HomeMy WebLinkAboutAs-Built - As-Built Plan / Installation Certificate Form - 506 BOSTON STREET 6/30/2020 -M vnI
h1p I P / a n o f L a n d
01(W I I., WAIA 4 Slsd-1 kvllll&�,CW16�1 71,1,1h I—
B!nchnta k' n
NO k, 4"P,r
liestw X52' North Andover, Mass.
1 0 L S h a w i n g
��Wkl",4 '7 70Z
frraun
d "As—Built Sanitary Disposal System"
NIFJolin &
Diane O'Connor 506 Boston Street
Prepared For
James E. Muzphy
sco/s. I"= 10' Date,November 5, 2009
2"PVC�- Revised.,Nevernbe, 12,2009
Assessors Map 107.D,Parcel 79
Schedule of Inverts
Design Data
Invert @ Coupling(a.)-8Z391
Sepik, To,*is -8Z31'(8Z27), Cut 8ZO61(870.")
I'Wo Ge�
crow
Lot D I Pump Chamber In�8Z0X(BZO0'), Out-867W(86.76')
D-B—io-r 97.35'(g132'), Out 97.18'(97.15')
100,wesm
1.6 Acres f/- 115W IV 80M,Z— Trench I in 97 I V(.9Z06')
s r
.";'.
A C T-0,2 h, 94.101(96,06 1)
Trench J In 94.52"(94,561)
4 Schedule of Tie Distances
AD 11.2' AD-64.4' Ad=60,V
81) 15,7' X-61.7" CJ-72.4'
AE 22.4' AN-SOX' AK-68,6'
s,' A BE 2Z8' CH-658' 8K-20,4'
AF-MY Al-61,2' AL. -69.7
BF=74A 2' a/=656' CL =79.71
This?Ian has the urpaoa of showing
,t,�eon prepared Lai
the As conditions of Iho sanitary disposal
system
installed on the promises.All we',was aI.In lolabs�onba`
conformance with the design gons as Prepared AN work was
'thin I I
a a w In he construction 7mitations experted for a job
41, d,,nth,.W..
Design anitanon R-S Data
s 0 tic rank Is Equipped Wits An Ettluent
mer That Sball He Inspected And Cleaned The Neve-Marin Group, Inc.
At Zeast On Al
n Annual Basis In Accordance Surveyors--Environmental
Utb 810 MR M ( ). =ts,--Land Use Planners
447 Old Boston Rood -US Route I
Topsfield,Massachusetts 0198J 887-8.586
-----------
2766-9,17DAB