Loading...
HomeMy WebLinkAbout- Permits #242-138 - 231 SUTTON STREET 12/4/1981 Fnhy 4 ORDER OF CONDI TIONS W E T L A N D S P R 0 T . E_C T. I O N A C T G. L. C. 1310 S. 40 CITY/TOWN NORTH ANDOVER FILE NUMBER 242- NAIV Cash Ener Inc ADDRESS 200 Sutton CERTIFIED MAIL NUMBER orth. Andy r, MA 01845 PROJECT LOCATION; Address _ 231 Sutton St North A ver MA Recorded at Registry of 1 Northern Essex , Book 1529 , Page 202 Certificate (if registered) REGARDING : Notice of Tment Dated. ^ Noyember ,� 81 and plans titled and dated THIS ORDER :IS ISSUED ON (date) —_� egr 4 1981 ---- ------------------------------------------------- ----------------- --- --- ----- Pursuant to the authority of G. L. c. 131 , s . 40, the North Andover Conservation Commission has reviewed your Notice of Intent and plans zdentt ied-�Tove,� and E asµ- etei-mined that the area on which the proposed work is to be done is significant to one or more of the interests listed in G. L. c, 131 , S . 40. Toya-i of North Andover bylaws, Section 3. 5 A & B Wetlands Protection. The North Andover Conservation Commission hereby orders that the folloying conditions are necessary to protect say interests and all work shall be per�'armed in strict accordance with them and with the Notice of Intent and plans identifi.od CONDITIONS al:ove_excc_pt,where_such_plans,are_modified_by_said conditions . 1 . Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this order. 2 . This order does not grant any property rights or any exclusive privileges , it- does not authorize any injury to proviate property or invasion of - private rights. 3. This order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal , -state or local statutes, ordinances, by-laws and/or regulations. 4. The ,,•ork authorized hereunder shall be completed within one (1 ) year from the date of this order unless it is for a maintenance dredging project s"bject to Section 5 (9) , This order may be extended by the issuing uthority For one or more additional one-year eriods caper application to the said ;issuing authority at least thirty (p30) days prior to the ON ira� ion date of the order or its extension , -ORDER OF CONDITIONS CONTINUED_:`- - 2 - FILE NO.. 242- Any fill used in connection with this project shall be clean fill , containing no trash, refuse, rubbish or debris, including without limiting the generality of the foregoing, lumber, bricks, plaster, wire ,lath, paper, carboard, pipe, tires, ashes, refrigerators, motor vehicles or parts of any of the foregoing. No work may be, commenced until all appeal periods have elapsed from the order of the Conservation Commission or from a final order by the Department of Environmental Quality Engineering. 7.. No work shall be undertaken until the final order, with respect to ' the proposed project, has been recorded in the Registry of Deeds ,-for the district in which tkj�- land is located within the chain of title of the affected property. The Document number indicating such recording shall be submitted on the form at the end of this order to the issuer of this order prior to commencement of work. 8 . A sign shall be displayed at the site not less °that two square feet or more than three square feet bearing the works, "Massachusetts Department of Environmental Quality Eggineering. Number 242- 138 ". 9. Where the Department of Environmental Quality Engineering is requested to make a determination and to issue a superseding order, the Conser- vation Commission shall be a party to all agency proceedings and hearings before the Department. 10. Upon completion of the work described herein, the applicant shall forthwith request, in writing, that a Certificate of Compliance be issued stating that the work has been satisfactorily completed. 11 . The work shall conform to the following described plans and additional conditions: a. Notice of Intent and Environmental Data Form submitted by Mark Henry dated November 6, 1981 six (6) pages. b. "Building Addition for Cash Energy, Inc. Site Plan" by Eric I. Brainerd dated November 16, 1981 and revised November 24, 1981, One (1) sheet. 12 . An easement along the entire length of the lot from Sutton St". south. to Perley - Road drain shall be granted to the Town of North Andover for purposes of maintaining this drainage. 13. A row of staked hay bales shall be placed between all construction areas and Wetland Areas, and shall be maintained until all construction on this site is completed. Upon completion of work, all accumulated sediment shall be removed from Wetland Areas, and from the hay bale chock dam. 2a • ORDER OF CONDITIONS : 231 Sutton St. 242-138 14. Upon completion of work, all altered areas shall be stabilized as soon as practical to prevent erosion and sedimentation of wetland areas. 15. All erosion prevention measures, and sedimentation protection measures found necessary during construction by the NAC(; shall be implemented at the direction of the NACC, including, but not limited to, the placement of hay bales at potential sedimentation points. 16. Any changes in the submitted plans or Notice of Intent or changes resulting from the aforementioned conditions must be submitted to the NACC for approval prior to implementation. If the NACC finds, by majority vote, said changes to be significant and/or to deviate from the original plans, Notice of Intent, or this Order of Conditions to such an extent that the interests of the Wetlands Protection Act cannot be protected by this Order of Conditions and would best be served by the issuance of additional conditions, then the NACC will call for another public hearing within 21 days, at the expense of the applicant, in order to take testimony from all interested parties. Within 21 days of the close of said public hearing, the NACC will issue an amended or new Order of Conditions. 17. Any error found in the plans or information submitted by the applicant shall be considered as changes and the procedures outlined for changes will be followed. 18. In addition to the requirements . of Condition No. 10, the applicant shall submit a letter from a registered professional engineer certifying compliance with this Order of Conditions . 19. The provisions of this Order shall apply to and ,)e binding upon the applicant, its employees, and all successors and assigns in interest or control . ORDER OF CONDITIONS CONTINUED,, , - 3 - F11I-E NO. 42- 13g The Applicant, any person aggrieved by this order, any owner of land i .;,.\abutting the land upon which the proposed work is to be done , or any ten _ residents of the city or 'town in which such land is located, are hereby notified of their right to appeal this order of the Department of Environ- mental Quality Egnineering provided the request is made in writing and by certified mail to the Department within ten (10) days from the issuance off, this order. ISSUED BY NORTH ANDOVER CONSERVATION COMMISSION WoOn this 4th day of December 19 8f me ersonaIIy appeared James R. Lafond to. me known to . e , .t a person described in-, and who executed, t e foregoing instrument and , acknowledged that he executed the same as his free act and deed. •. ; : My Commission expires' � DETACH ON DOTTED LINE AND SUBMIT TO THE ISSUER OF THIS ORDER PRIOR TO COMMENCEMENT OF WORK. To NORTH ANDOVER CONSERVATION COMMISSION (Issuing Authority) PLEASE BE ADVISED THAT THE ORDER OF CONDITIONS FOR THE PROJECT AT FILE NUMBER 242- HAS BEEN RECORDED AT THE REGISTRY OF ON (DATE) , . If recorded land, the instrument number which identifies this transaction is If registere an , t e document number which identifies this transaction is Signed Applicant