HomeMy WebLinkAboutConstruction Notes - Consultant Review - 326 CAMPBELL ROAD 7/30/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 326 Campbell Road MAP: 106.D LOT: 0023 INSTALLER: Brendan Larkin – Larkin & Larkin 781-944-7808 DESIGNER: James S. Fairweather Andover Consultants 978-687-3828 ex 13 PLAN DATE: March 28, 2019 BOH APPROVAL DATE ON PLAN: final revision May 21, 2019 approved May 23, 2019 INSPECTIONS TANK INSPECTION: DATE OF BED BOTTOM INSPECTION: 5/27/2020 thru 5/29/2020 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 6/23/2020 DATE OF FINAL GRADE INSPECTION: 7/9/2020 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-20 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) 24 inch cover to within 6” of finish grade installed over one access port Hydraulic cement around inlet & outlet Comments: S. Casey >6”stone at bottom of tank hole. 6/23/20 – Pipe bedding into and out of septic tank to be completed DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan (must be at least 59 x 37) Title 5 sand installed, if specified on plan (sample ok, will recheck on site) 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: S. Casey- 5.27.2020 Inspection 1 @ 9:45 am size ok, lots of rocks in bottom of bed, will re-inspect later today will also check the Title 5 sand 5.27.2020 Inspection 2 @ 1.45pm over dig and field > 59 x 37 but rock in one corner cutting into over dig 5.28.2020 Sand good, large rocks removed , one corner @ 4 ½’ over dig corrected, Title 5 sand and 5 ft around corner working on adjusting correct to meet 5ft over dig 5.29.2020 4” intrusion by massive rock to be addressed by Andover consultants 6ft over dig on other side has space to adjust 6/23/20 – Trench ends connected to header to be completed FINAL GRADE Loamed Seeded – see letter in correspondence Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer Viewpoint permit # 53781 As-Built Plan BM = __124.82__ HR = __6.21____ HI = __131.03__ SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark 6.21 Building Sewer OUT Septic Tank IN 3.32 127.38 127.35 Septic Tank OUT 3.61 127.09 127.10 Distribution Box IN 3.92 126.78 126.77 Distribution Box OUT 4.08 126.62 126.60 Lateral 1 BEG 4.11 126.59 126.55 Lateral 1 END 4.40 126.30 126.30 Lateral 2 BEG 4.13 126.57 126.55 Lateral 2 END 4.39 126.31 126.30 Lateral 3 BEG 4.13 126.57 126.55 Lateral 3 END 4.40 126.30 126.30 BARRIER 4.30 126.73 6/23/20 – Confirmed that building sewer pitch > 1% SKETCH PLAN