HomeMy WebLinkAboutACFrOgBXUEP4JBUuBvvkTHG_w_DmmlO3Y8WSNZh...InND66KUHIGs51TCLE9W3o4ZjS0mcvReaX2l0= r 5 Year Fire Department Connection Piping Hydrostatic Test Report CINTAS FIRE PROTECTION 710 NARRAGANSETT PARK DR PAWTUCKET, RI 02861 USA 42861 READY TM FOR THE WORKDAY Inspection date: Inspector: �nspec�ion Location Facility / Customer Name. �;�C:}-SJ(,��l/ �(����,�� 5 - �rGSUoI �Z���S�� �?�-j r1C� Street Address: /40 � �p 4 Cit, State, Zip Code: Ivp�.�h (A_vj�OVyMG` � 'e.C— CustamerPhone:�'(Z�•��� y�� E-Mail: 25�D Inspection performed in accordance with NFPA 25 Standard for the inspection, Testing, and Maintenance of Wader-Based Fire Protection Systems, 2014 edition. Page ],of 3 Powered by ASURiO Inspection Systems, Copyright 2010. All Rights Reserved ASURiO j i ............ ............ : .....::::: FDC ConnectionType (Staff Siamese) s !Location of i Connection Tested 1a a stern control valve Iosed riot to� �[� ? des.. n._ .'. f hich Valve Was Closed _ " F ....... .. .... ... } FDC vis1ble and accessible, without damage and signs in place 13,7.1 Pas Fail a Co �ling and wiveIs Free o damage and rotate smoothly (13.7.1 Pass Fail - ..... .. ._... _.. . . ..;Caps, plugs and gaskets in place and free from damage 1 •7.1 Pass Fail ::Check valve clapper free from leaks and automatic drain valve in place and operating properly 1 . .1 Pass Fail Interlor of the con n t[en free of ob tructions, 13 7.1 9 Pass Fail Internal inspection of check valve-components operate properly, cleaned/repaired as needed 1 . . .1 Pass Fair 'Hydrostatic test results of piping from FD to check valve acceptable. 1 .7. P F��l 'Tirne Began Hydrostatic Test a Time Ended Hydrostatic Test r i shown on gauge during testing. If a control valve was closed during testing, record rain drain test results to verify water supply Location of Drain Test Connection: 2 k f connection in good condition and gauge operable(13.4.1.1) bass fal l Exterior � ... . . # l draulic name late if a licable,, securely attached...and is legible . . „ bass Falb f Prrssur (psi) shown on the pressure gauge. 5 Pressure (psi)shown on Supply later pressure gauge. 1 . , 2 :Residual Pressure with valve open 1 . . r 'Static Pressure after valve closed 1 . . E [plain Drain Test Pressure less than 10% reduction in flog from original acceptance test or previous test # Pass Fail l -.results _ .. _ _ Pass El Fail >: Adequate drainage available 1 . .4) is . . .. lyres open when returned to service. 1 . .1.2.1 Pass �Fall ,:. Naive[ire status - a p - -' Page 2 of owered by ASURi Zn pectiorr Systems, opyright 01 . ll Rl~ hts Resented ASURIO tiabillitY,E'sel W-C-Statemgat; The owner and/or designated representative acknowledges the responsibility of the operating condition of the component parts at the time of this inspection. It is agreed that the inspection service provided by the Contractor as prescribed herein is limited to performing a visual inspection anidlor routine testing, and any investigation or unscheduled testing, modification, maintenance, repair, etc.., of the component parts is, not included as part of the inspection work performed. It is further understood that all information contained herein is provided to the best of the knowledge of the party providing such information. 107 Date: Diatel- Sir g U (Customer signature) (Technician;Signa ure) USN, a Tech *an Name Page 3 of 3 Powered by ASURiO Znspection S'ystems, Copyright 2010. AffRights Reserved ASURICO,