HomeMy WebLinkAboutQuarterly Fire Sprinkler System Inspection - Inspection - 10/30/2020 Quarterly
Fire Sprinkler Systems Inspection
CINTAS RE PROTECTION
10 NAR A A lSETT PARK D
PA11 TU KET, RI 02861
USA
081
READY FOR THE WORKDAY Thl
Inspection date: 10 3 0 .0 Inspector: LEWIS SUGGS 0OF4062
................
..........
..:... .........:.....
NAF99 SUTTON HXLL 27796 0OF4041779
5
1801 TURNPIKE ST
NORTH A DOVE , MA 018456322
Phone: F :
._ .... a .. .... ...� .. .. .:>.
' �:?k.:�'.�.:�:��'"��::.<:i�..:;:�:�'.;+>:`.�.":..ry'�.:'.:�'��x�r:'::`•'?:.:..':.:�::.:.ti::.-.:.ti"::.:.�.�':..?.':.�.'.�'::+.�.:�:.�.:'.�?:.�_�':M1':���.:�..:'..::�::.,�'.'.�"�'+::+'`..Y+'::kM1.:...':......'::;{::::�.':.?.�`:::'�''+�'�+:�:Y'h;ti?..�`+.::+'..�.:n'::j'.+'.:::.+::.::?:��;�:.:�'::' +.:..
NAF99 BUTTON HILL 27796 0OF4041779
5
1801 TURNPIKE ST
x NORTH A# DOVE MA 018456322
k
Phone: 7814397809 Fax:
Inspection performed in accordance with
NFPA 25standard for the Inspection, Tes in , and Maintenance
of Water-Based Fire Protection h em edition.
SPRINKLER 'age I of 6
Powered by ASURIO Inspection Systems, Copyright 2010. All Rights Reserved A URIO
:..:....r v:.........., ....
................
•................ .k'.....:':...:..:: .::..
''Fire P....ump System
......... ... .... .... ..
.....:........�.....:.......: ......................:..................... ...:.:... .. .. .. ... ....
Carr. t ....'.. :.....►...:..........t..
x.: :.....:.:.:.:.....::.: :.'.:.......:...' :..'..:. :.:':'.: ;'.:¢:... . " :. o : rat on: .c,::-:.,
....:.
�'.:..:::..'::'.t.. .......... of deg resent
:......
r.�. ............ .. ...... ...............................
::.::.:::.. :.......:.::.'...'.'........:.::.....:......:.....: ra ve., r e:. ro m:16tt ka g r
.Locator ..... :.:....:..:......:..:... ::.:.: :.'. :::...... ... ........
.. .................... .
...........:...:
rye:: r rx :d t r rar iar . Tab.
..............
... .. ......................:.....:...:......�.:......... .... ��Pass Pass.......
stairwell one2
Pass
stairwell one ground � '
stairwell one . . Pass Piss
Stairwell through
Pass Pass
E Pass Pass
tirroll g through _... ... ... . .
I 4
Stairwell g through Pass �........ ass..
Pass
Stairwell g through Pass r_................ ................v. .... ... ...n...-...n
......_.-.....n..............::..................-v........................ ..........
...... -..... .... ....... ........._....
Stairwell one ...v .r. .......
:.......:..........,..r.................... .............................................._...-........... .........v...
Pass Pass
a
:.......,...........:.:............ -
... ......:...
.............
f....:.:.:: :...:.::::.:.:...:.::........:......::....:.:':. :...............::. reaLoa :......... .':.: pras.prr. :..':
stairwell one 1st fl
Pass
.........:.. x N..................:..1.......-.............-...................:..:..,....... ... ....... . ........... .....I.-.. . .................. .n. .. .... .......... ....n . .... ... _..... .............. .. ..... ............. . ........_....,-...
Sprinkler room ceiling � Pass
...................:.........._-.w...:.:.......:..-.:.v....:....:....:-..........,._:.........:.....:........... . ... ... _......... ... ... .....
Stairwell one nd fir` Pass
....-..._:.................................................::-v...........................:........ .n. .. ..... _.. ...
.. .... .. ......
Stairwell one fir
Pass
Ex,
............
..........
:::..:.....:.:...:::.k.:..:..:':'..'.:.:.: or ditrot :::F.oierdA :::::::
...... ... . ............... .
'Control Valve - 11 ass Pass Pass NA
Butterfly � Fail Pops � P
{locked/tamper Sprinkler r ............
.......-.-.
;control Valve x and` �r Fail Pass Pass Pass Pass Na
locked/tamper Sprinkler�
k
,'Control Valve - � t �, k � E a
Iock d/tam or [sprinkler r
Butterfly 1 Fail Pass Pass Pass t Piss
Control Valve- �� �
locked tam rSprinkler rrn
Butterfly Fall € Vass Pass Pass PassNa
........... __.
....... -
'Control 1lalro-- and` Fall Pass Pass Pass Pass Na
locked/tamper I Sprinkler r ...
5
;
Control Valve 1 ..
'locked/tamper Sprinkler r �
Butterfly 'i Fall Pass Pass Pass Pass
:;ControlJ.
Valve Butterfly f " Fall � Pass � Pass Pass � Pass � NA
f locked/tamper Sprinkler r ... . .. ....
l Control Valve-
Pass Pass Pass NA
to l l tarn or rin Sprinkler r [Butterfly fail Pass
p ..... v...... .. .
:................:k-.v......................................:..........,. ...r.:.....__...._......................................_..... ..... and ..
....-....r.. -.. .........r.
control Valve �t Fail Pass Pass s Pass Pass N
locked/tamperISprinkler rm t 4
Control aIve ! �� .....
Lttrfly i Fail Pass Pass Pass PassNa
€locked/tamper Stairwell one F .. ..
..........
v................v........ r.............._...
i E
. k
k �
f Control Valve �� � � � �
f Butterfly Pass Pass Pass Pass PassNa
IIStairwell ono............................ -... ...i T'Control Valero-. j �� t � Pais f
locked/tamper 'Stairwell one
Butt rfl fail Pass Pass Pass
SPRINKLER
Page of 5
Powered by URi Inspection Systems, Copyright , All Rights Reserver!ASU
4
J
.............._.........._......................-.........-. .- ..... ...... ...... ..-... .. ..-_ ..-._.- ,_
.......-
'...'.:.: �**■■ dryans
W tch""""'
k
Sprinkler room }
!Does switch transfer power to alternate power source when power failure is simulated at peak load Pass
, ,3. {
',.Does oes pump continue to perform at peals load during simulation . . .4 Pass
After simulation removed, does switch transfer back to normal power source (8.3.3.4) Pass
:: � :: r► :
reu :.
Sprinkler room 5
;Pressure downstream of the relief valve fittings does not exceed pressure system rating. 13. .7t .1) Pass
:Valve in good condition, not leaking, and in open position (13.5.1.1) Pass
Nalve, under test conditions, relieves at correct pressure and closes below that pressure (13.5.7.2.2) Pass
..............:......:..:..............................
..............
..:....:....:...:.:.
.............:
:. �
.. .......:.
Outside sprinkler rooter "
AFDC risible and accessible, without damage and signs in place 13.7.1 Fail
:Couplings and swivels free of damage and rotate smoothly 1 .7.1 t Pass
,.Caps,, plugs and gaskets in place and free from damage 13.7.1 Pass
;Check valve clapper free from leaks and automatic drain valve in place and operating properly 13.7.1 Pass
'Interior of the connection free of obstructions. .3,7.1 Pass
Internal inspection of check valve-components operate properly, cleaned/repaired as needed 13i . ;1 ... Pass
Hydrostatic test results of piping from FDC to check valve acceptable. 13.7.4 � Pass
. ... ..... . ..... .......:..
ee n
t*O
........ ..
e1
fc ►: rr :: I . .:...:....... .. .... .
Sprinkler room riser f"
'Are isolation valves in open position (13.6.1.1) Pass
Differential-sensing valve relief port not continuously discharging water (13.6.1.2) Pass
{Forward flow test at minimum flog rate of system demand 1 .6. .1) Pass
Backflow performance test conducted satisfactorFly at completion of forward flow test Pass
lInternally inspection verifies all components operate correctly, move freely and are in good condition `
Pass
3(13.6.1.4)...
i
IL iY it
AG4
*PAR response indicated"Pass After Repair". Technician notes a deficiency of a device,and repairs the deficiency during Inspection.
Nam
:............ :;............... ...., ....v.::..
D6"d e h..' :ik
...Now
............
. ..........:
....:.....
...............
..................
..........:....:.
:..
......:...::::..
{
Outside sprinkler room 419
FDC visible and accessible, without damage and signs in place 1 .7.1
Technician Response: no fde sign
..................................... ......:........... . .
..:.............:........ .. ........ :.......
......... � fro �:�:�l.. � �.::.:..:':::� I'r.� :�'.:�.: �� ... .. .
r� .�
Sprinkler rm
Valve has proper signs, and is accessible.. (13.3.2.2
7echnician Response.
.;,..:,.::...v....:.:......... :y
:'..t......:.:.:..
....�.. .,.....,,....,...vim::....... ............... ..... .... ..... .. .... ... .... ... ...... ... ... .. ...... ... ..,...... ,....... .... ........ ... .... ....,..... ....... .. ... .... ........ ..
r Sprinkler rm
Valve has proper signs, and is accessible. 13.3. .
I'Tniia response:
.. .......:......:.................:...:..
.......:....:...:
#,.n...,
..............:.:.::
. .......... ..... . . .. .......In- ""'"
.. . .
.... .....:.......
.......:.:
. ... .................
Sprinkler rm
'. halve has proper signs, and is accessible. 1 . . .
}
i7 chni lan Response:
SPRINKLER Page 4 of
Powered by ASUM Inspection Systems, Copyright 2010. All Rights Reserved A URiO
x
i
" After Repair". Technician notes a deficiency of a device, and repairs the deficiency during inspection.
� bass .. ..... . ....:.......:..:..:.;.::'.y...;:...:._:...:.....
16C
response it
....:......
..:.........
;....:.:.:.v:.::..::
............:..
. .;::.:.. .... n ...
... .... .. .......�.. {.. ...,.:......: ...
.m:..... .:. ...:.\. ..}.. .... ...:.... ......:::: ..
.....:.:....
::...........
t
Sprinkler rm
�7
Valve has proper signs, and is accessible, 13.3. .
!Technician
. ..... ........:...................
r.. .... ...... '...
.....:..:::...
..............
ran ... .. . ..:....:�.....;:':::v::'.:.,:r...:.:.:::':...
Sprinkler rm
Valve has proper signs, and is accessible. (13.3.2..2)
tResponse: . ...... ....... .. ....n......... .. .....n... . .... ..
d/t
'"I
;..
...... ..:.
...........
..... .........:....
r.
..;............. . .........::... ...... .. ..
..........
k.. . Sprinkler r
t Valve has proper signs, and is accessible. (13.3.2.2
'Technician
OEM.
.. ro
..........v \:... .. ...:.... ...
.-t
Sprinkler rm
z Valve has proper signs, and is accessible. (13.3.2.2
'Technician
..........
... .......
...............
. .............:......::
Sprinkler rm
F Valve has proper signs, and is accessible. (13.3.2.2)
iTechnician Response:
...... .. . . . ... .......... ............. ........... ..... .
:.....v..:,.:.;...
.:.::.::..
::...:.....
#... ..Sprinkler
rm
} Valve has proper signs, and is accessible. (13.3.2.2.)
tTechnidan Response:
.........:...
..........
.......x....,.,,.:..:..::. ..... ;:...:nr.
............. ..
......... ..
........................ .............
..... . .............. .
:...:...:.
Stairwell one
t:
Valor has proper signs, and Is a s�b�e� 13.3. r _
.. .. .. ..
i
? �* �J #
•7
r�lla S.i
n RCS ................
..:......... .
......... ........
............
v............:........:..................v.....................:..........,...............,.....
:..:::.'.':.:::':n: '.:..:...'.....::.::'............:'.:'::
ye
,......,...
Stairwell one
Valve has proper signs, and is accessible. (13.3.2.
}Technician Response:
a
�.
C.
n
Sprinkler room
r d aCalibrat d gauge, error i less than % or gauge has been r calibrated
ue tion: Gauges on Valor , �nrl� n compared
1 or replaced (Table .1.
Technician Response:
Page 5 of
SPRINKLER
wered f A #J i Inspection n Systems, copyright 10. All Rights Reserved A URi
Y
* f
f
Liabfty Releo§c Sta men '
The owner and/or designated representative acknowledges the responsibility of the operating condition of the component
parts at the time of this inspection. It is agreed that the inspection service provided by the contractor as prescribed
herein is limited to performing a visual inspection and/or routine testing,, and any investigation or unscheduled testing,,
modification, maintenance, repair,, etc., of the component parts is net included as part of the inspection work rf rm .
It is further understood that all Information contained herein is provided to the hest of the knowledge dge f the party
providing such information.
10/30/ 0 10130/20
u tar`n �r: Jiro Technician:. ... ..LEWIS J F4 . ..
A-SJ-140852
i 1-FP
i
is
SPRINKLER Page 6 of
Powered by ASURiO Znsp ction Systems,. Copyright 2010. All Rights Reserved ASURi