Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 106 ROCKY BROOK ROAD 7/6/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 106 Rocky Brook Road MAP: 90.A LOT: 54 INSTALLER: Peter Breen – 978-687-7774 DESIGNER: John M. Morin PLAN DATE: 08.26.2019, revision 9.19.2019 BOH APPROVAL DATE ON PLAN: 10/28/2019 INSPECTIONS TANK INSPECTION: 11/5/2019 DATE OF BED BOTTOM INSPECTION: 10/31/2019 & 11/1/2019 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 11/14/19 DATE OF FINAL GRADE INSPECTION: 12/3/2019 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 11/14/19 – Existing septic tank not replaced, no inspection report provided to document its proper functionality. Letter Provided by Peter Breen – 12.3.2019 SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) _____ inch cover to within 6” of finish grade installed over one access port Hydraulic cement around outlet Comments: 11/14/19 – Reminded contractor of requirement for cover at grade over effluent filter PUMP CHAMBER Bottom of tank hole has 6" stone base Weep hole plugged 1500 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Separate on/off floats Drain hole in pressure line _____ cover at final grade installed over pump access port Water tightness of tank has been achieved by visual testing Hydraulic cement around inlet & outlet Comments: 11/14/19 – Reminded contractor of requirement for cover at grade over pump CONTROL PANEL Alarm & Pump are on separate circuits Alarm sounds when float is tripped Location of control panel: basement Alarm signal located inside: basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = ___137.77_ HR = ___1.84__ HI = ___139.61_ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Septic Tank OUT 5.96 133.32 133.30 Pump Chamber IN 6.26 133.05 133.00 Pump Chamber OUT (2”) 5.97 133.47 132.75 Distribution Box IN 2.81 136.47 136.41 Distribution Box OUT 2.97 136.34 136.24 Lateral 1 TOP 3.08 136.23 136.16 Lateral 1 INVERT 3.34 135.94 135.90 Lateral 2 TOP 3.07 136.24 136.16 Lateral 2 INVERT 3.34 135.94 135.90 Lateral 3 TOP 3.06 136.25 136.16 Lateral 3 INVERT 3.34 135.94 135.90 Lateral 4 TOP 3.05 136.26 136.16 Lateral 4 INVERT 3.34 135.94 135.90 Bottom of Bed/Chamber 4.30 135.31 135.40