Loading...
HomeMy WebLinkAboutSeptic Disposal System Construction Permit - Permits - 300 FOSTER STREET 7/2/2020 Date: May 19,2020 Septic Disposal System Construction Permit #53622 This is an e-permit.To learn more,scan this barcode or visit northandoverma.viewpointcloud.com/#/records/61147 ttTi.fn COMMONWEALTH OF MASSACHUSETTS 0 � ❑ TOWN OF NORTH ANDOVER f BOARD OF HEALTH - ❑� U_ Todd Bateson Bateson Enterprises, Inc. is hereby granted a Septic Disposal System Construction Permit Repair or replace an existing on-site sewage disposal system at this location 300 FOSTER STREET 104.13-0002-0000.0 This permit is granted in conformity with the statutes and ordinances relating thereto, and expires one year from date of issuance, unless sooner suspended or revoked. BUSINESS PHONE#:978-815-2703 4�_ CCONDITIONS: Expiration:May 19,2021 FRANCIS P.MACMILLAN,JR.,M.D. BOARD OF HEALTH CHAIRMAN Septic Disposal System Construction Applicant Location Permit 300 FOSTER STREET Todd Bateson NORTH ANDOVER, MA 01845 53622 9788152703 Status:Complete @ bei111@comcast.net Submitted:May 07,2020 General Information Application is hereby made for a permit to: Type of building: Repair or replace an existing on-site sewage disposal system Residential Dwelling Type of Septic System: Conventional System?(pipe and stone system) Gravity -- Infiltrator or Biodiff user(Gravel-less)?*Must attach copy of Pressure Distribution S.A.S.(No D-Box)? certification to install this type of system Pressure Dosed(D-Box Present)S.A.S.? Does the system require an effluent filter? Owner Information: Name: Email: DIPTI SHAH Not available Is owner's address different from work site address?: No Installer Information Name: Company: Todd Bateson Bateson Enterprises, Inc. Street address: City/Town: 111 Argilla Road Andover, State: Zip Code: MA 01810 Contact number: 978-815-2703 Electronic Signature The applicant agrees to ensure the construction and maintenance of the afore-described on-site sewage disposal system in accordance with the provisions of Title 5 of the Environmental Code,as well as the Local Subsurface Disposal Regulations for the Town of North Andover. I understand that until a final Certificate of Compliance has been issued by this Board of Health,the installed system is not approved. tru e Septic System Installer Project Management Obligations Static Field I understand -- true Static Field I understand -- true Static Field I understand -- true Static Field I understand -- true Static Field I understand -- true Static Field I understand -- true Staff Only Conditions/Restrictions/Comments(if applicable) Timeline ❑ Health Department Review Status:Completed May 8th 2020,9:33 am Assignee:Toni Wolfenden ❑ Permit Fee Status: Paid May 8th 2020,3:42 pm ❑ Health Department Approval Status:Completed May 19th 2020,8:51 am Assignee:Stephen Casey El Septic Disposal System Construction Permit Status: Issued May 19th 2020,8:51 am El Bottom of Bed Inspection Status:Completed May 29th 2020,8:41 am Assignee:Stephen Casey ❑ Title 5 Sand Inspection -Prior to use Status:Completed May 29th 2020,8:42 am Assignee:Stephen Casey Title 5 Stone Inspection Status:Completed June 3rd 2020, 12:42 pm Assignee:Stephen Casey Stephen Casey May 29th 2020, 11:23:41 am Septic Tank is existing per plan. ❑ Tank Hole Inspection with Stone Installed Status:Completed June 3rd 2020, 12:42 pm Assignee:Stephen Casey Stephen Casey May 29th 2020, 11:24:00 am Septic Tank is existing per plan. Final Construction Inspection Status:Completed June 3rd 2020,4:44 pm Assignee:Stephen Casey Stephen Casey June 3rd 2020, 4:44:07 pm Completed 6/2 by Mill River. 0 Final Grade Inspection Status:Completed June 4th 2020, 11:27 am Assignee:Stephen Casey Stephen Casey June 4th 2020, 11:27:53 am Final grade completed 6/3/20. Certificate of Compliance Status: Issued June 4th 2020, 11:27 am Town of North Andover, MA $361 .46 Paid via Credit Card ending in 2007 Thanks for using the Online Service Center Todd Bateson Septic Disposal System Construction Permit #53622 May 8, 2020 Full Repair or New Construction Fee $350.00 Processing Fee $11.46 Total Paid $361.46 Powered by the Viewpoint Cloud platform Receipt number#19814