Loading...
HomeMy WebLinkAboutAs-Built - As-Built Plan / Installation Certificate Form - 506 BOSTON STREET 6/30/2020 -M vnI h1p I P / a n o f L a n d 01(W I I., WAIA 4 Slsd-1 kvllll&�,CW16�1 71,1,1h I— B!nchnta k' n NO k, 4"P,r liestw X52' North Andover, Mass. 1 0 L S h a w i n g ��Wkl",4 '7 70Z frraun d "As—Built Sanitary Disposal System" NIFJolin & Diane O'Connor 506 Boston Street Prepared For James E. Muzphy sco/s. I"= 10' Date,November 5, 2009 2"PVC�- Revised.,Nevernbe, 12,2009 Assessors Map 107.D,Parcel 79 Schedule of Inverts Design Data Invert @ Coupling(a.)-8Z391 Sepik, To,*is -8Z31'(8Z27), Cut 8ZO61(870.") I'Wo Ge� crow Lot D I Pump Chamber In�8Z0X(BZO0'), Out-867W(86.76') D-B—io-r 97.35'(g132'), Out 97.18'(97.15') 100,wesm 1.6 Acres f/- 115W IV 80M,Z— Trench I in 97 I V(.9Z06') s r .";'. A C T-0,2 h, 94.101(96,06 1) Trench J In 94.52"(94,561) 4 Schedule of Tie Distances AD 11.2' AD-64.4' Ad=60,V 81) 15,7' X-61.7" CJ-72.4' AE 22.4' AN-SOX' AK-68,6' s,' A BE 2Z8' CH-658' 8K-20,4' AF-MY Al-61,2' AL. -69.7 BF=74A 2' a/=656' CL =79.71 This?Ian has the urpaoa of showing ,t,�eon prepared Lai the As conditions of Iho sanitary disposal system installed on the promises.All we',was aI.In lolabs�onba` conformance with the design gons as Prepared AN work was 'thin I I a a w In he construction 7mitations experted for a job 41, d,,nth,.W.. Design anitanon R-S Data s 0 tic rank Is Equipped Wits An Ettluent mer That Sball He Inspected And Cleaned The Neve-Marin Group, Inc. At Zeast On Al n Annual Basis In Accordance Surveyors--Environmental Utb 810 MR M ( ). =ts,--Land Use Planners 447 Old Boston Rood -US Route I Topsfield,Massachusetts 0198J 887-8.586 ----------- 2766-9,17DAB