6 E. Goldberg, Chairman: The Planning Board meeting for Tuesday,August 18,2020 was called to order at 7 p.m.
7 J. Ettrjglat: Cottfrrtned official attendance: K Goldberg, J. Simons, P. Boynton, K. Bargnesi, K Cortttier, (A.
8 Preston absent).
9
10 E. Goldberg: (Read the Governor's Order into the record). Votes will be recorded as roll call this everting. This
11 meeting was held remotely via Conference call.
12
13 Pursuant to Governor Baker's Alarch 12,2020 Order Suspending Certain Provisions of the Open Meeting Law, G.L. c.
14 30A,§18,and the Governor's March 15,2020 Order imposing strict limitation oil the number ofpeople that tnay gather in
15 one place,this sleeting of the North Andover Planning Board Will be conducted Via retwote participation to the greatest
16 extent possible.Specific information and the general guidellwes for remote pardeipation by twewbers of the public amUor
17 parties 3Vith a right andlor requirement to attend this meeting can be found on the Tomi's ivebsite,at
18 3PwlP.ttortltlwrllof�ertrta.gov. For this meeting,members of the public Who IPlsh to hatch the meeting tnay do so oil their
19 teleVlsiows by tuning to Conrcast Channel 8 or Verizon Channel26 or online at IP}VW.itol'tltattlloverca111.org. No in person
20 attendance of ntentbers of the public(Pill be permitted,but every effort Will be made to ensure that the public call
21 adequately access the proceedings in real blue, via technological means. In the event that we are unable to do so, despite
22 best efforts, we Will post oil the Town of North Andover►vebsite rnr audio or video recording,transcript,or other
23 cotwpreheusim record ofproceedings as soon as possible after the tweeting.If the public would like to participate in public
24 hearings please entailyour question/connnentprior to or during the meeting to jenright t northandoiernia.gov. Tlie
25 question/counnent will be read during the proceedings and responded to accordingly.
26
27 STAFF REPORT
28
29 BOND RELEASE
30 45 Woodberry Lane,Lisa Torbin-Shaw: Request for release of a $4,000 performance bond associated with a
31 Watershed Special Permit granted May 21,2019.
32 J. Enright: The project engineer has submitted an as-built plan certifying buildout of the addition is substantially in
33 compliance with the plan. The deed restriction has been recorded to reflect limited use of fertilizer and coal-tar
34 based pavement scaler; Planning is in support of a frill bond release.
35 MOTION: K. Bargnesi made a motion to release the$4,000.00 bond, plus any remaining interest, for 45
36 Woodberty Lane. J. Simons seconded. The vote was 4-0, unanimous in favor. Roll call vote: J. Simons voted yes.
37 E. Goldberg voted yes. P. Boynton voted yes. K. Bargnesi voted yes. The vote was 4-0, unanimous in favor.
38
39 CONTINUED PUBLIC HEARINGS
40 [E. Goldberg: Read Governor Baker's Order into the record] (K Bargnesi recused herseffi
41 1 160 Great Pond Road,Brooks School: Application for a Watershed Protection District Special Permit and Site
42 Plan Review Special Permit under Chapter 195 Art 4 Pt 5, Section 195-8, and Section 195-10.7 of the Town of
43 North Andover Zoning Bylaw to authorize the phased redevelopment and reconstruction of certain existing
44 developed areas of the Property, including relocation of the South Entrance, removal and reconstruction of
45 buildings, access ways and landscape areas, improvements and installation of new drainage improvements and
I
Town ofNor,th Andover
PLANNING BOARD
Tuesday,Aumust I8, 2020 a, 7 p.m., 1.20 Main Sheet Town Hall, Nodh Andovei% MA 0.1845
46 associated landscaping. The majority of the proposed work is within the General Zone with a small portion of
47 reconstruction of walks, parking and landscaping oil the outer edge of the Non-Disturbance and Nan-Discharge
48 Zones. The project is located in the Residential 1 (R-1)Zone.
49 E. Goldberg: Has any public comment been received on this project?
50 J. Enright:No public comment has been submitted to date. Hearing opened on April 14,2020(no evidence heard)
51 and has been continued to today's date. Applicant has submitted an overview presentation they will present to the
52 Board this evening. An NO[ is filed with Conservation. A Technical Review meeting was held this past March.
53 The applicant has submitted responses to comments received at that meeting. A site walk was scheduled with
54 NAPD to review access points and sight distances. Planning has requested the centerline of the relocated southern
55 entrance be staked; Board may want to schedule a site walk. Stormwater review has begun; peer review submitted
56 their first round of comments; applicant has responded. Department review comments have been received from
57 Fire, DPW and Police; we are waiting on the applicant's response comments. Since this driveway will now serve
58 two lots a Common Driveway Special Permit should be submitted. Typically, we request these for easement
59 documentation and maintenance agreement purposes based on dual ownership. These two parcels are owned by
60 Brooks School. The Board may consider a condition that should either parcel be sold in the future an easement
61 document and maintenance agreement would then be required.
62 Brian Vaughan, Smolak &Vaughan: Agreed that a condition to this effect could be include in the Common
63 Driveway decision. This application has not been filed yet, but will need to be noticed and heard. Introduced team
64 on remote conference call: Andrew Leonard, A.T. Leonard& Associates; Anthony Cleaves, Whitman&Bingham
65 and Paul Griffin, Brooks School. Project scope involves relocating existing southern entrance, connections to the
66 campus, internal modifications, and building modifications.Modifications have been made to the plans since
67 March.
68 Andrew Leonard: Reviewed project presentation. Watershed boundary remains; closest work is 1 K feet from lake.
69 Entry to be widened and moved; gating will be improved.Noted wetlands tributary to lake,consolidation of
70 driveway(s)along Great Pond Road. (P. Boynton requested overlay of new driveway over existing conditions/
71 topography contour lines).
72 A. Cleave: Referred to plan L.103 demonstrating this; agreed it could be presented more clearly for the next
73 meeting. Perspectives show rendered plans of new entrances, new driveway, views of the field adding trees and
74 lighting. Revisions include shifting Gatehouse away from Non-Disturbance Zone; removing unsalvageable
75 buildings(Frick& Alumni buildings)& adding improvements and new structures, i.e. admission arrival parking
76 lot to include new rain garden and deck around the Sugar Shack building(tennis court side). Goal for
77 reconstructing Main Street is to eliminate vehicles and snake the area universally accessible from the Library to the
78 Dining Hall. Site lighting will be improved.New Admission building(32 ft.tall/story and a half tall)will have a
79 view of lake and fields. Head of School House will be returned to its single family home use. Decreasing the
80 overall footprint and the amount of impervious surface within the watershed. Briefly discussed construction
81 sequencing; Spring 2021, with a fall completion.
82 P. Griffin: Prefers Board's site visit be scheduled soon based oil boarding student arrivals.
83 Board: No abutter comments have been received. Common Driveway permit should be applied for and noticed.
84 Site visit to occur on Friday August 215f a 6 p.m. Board to meet at driveway on 1116 Great Pond Road.
85 [Corrtirrtred to the September 1, 2020 Planning Board rrreeting]
86
87 NEW PUBLIC HEARINGS
88 [E. Goldberg:Read Governor Bakers Order into the record]
2
Town of North Andover
PLANNING BOARD
Trresrkr Au ust 18 2020 7 .in. 120 Maim Sheet Town Hall North Andover- MA 01845
89 40 Flaashin Drive(a/k/a0 Flagship Drive),DWT Holdings LLC: Application for Site Plan Review Special
90 Permit under Article 8 Pant 3 and Article 10 § 195-10.7 of the North Andover Zoning Bylaw. The Applicant
91 proposes construction of a 15,I00 SF single-story metal building with associated parking, landscaping, utilities
92 and stormwater management design. The primary use is a proposed office to serve the Applicant's construction
93 company and the accessory uses are indoor storage for equipment and vehicles as well as an outdoor gravel
94 laydown area also to serve the construction company. The property is located in the Industrial-1 Zoning District.
95 J. Enr gh : This is an undeveloped lot with a significant change in grade from the front to the rear of the lot, which
96 abuts a residential district. In the 1990s clearing was done on the lot resulting in a washout of sediment that ran
97 downstream into a wetland. Conservation issued an enforcement order and detention basins were constructed to
98 prevent it from happening again. Building Commissioner seeks information on the lay down gravel area. Board
99 may want the project engineer to provide a detailed review of the grading and drainage plan. Stormwater peer
100 review has conducted their first review. Applicant prefers to wait for the Board's initial review comments prior to
101 preparing a response to peer review and department review comments. Department reviews were submitted from
102 Health, Conservation, DPW, Fire, Police and Building.
103 Charlie Weir, Meridian Associates and Bill Linskey, Applicant: Applicant described general construction business
104 operation. Activity is typically off site. Outdoor Iay down gravel area is for parking large construction vehicles,
105 storage of materials; no storage of hazardous materials. Hours of operation would be access before 7 a.m., minor
106 activity during the day and close by 4:30—5p.m.
107 J. Enright: Parking spaces shown on the plan are in addition to the 8 contractor bays and equipment in the lay
108 down area overnight. The architectural plans recently submitted indicate 7 of the 8 bays are for tenant. Building
109 Commissioner will need to determine whether leasing of bay are allowed as an accessory use.
110 C. Weir: Reviewed plan set application. Grade of the contractor's yard is similar in elevation to the homes due to
111 rip rap and five foot fill. Maintaining the required 50 ft. buffer along rear of site. Lighting limited to wall packs; no
112 light spillage to neighboring properties. Two light poles on access drive are 12' high with full out off fixtures.
113 J. Simons: Noted historic issues related to commercial property and residential homes behind it. How close is the
114 property to nearest house?
115 C. Weir: Referenced locus; property is direct to a couple of homes; 100' from property line to the building.
116 Agreeable to possibility of a fence. Efforts will be made to minimize impacts to adjacent residential area. Building
117 is similar distance to residences as nearby industrial neighbors. Large wet basin will be constructed on site.
118 E. Goldberg: This is a developable lot in an industrial district; all efforts to minimize impact will be appreciated.
119 J. Enright: Stormwater review and Department review require responses. No abutter comments have been received
120 to date.
121 [Confirmed to the September 1, Planning Board ineeting]
122
123 DISCUSSION ITEMS
124 _
Lake Cochichewick Water Quality Testin
125 J. Enright: Town Mgr. M. Rodrigues, E. Goldberg, P. Boynton, J. Borgesi,Jim Stanford and myself met to
126 discuss the Board's request for data related to raw lake water testing. It was agreed the DPW will hire an intern
127 from Merrimack College to enter existing data from the Water Dept. and display that information in a meaningful
128 presentation format. Additionally, as discussed in the past, funding for an update to the 1987 Watershed Plan was
129 approved at Town Meeting.A scope of services has been finalized and P. Boynton,the Water Treatment Staff and
130 DPW have reviewed it. It has been mailed to four engineering consultant firms with a request for a response by
131 Sept 8.
3
Town of North Andover
PLANNING BOARD
Dieselay,Air ist 18 2020 7 .m. 120 Maim Street Tojvn Hall North Anrlover MA 01845
132
133 Planning Board Filing Fees
134 J. Enright: Per the Board's request, I have tallied Waivers and Insubstantial Changes; in 2019 the sum was 8 and
135 year to date sum is 7. Asked if the Board would like to add a filing fee for Waiver requests and Insubstantial
136 Changes. Currently the Land Disturbance Permit is not accounted for on the filing fee schedule. Made a
137 recommendation to add the permit with a fee of$400,consistent with the base fee for Site Plan Review. Board
138 chose not to establish fees for waiver requests, insubstantial changes, or repetitive petition and to add the Land
139 Disturbance Permit with a$400 fee,
140 MOTION: J. Simons made a motion to approve the Planning Board Filing Fee Schedule as proposed in the
141 packets including all additions and deletions, adding the permit filing fee tr $400 for a Land Disturbance Permit,
142 remain at$0 filing fee for Repetitive Petitions, Waiver Requests and Insubstantial Changes. K. Bargnesi seconded.
143 The vote was 4-0, unanimous in favor. Roll call vote: J. Simons voted yes. E. Goldberg voted yes. P. Boynton
144 voted yes. K. Bargnesi voted yes. The vote was 4-0, unanimous in favor.
145
146 MINUTES APPROVAL: Approval of July 21,2020 Planning Board minutes,
147 MOTION: P. Boynton made a motion to approve the July 21,2020 minutes. J. Simons seconded. The vote was 4-
148 0, unanimous in favor. Roll call vote: J. Simons voted yes. E. Goldberg voted yes. P. Boynton voted yes. K.
149 Bargnesi voted yes, The vote was 4-0, unanimous in favor.
150
151 J. Enri ht 1.600 Os ood Street:Notified the Board that the 1600 Osgood Street Redevelopment Project has
152 indicated they would like to be before the Board for a Modification on September 15, 2020. They have received
153 feedback from MADOT affecting internal circulation and are proposing some changes to stormwater design.
154
155 ADJOURNMENT
156 MOTION: J. Simons made a motion to adjourn the meeting. The motion was seconded by K. Cormier. The vote
157 was 4-0, unanimous in favor. Roll call vote: J. Simons voted yes. E. Goldberg voted yes. P. Boynton voted yes, K.
158 Cormier voted yes. The vote was 4-0, unanimous in favor. Meeting adjourned a 8:30p.m.
159
160 MEETING MATERIALS: Planning Board Meeting Agenda August 18,2020,DRAFT Planning Board Meeting
161 Minutes July 21, 2020; 200818 Staff Report; 45 Woodberry Lane: 20190614 Recorded Decision 45 Woodberry
162 Lane,45 Wood beriy—AsbuiIt; 1160 Great Pond Road,Brooks School: Continuance: Brooks SPR and WSP,
163 20200409 Request to open and continue, 20200413 Brooks School Continuance Request, 20200424 Continuance
164 Request, 20200630 Request to Continue to August 18, Site Plans: 200305 Site Plans, 200805 Site Plans Brooks
165 School Campus Improvements--Permit Set- Revision 1, SPR Application: Owner Authorization, Abutter List
166 (Brooks School)(00151031xBC4F6), 20200305 Site Plan Review Application, 200305 Memorandum of Support,
167 WSP Application: 20200305 Watershed Special Permit Application,200812 Memo of Support: Supplemental
168 Filing Memo to P1308.12.20, Department Review: 20200311 Police Department Review,20200312 Fire
169 Department Review, 20200312 DPW Review-Water, 20200817 Fire Department Review(2), Stormwater Review:
170 200403_Peer Review-Storm water 18065P 500 Brooks School, 200805 Review Response Comments School
171 Watershed SP South Ent., TRC Comment Response Supporting Info: TRC A- Brooks School Campus
172 Improvements-Vehicular Entries& Gates, TRC D-Brooks School Campus Improvements—Emergency Vehicle
173 Turning Diagrams,TRC F-Brooks School Campus Improvements--Reinforced Lawn Areas, TRC E-Brooks
174 School Improvements-Hydrants,TRC B--C1ick2Enter-Product Features,TRC F-Lawn Reinforcement
175 Grasspave2 Data Sheet, Stormwater Mgmt: 200305 Stormwater--Application Package,200805 Stormwater
4
Town of North Andover
PLANNING BOARD
Tuesday,A_rtg-ust 18, 2020 rr 7 p.m., 120 Merin Sh-eet Town Hall, North Andover-, MA 01845
176 Update, Cert no degradation lake Brooks School Watershed SP So _•�— uth E��t tivq cent, Presentations: 2QQ$1$ Brooks
177 Campus Improvements Planning Board Presentation;40 Flagship Drive(a/k/a/0 flagship Drive, DWT Holdings
178 LLC: Stormwater Management Review: 200803 I" Stormwater Peer Review_40 Flagship Drive, Department
179 Review: 200720 Health Dept Comments,200720 Police Dept Comments,200722 Conservation Comments,
180 200726 Bldg Comm Comments, 200720 NAFD Comments, 200814 DPW Comments, Application Materials:
181 Sunlike-user-30w, Ipp-squ are-straight-alu m,tech brite-full-cutoff-led-waIlpack, building elevations, 6288-
182 Stormwater Report, Site Plan Review Application Package, 2020-7-16_plan set application, Locus; Planning
183 Board Filing Fees: 20200818 Filing Fees—REV-DRAFT JE.
5 ''