HomeMy WebLinkAboutSeptic Plan Approval Letter - Correspondence - 125 BOSTON STREET 9/15/2020 North Andover Health Department
Community and Economic Development Division
September 15, 2020
Robert Landers
125 Boston Street
North Andover, MA 01845
Re: Subsurface Sewage Disposal System Plan for 125 Boston St(Map 107.D, Lot 43)
The proposed wastewater system design plan for the above site dated July 2, 2020, revised
August 20, 2020 and received on September 10, 2020 has been approved. The design plan has
been approved for use in the construction of an upgraded on-site septic system for a three (3)
bedroom home with a maximum of seven(7)total rooms utilizing a septic tank, distribution box
and UA technology of Cultec C-4 Chambers. This design plan approval is valid until September
15, 2022.
The variance request to allow a 63 foot distance instead of 100 foot distance from the leaching
field to the wetland has been approved. This variance also must be approved by the Conservation
Department, as the Health Department's approval does not satisfy Conservation requirements.
The variance to allow a 4 foot offset to groundwater instead of 5 feet has also been granted.
During this time, a licensed septic system installer must obtain a permit and complete this work,
and a Certificate of Compliance be endorsed by the installer, designer and the Town of North
Andover. In the event an imminent health problem, such as sewage backup into the dwelling is
occurring,the North Andover Board of Health may reduce the time period for which this plan is
valid.
This approval is also subject to the following conditions:
1. If site conditions are found in the field to be different from those indicated on the
design plan and/or soil evaluation,the originally issued Disposal System Construction
Page 1 of 2
North Andover Health Department
120 Main Street
North Andover, MA 01845
Phone: 978.688.9540 Fax: 978.688. 9542
125 Boston St September 15, 2020
Permit is void, installation shall stop, and the applicant shall reapply for a new
Disposal Systems Construction Permit(310 CMR 15.020(1)).
2. It is the responsibility of the applicant and/or the applicant's septic system designer,
septic system installer or other representative to ensure that all other state and
municipal requirements are met. These may include review by the Conservation
Commission, Zoning Board, Planning Board, Building Inspector, Plumbing Inspector
and/or Electrical Inspector. The issuance of a Disposal System Construction Permit
shall not construe and/or imply compliance with any of the aforementioned
requirements.
Please feel free to contact the office with any questions you may have. We look forward to
working with you to obtain a wastewater treatment and dispersal system which will be in
compliance with all regulations and assure protection of public health and the environment of
North Andover.
Sincerely,
FILE COPY
Stephen Casey Jr.
Health Inspector
Encl. Installers list
cc: Installer
File
Page 2 of 2
North Andover Health Department
120 Main Street
North Andover, MA 01845
Phone: 978.688.9540 Fax: 978.688. 9542