Loading...
HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 597 FOSTER STREET 1/13/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 597 Foster Street MAP: 104.B LOT: 50 INSTALLER: Daniel Fonzi 978-375-5663, bfconstructioninc@gmail.com DESIGNER: Thad Berry – 978-500-8419, thadberry2@verizon.net PLAN DATE: 08.10.2020 BOH APPROVAL DATE ON PLAN: 11.16.2020 INSPECTIONS TANK INSPECTION: 11.20.2020 10am S. Casey DATE OF BED BOTTOM INSPECTION: 11/24/2020 9:30am S.Casey DATE OF FINAL CONSTRUCTION INSPECTION: 12/2/2020 &12/3/2020 D.Ottenheimer DATE OF FINAL GRADE INSPECTION: 1/4/2021 – S. Casey SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: 12/2/20 – Existing septic tank not yet abandoned. Internal plumbing changes not yet completed. Grading between septic tank and street modified to be a retaining wall instead of fill material shown on plan SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-10 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (effluent filter) 20 inch cover to within 6” of finish grade installed over one access port Rubber boots around inlet & outlet Comments: Inspection 11.20.2020 @9:30pm for tank hole. Tank coming @ 1pm – will send pictures of tank in hole. DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 12/2/20 – Hydraulic cement needed around pipe penetrations SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 22 x 51’, sand good, C-layer visible 12/2/20 – 38’ x 12’ measured, pipes 4’ o.c. Leach stone not clean, to be removed FINAL GRADE Loamed Seeded Cover per plan Comments: S. Casey – 1/4/2021 DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan BM = 100.00 HR = 5.50 HI = 105.50 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT Septic Tank IN 3.01 102.16 102.07 Septic Tank OUT 3.21 101.96 101.82 Distribution Box IN 3.52 101.65 101.62 Distribution Box OUT 3.68 101.49 101.45 Lateral 1 BEG 3.72 101.45 101.44 Lateral 1 END 3.89 101.28 101.25 Lateral 2 BEG 3.70 101.47 101.45 Lateral 2 END 3.89 101.28 101.26 Lateral 3 BEG 3.72 101.45 101.44 Lateral 3 END 3.89 101.28 101.25 12/2/20 – Could not measure pipe out of house due to location of survey equipment setup, visually apparent pitch exists however.