Loading...
HomeMy WebLinkAboutConstruction Notes - Dbox - Consultant Review - 155 CHRISTIAN WAY 11/18/2020 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 155 Christian Way MAP: 104.D LOT: 0187 INSTALLER: Todd Bateson – 978-815-2703 INSPECTIONS D-Box Permit # 56271 10am-11.18.2020 S. Casey DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) – n/a Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: