HomeMy WebLinkAboutSeptic System - Correspondence - 469 BOSTON STREET 11/22/2019 12/10/2019 Town of North Andover Mail-Final Construction Inspection-469 Boston Street
NORTH--( ANDOVER
Massachusetts Stephen Casey<scasey@northandoverma.gov>
Final Construction Inspection - 469 Boston Street
2 messages
Dan Ottenheimer<dano@millriverconsulting.com> Fri, Nov 22, 2019 at 9:21 AM
To: Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey<scasey@northandoverma.gov>, Toni Wolfenden
<tolfenden@north and overma.gov>
Cc: Sandra Lezcano <sandral@millriverconsulting.com>
Brian, Steve, Toni -
Attached please find the findings of our inspection at 469 Boston Street.
There were some unresolved issues which will need to be re-examined. You can likely do so at the final grade inspection,
or we can do so if you'd like. They are noted on the report and also explained below:
• The distribution box did not have hydraulic cement at the pipe penetrations
• There was not enough water in the pump chamber to confirm the operation of the pump
• There was not even flow coming out of the distribution box to the three arms of the leach field. The branch closest to
the dwelling was not receiving much of any flow. They reported they were going to either adjust the pipes or d-box, or
else put in leveling devised inside the pipe. I asked them if they did the latter to check to make sure they have not
restricted the flow to the field when the pump turned on
The contractor was going to leave the distribution box area uncovered so these items can be reviewed at the final grade
inspection.
Any questions, do let me know.
Dan
Daniel Ottenheimer, PE
President
https://mail.google.com/mail/u/0?ik=fb8Oa9478f&view=pt&search=all&permthid=thread-f%3Al650912139045305497&simpl=msg-f%3A165091213904... 1/2
11/13/2019 Town of North Andover Mail-469 Boston St-Question
.._-___.----._----
NORTH ANDOVER
Massachusetts ,, Stephen Casey<scasey@northandoverma.gov>
469 Boston St - Question
Dan Ottenheimer<dano@millriverconsulting.com> Wed, Nov 13, 2019 at 12:35 PM
To: Stephen Casey<scasey@northandoverma.gov>
In looking at the plans there are a number of other features that look like they were survey located which could be
used as a replacement benchmark. For example there is a grade show on what appears to be the edge of the
driveway and another one on a different part of the house.
I would NOT encourage someone to use the bottom of something that they constructed as a benchmark since
anything that remotely relates to survey control is pure fabrication.
Why did the designer go along with this?Why did he not tell you about the other survey control points that he had?
I would approach this with a good degree of caution. The designer should provide a new benchmark and indicate to
you in writing what it is.
Let me know if you'd like me to help further with this at all.
Dan
[Quoted text hidden]
All email messages and attached content sent from and to this email account are public records unless qualified as an
exemption under the Massachusetts Public Records Law.
Visit us online at www.northandoverma.gov.
https://mail.goog le.com/mai I/u/0?ik=fb8Oa9478f&view=pt&search=a II&permmsgid=msg-f°/a3Al 650108943458750357&simpl=msci-f°/o3A l 65010894345... 1/1
11/13/2019 Town of North Andover Mail-[North Andover MA]469 Boston(Sent by Jim Kavanaugh, Kavanaughj@msn.com)
N ORTK AN DOVER
Massachusetts Stephen Casey<scasey@northandoverma.gov>
[North Andover MA] 469 Boston (Sent by Jim Kavanaugh, Kavanaughj@msn.com)
2 messages
Contact form at North Andover MA <crosmailer@civicplus.com> Wed, Nov 13, 2019 at 3:40 PM
Reply-To: Kavanaughj@msn.com
To: scasey@northandoverma.gov
Hello scasey,
Jim Kavanaugh (Kavanaughj@msn.com)has sent you a message via your contact
form (https://www.northandoverma.gov/user/2363/contact)at North Andover MA.
If you don't want to receive such e-mails, you can change your settings at
https://www.northandoverma.gov/user/2363/edit.
Message:
Steve,
As discussed, enclosed is a sketch of benchmark revision.
Do to the original benchmark that was placed on a tree on site,which no
longer exists, the benchmark on approved drawing was interpolated, as best
possible. The contractor was instructed to verify the bottom of existing
system elevation, infiltrator, and report to engineer. Based on actual field
verification and to ensure that the bottom of proposed system meets the 4 ft.
of separation to groundwater, the benchmark on approved plan will require
modification. The difference in benchmark elevations is 0.4 ft. Therefore,
the contractor will now use a bottom of siding benchmark of 103.98', which is
shown on enclosed plan.
Any questions please let me know.
Thanks Jim
978-375-9781
bmrevision.jpg
337K
R„
Stephen Casey<scasey@northandoverma.gov> Wed, Nov 13, 2019 at 3:54 PM
To: Dan Ottenheimer<dano@millriverconsulting.com>
Hi Dan,
https://mail.goog le.com/mai I/u/0?ik=fb8Oa9478f&view=pt&search=all&permthid=thread-f%3Al 650120566512216927&simpl=msg-f%3A165012056651... 1/2
11/13/2019 Town of North Andover Mail-[North Andover MA]469 Boston(Sent by Jim Kavanaugh, Kavanaughj@msn.com)
Attached is the sketch the designer sent me for 469 Boston St. It looks like he used the Bottom of Siding as the new
benchmark. The elevation he noted is .4 different than the plan states. Does he need updated elevations for the
inverts/system as well, or is this acceptable?Any feedback is appreciated.
Best,
Steve
[Quoted text hidden]
Stephen Casey Jr.
Health Inspector
Town of North Andover
` bmrevision.jpg
IF , ., :_, 337K
https://mai l.google.com/mail/u/0?ik=fb8Oa9478f&view=pt&search=all&permth id=th read-f%3A1650120566512216927&simpl=msg-f%3A165012056651... 2/2
11/14/2019 fieldchange.jpg
Environmental Consultant
JAMES M.KAVANAUGH,P.E. •Engineering Consultant
14 Shady Hill Drive • Septic System Designs
North Reading,MA 01864 •Construction Services
Tel./Fax(978)664-2925 • Custom Home Builder
tlfl3jly
V �.� L .I1i.:.'I' '� O^' /' v i/a n h('• J/ �0 7
Sjo
EL�
/,��U q'� b/ %n/!'l/a✓,ram.- pts t<i ..+"'" ,.�sh��
F N,
103.R8
C�
V r.[}
q! /�)g��,J
�.✓ gvai/m� (-�c�i1 1/cr��Ga�10,., l 0• �d ,(�i/�U�'y"✓I /�6��M
0 L 6 D Pf G f Y 0
,(`_0.....IIJIFF/l�..lAl..,...,..-�A...!`V..:..7.....:....a..--4 0-------n.... A—n 4 w.w
11/15/2019 Elevsched.jpg
Environmental Consultant
JAMES M.KAVANAUGH,P.E. •Real Estate Brokerage
14 Shady Hill Drive • Septic System Designs
North Reading,MA 01864 •Construction Services
(978)664-2925 •Custom Home Builder
Revised Elevations for 469 Boston St. N. Andover
BENCHMARK
BOT.OF SIDING 103.58'
SCHEDULE OF PIPE INVERTS
LOCATION LETTER INVERT
HOUSE OUTLET
SEPTIC TANK INLET A EXISTING
SEPTIC TANK OUTLET B EXISTING
PUMP CHAMBER INLET C EXISTING
EXISTING
PUMP CHAMBER OUTLET D EXISTING
DISTR. BOX INLET E 99.67
DISTR. BOX OUTLET F 99.50'
BEG. DISTR. FIELD G 99.4.1'
END DISTR. FIELD H 99.18'
BOTTOM OF FIELD 98.68,
REVISED 11/15/19