Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 61 FOREST STREET 6/4/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 61 Forest Street MAP: 106.A LOT: 168 INSTALLER: James Boraczek – 978-479-5236 DESIGNER: Jack Sullivan – Sullivan Engineering Group – 781-854-8644 PLAN DATE: final revision date – 4/8/2019 approval date – 4/17/2019 BOH APPROVAL DATE ON PLAN: 5/15/2019 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 10/24/2019 S. Casey 10/24/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 11/5/2019 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 11/12/19 S. Casey SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 11/5/19 – Building sewer remained as cast iron for first 10’, then transitions to PVC. Tree with benchmark was removed, top of foundation used as benchmark. SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base 10/21/2019 S. Casey Weep hole plugged 1500 gallon tank has been installed H-20 Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) 24 inch cover to finish grade installed effluent filter Rubber boots at inlet & outlet Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: SOIL ABSORPTION SYSTEM (Gravel-less Chambers) Brand and Model of Chamber: Standard Quick 4 LP Infiltrator Chambers Number of chambers per row: 8 Number of rows (trenches): 12 Comments: Total Chambers = __96__ FINAL GRADE 11/12/2019 S.Casey Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan Benchmark 1 used for Building Sewer & Septic Tank BM = __106.04__ HR = __0.49____ HI = __106.53__ Benchmark 2 used for Distribution Box & S.A.S. BM = __106.04__ HR = ___0.13___ HI = __106.17__ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 7.29 98.91 100.00 Septic Tank IN 7.41 98.79 99.58 Septic Tank OUT 7.63 98.57 99.33 Distribution Box IN 11.93 93.91 93.93 Distribution Box OUT 12.10 93.74 93.72 Top of Chamber 12.05 94.12 94.07 Lateral 1 INVERT 12.05 93.79 93.65 Bottom of Bed/Chamber 12.65 93.52 93.40 11/5/19 – Building sewer measured at transition from cast iron to PVC pipe, approximately 10’ from foundation wall. Distribution settled slightly and there is very slight pitch in the wrong direction between distribution box outlet and plastic chamber inlet. This should not impair operation of Soil Absorption System and was allowed to remain in place.