HomeMy WebLinkAboutAnnural Fire Sprinkler System Inspection - Inspection - 140 PRESCOTT STREET 8/14/2020 Annual
'ire Sprinkler Systems Inspection
CINTAS FIRE PROTECTION
710 NARRAGANSETT PARK D
PAII TUCKET, FBI 02861
USA
061
READY FOR THE WORKDAY T
Inspection date: 0 1 0 0 Inspector: BILL CORREIRA 0OF4068
.......... ......
.......... ......
.......... ......
. ...............
...............
..........:::
....... .......:..::::
...:...... . ..........................
......:.:::
NAF99 PRESCOTT !-SOUSE 2439 0OF4041704
140 PRESCOTT ST
NORTH AVE , MA 018451826
Phone: Fax,
NAF99 PRESCOTT HOUSE 2439 0OF4041704
140 PRESCOTT ST
I
NORTH ANDOVER MA 018451826
.. o n 5 ,e}}7J86 Fax:
nspec ion performed in accordance with
N PA 25 Standard for the Znsrpec ion, Vesting, and Maintenance
of Water-Based Fire Protection Systems,, 2014 edition.
SPRINKLER LE[ Rage I of
Powered byASURiO Jrnspe Lion Systems,Copyright 2010. Aft Rights Reserved ASUM
r
4
der #
................
:................................:.................:........................... .
....................... ..
..... .:.....................:..:....:.:.:.....:.:....
Person at alarm.. -receiving facility notified before testing...... .1.. ..................... ........ ........ ... ... ............ ... ... DI PAT H
.................................................... .v..... . . ...-. ......
Time alarm-receiving facility notified 07:00
x............ ............................:..... ................... .... ............. ... ..... ..
Person at Fire Department notified before testing .1.4 DISPATCH
;Time FD notified before testing 07:00
t.......Y.........v.............................. .
HJ notified before testing . ... ................... DISPATCH
Time A.........J not........ified 07.00
..::: V tff d t� ......:A T tI r
}Pers.................on at alarm-receiving.............. facility notified after tin .i.�4 ...................... ......................... ......................................................... DISPATCH
...
............
-"Time alarm-receiving facility notified after testing 11.00
I Person a t di re epartment notified after testing {4.1.4 DISPATCH
t.....................n.............:.................
;Time FD notified after testing k 11:00
AH] notified after testing.. .1. DISPATCH
Jame AH3 notified after testing 11:00
Date system restored to normal operation. f 1 2 2
. ................
7irne system restored to normal operation. ... 11: .
....
,..::.:....':.'.'......:...'.. ......... :.. i�ial.' . ..::..
x.............................................. . ........ n..............
t
'Wet System
kw 11116Ziril",
:: W
�i ie
;Sprinkler heads appear free of corrosion, foreign material, paint or damage, no signs of leakage and Pass
;leads/deflectors installed in proper orientation .2.1.1.
':Escutcheons and coverplates in place, if applicable. .2.1.1, Pass
inimum clearance maintained below all sprinklers .2.1. r Pass
replacement sprinkler heads per number installed in the bead box comply. 6 per 1-3 : 12 per 301 to Pass
.rOOO 4 per 1,,000 (5.4.1.5)
'Sprinkler lead wrench for each type head provided in bead box .4.1. Pass
t_ist of sprinklers installed on the property posted on head box. . .1* , Fail
`System piping and fittings free of mechanical damage, leaks, corrosion, misalignment, or other loads or
Pass
pi in hung from system , . ..
Pipe hangers and selsm1c braces secure and undamaged . t3 Pass
,,Sprinklersin building that are at least 50 gears old, has sprinkler sample been tested . .3.1.1.1 A
':Fast response sprinklers over 20 gears old, has sprinkler sample been tested ,3.1.1.1.3 N
;Dry sprinklers in service for 10}rears, has sprinkler sample been tested .3,1.1.1. i
:...........:......n:.
..................
ENTIRE BUILDING ILL ROOM CENTRAL SPRINKLER COMPANY it
water pressure gauges operating properly 13.4.1.1 Pass
E terior of vaIve free of physical damage, era Ives ire norma] position 13.4.1.1 Pass
:.System control valve is accessible and free of leaks, has appropriate wrench and properly secured Pass
petard chammer and alarm drains free from leakage 13. .1.1 f
;hydraulic nameplate, if applicable,securely attached and is legible ,2. Fail
;Information sign securely attached and legible, (4.1.9.2) Fail
Pressure(psi) shown on System side pressure gauge. 12
SPRXNKLER Page 2 of 5
Powered by ASUNO Inspection Systems, Copyright 2010. All Rights Reserved A UN
id
Al
r .. r ... ...... .
ENTXRE BUILDING BOILER ROOM CENTRAL SPRINKLER LE MPANY F
;pressure (psi) shown on Supply water pressure gauge. 1 .2.
;residual Pressure with valve open 1 .2. 65
'Static pressure after valve closed 13. . 0
Main in Drain Test Pressure lass than 10% reductive in flow from original acceptance test or previous test Kass
:results 1 .2.5. f
}
:Adequate drainage available (13.2.4) Pass
:valve Status Test-Valves open when returned to service. 13.3,1,2,1 r Pass
jnternal inspection - all components operate properly and rove freely, valve cleaned and in good condition €V I
` 13.4.2.1
.Internally inspect valve strainers,filters, and restriction orifices; free from obstructions,operating properly,
>and in good condition (13.4.1.2)
f
gauges on valve, when compared to calibrated gauge, error is less than %full scale or gauge has been
{ Yes
recalbrated or replaced . .2
........ ..
MAIN SPRINKLER CONTROL FRONT OF BUILDING M ELLER.CO, A 0 0
1lalve has proper signs,and is accessible 13,3.2.2 Pass
'Valve is free of external leafs, and appropriate wrench available 1 * .2.2 Pass
',Valve in open positlon 1 i . . Pass
Nalve properly seated, locked,or supervised 13.3.2.2 Pass
Valve exercised through full range to ensure proper operation 13;3.3.2 Pass
..................
...................
.....::......... ... ..........
..........
..............
.......:..
:.:.:...' .'. err .
'Externally inspect-Are gauges working properly, valve free of damage and in normal open or closed
;position, retarding chamber or alarm drain without leafs 1 . .. . Pass
Internal inspection and test valve for correct operation, valve moves freely and is it in good condition
13. .2*1 l I
...................
on
..':.::.....
control halve- CITY SIDE CHECK ' and � "� x �
locked/tamper BLEB DD bass Pass Pass Pass Pass 1 ICI
Control Valve TE SIDE CHECK �Butterfly � 4"' K P K � �
\A
locked/tamper ..............#.BOILER 1'�.... . . � ass ass ass Pass t Kass i � I
Lt�on'...............:...............'....:...........: lijoll
Valve Supervisory twitch CITY SIDE BOILER ROOM � Pass � Kass
t .. ......................................y... .... .. ... F
' MAIN All SPRINKLER LER CONTROL FRONT F
;halve Supervisory Switch BUILDING Pass Pass
:.............
'Tamper Switch SYSTEM SIDE BOILER ROOD � Kass Passon
....
S '
Electric Bell t Kass pass
SPRINKLER Page 3 of 5
Powered ASURiO Inspection Systems,, Copyright 2010. AH Rights Reserved ASURi
J ffi �
� Y �
.. isua
i .. :.". ... .."."... i.. ....
a/Loca :.'.:.. ::" ......
::..::.
.... ......... ... .
aterflow Alarms -- Pressure ENTIRE BUILDING 1301LER ROOM r Pass Pass 31
}
.........
f �
I
i
FI visible and accessible, without damage and signs in place 1 .7.1 PAID
r
% ouplings and swivels free of damage and rotate smoothly 13,7.1 j Pass
;Caps, plugs and gaskets in place and free from damage 1 .7.1 � Pass
;Check valve clapper free from leaks and automatic drain value in place and operating properly 1 .7.1 Pass J
'Interior of the connection free of obstructions. 13.7.1 Pass
;Internal inspection of check valve -components operate properly, cleaned repaired as needed (13.4.2.1) i t
Hydrostatic test results f FD t heck valve acceptable.
... ..:piping f�-erni 4
...........:.:.
............. .
10".`.----At&essme
......... .......... . ...
'Internal pipe condition assessment* 1 : .1 HI
':Date of last 5 year internal inspection. 017
PAR response indicated"Pass After Repair". Technician rotes a deficiency of a device,and repairs the deficiency during inspection.
.... ........... .:..... ....
......::.......:.:.
FDC visible and accessible, without damage and signs in place 1 .7.1
7 c nician response: PAID ADDED SIGN
.
.................
..................:.
,...........
List of sprinklers installed on the property posted on head box* . .1, r
Tchnlciar response: NO LIST
.#
t+
{ ENTIRE BUILDING BOILER ROOM CENTRAL SPRINKLER COMPANY E
Hydraulic nameplate, if applicable,, securely attached and is legible ( . .
:Technician Response: MISSING
:SYSTEM MAY BE SCHEDULED PIPE
:..........v.....::...n...
............:.:......
.::..:.::.... ......�....... ...... ..-
..:...:.:.
ENTIRE BUILDING BOILED ROOM CENTRAL SPRINKLER COMPANY
Information sign securely attached and legible. .1. .
I
3echnician Response:: ISSIN
N.......::.....:.:.:..............N........::........::...........v.........
.......::..:.:........ .........:.....
' '.:....:r...:..:.c::c.':':....:.'..o-.::. ':-:......:.
.r'.':..............:::.:::...
r.
:::.:..:.......::.:...°ry '.: '::
:...
.. :..
:.:...:..:........... .......:........ ::::::...:.....:;................................ ... ..... .
:.....:::::..:...::.:..::::...... :...............:.:.........:....::.:.::...:::.:::::.....::.::..:::::..:::
.......
esti : Internal inspection of check valve - components operate properly, cleaned/repaired as needed (13.4.2.1
Technician Response, NOT DUE FOR TESTING AT THIS TIME, BUT HEEDS TO BE TESTED
Question: Hydrostatic test results of piping from FDC to check valve acceptable. 13. .
Technician Response: HEEDS TO BE SCHEDULED
SPRINKLER
Page 4 of 5
Powered by ASURiO Inspection Systems,Copyright 2010. All Rights Reserved A SURID
.....................
.............:....
Question: Internal pipe condition assessment. 1 . .1
Technician Response: DONE BY OTHERS IN 2017
....:.....
.......::.
.....:....
.............:::.............:.
Question: Internal inspection and test valve for correct operation, valve moves freely and is it in good condition
1 , * *1
Technician Response: DONE BY OTHERS IN 17
...:...:... .........:..:..
...::.:::.:
... ....... ............... .........:...:..................... .....:..
....................................
.... .... . ..........
ENTIRE BUILDING BOILER Roots
Question: Internal inspection -- all components operate properly and move freely, valve cleaned and in good condition
1 . . .1
Technician Response: DONE BY OTHER IN 2017
} Question: Internally inspect valve strainers, filters, and restriction orifices; free ti-om obstructions'operating properly,
and in good condition 1 * .1#
Technician Response:F TESTED BY OTHER IN 2017
Liability tatemen
The owner and/or designated representative acknowledges the responsibility of the operating condition of the component
parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed
herein Is limited to performing a visual inspection and/or routine testing, and any investigation or unscheduled testing,
modification, maintenance, repair, etc., of the component parts is not included as part of the inspection world performed.
It is further understood that all information contained herein is provided to the best of the knowledge of the party
providing such information.
/1 / 0 11 to
.ust .e�';.....BIB.�COVID.................................. Technician:. . .......BILL... R EIR 00E
4068
SPRINKLER Page 5 of