HomeMy WebLinkAboutConstruction Notes - Consultant Review - 520 SHARPNERS POND ROAD 7/6/2020 North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 520 Sharpners Pond Road MAP: 90.B LOT: 42
INSTALLER: James Boraczek 978-479-5236
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
INSPECTIONS
VP# 54362
7.2.2020 S. Casey oultlet tee/Baffle Inspection
SEPTIC TANK
❑ Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
❑ Inlet tee installed, centered under access port
® Outlet tee installed, centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6" of finish grade
installed over one access port
® Hydraulic cement around outlet
Comments:
Existing Tank/System, only outlet tee and baffle replaced and inspected.
Sending photo of gas baffle.
rO�:.
- { d
s ♦ Y w
, � a
• Y
a �f
Sy`dbl
i 7-
' ' �,�' a' �',.i j' elf" -
,b '
IN
Ab
��r