Loading...
HomeMy WebLinkAboutDWC - Full Repair - Permits #55212 vp - 218 LACY STREET 10/13/2020 Date:August 17,2020 Septic Disposal System Construction Permit #55212 This is an e-permit.To learn more,scan this barcode or visit northandoverma.viewpointcloud.com/#1/records/64839 COMMONWEALTH OF MASSACHUSETTS 0 0 TOWN OF NORTH ANDOVER X BOARD OF HEALTH40 I �- Todd Bateson Bateson Enterprises, Inc. is hereby granted a Septic Disposal System Construction Permit Repair or replace an existing on-site sewage disposal system at this location 218 LACY STREET 105.C-0029 This permit is granted in conformity with the statutes and ordinances relating thereto, and expires one year from date of issuance, unless sooner suspended or revoked. BUSINESS PHONE#<:9788152703 CONDITIONS: Expiration:August 17,2021 FRANCIS P.MACMILLAN,JR.,M.D. BOARD OF HEALTH CHAIRMAN Septic Disposal System Construction Applicant Location Permit 218 LACY STREET Todd Bateson NORTH ANDOVER, MA 01845 55212 9788152703 Status:Complete @ bei111@comcast.net Submitted:Aug 13,2020 General Information Application is hereby made for a permit to: Type of building: Repair or replace an existing on-site sewage disposal system Residential Dwelling Type of Septic System: Conventional System?(pipe and stone system) Gravity Yes Infiltrator or Biodiffuser(Gravel-less)?*Must attach copy of Pressure Distribution S.A.S.(No D-Box)? certification to install this type of system Pressure Dosed(D-Box Present)S.A.S.? Does the system require an effluent filter? Owner Information: Name: Email: Troy Moran NA Is owner's address different from work site address?: No Installer Information Name: Company: Todd Bateson Bateson Enterprises, Inc. Street address: City/Town: 111 Argilla Road Andover State: Zip Code: MA 01810 Contact number: 9788152703 Electronic Signature The applicant agrees to ensure the construction and maintenance of the afore-described on-site sewage disposal system in accordance with the provisions of Title 5 of the Environmental Code,as well as the Local Subsurface Disposal Regulations for the Town of North Andover. I understand that until a final Certificate of Compliance has been issued by this Board of Health,the installed system is not approved. true Septic System Installer Project Management Obligations 1.As the installer, I am obliged to obtain all permits and Board I understand of Health approved plans prior to performing any work on a site. true I must have the approved plans and the permit on site when any work is being done. 2.As the installer, I must call for any and all inspections. If homeowner,contractor, project manager,or any other person not associated with my company schedules an inspection and the system is not ready,then item three shall be applied. I understand 3.As the installer, I am required to have the necessary work true completed prior to the applicable inspections as indicated below.I understand that requesting an inspection,without completion of the items in accordance with Title 5 and the Board of Health Regulations may result in a$50.00 fine being levied against me and/or my company, a. Bottom of Bed-Generally,this is the first(1st)inspection unless there is a retaining wall,which should be done first.The installer must request the inspection but does not have to be present. b. Final Construction Inspection -Engineer must first do their inspection for elevations,ties,etc.As-built of verbal OK(or e- mail to: healthdept@northandoverma.gov)from the engineer must be submitted to the Board of Health,after which installer calls for an inspection time.Installer must be present for this inspection.With a pump system,all electrical work must be ready and able to cause pump to work and alarm to function. c.Final Grade-Installer must request inspection when all grading is complete.Installer does not have to be on-site. I understand 4.As the installer, I understand that only I may perform the work true (other than simple excavation)and I am required to complete the installation of the system identified in the application for installation. I further understand that work done by others unlicensed to install septic systems in North Andover can constitute reasons for denial of the system and/or revocation or suspension of my license to operate in the Town of North Andover,significant fines to all persons involved are also possible. I understand true 5.As the installer, I understand that I must be on-site during the I understand performance of the following construction steps: true a. Determination that the proper elevation of the excavation has been reached. 6.As the installer, I understand that I am solely responsible for b.Inspection of the sand and stone to be used. the installation of the system as per the approved plans.No instructions by the homeowner,_general contractor,or any other c.Final inspection by Board of Health staff or consultant. persons shall absolve me of this obligation. d.Installation of tank,D-Box,pipes,stone, vent,pump chamber, retaining wall and other components. I understand true Staff nnly Conditions/Restrictions/Comments(if applicable) Attachments (1). pdf 218 Lacy Installation Cert signed.pdf Sep 24,2020 Timeline ❑ Health Department Review Status:Completed August 14th 2020,8:41 am Assignee:Toni Wolfenden El Permit Fee Status:Paid August 14th 2020, 11:15 am Health Department Approval Status:Completed August 17th 2020,3:21 pm Assignee:Stephen Casey Septic Disposal System Construction Permit Status:Issued August 17th 2020,3:21 pm Todd Bateson September 10th 2020, 1:22:03 pm HI Toni!Is there a way to delete all these files off my account once I have printed them?Also, can the date be moved up a line on these permits, It comes as a print 2 pages just for the date on the second page!! Thanks, Laurie Bottom of Bed Inspection Status:Completed September 9th 2020,2:00 pm Assignee:Stephen Casey Stephen Casey September 9th 2020, 2:00:07 pm 22x60'excavated. Down to c-layer across pit. Installer noted a boulder deposit removed from far side of bed. ❑ Title 5 Sand Inspection-Prior to use Status:Completed September 9th 2020,2:00 pm Assignee:Stephen Casey Stephen Casey September 9th 2020, 2:00:35 pm Sand good, checked 919 @ 12pm ❑ Tank Hole Inspection with Stone Installed Status:Completed September 9th 2020, 2:00 pm Assignee:Stephen Casey ❑ Title 5 Stone Inspection Status:Completed September 9th 2020, 2:00 pm Assignee:Stephen Casey ❑ Final Construction Inspection Status:Completed September 16th 2020, 10:21 am Assignee:Stephen Casey Stephen Casey September 16th 2020, 10:21:45 am Final Construction inspection completed. Awaiting as-builts from engineer. ❑ Final Grade Inspection Status:Completed September 24th 2020, 6:38 pm Assignee:Stephen Casey Certificate of Compliance Status:Issued September 24th 2020, 6:39 pm Town of North Andover, MA $361 .46 Paid via Credit Card ending in 2007 Thanks for using the Online Service Center Todd Bateson Septic Disposal System Construction Permit #55212 August 14, 2020 Full Repair or New Construction Fee $350.00 Processing Fee $11.46 Total Paid $361.46 Powered by the ViewPoint Cloud platform Receipt number#21688