HomeMy WebLinkAboutSprinkler Inspection Report and Fire Pump Test Report - Inspection - 815 CHESTNUT STREET 6/11/2020 rt
A.S.A.P. Sprinkler LLC SPRINKLER INSPECTION REPORT PAGE 1
6 Progress Ave. Unit ##
T- ngsborox A la. 01879 P�tolne 78- 4 -494 Fax 7 w -9�4 5
Company Name ;`'p Contact '
Street % _ `_ It �'' tVyl IN
date of TripTest --~ .. Technician x
-' . 1 r date
Owners Section(To be answered by owner or.occupant)
A.Explain any occupancy hazard changes since the previous inspection.
B. Describe lire protection modifications made since the last inspection.
' .Describe any fires since the last inspection
D. When was the system piping last checked for stoppage, corrosion or foreign material?
E.When was the dry-piping system last checked for proper pitch?
F.Are dry valves adequately protected from freezing?
Inspector's Section(All responses reference current inspection)
I.GENERAL YES NO
a. Is the building occupied? t
b.Are all systems in service?
c. is there a minihium of 18 in clearance between the tap of storage and sprinkler deflector?.
d.In areas protected by wet system,does the building appear to be properly heated in all areas including blind
attics and perimeter areas,where accesible?Do all exterior openings appear to be protected against freezing
Z.CONTROL VALVES(See item 14) XXXXXXXXX XXXXXXXXX
a,Are all sprinkler system control valves and all other valves in appropriate position?
b.Are all control naives in the open position and locked,sealed or equipped with tamper? L,�
3.WATER SUPPLIES(see Item 14) XXXXXXXXX XXXXXXXXX
r'
a.Was a water flow test of main drain made at the sprinkler riser? l-
4.-TANKS,PUMPS,FIRE DEPARTMENT CONNECTIONS XXXXXXXXX XXXXXXXXX
a.Are fire pumps,gravity tanks, reserviors and pressure tanks in good condition and maintained?
b.Are F0 connection in satisfactory condition,couplings free,caps in place&check valves tight?
Are they accessible and visible?
S.WET SYSTEMS(See item 131 XXXXXXXXX. XXXXXXXXX
a.Are cold weather valves( SM)In the appropriate open or closed position?
b. Have anti-freeze system~solutions been tested?
c.Were the antifreeze test results satisfactory?
6. DRY SYSTEMS(See Items 10-14) XXXXXXXXX XXXXXXXXX
a.is the dry valve In service?
b.Are the air pressure&priming water level in accordance with the manufacturers Instructions?
c.Were-the antifreeze test results satisfactory?
d.Wire low points drained during the inspection?
e.Did,quick-opening devices operate satisfactory?
f.Did the dry valve trip properly during the trip pressure test? �}�
g.Did the Keating equipment-in the dry-pipe valve room operate at the time of inspection?.
7,SPECIAL SYSTEMS(See item 16) XXXXXXXXX XXXXXXXXX
a.Did the deluge or pre-action?valves operate properly during testing?
b. Did the heat-responsive devices operate properly during testing?
c.Rid the supervisory alarm service test satisfactory?
S.ALARMS XXXXXXXXX :XXXXXXXXX
a. Did water motor and gong test satisfactory?
b.Did electric alarm test satisfactory?
c. Did supervisory alarm service test satisfactory?
9.SPRINKLERS XXXXXXXXX XXXXXXXXX
a.Are all sprinklers free from corrosion,loading or obstruction to spray discharge?
b.Are sprinklers over 50 years old,thus requiring sample testing?
c. is stock of spare sprinklers available?
d.Does the interior condition of sprinkler system appear to be satisfactory .----�:�-Y
e.Temperature.Are sprinklers of proper temperature ratidg for their location? '`
A.5. , .Sprinkler LLC INSPECTION REPORT Page
6 Progress Ave. Emit
Tyngs oro,Ma.0 7"9
Phone:97 - 49-4945-Pa 97 -649-944577
Wet rsterns Igo? Make and model? i
. , ..�
Dry Systems NoMake and model?
Special Systems fro? Type?
Make and Model Condition
10.Date dry-pipe valve trip tested(control valve partially opera)
1.Date dry-pipe valve trip tested-(control valve fully open)
1 .Date quick-opening device tested
13. ]ate deluge or preaction valve tested
14.See Control Valve Maintenance Table,
Control Valves Number Type Open Secured Closed Signs Abnormalities
City Connection Control
Tank Control
Pump Control
Sectional Control
z '
/ y�r
System Control 1�
Other Control IOU
Water Pressure? Tank PSI Fire Pump
Dater flow test? (if none made WHY?)
• • u * }
.}..12
- _
{ E{ (r-;
1 .beat Responsive Device
Test Method
Type of Equipment
.Manufacturer
Test Results:
a l e# B C D Valve# 0 C D E F
Valve#� C D�E_,,,,,.... Valve#I`� +� D E _
Valve## A E C D E f Valve# E F
Valve#_� D �, Valve#� A EF
Auxiliary Equipment:No?, Type Location? Test Result?
17.Explain any"'No"answers and comments:
18.Adjustments or corrections made during this inspection:
�9.Although these comments are riot the result of a a gin ringreview,tine following d srahe improre€ ents are recorrrern ed.
vyN
Technician '. License Signature/dateio.Cust
; n tl.niWiF tl,
Y
1.
6 PROGRESS AVE
TYNGSBOR MA 01879
A.S.A.P. Sprinkler, LL # TEL:978-649-4945
EARL:978-649- 445
Fire Pump Fast Report
Customer Larne: WATrS Late: 5 18 0
Site Address: 815 CHESTNUT STREET Task
City: I .ANDOVER State: h� Postal Code: Technician:JEFF i ELSE
Pu Imp Information
Manufacturer: FAIR A KS Model 4"15 10F Serial M 16- 4SR657
Approved: Yes Mated Capacity: 500 Rated Pressure: 50
Pump Type: IN LINE RPM:3500 Supplied From: CITY
Flow deter: make: Model: Ran e:
I river Information
Manufacturer: Model#: Serial M.
Type: Electric Volts: AMPS:
H.P. Frame: RPM:
Enclosure- Service Factor:
ontroiier Information
Manufacturer:Torna Tech Model M. CPS-4 O S/ O Serial#: 165043
Approved:Yes Transfer Switch: I f A
....................
H.P. 25 Volts: 460 AMPS:4
Phase: Mar-60 Manual: Automatic:Yes 80 psi
Docks Purap Information
Manufacturer: Model##: Serial#:
HP: Phase: I Molts: AMPS:
Pura tin PSI:90 Pump Off PSI: 95 Automatic: Yes
Molts AMP RPM DISCH SUCT PSI NET Nozzle PITOT READING GPM REMARKS
A-8 A-C B-C A 0 C PSI PSI Site 1 2 3 4 5
4
............
IL
::........:..:...........:....... :.. ::...:1C.:. :..:.:.. 5 1
0
° 46AP
ti -16'
675
70
i
60
�0-4b.
OW 4ft
DFAMp
lob
40 ••
PSI
30
0
10 '
0
0 250 500 70 1000
GPM
-#�-Rated Curve let Pressure Curve
Test Results 100
suppler runs out of water.
Sooke,BC,V9Z OVI
Fire Pump Fast Report
Customer Name: Date: �
Site Address: - Task 4:
city: , �` ' ; Postal Code: Technictam:
Pump-Information
Manufacturer: Model : i, 'r Serial p` '�
Approved: Rated Capacitor: �� ffi' O Rated Pressure: .�
RPM.
p Type: Supplied From. .
Flow Meter: Make.: Model: Range, '
=rlver Information
Manufacturer: Model : Serial#:
Type: Molts: AMPS:
I .P. Frame: RPM:
Enclosure: Service Factor.
on ro ler Information
Manufacturer:- Model th v � Z � � Serial � t
Approved: Transfer Switch:
H.P. volts: �` AMPS:
Phase: `' Manural: Automatic:
lJockey Pump Information
Manufacturer. Model#; Serial
HP. Phase: I Volts. AMPS:
Furst 0n PSI: Pump Off PSI: Autornatic.
Molts AMP RPM DISC" SUC.r,PSI NET Nozzle PITON'READIN GPM REMARKS
A-B A-C B-C A B PSI Pal Size 1 2 45 G
Ut
;; D Churn
69
s
70
Psi
0
0 250
GPM
- -Rated Curve -mow Net Pressure Curve
Test Results@ 10OV-2 ITHIS PUMP IS PERFORMING WITHIN SPECIFIED TOLERANCE OF RATED CARVE 100%