23' addition and deck. This lot was created in 2010. All the work is outside of 150 feet to Lake Cochichewick. The following items as outlined in the Watershed Special Permit requirements are listed below(responses to required items are in italic); 1. Encouraging the most appropriate use of land This site is zoned residential and the proposed site development items listed above are appropriate for this parcel. The addition is located over a previously disturbed area. 2. Preventing overcrowding of land The proposed addition is 22'x 23'which is minimal. The proposed addition conforms to zoning requirements. 3. Conserving the value of land and buildings. The proposed site development will enhance surrounding building and land values,while being aesthetically pleasing. 4. Lessening congestion of traffic This project will not increase traffic congestion since this is a single family dwelling with limited trips per day. The number of residents within the household has not changed, therefore the number of vehicle trips will not change with this project. 5. Preventing undue concentration of population This project is consistent with surrounding property uses and as such will not have a measurable impact on population. 6. Providing adequate light and air There will be no adverse impact to current background air and light levels. 7. Reducing the hazards from fire and other danger. There will be no increase in hazard levels from fire or other dangers. The proposed structure will be easily accessible to fire fighting equipment and will meet Building Code requirements in providing smoke detectors. PO Box 2004 Woburn,Massachusetts 01888 (781)854-8644-Phone 8. Assisting in the economical provisions of transportation,water, sewerage, schools,parks, and other public facilities. This project will not impact the above noted public facilities andlor utilities. There will not be a negative impact to the economics of any public utility. 9. Controlling the use of bodies of water,including watercourses: This project will not have a negative impact on present uses of the Lake or tributaries thereto. 10. Reducing the probability of losses resulting from floods: This property is not located within a designated Flood Plain as shown as the latest FIRM maps. The proposed construction will utilize drainage mitigation to collect& recharge stormwater runoff back to the groundwater table. There will be no increase of stormwater runofffrom this site. There will be no increase in flooding probability due to the development of the property. 11. Reserving and increasing the amenities of the Town This project will increase the amenities of the Town through an improvement to the property and additional tax revenue due to the new construction assessment. The Planning Board, in reviewing this application, will note that all threshold requirements for granting the Special Permit are met and/or exceeded. Further written documentation is provided below(responses to required items are in italics) 1. Written certification by a Registered Professional Engineer, or other scientist educated in and possessing extensive experience in the science of hydrology and hydrogeology, stating that there will not be any significant degradation of the quality or quantity or water in or entering Lake Cochichewick. 1) No pesticides,fungicides, chemicals, or non-organic fertilizers will be used in lawn care or maintenance. Presently, there are no limitations on the type or quantity of fertilizers. 2) Siltation controls are proposed at the limit of work during construction and until the site is final stabilized by landscaped means to protect the lake and surroundingproperties from any potential runoff impacts. 3) Stormwater mitigation has been provided to account for all increased impervious areas. Runoff associated with the increased impervious surface (roof area)will be conveyed to a drywell system to promote groundwater recharge. 4) The existing dwelling is connected to the municipal sewer system;therefore there will be no potential increase in nitrogen levels over the existing background levels at the property. 5) This site directly abuts the lake. Natural wooded buffers will be retained within 150 feet of the lake. 6) Careful planning went into the addition to limit site grading changes and to match the existing topography. By limiting the grading changes onsite, existing drainage watercourses will continue to function as in the existing condition. 2. Proof that there is no reasonable alternative location outside the Non-Disturbance and/or Non-Discharge Buffer Zones, whichever is applicable, for any discharge, structure, or activity, associated with the proposed use to occur. Since the existing house is located entirely within the Non-Disturbance zone and the addition is attached there is very little flexibility in locating the addition outside the Non-Disturbance Zone. PO Box 2004 Woburn,Massachusetts 01888 (781)854-86"-Phone 3. Evidence of approval by Mass DEP of any industrial waste water treatment or disposal system or any waste water treatment of system 15,000 GPD capacity. This item does not apply to this site. 4. Evidence that all on-site operations including,but not limited to,construction,water water disposal, fertilizer applications,and septic systems will not create concentrations of Nitrogen in groundwater,greater than the federal limit at the downgradient property boundary. The existing dwelling is connected to the municipal sewer system and the deed restriction only allowing organic or slow-release nitrogen,phosphorus free produce for fertilizer use will insure that background nitrogen levels in the groundwater table will not be increased. 5. Projections of downgradient concentrations of nitrogen,phosphorus,and other relevant chemicals at property boundaries and other locations deemed pertinent by the SPGA. There will be no downgradient concentration of the above referenced chemicals as outlined in the response to Item 4 above. If you should have any questions or require additional information please feel free to contact me. Very Truly Yours, `mod Jack SullivaYi,P.E. .. Attachments(as noted) Cc: Thomas and Nicole Friel PO Box 2004 Woburn,Massachusetts 01888 (781)854-86414-Phone is Roof Area to DryweII AAle, �P 500 � K) Gallon Drywell / 12" Surrounding Subcat �Rea.hll �\n� Link Drainage Diagram for 254 Great Pond Road Prepared by{enter your company name here} 11/12/2015 HydroCADO 7-00 s/n 001433 01986-2003 Applied Microcomputer Systems 254 Great Pond Road Type ill 24-hr 2 yr Rainfall=3.10" Prepared by {enter your company name here} Page 2 HydroCAD®7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 11/12/2015 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment IS: Roof Area to Drywell Runoff Area=506 sf Runoff Depth=2.68" Tc=6.0 min CN=98 Runoff=0.03 cfs 113 cf Pond 1 P: 500 Gallon Drywell w/12"Stone Surroupeak Elev=140.04' Storage=27 cf Inflow=0.03 cfs 113 cf Outflow=0.01 cfs 113 cf Total Runoff Area=506 sf Runoff Volume= 113 cf Average Runoff Depth=2.68" 254 Great Pond Road Type 111 24-hr 2 yr Rainfall=3.10" Prepared by {enter your company name here} Page 3 HydroCAD®7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 11/12/2015 Subcatchment 1S: Roof Area to Drywell Runoff = 0.03 cfs @ 12.09 hrs, Volume= 113 cf, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS,Time Span=5.00-20.00 hrs, dt=0.05 hrs Type III 24-hr 2 yr Rainfall=3.10" Area(sf) CN Description 506 98 Roof Area to Drywell Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, From Roof. Subcatchment 1S: Roof Area to Drywell Hydrocgrapah 0.038 C1 Runoff 0.036 0.03 cfs 0.034 Type III 24-hr 2 yr 0.032 O.o3 Rainfall=3.10" 0.028 0.026 Runoff Area=506 sf 0.02 0.022 Runoff Volume=113 cf � 0.02 Runoff Depth=2.68" 0 0.018 a 0.016 Tc=6.0 m l n 0.014 0.012 CN=98 0.01 0.008 0.00 o.00a 0.000 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 254 Great Pond Road Type/1/24-hr 2 yr Rainfall=3.10" Prepared by{enter your company name here} Page 4 HydroCAD®7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 1 111 2/201 5 Pond 1P: 500 Gallon Drywell w/ 12" Stone Surrounding Field Percolation Rate of Soil= 12 MPI Inflow Area= 506 sf, Inflow Depth = 2.68" for 2 yr event Inflow = 0.03 cfs @ 12.09 hrs, Volume= 113 cf Outflow = 0.01 cfs @ 11.75 hrs, Volume= 113 cf, Atten=78%, Lag=0.0 min Discarded = 0.01 cfs @ 11.75 hrs, Volume= 113 cf Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt=0.05 hrs Peak Elev= 140.04' @ 12.49 hrs Surf.Area=64 sf Storage=27 cf Plug-Flow detention time=20.4 min calculated for 113 cf(100%of inflow) Center-of-Mass det.time= 19.9 min (758.8-738.9) # Invert Avail.Storage Storage Description 1 139.00' 76 cf 8.00'w x 8.00'L x 4.00'H Prismatoid 256 cf Overall-67 cf Embedded = 189 cf x 40.0%Voids 2 140.00' 67 cf 5.33'D x 3.00'H Vertical Cone/Cylinder Inside#1 143 cf Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.006944 fpm Exfiltration over entire Surface area Discarded OutFlow Max--0.01 cfs @ 11.75 hrs HW=139.04' (Free Discharge) L1=Exfiitration (Exfiltration Controls 0.01 cfs) Pond 1P: 500 Gallon Drywell w/ 12" Stone Surrounding Hydrograph Inflow 0.038 0.03 cfs ``1 Discarded 0.036 0.034 Inflow Area=506 sf °003 Peak Elev=10.0 ' 0.028 — 0.026 Storage=27 cf 0.024 w 0.022 w 0.02 c 0.018 a 0.016 0.014 0.012 0.01 0 01 cfs 0.008 0.006 <` 0.004 0.002 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 254 Great Pond Road Type 111 24-hr 10 yr Rainfall=4.80" Prepared by {enter your company name here} Page 5 HydroCAD®7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 11/12/2015 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Roof Area to Drywell Runoff Area=506 sf Runoff Depth=4.24" Tc=6.0 min CN=98 Runoff-0.05 cfs 179 cf Pond 1P: 500 Gallon Drywell w/12"Stone SurrotPeak Elev=140.76' Storage=55 cf Inflow=0.05 cfs 179 cf Outflow=0.01 cfs 179 cf Total Runoff Area=506 sf Runoff Volume= 179 cf Average Runoff Depth=4.24" 254 Great Pond Road Type 1/124-hr 10 yr Rainfall=4.80" Prepared by(enter your company name here) Page 6 HydroCADO 7.00 s/n 001433 ©1986-2003 Applied Microcomputer Systems 11/12/2015 Subcatchment 1S: Roof Area to Drywell Runoff = 0.05 cfs @ 12.09 hrs, Volume= 179 cf, Depth= 4.24" Runoff by SCS TR-20 method, UH=SCS, Time Span=5.00-20.00 hrs, dt=0.05 hrs Type III 24-hr 10 yr Rainfall=4.80" Area(sQ CN Description 506 98 Roof Area to Drywell Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, From Roof Subcatchment 1S: Roof Area to Drywell Hydragrap h C7 Runofr I 0.055 0.05 cfs Type III 24-hr 10 yr OM 0.045 Rainfall=4.80" 0.04 Runoff Area=506 sf 0.035 Runoff Volume=179 cf w 3 0.03 Runoff Depth=4.24" LL 0.025 / Tc=6.0 m i n 0.02 CN=98 0.015 f 0.01 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 254 Great Pond Road Type M 24-hr 10 yr Rainfalh4.80" Prepared by{enter your company name here} Page 7 HydroCADO 7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 11/12/2015 Pond 1 P: 500 Gallon Drywell w/ 12" Stone Surrounding Field Percolation Rate of Soil= 12 MPI Inflow Area= 506 sf, Inflow Depth= 4.24" for 10 yr event Inflow = 0.05 cfs @ 12.09 hrs, Volume= 179 cf Outflow = 0.01 cfs @ 11.65 hrs, Volume= 179 cf, Atten=86%, Lag=0.0 min Discarded = 0.01 cfs @ 11.65 hrs, Volume= 179 cf Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt=0.05 hrs Peak Elev= 140.76' @ 12.60 hrs Surf.Area=64 sf Storage=55 cf Plug-Flow detention time=47.5 min calculated for 178 cf(100%of inflow) Center-of-Mass det.time=46.9 min (782.3-735.4) # Invert Avail.Storage Storage Description 1 139.00, 76 cf 8.00'NV x 8.00%x 4.00'H Prismatoid 256 cf Overall-67 cf Embedded= 189 cf x 40.0%Voids 2 140.00' 67 cf 5.33'D x 3.00'H Vertical Cone/Cylinder Inside#1 143 cf Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.006944 fpm Exfiltration over entire Surface area Discarded Outflow Max--0.01 cfs @ 11.65 hrs HW=139.05' (Free Discharge) L1=Exfiltration (Exfiltration Controls 0.01 cfs) Pond 1 P: 500 Gallon Drywell w/ 12" Stone Surrounding Hydrograph 0.05 cfs r inflow i�!Discarded 0.055 Inflow Area=506 sf 0.05 Peak lev=10. 6' 0.045 0.04 Storage=55 cf 0.035 0 3 0.03 0 0.025 0.02 0.015 0.01 0 01 cfs 0.005 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 254 Great Pond Road Type 111 24-hr 100 yr Rainfall=6.40" Prepared by{enter your company name here} Page 8 HydroCADO 7.00 s/n 001433 01986-2003 Applied Microcomputer Systems 11/12/2015 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Roof Area to Drywell Runoff Area=506 sf Runoff Depth=5.69" Tc=6.0 min CN=98 Runoff=0.07 cfs 240 cf Pond 1P: 500 Gallon Drywell w/12"Stone SurrouPeak Elev=141.50' Storage=84 cf Inflow=0.07 cfs 240 cf Outflow=0.01 cfs 240 cf Total Runoff Area=506 sf Runoff Volume=240 cf Average Runoff Depth=5.69" 254 Great Pond Road Type 111 24-hr 100 yr Rainfall=6.40" Prepared by{enter your company name here} Page 9 HydroCAD®7.00 s/n 001433 ©1986-2003 Applied Microcomputer Systems 1 111 2/201 5 Subcatchment 1S: Roof Area to Drywell Runoff = 0.07 cfs @ 12.09 hrs, Volume= 240 cf, Depth= 5.69" Runoff by SCS TR-20 method, UH=SCS, Time Span=5.00-20.00 hrs, dt=0.05 hrs Type III 24-hr 100 yr Rainfall=6.40" Area(sf) CN Description 506 98 Roof Area to Drywell Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, From Roof Subcatchment 1S: Roof Area to Drywell Hydrngrap h E7 Runoff 0.075 0.07 cfs 0.07 Type III 24-hr 100 yr 0.065 Rainfall=6.40" 0.06 0.055 Runoff Area=506 sf 0.05 Runoff Volume=240 cf w 0.045 3 0.04 Runoff Depth=5.69" LL 0.035 Tc=6.0 m i n 0.03 0.025 CN=98 0.02 0.015 0.01 f 0.005 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 254 Great Pond Road Type 111 24-hr 100 yr Rainfall=6.40" Prepared by{enter your company name here} Page 10 HydroCADO 7.00 s/n 001433 ©1986-2003 Applied Microcomputer Systems 11/12/2015 Pond 1 P: 500 Gallon Drywell w/ 12" Stone Surrounding Field Percolation Rate of Soil= 12 MPI Inflow Area= 506 sf, Inflow Depth = 5.69" for 100 yr event Inflow = 0.07 cfs @ 12.09 hrs, Volume= 240 cf Outflow = 0.01 cfs @ 11.45 hrs, Volume= 240 cf, Atten=90%, Lag=0.0 min Discarded = 0.01 cfs @ 11.45 hrs, Volume= 240 cf Routing by Stor-Ind method, Time Span=5.00-20.00 hrs, dt=0.05 hrs Peak Elev= 141.50' @ 12.81 hrs Surf.Area=64 sf Storage=84 cf Plug-Flow detention time= 80.0 min calculated for 239 cf(100%of inflow) Center-of-Mass det.time= 79.3 min (813.2-733.9) # Invert Avail.Storage Storage Description 1 139.00' 76 cf 8.00'VV x 8.00'L.x 4.00'H Prismatoid 256 cf Overall-67 cf Embedded= 189 cf x 40.0%Voids 2 140.00' 67 cf 5.33'D x 3.00'H Vertical Cone/Cylinder Inside#1 143 cf Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.006944 fpm Exfiltration over entire Surface area Discarded OutFlow Max--0.01 cfs @ 11.45 hrs HW=139.04' (Free Discharge) L1=Exfiltration (Exfiltration Controls 0.01 cfs) Pond 1 P: 500 Gallon Drywell w/ 12" Stone Surrounding Hydrograph Inflow 0.07 cfs _ ?Discarded 0•075 Inflow Area= 06 sf 0.07 0.065 Peak lev=11. 0' 0.06 0.055 Storage=84 cf 0.05 u 0-045 3 0.04 i j: 0.035 0.03 0.025 0.02 0.015 0.01 0.005 r.,. 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Abutter to Abutter( ) Building Dept. ( ) Conservation (X ) Zoning ( ) Town of North Andover Abutters L,istinq REQUIREMENT: r6G1.40A,Section i t states in pan Parties in Interest as used in this chapter sha7 mean the pebt,orer, abutters,o..rets of lard d reedy oppos;te on any pub`.c or private way,and atutlers to abutters vStY1n '.. three hundred(200)feet of the property me of the petitioner as they appear on the most recent app5cab'e tax Fsl,not w-Ahstand'ng that the fand of any such o.•.ner is fccated in another oly or taut,the p!ano'ng board of the city or toAn,and lha ptann*ng beard of overy abuWng city or torn. Subject Property: MAP PARCEL Name Address 37.A 6 Anthony Dinapoli 290 South plain street,Andover,61A 01810 Abutters Properties Location: 254 Great Pond Road,North Andover,MA 01845 plan Parcel's Name Address 37.A 6.A Town of North Andover 120 Main Street,North Andover,MA 01845 37.A 53 Bill Karras 316 Great Pond Road,North Andover,MA 01845 37.A 56 Nanje Realty Trust 270 Great Pond Road,North Andover,MA 01845 37.0 10 112 Fox Hill Realty Trust 112 Fox Hill Road,North Andover,MA 01845 37.0 11&56 Kingfish Trust 11 Marbleridge Road,North Andover,MA 01845 37.0 14 Elke Ehrig 177 Great Pond Road,North Andover,MA 01845 37.0 53 Michael Foster 235 Great Pond Road,North Andover,MA 01845 37.0 54 Stephen Boyko 243 Great Pond Road,North Andover,MA 01845 37.0 55 Hiroshi Saimoto 245 Great Pond Road,North Andover,MA 01845 This carljrras HIM tho ran f1Lo ro'cords of the set;s 1rs f or lifiod by: -