Septic Disposal System Construction Permit
#56158
This is an e-permit.To learn more,scan this barcode or visit northandoverma.viewpointcloud.com/#/records/66598
� yt1il F"Ili
COMMONWEALTH OF MASSACHUSETTS !j!1
TOWN OF NORTH ANDOVER
BOARD OF HEALTH _
Melissa Donnelly
Wind River Environmental
is hereby granted a
Septic Disposal System Construction Permit
Repair or replace an existing system component
DBox,Outlet Tee
at this location
235 RALEIGH TAVERN LANE
106.C-00"
This permit is granted in conformity with the statutes and ordinances relating thereto,
and expires one year from date of issuance, unless sooner suspended or revoked.
BUSINESS PHONE#:800-499-1682 ` *// �C
CONDITIONS: nr
EXPIRATION:October 5,2021
JOSEPH W.McCARTHY
BOARD OF HEALTH CHAIRMAN
Septic Disposal System Construction Applicant Location
Permit
235 RALEIGH TAVERN LANE
Melissa Donnelly NORTH ANDOVER, MA 01845
56158 800-499-1682 ex 5871
Status:Complete @ mdonnelly@wrenvironmental.com
Submitted:Oct 05,2020
General Information
Application is hereby made for a permit to: What component?
Repair or replace an existing system component DBox, Outlet Tee
Type of building: Type of Septic System:
Residential Dwelling Gravity
Conventional System?(pipe and stone system) Infiltrator or Biodiffuser(Gravel-less)?*Must attach copy of
certification to install this type of system
Pressure Distribution S.A.S. (No D-Box)? Pressure Dosed(D-Box Present)S.A.S.?
Does the system require an effluent filter?
Owner Information:
Name: Email:
David Starrett daves@axiomtek.com
Is owner's address different from work site address?:
No
Installer Information
Name: Company:
Robert Herrick Wind River Environmental
Street address: City/Town:
46 Lizotte Drive Marlboro
State: Zip Code:
MA 01752
Contact number:
800-499-1682
Electronic Signature
The applicant agrees to ensure the construction and
maintenance of the afore-described on-site sewage disposal
system in accordance with the provisions of Title 5 of the
Environmental Code, as well as the Local Subsurface Disposal
Regulations for the Town of North Andover.I understand that
until a final Certificate of Compliance has been issued by this
Board of Health,the installed system is not approved.
true
Septic System Installer Project Management Obligations
1.As the installer, I am obliged to obtain all permits and Board I understand
of Health approved plans prior to performing any work on a site. true
I must have the approved plans and the permit on site when any
work is being done. 2.As the installer, I must call for any and all inspections. If
homeowner,contractor, project manager,or any other person
not associated with my company schedules an inspection and
the system is not ready,then item three shall be applied.
I understand 3.As the installer, I am required to have the necessary work
true completed prior to the applicable inspections as indicated
below. I understand that requesting an inspection,without
completion of the items in accordance with Title 5 and the
Board of Health Regulations may result in a$50.00 fine being
levied against me and/or my company_
a. Bottom of Bed-Generally,this is the first(1st)inspection
unless there is a retaining wall,which should be done first.The
installer must request the inspection but does not have to be
present.
b. Final Construction Inspection -Engineer must first do their
inspection for elevations,ties,etc.As-built of verbal OK(or e-
mail to: healthdept@northandoverma.gov)from the engineer
must be submitted to the Board of Health,after which installer
calls for an inspection time. Installer must be present for this
inspection.With a pump system,all electrical work must be
ready and able to cause pump to work and alarm to function.
c. Final Grade-Installer must request inspection when all
grading is complete. Installer does not have to be on-site.
I understand 4.As the installer, I understand that only I may perform the work
true (other than simple excavation)and I am required to complete
the installation of the system identified in the application for
installation. I further understand that work done by others
unlicensed to install septic systems in North Andover can
constitute reasons for denial of the system and/or revocation or
suspension of my license to operate in the Town of North
Andover,significant fines to all persons involved are also
possible.
I understand
true
5.As the installer, I understand that I must be on-site during the I understand
performance of the following construction steps: true
a. Determination that the proper elevation of the excavation has
been reached. 6.As the installer, I understand that I am solely responsible for
b.Inspection of the sand and stone to be used. the installation of the system as per the approved plans. No
instructions by the homeowner,_general contractor,or any other
c. Final inspection by Board of Health staff or consultant. persons shall absolve me of this obligation.
d.Installation of tank,D-Box,pipes,stone, vent,pump chamber,
retaining wall and other components.
I understand
true
Staff Only_
Conditions/Restrictions/Comments(if applicable)
Attachments (2).
---- - -
; . A
Gas baffle image 1 Gas baffle image 2
Oct 14,2020 Oct 14,2020
Timeline
❑ Health Department Review
Status:Completed October 5th 2020, 1:46 pm
Assignee: Toni Wolfenden
Permit Fee
Status:Paid October 5th 2020, 1:51 pm
Toni Wolfenden October 5th 2020, 1:47:36 pm
Payment is now due. Please pay by credit card or mail a check for$175 to: Town of North Andover,Attention Health
Department, 120 Main Street North Andover, MA 01845
Health Department Approval
Status:Completed October 5th 2020,2:02 pm
Assignee:Stephen Casey
Septic Disposal System Construction Permit
Status:Issued October 5th 2020, 2:02 pm
Toni Wolfenden October 5th 2020, 2:31:12 pm
Permit has been issued. Please print and post. Thank you.
Component Inspection
Status:Completed October 14th 2020,3:31 pm
Assignee:Stephen Casey
Stephen Casey October 13th 2020, 10:11:57 am
Was the gas baffle ever attached?Ryan said he would attach it after the inspection last week noted it was missing one.
Stephen Casey October 14th 2020, 3:31:12 pm
Images received.
Certificate of Compliance
Status:Issued October 14th 2020,3:31 pm
. I �q,.: ) ♦`fix ( _
i J
saa.
r
lei
R 'o,r'r
14
S
�.+i►�Su+,y, mac" ; � w. - ,'1
t. a
Town of North Andover, MA
$ 181 .22 Paid
via Credit Card ending in 1005
Thanks for using the Online Service Center
Melissa Donnelly
Septic Disposal System Construction Permit
#56158
October 5, 2020
Component Repair Fee $175.00
Processing Fee $6.22
Total Paid $181.22
L:J
Powered by the ViewPoint Cloud platform
Receipt number#23648