HomeMy WebLinkAboutSprinkler Inspection Report - Inspection - 350 HOLT ROAD 7/15/2019 {
A.S.A.P. Sr t'!{ PI IN LEF INSPECTION REPORT PAGE 1.
6 Progress Ave. Unit 12
Tyng born, Ma. 01879 Phone 9 c R494 fax - 4 � 44
Company Name me � Contact L qfI
Street �� ��_ ��� k -
city � Y - State
.t,
Date of Trip Test Technician . � Date "
Owners Section(To be answered by owner or occupant) . ,
A. Explain any occupancy hazard changes since the previous inspection, i'
B.Describe fire protection rnodif[cations made since the iast inspection. .44(- .. . �.
r
C.Describe any fires since the last inspection_�..� �.,f.,__
D. When was the system piping last checked for stoppage,corrosion or foreign material?
E.When was the dry-piping system last checked for proper pitch?
F.Are dry valves adequately protected from freezing? A�t �
Inspector's Section(All responses reference current inspection)
1. €NERAL YES"IlNO
a. is the building occupied?
11.41
b.Are all systems in service?
c. Is there a minimum of lg in clearance between the top of storage and sprinkler deflector? .
d. In areas protected by wet system,does the building appear to be properly heated In all areas Including blind
attics and perimeter areas,where accesible?Do all exterior openings appear to be protected against freezing
2. CONTROL VALVES(See item 14) XX }LXJ{ XX XXXXXXXXX
a,Are all sprinkler system control valves and all other valves in appropriate position?
b.Are all control valves In the open position and locked,sealed or equipped with tamper?
3.WATER SUPPLIES(see Item 14)
XXXXXWX XXXXXXXXX
a. Was a water flow test of main drain made at the sprinkler riser?
4.TANKS,PUMPS, FIRE DEPARTMENT CONNECTIONS XXXXXXXXX XXXXXXXX
a.Are fire pumps,gravity tanks,reserviors and pressure tanks in good condition and maintained?
b.Are FD connection in satisfactory condition,couplings free,caps in place&check valves tight?
Are they accessible and visible?
5.WET SYSTEMS(See Item 1 ) XXXXXXXXX XXXXXXXXX
a.Are cold weather valves(OS&Y)in the appropriate open or closed position?
b. Have anti-freeze system solutions been tested?
c.Were the antifreeze test results satisfactory,?
6. DRY SYSTEMS(See Items 10-14) XXXXXXXXX XX XXXXX
a. is the dry valve In service?
f
b.Are the air pressure&priming water level-in accordance with the manufacturers instructions?
c.Were the antifreeze test results satisfactory? #.
d.Wire low points drained during the inspection?
e.Did quick-opening devices operate satisfactory? '
f. laid the dry valve trip properly during the trip pressure test? rr''
g. Did the heating equipment in the dry-pipe valve room operate at the time of inspection?
7. SPECIAL SYSTEMS.(See Item 16) XXX}(J{}i}(J{}i< XXXXXXXXX
a. Chid the deluge or:pre action valves operate properly,during testing? i
b. Did the heat-responsive.devices operate properly during testing? -
c. Did the supervisory alarm service test satisfactory? #�
S.ALARMS
XX}XXX X XXXXXXXXX s
a. Did water motor and gong test satisfactory?
b. Did electric alarm test satisfactory?
c. Did supervisory alarm service test satisfactory? �
.SPRINKLERSXXXXXXXXX X.XXXXXVX.
a.Are all sprinklers free from.corrosion, loading or obstruction to spray discharge?
b.Are sprinklers over 50}rears old,thus requiring sample testing?
c, is stock of spare sprinklers available?
d. Does the Interior condition of sprinkler system appear to be satisfactory
e.Temperature.Are sprinklers of proper temperature rating for their location? {" ..
A.S.A.P.Sprinkler LLC INSPECTION REPORT Page
Progress Ave. Unit##
Tyngs oro,Ma,01879
Phone:9 - 4 -4945 Fax 9 - 49-9445
Wet Systems o? Ma and model? A).t r - �' ryV;� '� �. �� �� ��Y�F�F�
l
[dry Systems o Make and model?
Special Systems Flo? Type?
Make and Model Condidon
4111h FIF�1-Iryill�diyi4_
5V4 F i F��II511„tlOtl
10.mate dry-pipe valve trip tested(control valve partially open)
11.Date dry-pipe vaIve trip tested(control valve full+open)
1 .[ante gulch-opening device tested
. .'Date deluge or preaction valve tested
14.See Control Valve Maintenance Table,
Control Valves Number Type Open SecuredZ Closed Signs Abnormalities
. r
City Connection Control - :..;I
Tank Control
Pump Control
Sectional Control J-7
4 f
System Control
Other Control
,
P.
x
Water Pressure Tank PSI Fire Pump
Water flow test? ;w.,.:� (if none made WHY?)
+:.
- x ! .17
16.Heat Responsive Device
Test Method
Type of Equipment
Manufacturer
Test Results:
Valve -»#� F valve F
�.
D E _
Valve I^ Valve_ � J�
Valve
# B C D
Valve A
Valve Va l ire 0
BCD�E �
l�F
Auxiliary Equipment:Igo?, Type? Location? Test Result?
17'.Explain any"No"answers and comments.
i #
18.Adjustments off`corrections ma .�.� inspection.duringthis
19.Although these comments are not tin result of an engineering review,the following desirable improvements are recommended,
c.
i J
. a 5'a 4 i O, s + ++ M1�• vYr~-t T.{ A t • % • .A;'. .r' lrti 'X • t '1
-. -• {LL i t '-
TeOn cian ti ..... �4 Lei f License Cu�st Signature €apt
_N,I IBY ! , ui —