Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 1995 SALEM STREET 7/6/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 1995 Salem Street MAP: 106.13 LOT: 247 INSTALLER: Dave Maynard — 978-375-7228 DESIGNER: T.J. - Christiansen and Sergi —978-373-0310 PLAN DATE: May 5, 2017, rev Aug 14 2017 BOH APPROVAL DATE ON PLAN: 8/24/2017 INSPECTIONS TANK INSPECTION: 9/10/2019 DATE OF BED BOTTOM INSPECTION:9/10/2019 DATE OF FINAL CONSTRUCTION INSPECTION: 9/19/19 DATE OF FINAL GRADE INSPECTION: I,l Ic, SITE CONDITIONS E/ Contractor reports any changes to design plan -8� Existing septic tank properly abandoned ® Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: 9/19/19 — New benchmark established, need confirmation from designer that it is correct. SEPTIC TANK ® Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ® Bottom of tank hole has 6" stone base ❑ Weep hole plugged ® 1500 gallon tank has been installed H-10 loading ® Monolithic tank construction ® Watertightness of tank has been achieved by visual testing ® Inlet tee installed, centered under access port ® Outlet tee installed, centered under access port (gas baffle) ® 24 inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet Comments: 9/19/19 — Rubber boots on tank pipe penetrations. Risers and manhole covers at site, to be installed. DISTRIBUTION-BOX ® Installed on stable stone base ® H-20 D-Box ❑ Inlet tee (if pumped or >0.08'/foot) ® Hydraulic cement around inlet & outlets ® Observed even distribution ® Speed levelers provided (not required) ® Schedule 40 PVC Pipe Comments: 9/19/19 — Distribution box riser at site, to be installed. SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan ❑ 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header (and vented if impervious material above) ® Elevations of laterals and chambers installed as on approved plan ❑/ Retaining wall (boulder/ concrete /timber/ block) Final cover as per plan Comments: Bottom of Bed ok 9/10/2019 — B. LaGrasse FINAL GRADE L—�// Loamed Seeded L Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer VAs-Built Plan 6� Z BM = 125.01 H R = 1.39 HI = 126.40 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 2.62 123.45 122.75 Septic Tank IN 3.48 122.59 122.55 Septic Tank OUT 3.72 122.35 122.30 Distribution Box IN 6.19 119.88 119.83 Distribution Box OUT 6.38 119.69 119.66 Lateral 1 beginning 6.44 119.63 119.56 Lateral 1 end 6.70 119.37 119.33 Lateral 2 beginning 6.45 119.62 119.56 Lateral 2 end 6.70 119.37 119.33 Lateral 3 beginning 6.45 119.62 119.56 Lateral 3 end 6.68 119.39 119.33 Lateral 4 beginning 6.46 119.61 119.56 Lateral 4 end 6.71 119.36 119.33 Bottom of Bed/Chamber 7.58 118.82 118.83 SKETCH PLAN