HomeMy WebLinkAboutDWC - Septic Permit - Permits - 1975 SALEM STREET 8/31/2020 • �K''""' ' . Commonwealth of Massachusetts Map-Block-Lot
• ------------------ ---
BOARD OF HEALTH
Permit No
North Andover BHP-2018-0268
------------------
FEE
$350.00
-----------------------
DISPOSAL WORKS CONSTRUCTION PERMIT
Permission is hereby granted Dave Maynard
to(Construct)an Individual Sewage Disposal System.
at No 1975 SALEM STREET
---------------------------------------------------
-- -- ---------------- --- ----- -----
as shown on the application for Disposal Works Construction Permit No. BHP-201 ted to 018
Issued On: Sep-06-2018 ----------------------
----------------------------
— BOARD OF HEALTH
• Application for Septic Disposal System 9-6 `,4ol8
Construction Permit — TOWN OF TODAY'S DATE
NORTH ANDOVER, MA 01845 $ -Full Repair
$175.00 5.00-Component
Important: Application is hereby made fora permit to:
When filling out 2rtonstruct a new on-site sewage disposal system*
forms on the
computer,use ❑ Repair or replace an existing on-site sewage disposal system* RECEIVED
only the tab key ❑ Repair or replace an existing system component—What? I�
to move your
cursor-do not D o6 �O'�
use the return A. Facility Information // SEf
key. j 9 7 S 15c w.- S OF NORTH ANDOVER
Address or Lot# 3 HEALTH
City/Town
` 2,*TYPE OF SEPTIC SYSTEM*:
➢ [-] Pump ravity(choose one)
***If pump system, attach copy of electrical permit to application***
➢ E'r;onventional System (pipe and stone system)
➢ ❑ Infiltrator or Biodiffuser(Gravel-Less) (Attach a copy of your certification to install this type of system.)
➢ ❑ Pressure Distribution S.A.S.(No D-Box)
➢ ❑ Pressure Dosed(D-Box Present)S.A.S.
➢ ❑ Does the system require an effluent filter? Yes No �---
If yes, does plan specify make and model of filter? YES=(no further info. needed)
NO=(installer must specify brand of filter before DWC issuance)
What is the Make? What is the Model?
2. Owner Information
Name
FO b o n ,—
Address(if different from above)
City/Town State State Zip Code
1�✓✓
Email address Telephone Number
3. Installer Information J
c.--t w'c� /� /�ii-y�y.r-�- �.-,.�c7C,aya�im Fc,
Name Name of 000bpany
2,2
Address
City/Town State Zip Code
Telephone Number(Cell Phone#if possible please)
4. Designer Information`` p
PA d/ i��i rt t S�T�lw-s •.�— C �n r.S 7'/�'�Sp T��Pt�L
Name Name of Company
Address
City/Town State Zip Code
Telephone Number(Best#to Reach)
Application for Disposal System Construction Permit•Page 1 of 2
• � Application for Septic Disposal System
Construction Permit - TOWN OF TODAY'S DATE
$350.00-Full Repair
NORTH ANDOVER, MA 01845 $175.00-Component
PAGE 2OF2
A. Facility Information continued....
s. Type of Building: Residential Dwelling or❑Commercial
B. Agreement
The undersigned agrees to ensure the construction and maintenance of the afore-described
on-site sewage disposal system in accordance with the provisions of Title 5 of the
Environmental Code, as well as the Local Subsurface Disposal Regulations for the Town of
North Andover. I understand that until a final Certificate of Compliance has been issued by
this Board of Health, the installed system is n t approved.
/ice
ame Date
placation Appr B (Boar of Health Representative)
ame Date
Application Disapproved for the following reasons:
For Office Use Only: +/
1. Fee Attached? Yes' No
2. Project Manager Ohli anon Form Attached.? Yes V No
I �' g
3. Pump System? If so,Attach copy of Electrical Permit Yes No—K
Applicant received copy of
"Electrical Inspection Notes for Septic Systems" Yes No
Handout?
4. Reviewed aPP rovalletter, all paperworkreceived? Yes No
Missing:
5. Foundation As-Built?(new construction only): Yes No
(Same scale as approved plan)
G. Floor Plans?(new construction only): Yes No
Application for Disposal System Construction Permit-Page 2 of 2
SEPTIC SYSTEM INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction for the septic system for the property at:
/9 7s- _Z�X�_ S-
For plans b
(Address of septic system) P Y �—
(Engineer)
Relative to the application of (Installer's name)— And dated J-A--Cl /r -
(Original ate
Dated �
r (1'oT's to With revisions dated
(Last revised date)
I understand the following obligations for management of this project:
1. As the installer,I am obligated to obtain all permits and Board of Health approved plans prior to
performing any work on a site. I must have the approved plans and the 12ermit on site when any work is
being done.
2. As the installer,I must call for any and all inspections. If homeowner,contractor,project manager, or any
other person not associated with my company schedules an inspection and the system is not ready,then
item three shall be applicable.
3. As the installer,I am required to have the necessary work completed prior to the applicable inspections as
indicated below. I understand that requesting an inspection,without completion of the items in accordance
with Title 5 and the Board of Health Regulations may result in a$50.00 fine being levied against me and/
my company.
a. Bottom of Bed—Generally,this is the first (1� inspection unless there is a retaining wall,which
should be done first. The installer must request the inspection but does not have to be present.
b. Final Construction Inspection—Engineer must first do their inspection for elevations, ties, etc.
As-built of verbal OK (or e-mail to:healthdept@northandoverma.gov) from the engineer must be
submitted to the Board of Health, after which installer calls for an inspection time. Installer must be
present for this inspection. With a pump system,all electrical work must be ready and able to cause
pump to work and alarm to function.
c. Final Grade—Installer must request inspection when all grading is complete. Installer does not
have to be on-site.
4. As the installer, I understand that only I may perform the work (other than simple excavation)and I am required
to complete the installation of the system identified in the attached application for installation. I further
understand that work done by others unlicensed to install septic systems in North Andover can constitute
reasons for denial of the system and/or revocation or suspension of my license to operate in the Town of
North Andover, significant fines to all persons involved are also possible.
5. As the installer, I understand that I must be on-site during the performance of the following construction
steps:
a. Determination that the proper elevation of the excavation has been reached.
b. Inspection of the sand and stone to be used.
c. Final inspection by Board ofHealth staff or consultant.
d. Installation of tank,D-Box,pipes, stone, vent,pump chamber,retaining wall and other
components.
6. As the installer,I understand that I am solely responsible for the installation of the system as per the
approved plans No instructions by the homeowner,general contractor, or any other persons shall absolve
me of this obligation.
Undersigned Licensed Septic Installler: (Today's Date)
Name—Print) (Name—Signed)
8 C � 1
e. r�
of "A i
Town of North Andover
HEALTH DEPARTMENT
CHECK#:
DATE:
LOCATION: 9 S $ /
H/O NAME: 14id
OR NAME: �aA� {
CONTRACT ,.
Type of Permit or License: (Check box) j
❑ Animal $
❑ Body Art Establishment $
i
❑ Body Art Practitioner $ j
❑ Dumpster
❑ Food Service-Type: $
❑ Funeral Directors $
❑ Massage Establishment $
❑ Massage Practice $
❑ Offal(Septic)Hauler $
❑ Recreational Camp $
❑ Sun tanning $
❑ Swimming Pool $
❑ Tobacco $
❑ Trash/Solid Waste Hauler $
❑ Well Construction $----
SEPTIC Systems
❑ Septic-Soil Testing $----
�❑ Septic-Design Approval $
p� Septic Disposal Works Construction(DWC) $
�❑ Septic Disposal Works Installers(DWI) $
❑ Title 5 Inspector $
❑ Title 5 Report $— {
❑ other:(Indicate) j
j
tWAgent Initials
White-Applicant Yellow-Health Pink-Treasurer