Loading...
HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 500 BOXFORD STREET 1/20/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 500 Boxford Street MAP: 105.C LOT: 0042 INSTALLER: James Heider – 978-606-1435 DESIGNER:Andover Consultants Inc. – James S. Fairweather PLAN DATE: September 26, 2018 BOH APPROVAL DATE ON PLAN: October 10, 2018 INSPECTIONS TANK INSPECTION: 11/23/2020 S. Casey DATE OF BED BOTTOM INSPECTION: 11/24/2020 7:45 am S. Casey DATE OF FINAL CONSTRUCTION INSPECTION: 12/4/20 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 12.16.2021 S.Casey – Images of grass see provided on 12.18.2021 see viewpoint permit # 56774 SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base N/A - Cleanouts per plan Bottom of tank hole has 6” stone base Weep hole plugged 1500 gallon tank has been installed H-20 loading Monolithic tank construction Water tightness of tank has been achieved by visual testing Inlet tee installed, centered under access port Outlet tee installed, centered under access port (gas baffle) 24 inch cover to within 6” of finish grade installed over one access port Neoprene boots and Hydraulic cement around inlet & outlet Comments: Jim noted he had additional stone to add in hole. Appeared to be 6” @ time of inspection DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: 12/4/20 – Hydraulic cement at pipe penetrations to be provided SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to C soil layer, as provided on plan Size of SAS excavated as per plan Title 5 sand installed, if specified on plan 40 Mil HDPE barrier installed Laterals installed and ends connected to header (and vented if impervious material above) Elevations of laterals and chambers installed as on approved plan Retaining wall (boulder / concrete / timber/ block) Final cover as per plan Comments: 1 large rock in the center of bottom – to be removed Elevations shot under 126.70 (Plan elevation for bottom of bed Sand on site good FINAL GRADE Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted By engineer and signed and dated by Engineer and installer As-Built Plan Note: Benchmark on plan removed – new BM set BM = _127.97 HR = _5.69 HI = _133.66 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 3.23 130.10 130.0 Septic Tank IN 3.54 129.79 129.75 Septic Tank OUT 3.81 129.52 129.50 Distribution Box IN 4.08 129.25 129.20 Distribution Box OUT 4.24 129.09 129.03 Lateral 1 BEG 4.38 128.95 128.95 Lateral 1 END 4.64 128.69 128.70 Lateral 2 BEG 4.39 128.94 128.95 Lateral 2 END 4.65 128.68 128.70 Bottom of Bed/Chamber 6.94 126.72 126.70