Loading...
HomeMy WebLinkAboutSprinkler Inspection Report - Inspection - 11 BAYFIELD DRIVE 9/10/2019 4 A.S.A.P. Sprinkler LLC SPRINKLER INSPECTION REPORT T PAGE I Progress Ave. Unit #3 - � Tyngsbor # Mai. 01 Pole -649- 9 5 Fax978-649-9445 Company am ._ .��r' rrk nt t •' St reet at Uc. .1.1 &- 'V tat Date of TripTest r 1'e h i ian .TY� Date Owners Section(To be answered by owner or occupant) ' J 7 A. Explain any occupancyr hazard changes since tyre previous inspection. B. Describe fire protection modifications made since the last inspection. � ' 1- f _. .. } C. Describe any fires since the last inspection '`* D. When was the system piping last checked for stoppage,corrosion or foreign material? "/,%0 E. When was the dry-piping system last checked for proper pitch? F.Are dry valves adequately � .q yr protected from freezing? Inspector's Section(All responses reference current inspection) 1. ENERAL NO a.Is the building occupied? b.Are all systems in service? c. Is there a minimum of iB in clearance between the top of starage and sprinkler deflector? d. In areas protected by vet system,does the building appear to be properly heated in all areas including blind attics and perimeter areas,where accesible?Do all exterior openings appear to be protected against freezing . CONTROL VALVES(See I#ern 14) XXXXXX XX XXXXXXXXX a.Are all sprinkler system control valves and all other valves in appropriate position? b.Are all control valves in the open position and locked,sealed or equipped with tamper? . WATER SUPPLIES(see Item 1 ) XXXXXXXV XXXXXXXXX a.Was a.water flow test of main drain made at the sprinkler risen 4.TANKS,pI1f11fO ,FIRE DEPARTMENT CONNECTIONS XXXXXXXXX XXXXXXXXX a.Are fire pumps,gravity tanks, reserviors and pressure tanks in good condition and maintained? b.Are FD connection in satisfactory condition,couplings free,caps in place&check valves tight? ,,�e' Are they accessible and risible? S,WET SYSTEMS (See item 1 ) XXXXXXXXX XXXXXXXXX a.Are cold weather valves {S&Y)in the appropriate open or closed position? b. Have anti-freeze system solutions been tested? Zee.,- c.Were the antifreeze test results satisfactory? 6. DRY SYSTEMS(See items 10-14) XXXXXXXXX XXXXXXXXX a. Is the dry valve in service? .Are the air pressure&pruning water level in accordance with the manufacturers instructions? c.Were the antifreeze test results satisfactory? d.Wire low points drained during the Inspection? e. Did quick-opening devices operate satisfactory? Irz f. Did the dry valve trip properly during the trip pressure test? g. Did the heating equipment in the dry-pipe valve room operate at the time of inspection? 7. SPECIAL SYSTEMS{See Item 16) XXXXXXXXX XXXXXXXXX a. Did the deluge or pre-action valves operate propedyr during testing? b. Did the heat-responsive devices operate properly during testing? ` c. Did the supervisory alarm service test satisfactory? 8.ALARMS XXXXXXXXX XXkXXXXXX a. lid water motor and gang test satisfactory? .- b. Did electric alarm test satisfactory? c. Did supervisory alarm service test satisfactory? .SPRINKLERS XXXXXXXXX XXXXXXXXX a.Are all sprinklers free-from corrosion,loading or obstruction to spray discharge? b.Are sprinklers over 50 years old,thus,requiring sampfe testing? , c.Is stock of,spare sprinklers avallable? d, [does the Interlor condition of sprinkler system appear to be satisfactory e.Temperature.Are sprinklers of proper temperature rating for their location? A. .A. . prin ler L.LC INSPECTION DEPORT Page 6 Progress Ave. Unit T n sbvr , Ma.01879 Phone.978-649-4945 Fax 978-649-944 Wet Systems NoMake and model? Dry Systems o? Make and model? Special Systems o? Type? Make and Model Condition 10.pate dry-pipe valve trip tested(control valve partially open) 11,gate dry-pipe valve trip tested(control valve fully open) 12.Date quick-opening device tested 13.Date deluge or preaction valve tested 14.See Control halve Maintenance Table. Control Valves Number Type. Open Secured Closed Signs Abnormalities City Connection Control Tank Control Pump Control Sectional Control System Control Other Control Water Pressure? Tank PSI Fire Pump Water flow test (If none made WHY?) f 16.Heat Responsive Device Test Method 5 -41IIi14INiYii Niii YXYw_ Type of Equipment 14 III I i it it■4i Xiii4illltlYi5111NIN i1415444441i51rtii -■�1�111114itli0iiiitltllY I�FIwY� Manufacturer Test Results: Valve tt AB D F Valve# E — Valve B F a l e B E F •MXIhIY11�wYMw iwlf� ... �1 �- _ llll� Valve�#�� E _F Valve k--B C D�E — Valve A B E —F Valve A B C D F F Auxiliary Equipment:No?, Type? ocaon Test Result r 17.Explain any"No"answers and comments: ;� � � #r� �� f � � .-� 18.Adjustm n or corrections made during this inspection: ._ I ■iiillR iiii• yyyyyyy4 i4IWXl 19,Although these comments are not the result of an engineering review,the following desirable improvements are recommended. 1-j foe if e-.-,f,0 1 L-4 Ili r.. ,t/ e C V L k Yo. �}+ �y Lice (-[y +y++�[� }ry+� J TchlFlcl!{k -- , - i LI!SrC nr1Gr k�`� %r kl rltIIOea �4 r..• 4..+ , I I I I i