Loading...
HomeMy WebLinkAboutSeptic System - full repair - Correspondence - 204 MILL ROAD 4/16/2020 4/9/2020 XfinityConnect Re_204 Mill Rd,North Andow-Septic As-built Plan Printout Toni Wolfenden <twolfenden@northandoverma.gov> 4/9/2020 8:42 AM Re: 204 Mill Rd, North Andover - Septic As-built Plan To Jack Sullivan <jacksu1153@comcast.net> Copy Brian LaGrasse <blagrasse@northandoverma.gov> Frank L Ventola Jr<fl\tentola@comcast.net> Thank you! Jack, Please mail 3 copies of the As-Built for the file. We appreciate it! Ha\e a great day, Toni Toni K. Wolfenden Health Department Assistant 978-688-9540 On Wed, Apr 8, 2020 at 6:22 PM Jack Sullivan <jacksull531c_comcast.net> wrote: Brian/Toni, I went out today and survey located the septic system Todd Bateson put in. Attached is completed As-built plan. The location and elevations are within tolerance. Could you look to schedule the inspection so Bateson can then backfill the system?? Hope you are doing well.... Let me know if you need paper plans mailed to Town Hall... with the Town Hall closed I wanted to at least get an electronic copy to everyone since this property is sold and papers will be passing shortly. Thank you. Sullivan Engineering Group, LLC Jack Sullivan P.O. Box 2004 Woburn, MA 01888 781-854-8644 All email messages and attached content sent from and to this email account are public records unIessquaIified as an exemption under the Massachusetts Public Records Law . https://connect.Anity.corryappsuite%7.10.0-29.20200324.081233/print.htrri?print 15864338766070 1/2 6/4/201,cl Town of North Andover Mail-Revised plan review-204 Mill Road NORTH ANDOVER Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov> Revised plan review - 204 Mill Road 2 messages Dan Ottenheimer<dano@millriverconsulting.com> Mon, Jun 3, 2019 at 5:08 PM To: Brian LaGrasse<blagrasse@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Cc: Sandra Lezcano <sandral@millriverconsulting.com> Brian, Toni - We have reviewed the revised design plan and accompanying information for 204 Mill Road and have found them to be in compliance with state and local regulations. Please let me know if you have any questions. Dan Daniel Ottenheimer, PE President WMILL RIVER CONSULTING Creative Soltitimms for t=id Nvelopmrnt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com hftps://mai l.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=a II&permthid=thread-f%3A1635355069786921429&simpl=msg-f%3A163535506978... 1/2 6/4/20V Town of North Andover Mail-Revised plan review-204 Mill Road Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association Toni Wolfenden <tolfenden@northandoverma.gov> Tue, Jun 4, 2019 at 8:12 AM To: Dan Ottenheimer<dano@millriverconsulting.com> Cc: Brian LaGrasse <blagrasse@northandoverma.gov>, Sandra Lezcano <sandral@millriverconsulting.com> Thank you! Toni K. Wolfenden Health Department Assistant 978-688-9540 � cid:image002.jpg@01 CD02A1.85A49B40 [Quoted text hidden] • image001.jpg 4K https://mail.google.com/mai I/u/0?ik=aOc6f4e4cf&view=pt&search=al I&permth id=thread-f%3A1635355069786921429&simpl=msg-f%3Al 63535506978... 2/2 Sullivan Engineering Group, LLC Civil Engineers&Land Development Consultants May 29, 2019 RECENED Town of North Andover Health Department MAY 31201Q 120 Main Street North Andover, MA 01845 ?0 00H OF pEPAR MENT Re: 204 Mill Road, North Andover (Tax Map 107A Lot 63) Septic Design Plan Health Department: Enclosed are the revised Septic Design Plans (3 sets) for the above referenced property for your review and approval. In response to the review letter dated May 14, 2019 the following changes and/or revisions have been made 1) The DEP approval for the infiltrator system requires proof that the designer has satisfactorily completed any required training by the company. In a phone call to Infiltrator systems on 5/29/19 by this office there is NO training and/or certification required for designers. 2) The owner has been provided a copy of the Title 5 UA technology approval by MassDEP. There is no owners manual or O&M manual for the infiltrator chamber. 3) The owner agrees to fulfill his responsibilities to provide written notification of the Approval to any new Owner, as required by 310 CMR 15.287(5). 4) This system is designed WITHOUT the use of a garbage grinder and the restriction of not allowing a garage grinder with this design is understood and accepted. 5) The System owner understands the requirement to repair, modify, or take any other action as required by the Department or the LAA (Local Approving Authority), if the Department or LAA determines the system to be failing to protect public health and safety and the environment, as defined in 310 CMR 15.303. 6) A best feasible upgrade plan is shown on the design plan. A conventional septic system leaching field (pipe/stone) is shown in trench configuration and sizing calculations are provided as well. 7) The maximum area available for a conventional system is shown. If you should have any questions or comments please feel free to contact me. Very Truly Yours, A Jack Sulliva E W(Designer) Frank Ventola, fr. (Homeowner) P.O. Box 2004 Woburn, MA 01888 (781) 854-8644 e-mail:jacksu1153@comcast.net i• r ;4!"#EI r... .: ,. r"4 6 ! 'fi 't`1. 1'. -JsC .f _ f)Li .. .., _, '.;!L � ,ti�.f x.i''�'.�'" ��'<..: '!"! i• ..... ii`.%.. - ,. i .' :. •xi'!?sC.v':-. .f'_,a.:;6 4: J;. i' tt k ♦ , sF 4".}f,. -".f3>f, -v:}z2 11 �:�^ ih r: .. ;i. ,{ t tA.i f. 3`.}•' {. �`R: ..iir.js.,i.r.. Ji! ,.':'� ..:/f aa..., AT r'� f'. .a'y t;fi _ i`1`.7 _.{� 3ijz.,+{t'Ri:. {s_'+ ,:�.+ _ .x, _l t:�.'�i>ie•.. J� f`f ;1 1� 3 ...SJ d f Jt_!• i`Y3_t'"!,a';x}j ` ?: ,i ✓:'.< s . ' i` •sx4r[ >/� °�.tj`. lid:d 'f'J < 'f�;t�„ R'. � :,xa! if..i � €� + r it.;r�ii e7 � . . . . .,...� ,! ._;J; #; r'_, _ } .}; ..r .. •- :�.+ ;i! is .1� c.ff`.: ,,qj ` iI(} �.:< ...•l::��.i.hl.._.� .. . - ;ii.:9 .;Trig:.,�.. .-!ii a ry!f s ,.'r.r fi •�a{-:.t Y'+l .s 1}rt/c.,. • _. ... ~i: ¢. . . ! fTf - _dl{! 1 >..._ .,.f.:... ✓f, ..... � ... �J:: .. :t.r.. _ }! ✓'a, t. . ♦)_ f: {f_ s..1 1.il—ij , 3t Of 5115/2019, Town of North Andover Mail-Initial plan review-204 Mill Road NORTH ANDOVER Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov> Initial plan review - 204 Mill Road 1 message Dan Ottenheimer<dano@millriverconsulting.com> Tue, May 14, 2019 at 6:38 PM To: Brian LaGrasse <blagrasse@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Cc: Sandra Lezcano <sandral@millriverconsulting.com> We have completed our review of the submitted design. It appears the designer was using an earlier approval for the plastic chambers that are being proposed to be used. The most recent approval requires different material to be provided on the plan and also accompanying the design plan. These have been enumerated in the attached letter. I will send the designer a copy of the approval so he can move this forward in a prompt manner. Any questions, do let me know. Dan Daniel Ottenheimer, PE President AF., 1t_ MILL RIVER CONSULTING Creative 5ol►ttions for Laid Ikvelopmrrtt 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3AI 633548773913032383&simpl=msg-f%3A1 63354877391... 1/2 5/15/2019 Town of North Andover Mail-Initial plan review-204 Mill Road Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association 9-1 204 Mill Road Review Letter May 14, 2019.docx 78K https://mail.goog le.com/ma i I/u/O?i k=aOc6f4e4cf&view=pt&sea rch=a I I&permth id=th read-f°/a 3A l 633548773913032383&s i m pl=msg-f%3A 163354877391... 2/2 11/26/2018 Town of North Andover Mail-Re:204 Mill Road,NA-Soil Test(postpone till early spring) NORTH ANDOVER Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov> Re: 204 Mill Road, NA - Soil Test (postpone till early spring) 2 messages Jack Sullivan <jacksu1153@comcast.net> Mon, Nov 26, 2018 at 9:16 AM Reply-To: Jack Sullivan <jacksuI153@com cast.net> To: Dan Ottenheimer<dano@millriverconsulting.com> Cc: Mgrant@northandoverma.gov, Brian LaGrasse <blagrasse@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Dan, I just spoke to my client and due to the lateness in the season and no emergency for the soil testing to be performed we are going to wait until early Spring 2019 to conduct the soil test. Brian/Michelle/Toni....Dan and I have been rained out multiple times in November...so at this point a system will not be going in this year....I will reach back out to everyone in late march/early april to schedule. Sullivan Engineering Group, LLC Jack Sullivan P.O. Box 2004 Woburn, MA 01888 781-854-8644 Toni Wolfenden <tolfenden@northandoverma.gov> Mon, Nov 26, 2018 at 9:18 AM To: Jack Sullivan <jacksu1153@comcast.net> Cc: Dan Ottenheimer<dano@millriverconsulting.com>, Michele Grant<Mgrant@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov> Ok, thanks for the update. Toni K. Wolfenden Health Department Assistant 978-688-9540 �,`',cid:image002.jpg@01 CD02A1.85A49B40 [Quoted text hidden] image001.jpg 4K https://mail.google.com/mai I/u/0?ik=aOc6f4e4cf&view=pt&search=all&permth id=thread-f%3A1618206283422438800&simpl=msg-f%3A161820628342... 1/2 11/26/2018 Town of North Andover Mail-Re:204 Mill Road,NA-Soil Test(postpone till early spring) Iwo https://mai I.googIe.com/mail/u/0?ik=a0c6f4e4cf&view=pt&search=a II&permthid=thread-f%3A 1618206283422438800&simpI=msg-f%3A161820628342... 2/2