HomeMy WebLinkAboutSeptic System - full repair - Correspondence - 204 MILL ROAD 4/16/2020 4/9/2020 XfinityConnect Re_204 Mill Rd,North Andow-Septic As-built Plan Printout
Toni Wolfenden <twolfenden@northandoverma.gov> 4/9/2020 8:42 AM
Re: 204 Mill Rd, North Andover - Septic As-built Plan
To Jack Sullivan <jacksu1153@comcast.net> Copy Brian LaGrasse <blagrasse@northandoverma.gov>
Frank L Ventola Jr<fl\tentola@comcast.net>
Thank you!
Jack,
Please mail 3 copies of the As-Built for the file.
We appreciate it!
Ha\e a great day,
Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
On Wed, Apr 8, 2020 at 6:22 PM Jack Sullivan <jacksull531c_comcast.net> wrote:
Brian/Toni,
I went out today and survey located the septic system Todd Bateson put in. Attached is
completed As-built plan. The location and elevations are within tolerance. Could you
look to schedule the inspection so Bateson can then backfill the system??
Hope you are doing well....
Let me know if you need paper plans mailed to Town Hall... with the Town Hall closed I
wanted to at least get an electronic copy to everyone since this property is sold and
papers will be passing shortly.
Thank you.
Sullivan Engineering Group, LLC
Jack Sullivan
P.O. Box 2004
Woburn, MA 01888
781-854-8644
All email messages and attached content sent from and to this email account are public records unIessquaIified as an exemption
under the Massachusetts Public Records Law .
https://connect.Anity.corryappsuite%7.10.0-29.20200324.081233/print.htrri?print 15864338766070 1/2
6/4/201,cl Town of North Andover Mail-Revised plan review-204 Mill Road
NORTH ANDOVER
Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov>
Revised plan review - 204 Mill Road
2 messages
Dan Ottenheimer<dano@millriverconsulting.com> Mon, Jun 3, 2019 at 5:08 PM
To: Brian LaGrasse<blagrasse@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov>
Cc: Sandra Lezcano <sandral@millriverconsulting.com>
Brian, Toni -
We have reviewed the revised design plan and accompanying information for 204 Mill Road and have found them to be in
compliance with state and local regulations.
Please let me know if you have any questions.
Dan
Daniel Ottenheimer, PE
President
WMILL RIVER CONSULTING
Creative Soltitimms for t=id Nvelopmrnt
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
hftps://mai l.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=a II&permthid=thread-f%3A1635355069786921429&simpl=msg-f%3A163535506978... 1/2
6/4/20V Town of North Andover Mail-Revised plan review-204 Mill Road
Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts
Environmental Health Association
Toni Wolfenden <tolfenden@northandoverma.gov> Tue, Jun 4, 2019 at 8:12 AM
To: Dan Ottenheimer<dano@millriverconsulting.com>
Cc: Brian LaGrasse <blagrasse@northandoverma.gov>, Sandra Lezcano <sandral@millriverconsulting.com>
Thank you!
Toni K. Wolfenden
Health Department Assistant
978-688-9540
� cid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
•
image001.jpg
4K
https://mail.google.com/mai I/u/0?ik=aOc6f4e4cf&view=pt&search=al I&permth id=thread-f%3A1635355069786921429&simpl=msg-f%3Al 63535506978... 2/2
Sullivan Engineering Group, LLC
Civil Engineers&Land Development Consultants
May 29, 2019
RECENED
Town of North Andover
Health Department MAY 31201Q
120 Main Street
North Andover, MA 01845
?0 00H OF pEPAR MENT
Re: 204 Mill Road, North Andover (Tax Map 107A Lot 63)
Septic Design Plan
Health Department:
Enclosed are the revised Septic Design Plans (3 sets) for the above referenced property for your review and
approval. In response to the review letter dated May 14, 2019 the following changes and/or revisions have
been made
1) The DEP approval for the infiltrator system requires proof that the designer has satisfactorily
completed any required training by the company. In a phone call to Infiltrator systems on 5/29/19 by
this office there is NO training and/or certification required for designers.
2) The owner has been provided a copy of the Title 5 UA technology approval by MassDEP. There is no
owners manual or O&M manual for the infiltrator chamber.
3) The owner agrees to fulfill his responsibilities to provide written notification of the Approval to any
new Owner, as required by 310 CMR 15.287(5).
4) This system is designed WITHOUT the use of a garbage grinder and the restriction of not allowing a
garage grinder with this design is understood and accepted.
5) The System owner understands the requirement to repair, modify, or take any other action as required
by the Department or the LAA (Local Approving Authority), if the Department or LAA determines the
system to be failing to protect public health and safety and the environment, as defined in 310 CMR
15.303.
6) A best feasible upgrade plan is shown on the design plan. A conventional septic system leaching field
(pipe/stone) is shown in trench configuration and sizing calculations are provided as well.
7) The maximum area available for a conventional system is shown.
If you should have any questions or comments please feel free to contact me.
Very Truly Yours,
A
Jack Sulliva E W(Designer) Frank Ventola, fr. (Homeowner)
P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net
i•
r
;4!"#EI r... .: ,. r"4 6 ! 'fi 't`1. 1'. -JsC .f _ f)Li .. .., _, '.;!L � ,ti�.f x.i''�'.�'" ��'<..: '!"! i• ..... ii`.%.. - ,. i
.' :. •xi'!?sC.v':-. .f'_,a.:;6 4: J;.
i' tt
k ♦ ,
sF 4".}f,. -".f3>f, -v:}z2 11 �:�^ ih r: .. ;i. ,{ t tA.i f. 3`.}•' {. �`R: ..iir.js.,i.r.. Ji! ,.':'� ..:/f aa..., AT
r'� f'. .a'y t;fi _ i`1`.7 _.{� 3ijz.,+{t'Ri:. {s_'+ ,:�.+ _ .x, _l t:�.'�i>ie•.. J� f`f ;1 1� 3 ...SJ d f Jt_!• i`Y3_t'"!,a';x}j
` ?: ,i ✓:'.< s . ' i` •sx4r[ >/� °�.tj`. lid:d 'f'J < 'f�;t�„ R'. � :,xa! if..i � €� + r it.;r�ii e7 � . . . . .,...� ,!
._;J; #; r'_, _ } .}; ..r .. •- :�.+ ;i! is .1� c.ff`.: ,,qj `
iI(}
�.:< ...•l::��.i.hl.._.� .. . - ;ii.:9 .;Trig:.,�.. .-!ii a ry!f s ,.'r.r fi •�a{-:.t Y'+l .s 1}rt/c.,. • _. ... ~i: ¢. . . ! fTf -
_dl{! 1 >..._ .,.f.:... ✓f, ..... � ... �J::
.. :t.r.. _ }! ✓'a, t. . ♦)_ f: {f_ s..1 1.il—ij
,
3t
Of
5115/2019, Town of North Andover Mail-Initial plan review-204 Mill Road
NORTH ANDOVER
Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov>
Initial plan review - 204 Mill Road
1 message
Dan Ottenheimer<dano@millriverconsulting.com> Tue, May 14, 2019 at 6:38 PM
To: Brian LaGrasse <blagrasse@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov>
Cc: Sandra Lezcano <sandral@millriverconsulting.com>
We have completed our review of the submitted design. It appears the designer was using an earlier approval for the
plastic chambers that are being proposed to be used. The most recent approval requires different material to be provided
on the plan and also accompanying the design plan. These have been enumerated in the attached letter.
I will send the designer a copy of the approval so he can move this forward in a prompt manner.
Any questions, do let me know.
Dan
Daniel Ottenheimer, PE
President
AF.,
1t_ MILL RIVER CONSULTING
Creative 5ol►ttions for Laid Ikvelopmrrtt
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3AI 633548773913032383&simpl=msg-f%3A1 63354877391... 1/2
5/15/2019 Town of North Andover Mail-Initial plan review-204 Mill Road
Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts
Environmental Health Association
9-1 204 Mill Road Review Letter May 14, 2019.docx
78K
https://mail.goog le.com/ma i I/u/O?i k=aOc6f4e4cf&view=pt&sea rch=a I I&permth id=th read-f°/a 3A l 633548773913032383&s i m pl=msg-f%3A 163354877391... 2/2
11/26/2018 Town of North Andover Mail-Re:204 Mill Road,NA-Soil Test(postpone till early spring)
NORTH ANDOVER
Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov>
Re: 204 Mill Road, NA - Soil Test (postpone till early spring)
2 messages
Jack Sullivan <jacksu1153@comcast.net> Mon, Nov 26, 2018 at 9:16 AM
Reply-To: Jack Sullivan <jacksuI153@com cast.net>
To: Dan Ottenheimer<dano@millriverconsulting.com>
Cc: Mgrant@northandoverma.gov, Brian LaGrasse <blagrasse@northandoverma.gov>, Toni Wolfenden
<tolfenden@northandoverma.gov>
Dan,
I just spoke to my client and due to the lateness in the season and no emergency for the soil
testing to be performed we are going to wait until early Spring 2019 to conduct the soil test.
Brian/Michelle/Toni....Dan and I have been rained out multiple times in November...so at this point
a system will not be going in this year....I will reach back out to everyone in late march/early april to
schedule.
Sullivan Engineering Group, LLC
Jack Sullivan
P.O. Box 2004
Woburn, MA 01888
781-854-8644
Toni Wolfenden <tolfenden@northandoverma.gov> Mon, Nov 26, 2018 at 9:18 AM
To: Jack Sullivan <jacksu1153@comcast.net>
Cc: Dan Ottenheimer<dano@millriverconsulting.com>, Michele Grant<Mgrant@northandoverma.gov>, Brian LaGrasse
<blagrasse@northandoverma.gov>
Ok, thanks for the update.
Toni K. Wolfenden
Health Department Assistant
978-688-9540
�,`',cid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
image001.jpg
4K
https://mail.google.com/mai I/u/0?ik=aOc6f4e4cf&view=pt&search=all&permth id=thread-f%3A1618206283422438800&simpl=msg-f%3A161820628342... 1/2
11/26/2018 Town of North Andover Mail-Re:204 Mill Road,NA-Soil Test(postpone till early spring)
Iwo
https://mai I.googIe.com/mail/u/0?ik=a0c6f4e4cf&view=pt&search=a II&permthid=thread-f%3A 1618206283422438800&simpI=msg-f%3A161820628342... 2/2