HomeMy WebLinkAboutApproved 5.12.2020 - Approved Septic Plan - 300 FOSTER STREET 7/2/2020 102WN
I A 1 E G-E N rEj:
D!PTI SHAH j
300 IFOST R S T R E E T
1351 TAV r0cl_CONTOUP
NORTH ANDOVER,MA 0184-5A X 17 AA H - RE I - IND E -10 FAU_ G D� (7E0-x0 is-0r2uN'S
GO&-'.4TO0 RE
vMcA
IN)
SPOT ORAI-E
&7=0 REMAIN)
ASSESSOR INEORMAEQN:
5,-4,s pvc URLfTr PCkE
_p
MAP 104E? I-T R A
1 5 3 FW H-20 CONCR�-- n
L C 0 N C. D-130 X W' H N -BOK
_r LA
PINISJIED GPADE PCA-T
iu 4sf C-AbluD AWSMAE WAIER&-m-WOF
ow-p D-BOX 1 TO r-RA-,%v
10y,GRAVE w,
--FF:'R-0P FIIIIIS�CG QRA-,
E z
_Q S0Nf I== f
3) U-S 1 NIG S 011 0 G S AND P-R(,n A-in N ;RjA T RROM APPROVED 2003 A N B Y t(-)TH Ir-R S nuo"vous
EA'CHM- BIE k,� -U 11 i i J,
D MGN FLOW.4 BDRMS X 710 GALLONSABDRM,DAY 440 C-DO CaNC CONCRETE
it
• V
PERC RATE-3 MP?IPEER 2,003 APPROWED SEP-HC P-LAN) 0-1 L A
BB BI 7
-Q P'ANS REEFFERENCED IN PREP ice-.NG THIS P�_AN:t
-ED:
LEACHING AREA RESAK
�c
_PER�SO4 444D GPu-x 11/0.74 -94s�F_ 41. -D SEPTIC DESIGN PLAN BY MERRIMACK ENGINEERING-SERVICEES(APPROkED 10/29/201003 BY_Ez0H_' 40 PPOP SPOT GRADE
A P D R OVE Ko Adn
(A_N I- Q, I I /n 'AP F_ u u t TOF I'0-P OF POUND cW
LEA 1 G AREA PRONFIDED, 2) SEP-PC AS-BI III PLAN PREPARED BY MERRIMACK ENGINEERING SERV111r.-E_S DATED 11/225__3
LON- 600-G_F -9 X 20'WDZ E
sm mo avulmEv& �oR
6
x
A-pprox-a-_
LOT AREA
'28 54,506 S.F. 4 LJA T�6\ 4o D TA, U--
6'cpuswr,
STONE COMPAC-TE-D
P,
1 cs BASE k-i i/X1 cTONF)
o-F QQ- MAE-�
M 0
GROUND WA R�1-96 6'
10 SCALE
8 t
MECHANIC—rOMPA--T (i YQ TM ERQ �F
7-�C_
z ;6 MA-TRIAL
OF,,S> FILL a-ASE k IEP I L
D-BOX TO INSURE 1_VEL/
`2"tvzmui6m, <
PLAN VIEW Fill SASF�
SECT"ZON VIEW
SID
2 CII�
Z<
2u
AVOID.FIRfu <
-I UC7,.,�E 0 L'I GARAGE I WEIGH-
NO ES:
:=W/:C:0 <
z I -u!ROW HolpzZ�)
Q-
CONCRETE:4,000 PSI MINIMUM AFiER 28 DAYS. 0
F=0
L'-QES�
2 DESTGN CONFORM-WITH 310 CMR 35,000,DEP <
T_T_E 5 PROVIDE 6'I3PUSHED STONE—BASEE 1/2"STjNE)
>
-F REGS.FOR DISTIRTBU-0N BOXES. Lu ,j
1FIVE;700T OVERDI
1,500 GAI I=I ALRFAEY 'D TE
z
ION AND IS,sus;NEEDED 2)Ai rj-,- Ld
2003 INSTIALLA-1OURLETIS TO BE A IT 7TfEE SAME---Lr-VA 7710tv
I CONC,SEPT;C >
Ij
Conc i 3,,D-80w-0 RE WA7EPTIGH7
I TANK REMAIN I A P R OV E D B'
z Q�
Ex Lu
BOAR
_7 D-BOX(6 OUTLET)BY SHEA CONCRETE PRODUCTS
1EX,CONCRETE D-ElOx
IN
im Sr Rc'�ACED 20'mj,, NzT S,
i
SAME LOCA'PlION WITH 0
Z
-A H-20 RATED CONC.
D-BOX, DA 1 Lu w
PROP.SOIL ABSORPTION AREA 17INISHEf'—e
LEACHING BED MIN'%
Z mi 9�'MN,EK'LUDING 131,78'� <
0IIIER D-BOX 133-0911, 10P SOIL 1 -0 1
10W x 30"!
MAX� 0
INCL.UDiNG 1 ED STONE BREAKOUT FI'7V,
�if/4 01S�,_R0UTIfDNI LINES OP S011 WASH-
4". "HIGH SID-1)
1 TO REPLACE Ex.LEACH
0
71,6
FIE ID
-------- BREAKOUT
f r,Gn
f (LOW SIDE
04
3C W 4`PERF,P,V.�, 0 0
DE W 3- 5/8' 6"
2��12,1 �2_�7) 1 J-OF FINISHED GRA
/8 7 1
14.0 0 0 40
4,0- Z, Z!o
0135FIC-E-S 4
ffij-,LAICCW14ECT 1/4"DOUB-1-WASH-D
10 _lt4DS C_-1 2
E_5-ONE
C4�`57RIBUPON PIPES W/
ws
4'PVC PIPE
25'
kj
22=
15'ROAD WqDENING EASEMENT
G'ENERAL NCJ
201
c
'o PREVENT QREAKQQT.�
Edae of Pavement
3 0 LIN
i
T-FKSHOD SIDE S1 OPFS OF HLE_PRODOSED SzOil_ABSORPT ON SYSIF M ELEVATIONS BASEED ON ASSUMED DAT1,1M
4 EA.CHING ES-1�0 BE RROWDED
IHE I I tu-1 L
SH A L' N �B E P PER T m i
CH E E 3:1. A INIMUN 15 FOOT HORIZONTAL SEPARATION 2, EXM-=nNG TC�POGRAPHIC iNFICIRMA*N FROM FIELD SURVEY,
F n BIE PE-OMDED KTWEEN SOIL ABSORPTION AREA AND)
DI`® CE
P E R Pr A N THE ADUIACEN SIDI,SLOPE,
T -"E CONTRACTCR S4AE TAKET47 NEC97q ARY
F T STEPS TX-PRO R�TtNG PRO
ADjACENT PROPER=1S,
N
r GRAPHIC SCALE LEACHING BED D1 TAIL
z4
4 AU-CONSTRUCTION METtiODS AND MATERIAIL�l
0 SHAI L CONFOPM W- THE MASSACHUSETTS DEPARTMENT
NOT TO SCAIE OF ENIARONIMENTAL PROTECTIO&_�-
A7E ENMIRONMENTAL
CODE TITLE 5(310--MR 15,00)AND THE NOR-IHI ANDCVZR BOARD
L
Or HEAL-m REQUIREMENTS.
am 7H;7 -_ENGINgEFR AND TIHE LOCAL APPRO�,ANG
inch 20 ft- 5� DESIGN
AUTHORITY AREE-in,SE NOTIFIED AT LLAS 72 HOiRS
Zl
i Y I-EM PROF ILF PRIOR TO INSPECTI-ONS REQUIRED BY 3110 im-o_
S S-T F`X, CUONCRD�IFE D-BOX TO 6 THI CONTRACTOR IS TO VERIFY EXISTING SI�E CCINDtnIONS <
97
1H A NEW BE REPLACFC) WU AND NOTIFY TIME ITNGNEER OF ANY DIFFERENCES.
1 10 , Lt
TOP OF FND 13557' NOT T KAI E
M-20 RATED C-O'NC. D-Box 7� T,4 fE CONTRACTOR IS RESPONSIBLE FOR ALL OF-HE HORI�ONTIA�
AN"WER-11--CAI CONTROL 01 Al SYSTEM COMPONENTS,
f
IN _SAME LOCATON ANE-1 8, J.TWO-FEET OF EAP-H UNE EXI-PING
G 1 0 40 PV- 1=17
f I f- DISTRIBUTION BOX SHALL BE I PIEL,
ELEVATIION'Nz)
Al PIPIN-T BE A MIN, OF KHEDUI SAM'E INVER! ,fitcc -Pnr LL <
St SYS-ILM OWNER SHA HAvE SFPT;l TANK
XISTING.
A107�_� A M 5 UM rjP&7"CiF
J Nt M cov_Fw PUMPED PRIOR TO INSTALLATION OF 7HE NEW LEACH ac
171�__LD AND HAkrt ENGINEER WSPrEFT 7AANK FOR SOUNDNESS
TO a---PROWDED OVER D-80X \j 00
10�-HiS PLAN HASBEEN PREPARED FOR THEE
FINISHED,GRADE CONSTRUC_P.0�OF THE PROPOSED SEPTIC SYSTEM, AN'
0
C_OIIITER TO GRADE 0�-_P D-BOX 733 00',1 F- T-jz EX. LEA(CHING2 IFIE�101 BE
IRS I _�-Q Fal--T RN SHED GRANPE MUST BE APPRO'rED IN BY THE
r ALT C()
ENGINEER.
I
I
A -A,CAST IRrvv COVER REDiACED IN-MND.
20'OF T-n BE SET LEioo2O= SLOPE(MIN,,
<
OUT GNr D-BOX 11 THERE ARE NO PUBLIC OR PR VATS WELLS W1`T4IN 100 X N:-
OF T`ri-�LEACHING FACIUTY,
/Z 0 Lrj
f DOU80' WASHED ST�Nr_ Z THIS IS TEV NOT DESIG ED ACCCAPIODA-Tt A oc
. - 1-1;Si
BUT'ON BOX GARBAGE GRINDER,
SOLID PVC SCH w of
4'
ATERTIGHT, E S0ZL Pi ACED AS BACKRIL,OVER-PHE
7 11 TH
-T-3, H-20.LOADING SYS-REM SH� M�A
4' 9" IN,EXCLUDING TOP SUL U_--MINIMWi OF NINE INCHES,
SOLID Pvc SCI. -VA.qip�z EXCLUDING TOPSOIL.PLACED IN UrT_�AND
SOIL S ONE
Pow LiJ I lz�- 3-6 MAX.'IN "NNI T 4"PERF.SCK 40 P
COMPACTED TO PREVENT-ULID 01-Z SUFRCIENTI 0
i-------T1
u V, F
3/8'-5/68'CRIACES Ef- 131 63'
-SIONS DUE TO SETv_!N�WHICH MAY-N,4n lop STONE DEPREE
14, - _n. INTERCEPT OR COLLECT SURFACE WATER
0,005 1
i r-L- 1-1 joor
Q
RUNS ABOVEE TIff
7 -�YSTEM' MUST SE
4 EXYST�IAr D
_f", CLEAN AND FREE OF STON�ES A D BOULJ)ERS
EL_ 1j" 1 C-R--ATER-HA N SIX!NCHES IN SIZE TAILINGS,
6"-RUSHED
E PROHIBI-HED.-A. I
cl Y OR SIMILAR-4A-;--RIA;_s AR
BASE 0- _C
41 tAIC 3/4 FINAL COVER ABOVE THE S_��TEM S H AL B
I 1/Z'STONE EXiS T I+ -
Ex/s P11%IG+ I
OF SSLIRFAC_
STONE I I= I- GIRADED TO,REDUCE INFILIII 1,
DOUBI WASHFD _X. RPIE AND ST ONIE To BE A ID OR 01) j 14
jai
PROPOSE
T WA-jER ND M-NIMZE EROS UNI F NISH ACE f-
M REMAW
lj7�jj,EL, TA ORIMNAL SOIL TO BE REMOVED AND E_XCA_v,ATED AND REMOVED, SHALL HAVE A MINimum S-01"E OF 0,02 F_E_PER 10 MEr ANICAL COMPACT\===�-� - -
_H I -- . @ W-THI CLEAN 7ITLEE 5 SAND
EXIISRNG-i,- E . SURFACE DRAINAGE SHALL BE DIRECTED
ADDI T11 AvY OOT-F AWAY FROM HOUSE&SOIL ABSORPTON SYS�I_kft_
jrlkl A I Ffl BASz-MAIERIAL OF ---
TO INSURE LEVEL/
< QL.
4'M N
T I-
F,
P_F Ci
N
[2 GRAPHIC
T_
or To
2 x E
6"('RUSHED STONE BASE ?01?,�,POSF,�
14, ARE NO-IRIBUTARIES ISS THAN 39-5 ET,NO
_f GROIUNDWATI�R UNDERIYING SOIL Tu _P E FF 11 AND NO DRAINS
FIRM BASE, RESERI 1RS/PU8C WELLS LESS 11HAN 400'E
EV/ST1&1uG-
-PH
XCA.VATFn/,7F_JkAnV,_-n/jRp-pj A f`C-J') LE SS THAN 50 FEET FROM -E PROPOSED S BSUQFAIE DISPOSAL
EK 15-00 GALLON CONC-RETE EV. 6`_�L
OSED NO TE, FL W F q
10 BLDG Q�A IZER5 )n u I
'PER 2`003 APPROVED PLAN I SYSTEM. T E DWEL-NG DOES NOT HAVE A FOUNDA-nON
T E SAND, -1 CE
'M TITILL
D-H- TO BE PROVIDEV,A A IL
SO
_20'MIN,TO BLDG, MA.GNE-TIC TAPE SHALL BE PLAC D AROUND _174 I E*
OUTLETS FRO.M D-80,< UE A ICI I I N G BED: 20' W'D-_ X 30' LONIG A! SEFnC COMPONENTS PRICHR To BACK-HILUNG. N101V 5, 220 1 9
--------------
6 THIS PROPERTY NO THE SIB
WA-1,11TERSHED 0,FF LAKE COCHICHOWICK, o f I!