Loading...
HomeMy WebLinkAboutConstruction Notes - Septic - Consultant Review - 300 FOSTER STREET 7/2/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 300 Foster Street MAP: 104.B LOT: 0002 INSTALLER: Todd Bateson 978-815-2703 DESIGNER: Jack Sullivan 781-854-8644 PLAN DATE:11/19/2019 BOH APPROVAL DATE ON PLAN: final revision 1/8/2020, received 5/12/2020 Expiration Date – 05/12/2023 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 5/28/2020 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 6/2/2020 DATE OF FINAL GRADE INSPECTION: 6/3/2020 S.Casey SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 6/2/20 – Existing 1500 gal. septic tank to remain per design plan. SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) _____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: 6/2/20 – Effluent filter installed on existing septic tank outlet and centered under access port. DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan 20’ x 30’ Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 31 x20 ½ leach field in kind replacement. Per plan 5 ft over dig already completed and not needed for inspection FINAL GRADE S. Casey 6/03/2020 4:00pm Loamed Seeded Cover per plan Comments: Cover to Grade DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = _131.59__ HR = _6.82____ HI = __7.15___ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark 6.82 131.59 131.59 Septic Tank OUT 6.82 131.59 131.59 Distribution Box IN 6.91 131.83 131.50 Distribution Box OUT 7.09 131.65 131.33 Lateral 1 INVERT 7.46 131.28 131.26 Lateral 2 INVERT 7.46 131.28 131.26 Lateral 3 INVERT 7.48 131.26 131.26 Lateral 4 INVERT 7.47 131.27 131.26