HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 469 BOSTON STREET 9/1/2020 • SFTTLEDI • North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 469 Boston Street MAP: 107.D LOT: 49 INSTALLER: Ralph Simard — Simard Construction 508-958-2002 DESIGNER: James Kavanaugh — Environmental Consultant 978-664-2925 PLAN DATE: 5/3/2019, rev 6/3/2019, rev 7/3/2019 BOH APPROVAL DATE ON PLAN: 9/23/2019 INSPECTIONS TANK INSPECTION: 11/12/2019 S. Casey DATE OF BED BOTTOM INSPECTION: 11/14/2019 S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 11/21/19 DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS ❑ Contractor reports any changes to design plan ❑ Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: 11/21/19 — Existing septic tank and pump chamber re-used. Confirmed manholes to finished grade and effluent filter in outlet of septic tank, manhole to grade on pump chamber. Confirmed alarm functionality. No water in tank to confirm pump functionality DISTRIBUTION-BOX ❑ Installed on stable stone base ® H-20 D-Box ® Inlet tee (if pumped or >0.08'/foot) ❑ Hydraulic cement around inlet & outlets ❑ Observed even distribution ❑ Speed levelers provided (not required) ® Schedule 40 PVC Pipe d Comments: 11/21/19 — Flow was not evenly distributed to distribution box outlet pipes, no hydraulic cement around pipe penetrations SOIL ABSORPTION SYSTEM (General) ® Bottom of SAS excavated down to C soil layer, as provided on plan ® Size of SAS excavated as per plan ® Title 5 sand installed, if specified on plan S.Casey inspected at Bottom of Bed 11/14/2019 ® 40 Mil HDPE barrier installed ® Laterals installed and ends connected to header (and vented if impervious material above) ® Elevations of laterals and chambers installed as on approved plan ❑ Retaining wall (boulder/ concrete / timber/ block) ❑ Final cover as per plan Comments: 11/21/19 — Confirmed presence of former impervious barrier at approximate elevation indicated on design plan FINAL GRADE ❑ Loamed Wt\\ ❑ Seeded ❑ Cover per plan �L) Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 103.58 HR = 1.43 H I = 105.01 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Distribution Box IN 4.95 99.73 99.67 Distribution Box OUT 5.13 99.55 99.50 Lateral 1 Beg 5.23 99.45 99.41 Lateral 1 End 5.46 99.22 99.18 Lateral 2 Beg 5.23 99.45 99.41 Lateral 2 End 5.46 99.22 99.18 Lateral 3 Beg 5.23 99.45 99.41 Lateral 3 End 5.46 99.22 99.18 Barrier, Top 5.84 99.17 99.56 Bottom of Bed 6.40 98.61 98.68 11/22/2019 Town of North Andover Mail-Final Construction Inspection-469 Boston Street NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> Final Construction Inspection - 469 Boston Street 1 message Dan Ottenheimer<dano@millriverconsulting.com> Fri, Nov 22, 2019 at 9:21 AM To: Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey<scasey@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Cc: Sandra Lezcano <sandral@millriverconsulting.com> Brian, Steve, Toni - Attached please find the findings of our inspection at 469 Boston Street. There were some unresolved issues which will need to be re-examined. You can likely do so at the final grade inspection, or we can do so if you'd like. They are noted on the report and also explained below: • The distribution box did not have hydraulic cement at the pipe penetrations • There was not enough water in the pump chamber to confirm the operation of the pump • There was not even flow coming out of the distribution box to the three arms of the leach field. The branch closest to the dwelling was not receiving much of any flow. They reported they were going to either adjust the pipes or d-box, or else put in leveling devised inside the pipe. I asked them if they did the latter to check to make sure they have not restricted the flow to the field when the pump turned on The contractor was going to leave the distribution box area uncovered so these items can be reviewed at the final grade inspection. Any questions, do let me know. Dan Daniel Ottenheimer, PE President https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1650912138982392866&simpl=msg-f%3A165091213898... 1/2 11/22/2019 Town of North Andover Mail-Final Construction Inspection-469 Boston Street MILL RIVER CONSULTING CArAh r Solutinns for land Developnnc-tit 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association c Construction Notes -469 Boston Street.doc 369K https://mai l.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permth id=th read-f%3Al 650912138982392866&sim pl=msg-f%3A165091213898... 2/2 To whom it may concern, I, Matt Quinlan, Owner of 469 Boston St. have requested that Simard Construction loom and seed in the spring due to time of year. Thank you Matt Quinlan