HomeMy WebLinkAbout20170620 O&M Plan 58 COUNTRY CLUB CIRCLE 4/13/2017 E-
AtlanticEngineering&Survey Consultants,lit . John B.Paulson,P.L.S.President
7 Tenney street Georgetown,MA,0 1 33 George I Zaniboufas,P.E.
Swimming Pool& BMA'Maititenance Requirements
58 Comitiy Club Circle
North Andover; Ma 01845
April 1 , 2017
STORAGE of CHEMICALS
Pool Chemicals shall be stored inside the basement or inside garage to ensure contaimuent of any
spill or drips.
POOL I I AINDOWN MAINTENANCE AND OVERFLOW PROTECTION
At the time of pool closure for the season or anytime e the pool water seeds to be drained for
maintenance or to protect form overflows during major storm events; the chlorine levels shall be
reduced to undetectable levels of o.I ing 1. This shall be accomplished by utilizing either of the
two 2 methods listed below:
• Prior to discharging the no chlorine shall be added to the pool for approximately ten days
to allow e ilorine levels to dissipate,
• Discharge water shall be de-chlorinated ated till ing sodium thio ulphate or other approved
pool de-chlorination chemicals approved by DEP for use in watershed areas.
• The de-chlorinated water shall then be discharged over the grassy lawn surfaces or
planting areas prior to entering into the wooded portion of the yard.
POOL OVERFLOWS
To prevent the overtopping of chlorinated pool water during a l00- ear storm event; whenever a
severe storm event is predicted the pool level shall be drained to a level to permit the collection
of -Inches off'rain. All discharged pool water shall be de-chlorinated in accordance with the
above methods.
x
Trenches shall be inspected every 6 montlis and after major storms. Debris shall be removed and
the top lager ofpea stone shall be inspected for sedimentation. Areas Found to be clogged shall
be removed and replaced to a depth necessary to assure proper functioning of the trench.
2