Loading...
HomeMy WebLinkAboutGLSD Organics to Energy Project - Correspondence - 240 CHARLES STREET 3/20/2018 0 VE.. '.. .. Donald Belanger<dbelanger@northandoverma.gov 240 Charles St, GLSD 2 messages Donald Belanger dbelanger@port andover ma.g v Tu , Isar 20, 2018 at 1 r 2 P To: Eric I foury el for @northandoverma.gov , Jim Hurley jhurley@northandoverma.gov , Steve Galinsky gaIinst @northandoverrna.goer Bee: Donald Belanger dbelanger@rrorthandov rr a.gov Erie, l requested The Plumbing Inspector Place a Stop on Gas Permit 34327, This permit had been issue prematurely, This permit is not complete and should not have been issued. Donald Belanger Donald Belanger dbelanger@nortlnandoverrna.gov Tue: Mar 20, 2018 at 5.h06 PM To: Tom@pjdlonne,eorn Ce: Eric Kfoury e foury@n rthandoverr a.gov , Steve Galinst y sgalins y@northandoverrna.gov , Jim burley jhurl ey@northandoverr a.gov , pdionne@pjdionne.corn Bee: Donald Belanger dbelanger@northandoverma.gov Mr. Kosi l : Per our conversation above is a copy of the email I sent to the Plumbing/Gas inspector Jinn Hurley requesting a STOP/HOLD STOP/HOLD on Gas Permit 34327. My Plumbing/Gas Inspectors informed that unlicensed Individuals were working on the gas system, as you stated without your knowledge wheir your Company PJ Dionne's permit GP 34327. Therefore until further notice I will be asking my Gas Inspector to place a MOLD GP 34327 (not a stop work order)as of g -2 - 201 . If you have any further questions please feel free to contact me by email at dbelanger@northandoverma.gov Thank You Donald Belanger Inspector of Buildings/ Zoning Enforcement Office [Quoted text hidden] t I I M1 144 Main Strbet ' Methuen n - .CONSTRUCTION , Ph:603-328-2222 RF1 To; Lee Storrs RF1 : 1 GDM Smith Date: / 1 01 ' 75 State Street,Suite 701 Job: 2044 GLSDOrganics Energy Phaso Boston,MA 02109 Phone: Subject: Pressure Regulator for etur l'Gas Service to Cogen Building Drawing: P-3 Sec ecflo : Cost' ot: None LL 'Schedule Impact: None Request: Date Required: 1201 See attached from P.J.Dlonn6 requestin clarification c given the maximum inlets pressure for the specified regulator in the response to RF14035E and given the inlet pressure specified In e'response tb RF1 1.Please advise as requested. Requested by: Jeffrey Lee Methuen Construction Co., Inc. Rosp6nse: # �S%r= S F. AT 0 F-P MAAK-UPS ON SHOT P-a,? 0 ak a E�X r,�Z R 2.1 e9v SHOWN IM PROVIDE ONE 6M oepU rnr_ VAI-Vr- 114 1,ACC-- O 'ro 5C-.RVr= WATr-_A HEATFIZ, CAPACITY4#0 /70 -326 CFN" REDUCTIM: " PO 6 f6)& P1?6VIDE MIE-SC-COMP 3 SOSREDUCW6�-:57-4170H Sp-.RVF W MP. H TER.. CAPAC 740 -9240CFI)' (TW5 PRY, 15 R E-R RED To IN F,r,,l VO A- Doug 1i erme GDM Smith 21 2 1 Page I of i