HomeMy WebLinkAbout2019-04-02 O&M Plan Long Term Stormwater Best Management Practices Operation and Maintenance Plan for 100 Witor Street North Andover,---.Massachusetts March 15, 2019 The following operation and maintenance plan has been provided to satisfy the requirements ents of Standard 9 of the Mass DEP Stormwater Management Handbook associated with development of the site and associated infrastructure. The success of the Stormwater Management Plan depends on the proper implementation, operation and maintenance of several management ent components. The following procedures shall be i piemented to ensure success of the 8tormw t r Management Plan: 1. The contractor shalt compty with the details of construction of the site as shown on the approved plans. . The stormwater management system shall be inspected and maintained as indicated below. . Effective erosion controt measurers during and after construction shall be maintained until a stable turf is established on all altered areas. 4. A Stormwater Management Maintenance nanee Log is included at the end of this Appendix. as'Ic Information tormwater Management System Owner: Gourmet Specialty Foods 123 Tewksbury Street Andover, MA 018 o R 978 7 -1507 Forth Andover EngineeringDepartment: 384 Osgood Street North Andover, MA 01845 P: 97 85#0950 North Andover Nanning Board: Town Halt 120 Main Street . North Andover, NSA 01845 978 88-9 3 Long Term Stormwater Best Management Practices Operation&Maintenance Plan 100 Wit ow Street, North Andover, Massachusetts March of 4 Erosion and d'r entation ControLs during...Construction: The site and drainage construction contractor shall be responsible for managing stormw ter during construction. Routine monitoring of disturbed soils shall be performed to ensure adequate runoff and pollution control during construction, A sediment and erosion control barrier will be placed as shorn on the Grading, Utitit r & Drainage Plan prior to the co m m e ncem e nt of airy clearing,9 rub bing,a rid earth removal or construction activity. The integrity of the erosion control barrier witt,be maintained by periodic inspection and replacement as necessary. The erosion control barrier wilt remain in place until the first course of pavement has been placed and ail side slopes have been foamed and seeded and vegetation has been established. Operations and rnaintenance plans for the Stormwate r Ma nag e m ent con stru ction phase and long term operation of the stun have been attached to this report. Ge er L Conditions 1. The site contractor shall be responsible for scheduling regular inspections and maintenance of the storm ter MP's until the project has been completed. The BAP maintenance shall be conducted as detai ed in the following long-tern pollution prevention plan and illustrated on the attached Drainage System Key Plan and o n the approved design plans: 'Site improvement Man in North Andover, Massachusetts, 100 Willow Street prepared for Gourmet Specialty Foods by The Morin-Cameron Group, Inc. dated February 13, 2019 and reprised through March 15, 2019. . All Stormwat r IP's shall be operated and maintained in accordance with the design plans are the following Long--Term Pollution Prevention Plan. . The owner shall: a. Maintain an operation and Maintenance Log (see Attachment A)for the last three years. The Log shall include all BMP inspections, repairs, replacement activities and disposal activities (disposal material and disposal location shall be included in the Log); b. Make the tog available to the North Andover Planning Board and Engineering Department upon request; c. Allover members and agents of the North Andover Planning Board and Engineering Department to eater the premises and ensure that the Owner has complied with the Operation and Maintenance Plan requirements for each BIAP. . A recommended inspection and maintenance schedule is outlined below based on statewide averages. This inspection and maintenance schedule shall be adhered to at a minimum for the first year of service of ell B MP's r f renced in this 8ocument. At the co rn mencernent of the first year of service, a more accurate inspection/maintenance schedule shall be determined based on the level of service for this site. Long Term St rm rat r Best Management Practices Operation &Maintenance Plan 10 B Wittow Street, IN o rt Andover, Ma setts Larch 15,2019—Page 2 of 4 Long-Term Pottufion Prevention Plan (LT PPP) Vegetated Areas: Immediately after construction, monitoring of the erosion control systems shall occur until establishment of naturat vegetation. Afterwards, vegetated areas shalt be maintained as such. Vegetation n shalt be replaced as necessary to ensure proper stabilIzation of the site. Cost: Included with annual landscaping budget. Consult with tocat landscape contractors, Paved Areas: Sweepers shalt sweep paved areas periodically during dry weather to remove excess sediments and to reduce the amount of sediments that the drainage system shall have to remove from the runoff. The sweeping shalt be conducted primarily between March 15 1n and November Wh. Special attention should be made to sweeping paved surfaces in March and April before spring rains wash residual sand into the drainage system. Cast.Consult with tocat landscaping companies for associated costs if necessary. Salt used for de-icing on the roadway during winter months shall be limited as much as possible as this gill reduce the reed for removal and treatment. Sand containing the minimum amount of calcium chloride or approved equivalent) needed for handling may be apptied as part of the routine winter maintenance activities. Infittration Basin: The infiltration basin shall be inspected after every major storm event for the first 3 months after construction;a major storm evert is 3.1 inches of rainfatl in a 24 hour period year storm). Thereafter, the basin shall be inspected twice per year, t rpicatly in the spring and fall. If erosion or lass of vegetation is observed in the basin, it shall be repaired immediately and new vegetation shalt be established. Trash, leaves, branches, etc.shall be removed from facility. The area drains and catch basin outlet shall be inspected annually for obstructions and structurat integrity. The inspections shall be conducted by qualified personnel. Cost: Consutt with local landscaping companies for associated costs if necessary. Subsurface Detention System: The subsurface pipe detention system shalt be monitored annually to ensure that it is draining properly. The outtet structure shall be checl eci fc r debris a ccu rn u tation twice per year, in the spring and fate, In the case that water remains its the detention system for greater than three days after a storm event, an inspection is warranted and necessary maintenance or repairs should be addressed as necessary. Confirm that the low flow outlet in the o ctet structure is not obstructed by debris.The inspections shalt be conducted by quatified personnel. Cost; Consult with tocat landscaping companies for associated casts if necessary. Public Safety Concerns: Manhole covers or inspection port covers shalt not be left open and unattended at any time during inspection, cteaning or otherwise. Broken covers or frames shalt be replaced immediatet r, At no time shalt any person eater the subsurface structure unte s measures have been taken to ensure safe access in accordance with OSHA enclosed space regulations. Long Term Stormwater Best Management Pract€ces operation Maintenance Ptah 100 Wittow street, North Ando er# Massachusetts March 15,2019—Page 3 of Lure t Spreader: The inlet pipe, rip-rap basin and overflow berm shall be inspected after every major Storm evert for the first 3 months after construction; a major storm event is 3.1 inches of rainfall in a 24 hour period year storm). Thereafter, the system shalt be inspected on an annuat basis, typically in the spring months. Any sig ns of erosion shall be re paired imm ediate lyt and any trash o r debris shall be removed, Cost: Consult with local landscaping companies for associated costs if necessary. Debris& Utter: All debris and titter shall be removed from the roadway and parking tots as necessary to prevent migration into the drainage system. P stici des, Herbicides* and F rtii ers: Pesticides and herbicides shall be used sparingly. Fertilizers shall be restricted to the use of organic fertirers only. All fertilizers, herbicides, pesticides, sand and salt for deicing and the like shall b stored in dry area that is protected from weather. Cost: Included in the routine landscaping maintenance schedule. The Owner shall c nsutt local landscaping contractors for details. Public Safety Concerns: Chemicals shall be stared in a secure area to prevent children from obtaining access to therm. Any major spills shall be reported to municipal officials. Prevention ofItticit.., *tsc ar es: illicit discharges to the st rmwater management system are not allowed. Illicit discharges are discharges that are not comprised entirely of stormwat r. Pursuant to Mass DEP Stormwater Standards the foRowing activifi s or facilities are not considered illicit discharges:firefighting,water tine flushing, landscape irrigation, uncontaminated groundwater, potable water sources, foundation drains, air conditioning cond e n ation,footing d rains,individual resident car washing,flows from riparian habitats and wetlands, dechl rinated water from swimming pools, water used for street washing and water used to clean residential building without detergents. To prevent iiticit discharges to the st rr wat r management system the fotlow ng policies should be implemented: . Provisions For Storing Matriats And Waste Products Inside Or lender Cover . vehicle Maintenance And Washing Cunt r l,s . Requirements for Routine Inspections of the St rrrmwat r Management System (i. .: catch basins, area drains, infittrati n basins &subsurface infiltration system. 4. Spilt Prevention and Response Plans. Long Term Stormwater Best Management Pr ctitces Operation&Maintenance Ptah 100 Wittow Street, Forth Andover, Massachusetts March IS, 2019—Page 4 of 4 DRAINAGE SYSTEM KEY LOT D PLAN AREA=217,119� SF± HUAM FOR ASSESSOR'S GOURMET SPECIALTY FOODS MAP 98D, LOT 54 100 WILLOW STREET NORTH ANDOVEK MA } DAM MMCH 1 ,2019 PLAN SCALE: 1" ' 25 50 100 • r'� . s . . �'~ �� �' r� - r�' x ,�' .� t-� .ter' I r' I I r' EXISTING IND SNOW STORAGE (#1 00 WILLOW STREET) LEVEL SPREADER I' AREA TYP. SUBSURFACE DETEN110N SYSTEM INSPEC11ON PORT OUTLET CONTROL i STRUCTURE (D E3 iL 3r F 11 Fc STONE DIAPHRAGM AND. OLEA UT VEGETATED INFILTRATION FILTER STRCPTYP. TP. OF AREA DRAIN v T DOME BASI • ■*..*. •*.*p•tr ..r r.r•.� GRAB (TYP. F .. .;. ....r..... .,...........�::.,,. A ' i..#. wow DOME GRATE �- - --` BASIN 1TH t�".gyp y* •r•r.- /�.'ti...a* .Fr ♦ lrt .i-,*r ;r �-�.�._. �-„Y y'� :xy�•',1�f t.���'1�34`�,'..�y�-k:.�L`�}�W�r JLRa .. yw�• . {J.. oir'-'.Yi,f..i �.�.+.' .',�y wF-,+.+r# �. {•'G�� •. 1"�T'ri• r4iiY�4rt#�•rrr.+'*'*+4rt"w�rr.rr�.. rY4.r.�r4. .r +�rrtr .rwwrr�+•Y+��+ +�'-^4 *�.1` ri1[� �rt�w tt .*r.....i.••rt.art#►t•.trfrr*...w•rr.••rtrtrt#�rtrtrrt# s•r�trtirtr*.*�r�r.rrrtrtrt*.rtrt.r......#..t••ti•#.#rtrtrst*�.#�irtsrrt`.*i!J # •+ .r f r'ri'�` 'y Yi i*J 'f'''i a "y. -3..r1'ti3� F r.iaF t�.�*"+ 'L.':I" .� •},ry'..:1 -}"��' w` �i� x fr'.',•�5 " .�.r�•y i� . +w•,.•," t, ak-',-. 'w��.• # - ��w=wr4 �`N.ri �r'�T. y.•Sy-+y 5 r y.y`a ,' •`.-'�.�.r'4', iMt�,r1 y�+ *�} si i�x�\i"`.� s��'-'`.- r'�i�T�i ♦h,. r ` �+.a�i r,•3 r '*P�rwr".4rrrrrrr.r�ti�rrf,4i'+.�w.iwr`r�, r.y. �L_ _ �*.ti-�.....-.�..r1_.r�.t"-r. ':}..,�w;y �...y �� f", r+'rtY�'.�'.•,*�.•a 4.t �.�4#;r} +.. CATCH BASIN cj � February 13, 2019 Revised March 15,2019 Stormwater 100 Willow Street- North Andover, MA STANDARD : Recharge To Groundwater: St tLc Method o Calculate New Impervious Area (From HildroCAD Model) Existing Impervious Area G C Soil) = 6,052 S Proposed Impervious Area SG C Soil) -_ 25,153 SF New Impervious Area SG C Solt) = 19,11 S • Determine Rainfall Depth to be Recharged (MassDEP Sormerater Ma nag emn t Handbook.- Tab le 2.3.2 drolo lc Soil Group Recharge Rainfall Depth . 5"" o atclate Recharge Volume v [0.25" x 19,101 SH 12 SF-In v Capture Area Adjustment Schedule of Areas Tribute to Recharge Systems HAD "tributary System ID Impervious Area PS2 19159 f Total* 19,591 sf Total Impervious Area = 25,153 Capture Area Adjustment = 25,153 f 19,591 sf = 1.2 Required Recharge Volume ' v'- 1.29 x Rv 1.29 x 398 CF 514 CF Provided Recharge Volumes HCAD Lowest System System ID System Outlet Volume @ Description Et=242.60 Pi 242.601,678 CI~ Infiltration Basin Totat Volume. 1, cha rge volume provided measured to lowest ou He t or 10-yea r s to rm elevation, whichever is tower. February 13, 2019 Revised March 15, 2019 Required Recharge 1 oLu a Summary of ResuLts Total Volume Provided = 1,678 CF Total Volume Required = 514 CIF Verify ra o r MaxLMU -Hoy rs: Static Method HCAD Recharge Bottom Drawdown Time System VoLu a Surface a m Rv K - Description I aches Hour I { I~ Area Hours 1 1,678 1,985 2.41 4,2 Infiltration Basin "Design Complies with Recharge Volume Standard" STANDARD 4: WaterQuatity1'o u e ------ -- .„, ------------ WW Area-Storage for PoWPi:I nfiftmOonI evation & am a0rage • Tributary Impervious pervio Area = 19,591 SF ��� Om-l 0ibi feet) 41,9 724 0 241.92 976 17 1228 Ca cu[ate re u ire d ater quality volume " depth) 241. 6 1,481 3 WQV [1"' x 19,591 SF] 12 SF-In 1,633 CIF 4 .a0 1,985 *135 242.02 2,022 176 2,059 216 0 Lowest outlet elevation 2. .o 42.08 2,133 36 242-10 2,171 343 11 Q �provi e below lowest outlet 116 C (OK , 242.14 2,245 432 242.16 2,282 477 242.16 2,319 3 242.20 2,356 570 242.22 2,393 617 242.24 2,430 665 242,26 Z468 714 242.28 2,505 764 242, 0 21642 814 242,32 2,579 666 242.34 2,616 918 242.36 2,653 970 242.38 Z690 1,024 242.40 2,727 1,078 242.42 Z765 1,133 242.44 2,802 1,189 242.46 2,639 1,245 242.48 2,876 1,302 242.50 2,913 1,360 242.62 3,019 i,419 242.64 3,125 1,461 242.56 3 1,544 242.58 3,338 1,610 4 ti .- ._........... ........ .444 1,678 242.62 ,650 1,748 242.64 ,657 1,820 _ 242.66 3,763 1,894 24Z66 3,869 1,970 42.70 3,976 2,049 242.72 4,082 2,129 24Z74 4j188 21212 Proposed Par g Area Infiltration B�asin S surface Detention Sur 74t. _; - _- .0 r: - - . - _ 71 Dp,-, - - - NORTH WEST OF ESide Yard BUILDING Routing Diagram for 1 Proposed Conditions F e i Prepared bar The Morin-Cameron Group, Inc., Printed 11 / {�1 1' Hydro 10.00-13 On 00401 @ 2014Hydro CAD Software Solutions LL 3819 Proposed conditions Type !/ 2 -fir 2-Year RainfaP3, "' Prepared by The Morin-Cameron Group, Inc. Printed 3/15/2019 HLd roCADO 10.00-13 s n 0 401 0 2014 HydroCAD Software Solutions LLC lea � Summary for Subcatchment PS2: Proposed Parking Area Runoff 1.63 cfs @ 12.09 hrs, Volume= 6#110 cf, Depth 2. " Runoff by SCS TR-20 method, =SCs, Weighted-CN, Time Span 0.00- 6. 0 hrs, dt=0.01 hrs Type III 4-hr -Year Rainfall=3.10" Area CN T e crl ton 192691 98 Paved parking, HSG D 9942 7 % Grass corer, Good, HSG C 29,533 90 Weighted Average %942 33.66% Pervious Area 1%691 66.34% Impervious Area Tc Length Slope Velocity Capacity Description rnr feet !ft (fflsec) ( 6.0 Direct Entry, Direct Entry Summary for sctchmet Psi: Existing Sias Yard Runoff 0.11 cfs 1 .10 hrs, Volume= 872 cf, Depth= 49 " Runoff by SCS T -20 method, =SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, d - 0.01 hrs Type III 24-hr 2-Year Rainfall=3.10" Area (sD CN Description 93 74 75% Grass corer, Good, HSG D 4593 10 . % Pervious Area Tc Length Slope Velocity Capacity Description (min) feed fit) (fttse2lcfs .0 Direct Entry, Direct Entry Summary airy for Reach D 2: NORTH WEST OF BUILDING Inflow Area 34,126 sf, 57.41 o Impervious, Inflow Depth = 0.22" for -Year evert Inflow 6.11 cfs @ 1 .10 hrs, Volume= 60 cf Outflow 6.11 cfs @ 12.10 hrs, Volume= 620 cf, A en= %, Lag= 0.0 min Routing by Stow=find+Trans method, Time span= .00- 6.0 hrs, dt= 0.01 hrs Summary for Pond PSI: Infiltration Basin Inflow Area 29533 sf, 66.84% Impervious, Inflow Depth 2.08" for 2-Year even Inflow 1.63 cfs @ 12.09 hrs, Volume 51110 cf oufflow 6.73 cfs @ 12.28 hrs, Volume= 5,110 cf, Men= %, Lag= 11.5 min Discarded 0.18 cfs @ 12.28 hrs, Volume= 4,465 cf Primary - 0.66 cfs @ 12.28 hrs, Vole e� 644 cf Secondary 0.00 cfs @ 0.00 hrs, Volume= 0 cf 3819 Proposed Conditions Type ///24-err 2-Fear I ire I1-3. " Prepared by The Morin-Cameron Group, Inc. Printed 3/15/2019 EydroCADO 0. 0-1 s/n 00401 Q 2014 H droCAD Software Solutions LLC Ira e Routing by St r-Ind method, Time Spar= 0.00-36,00 first dt= 0.01 firs Peals Bev=242. 4' @ 12.28 hrs S rf.Are � 3,142 sf Storage= 1,490 of Flog-Flow detention time= 66.4 Amin calculated for 5,1 f 1 0% of inflow) Center-of-Mass det. time=65.4 min 873.6-*808.1 Volume Invert Avail.Stora a Storage Description #1 241.90' 2,254 cf Custom stage Data(Prismatic)Listed below (Recalc) Elevation Surf.Area Ill .St re Cum.Store (feet) q ft cubic-Meet (cubic- ( et 241.90 724 0 0 242.00 13985 135 135 242.50 2,913 11225 10360 242-75 4,241 94 21254 Device a Routing Invert Outlet Devices ##1 Discarded 24 .90' 2.4101n/hr Exf 1 Itration over surface area ##2 Primary 241.20' .o" Round n Culvert x 2f L�49. ' Kew 0.500 Inlet Outlet Inv rt= 24 .29'#2 1.2 ' S� 0.0000T Cow 0.900 n= 0.012, Flow Area= 0.35 sf #3 Primary 241.5 ' * }' Round Culvert L= 117.0' Ke= 0.500 Inlet I Outlet I vert= 241. 0'#241.2 ' S= .002 '#' Cow 0.900 n= .0 2, F1 ow Area 0.35 sf 4 Device 2 242. ' 1 *0" Horiz.Orifice/Grate x 2.00 C� 0.600 Limited to weir flow at low Leads ##5 Device 2 42. ' 2 . " Horiz.Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device ice 0 242. r .0" Horiz. Orifice/Grate x 2.00 C= 0.600 Limited to weir flow at low heads 7 Secondary 24 .70' 1 .0' long x 25.0r re dth Broad-Crested Recta ng u lar Weir Head (feet) 0.20 0.40 .6 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 isearded OutFlow Max=O.18 ofs @ 12.28 hrs I--11! =242.54' (Free Discharge) 'l=E filtrat1*on Exfiitration Controls 0.18 cfs) Primary tFlo1�'1� lax= . 5 fs @ '12.2 hrs 1 1�=242. 4' (Free Discharge) J.L =Culvert (Passes 0.37 efs of 2.38 cfs potential flow) = r fine/Gra a Weir Controls 0.18 ofs @ 0.68 fps) orffloe#Grate 1,11leir Controls 0.18 ofs @ 9.68 fps) L-t= u l ert Passes 0.18 efsof 0.88 cfs potential flow) =Orifice#Grate Weir Controls 0.18 ofs a@ 0.68 fps) §econdary OutFlow Max=0. 9 cfs @ 0.00 hrs 1--WO-02 '1.9 ' (Free Discharge) = road-Chested Rectangular Weir Controls 0.00 os 3819 Proposed Conditions T e !d 2 -err 2-Year Rainfall=3. " Prepared by The Lorin-Cameron Group, Inc. Printed 019 hLdroCADO o. -1 3 s1n 00401 0 2014 HydroCAD Software Solutions LLG Page 4 Summary for Pond P2: subsurface Detention Inflow Area 29,533 sft 66.84% impervious, inflow Depth 0. 6" for 2-Year evert Inflow 0.55 cfs @ 12.28 brs, Volume= 644 of Outflow 0.99 cfs @ 12.67 brs, Volume= 248 cf, tten� 84 , Lague 23.5 min Primary 0.09 ofs @ 12.67 brs, Volume= 248 cf Routing by Stor-i d method, Time Span= 0.00-86.00 brs, dt 0.01 brs Peak lever 241.28" a@ 12.67 hrs s rf.Area ,498 sf Storage=532 Cf Ping-Flow detention time=39.0 min calculated for 248 cf 88% of inflow) Center-of-Mass det. time=30.3 min 774.7-744.4 Volume Invert Avail.Stora a Story a De ri do ##1 A 240.70' 947 of . 8'w x 87.651 x 1.82'H Field 2, 27 cf Overall- 160 cf Embedded = 2,367 cf x 4 .0%holds #2A 241. 0' 160 cf CPP 8 x 16 inside# 1 inside= 8.0"W x 8.0"H => 0.47 sf x 20.001 9.4 cf tsi e= 9.9"W x 9.9"H => 0.47 sf x 29.001 9.4 of 4 Rows of 4 Chambers 0.89' Header x 0.47 sf x 2 10.1 of Inside #3 241. 0' 37 of 8. " Round Pipe storage x 2 L .7' #4C 240.70' 731 cf 16.80'W 67.6 'L x 1.82'H Field C 1,951 cf Overall- 123 cf Embedded 1,828 cf x 49.0%Voids #6C 241.20' 123 of CPP 8 x 12 inside#4 Inside 8.0"W x 8. " 0.47 sf x 20.001 = 9.4 of Outside= 9.9"W x 9.9"H => 0.47 sf x 20,001 9.4 cf 4 Rows of 3 Chambers 1 o.80' Header x 0.47 sf x 10.1 cf Inside #6 40.80' 84 cf 4.00"D x 2.70' Vertical Coned under ,088 cf Total Available storage Storage Group A created with Chamber wizard Storage Group C created with Chamber Wizard Device Rout RoutM invert Outlet Devices �... # 1 Primary 241.1 U 1 . ' long x * ' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 .50 3.00 3.69 Coef. (English) 2.64 2.61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 .8 8.07 8.20 3.32 #2 Device 1 240.70' . " Round Culvert L=47. ' CPP, projecting, no headwall, Ke=0.999 Inlet/Outlet Invert=24 .70' 24o.5 ' S= 0.004311' C =0.900 = 0.012 Corrugated PE, smooth interior, Flow Area=0.79 sf ##3 Device 2 240.70' . "Vert.Orifice/Grate C 0.600 #4 Device 2 241.30' 1 . "'W x 3.0" Wert. Orifice/Grate C= 0.600 #5 Device 2 24 . ` 0"w x *8{# H Vert, orifice/GrateC= 0.600 #6 Device 2 242-45' 4. ' long x 0.6' breadth Broad-Crested Rectan lair weir Head (feet) 0.20 0.40 0.60 0.80 1.00 3819 Proposed Conditions Type !l/2 - 2-Year f ainfa l=3. " Prepared by The Morin-Cameron Group, Inc. Printed3/15/2019 droC D 10. o-1 01 02014 HydroCAD Software Solutions LLC Page Coef. (English) 2.80 2,92 3.08 3.30 3.32 Primary o fFlow Max=0.09 cfs@ 12.67 hrs IOW= . 3' (Free Discharge) '�—t=—Brand-Crested Rectangular Weir (Passes o.09 cfs of 1.25 Gfs potential flow) =Cnlvert (Passes o.09 cf of o. 'cfs potential flow) t�3=0 r1fi eIGr to (Orifice Controls 0.09 cfs@ 1.76 fps) =orif e1Gr to Controls 0.00cfs) —Orifice/Grate Controls .00 of road Rectangular We Controls 0.00 cfs) 3819 Proposed conditions Type 111 -hr I 0-Year frill= .5 , Prepared by The Morin-Cameron Group, Inc. Printed 3/1 2 19 dr CAD 0.00-13 s/n 00401 C 2014 HLdroCAD Software Solutions LLC lea Summary for Subcatchment S2: Proposed Parking Area Runoff 2.62 cfs 12.09 hrs, Volume= 8,357 cf, Depth= 3.40" Runoff by SCS T -20 method, H=SCS, Weighted-CN, Time Span= 0.00-36-00 hrs, dt 0.01 hrs Type Ill 4-hr 10-Year rainfall=4. 0" Area CN Dscrl lion 19,591 98 Paved parking, HSG C 9294 74 % Grass cover, Good, HSG C 299533 90 Weighted Average 91942 33.66% Pervious Area 19,591 .34° Impervious Area Tc Length Slope Velocity Capacity Description (min) feet .. ) ftlf LfiLsep (cfs) .o Direct Entry, Direct Entry Summary for sctc Psi* Existing Side Yard Runoff 0.24 cfs a� 12.09 hrs, Volume= 755 cf, Depth= .97" Runoff by SCS T -20 method, 1- =SCS, Wei hf d-C11, Time Span=0.09-3 .0 hrs, dt=0.01 hrs Type III 24-hr 10-Year 1 ainfall= . oar Area CN Description 4t593 74 7 % Grass corer, Good, HSG C 41593 100.00% Pervious Area Tc Length Slope Velocity Capacity Description min feet ftft ftlso (cfs) .o Direct Entry, Direct Entry Summary r sry for Reach D 2* NORTH WEST of BUILDING Inflow Area 34 126 sfr 57.41% Impervio s, I nflow Depth 1.00" for 10-Year event Inflow 1.04 cfs @ 12.32 hrs, Volume= 2,849 cf oufflow 1.04 cfs 12.32 hrs, Volume= 2,849 cf, Men= %, La =0.0 min Roofing by S or-ind+Trans method, Time Span=0.00-3 .00 hrs', df= 0.01 hrs Summary sry for Pond : Infiltration Bssi Inflow Area 29,533 sf, 66.34% Impervious, Inflow Depth 3.40" for 10-Year event Inflow 2.62 cfs @ 12.09 hrs, Volume= 8,357 cf fflow 2.35 cfs @ 12.13 hrs, Volume 8,357 cf, Men= 10%, Lag -2.4 min Discarded 0.19 cfs @ 12.13 hrs, Volume= 5,867 cf Primary 2.16 cfs @ 12.13 hrs, Volume= 2,490 cf Secondary--F 0.00 cfs 0.00 hrs, Volume= 0 Cf 3819 Proposed Conditions Type /12 -fir -Year ire 1i= .50" Prepared by The Morin-Cameron Group, Inc. Print 3115/2019 -HydroCADO 1 . 0-13 s 1 C 2014 droCAD Software Solutions LLC Pa Routing by Stor-Ind method, Time Span= 0. -3 . 0 hrs, dt= 0.01 hrs Peals Bev= 242. 1' @ 12.13 hrs S rf.Area= 3,481 sf Storage= 1,702 cf Plug-Flow detention time=56.1 miry calculated for 8,355 of `I % of inflow) Center-of-Mass det. time= 56.1 min . -794.4 Volume Invert Avail.Stora a Storage.Desc0pLion #1 241. 0' 2,254 cf Custom Stage Data (Prismatic)Listed below(Reca1c) Elevation Su f.Area In .Store Cl.m.S ore feet -ft ulfeet Cubic--feet 241.90 7' 4 4 . 0 1 J985 13513 242.50 21913 1122 113 242.7 4$241 894 2,254 Brie Routing Invert Outlet Devices 1 Discarded 241. ' 2.410 In1hr EV11tration over surface area #2 Primary 41. ' . "` Round Culvert X 2,00 L=4 .0' Ke=0.500 Inlet/Outlet Invert=241.2 '1241.2 ' S_ . o T Cc= * o n= . 12, Flow Area=0.35 sf ##3 Primary 4'1.50' .0" Rou nd Culvert L= '1 7. ' 1 e= .6o Inlet/Outlet Invert= 41. ' /241.2 ' S= . 2 '/' Cc= 0.900 = 0. 1 , Flow Area= 0.3 sf 4 Device 2 24 . 0' . " Heri , orifioel rate X # C= 0.600 Limited to weir flog at low heads #5 Device 2 242. 0' 4. " H ri . Orifice/Grate C= 0.600 Limited to weir flog at low heads #6 Device 3 42. ' 2. " H ri . orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #7 Secondary 242.7 ' 1 . ' long x 26. ' ire t r -Created Rectangular Weir Head (feet) .2 .4 .60 0.80 1.00 1.20 1.401.0 Coef. (English) 2.68 2.70 .7 2.64 2.63 2.64 2.64 2.63 is ar ed oust low lea = .19 cfs @ 12.13 hrs HW1 24 .61' (Free Discharge) = xfiltration Exflltration Controls 0.19 cfs) Primary outFl w Max=2.16 cfs@ 12.13 hrs HW= 4 .61' (Free Discharge) =Culvert (Passes 1.43 cfs of 2.49 cfs potential flow) =Orifice/Grate (Weir Controls 0.72 cfs @ 1.07 fps) =Orlfi /Grate (Weir Controls 0.72 cfs @ 1.07 fps) Culvert (Passes 0.72 cfs of 0.92 cfs potential flow) =Orifi a/Grate Weir Controls is .72 cfs @ 1.07 fps) §econdary outflow Max=0.00 cfs @ 0.00 hrs H MI441.g ' (Free Discharge) 7=Broad*.Crested Rectangular Weir Controls 0.00 cfs) 3819 Proposed Conditions Typ ///24-h f -Year [+inf ll= .5 ft Prepared by The Morin-Cameron Group, Inc. 1 *rated 3 /201 HLdroCADO . -1 00401 0 2014-HydroCAD Software Solutions L C Pa e Summary for Pond P : Subsurface Detention Inflow o Area w , 88.34°o Impervious, Inflow Depth .01" for 10-Year event Inflow = 2.16 cfs @ 12.13 hrs, Volume 2,490 cf Oufflow 0.93 cfs @ 12.33 hrs, Volu e= 2,094 cf, Atten= 7%, Lag= 12.2 min Primary 0.93 cfs 12.33 hrs, Volume= 2,094 cf Routing by Stor-Ind method, Time Span= .00-3 .0o hrs, dt=0.01 hrs Peak Elev-241. 9' @ 12.33 hrs Surf. rea= 2,639 f Storage= 1,1 f Plug-Flow detention time 26.8 miry calculated for 2,094 f 84% of inflow) Center- f-glass det. tire= 20.7 min 760.7-74 .0 Volume Invert Avaii.Stora a Storage Description # A 240.70' 947 cf 16.,80'W87,65%x 1.82'HField 2,527 cf Overall - 160 cf Embedded 2,367 cf x 40.0%Voids #2A 241.20' 180 cf C P 8 x 16 Inside# inside= 8.U'W x 8.0"H => 0.47 sf x 20.001= 9.4 of Outside= 9.9"W x 9.9"H = .47 sf x 20. 0'L=9.4 of 4 Rows of 4 Chambers o. of Header x 0.47 sf x 2= 10.1 cf I aside #3 241.20' 37 cf 8.0" Round Pipe storage x 2 L=537 #4C 24 .7 ' 731 of 16.80'W x 87.66%x 1.8 'H Field C 1.951 of Overall - 123 of Embedded = 1,828 cf x 40.0%Voids # C 241.20' 123 cf CPP 8 x 12 inside#4 Inside= 8.0"HIV x 8.0"k => 0.47 sf x 20.00% 9.4 cf outside= 9.9"W x 9.9" _> 0.47 sf x 20.001 9.4 cf 4 Rows vs of 3 Chambers 1 o.80' Header x 0.47 sf x 2 10.1 f Inside 240.8 ' 34 cf 4.00T x 2.70" Vertical Cone/Cylinder 2,033 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group C created with Chamber Wizard Device Rouqnq invert outlet Devices #1 Primary 24 .1o' 10; ' long 2. ' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 C ef. (English) 2.54 2.61 2.61 2.60 2.66 2.70 2.77 2.892.88 2.85 3. 7 3.20 3.32 #2 Device 1 240. " ' 2. " Round Culvert L=47.0' CPI , projecting, no headwall, Ke= 0.909 Inlet#outlet Invert= 240.7 '/240. ' S .0 43' ' Cc 0.900 = 0.012 Corrugated PE, smooth interior, Flow Area 0.79 sf ##3 Device 2 240.7 ' 1 "Vert. Orifice/Grate C=0.600 #4 Device 2 24 .30' 12.0"W x 3.8" H pert. Orifice/Grate C= 0.890 #5 Device 2 4 .8 ' 10. "W x 3.0" H Vert.Orifice/Grate C 0.609 #6 Device 2 242. ' 4. ' long x . r breadth Broad-Crested Rectangular guar Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 3819 Proposed Conditions Type H/2 - r -Year in ll� . " Prepared by The Morin-Cameron Grp, Inc. Printed 39 HydroCADO 10.00-13 s/n 00401 @ 2014 HLdroCAD Software Solutions LLC Page 9 C ef. English 2.80 2.92 3.08 3.30 3.32 r1mary OutFlow Max=0.98 ofs @ 12.33 hrs W=241. 9' (Free Discharge) =Broad-C rested Rectang ula r Wet r (Passes 0.93 cfs of 1 .82 cfs potent!ai flow) .2=Culvert (Passes 0.93 cfs.of 1,98 efs potential flow N= r i e/Grate (Orifice Controls 0.18 cfs @ 3.70 fps) =Orifice/Grate Trifle Controls 0.61 ofs @ 2.45 fps) =Orifice/Grate (Orifice Controls 0.14 cfs @ 1.20 fps) �Broad-Crested Rectangular Weir Controls 0.00 ofs 3819 Proposed Conditions Type ///2 - r -Year Rainfall= .50" Prepared by The Morin-Cameron Group, Inc. Printed /1612019 hLdroCADO1 . 0- 3 sin 00401 0 2014 1roC D Software Solutions LLC Page 19 Summary for Subcatchment Ps2# Proposed Parking Area Runoff F . 2 cfs 12.08 hrs, Volume= 13,127 of, Depth 5.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CIS, Time Span0.00-36.00 hrs, dt=0.01 hrs Type III 24-fir 100-Year Rainfall . " Area CN Description 19,591 98 Paved parking, HSG C 91942 74 75% Grass cover, Good, SG C 29,533 90 Weighted Average 91942 33. 6% Pervious Area 1%591 66.34% Impervious Area T Length Slope Velocity Capacity Description (minj._......,Leqt) LftLftjLfUsec) 6.0 Direct Entry, Direct Entry Summary for Subcatchment Psi* Existing side Yard Runoff 0.45 f a� 12.09 hrs, Volume= 1 382 cf, Depth - 3.61,E Runoff by SCS TR-20 method, =SCS, Weighted-CN, Time Span- 0.00-36.00 hrs, dt= 0.01 hrs Type III 2 -hr 1 0-Year Rainfall=- .50" Area sO CN Description 1593 74 >75% Grass cover, Goo HSG C 40693 100. 0% Pervious Area Te Length Slope velocity Capacity Description Iryfin),_ Yftjfe ifs .0 Direct Entry, Direct Entry Summary for Reach DP2: NORTH WEST OF BUILDING Inflow Area 34,126 sf, 57. 1% Impervious, Inflow Depth 2.34" for 1 ear event Inflow - 2.52 of @ 12.21 hrs, 1 olur e= 6,654 of Outflow = 2.52 cfs @ 12.21 hrs, volume= 6,654 of, Atten %, Lag=0.0 rein Routing by Stor-Ind+Trans method, Time Span= . -35. hrs, dt= 0.01 hrs Summary for Pond P : Infiltration Basin Inflow Area 29,533 s , 6 .34 Impervious, Inflow Depth = 5.33" for 1 - earr evert Inflow 4.02 ofs @ 12.08 hrs, of u m e= 13,127 of Outflow 3.71 cfs @ 12.12 hrs, volume= 13,127 of, Men= %, Lag= 1.9 miry Discarded = 0.21 ofs @ 12.12 hrs, Volume 7,458 o Primary 3.50 cfs @ 12.12 hrs, Volume= 5,669 cf Secondary- 0.00 ofs 0.00 hrs, Volur e- 0 Cf 3819 Proposed Conditions Type N 2 -fir Year Rainf & . " Prepared by The Morin-Cameron Group, Inc. Printed 311 /201 g droCAD 10.0 -13 s1n 040'1 02014Hydr AD Software Solutions LLC Pag 11 Routing ting by Stor-Ind method,Time Span .0 -30.0 hrs, dt= 0.01 hrs Peak Elev= 242. ' @ 12.12 hrs Surf.Area= 3,748 sf Storage= 1,884 cf Plug-Flow detention times 49.3 miry calculated for 13,127 of 1 0%of Inflow) Center-of-1 lass det. time=49.3 min 31.4--782.2 Volume Invert Avail.Stora a Storage Description 1 241.90' 2,24 cf Custom Stage Data(Prismatic)Listed below(Recalc) Elevation Surf.Area In .Store Cum.Store (feet) -ft (cubic-feet) cubic-fe , 241.90 724 242. 0 1;985 135 135 242.50 22913 11226 10360 242.75 41241 894 22254 Device Routing Invert Outlet Devices 1 Discarded 241.90' 2.410 1n hr Exfiltrat!o ever surface area 2 Primary 241.20' 8. " mound Culvert X 2.0 0 L=4 .0' Ke� 0.500 inlet 1 Outlet Invert 241.20' 241.20' S= 0.00 0 T C � 0.90 0.0 12, Flog Area=0.3 sf Primary 241. 0' 8. " Round Culvert L= 117.0' Ke= 0.500 Inlet 1 Outlet Invert= 241. 0'/241.20' S= 0.0026 T C �0.90 n� .0 12, Flow Area- 0.35 sf 4 Device 2 242.50' 2. "' Hori . orifice/Grate X 2.00 C� 0.600 Limited to weir flog at low leads Device 2 242.50' 4.0" H oriz. orifice/Grate C= 0.600 Umited to weir flow at low head Device 3 242.50' 12. " H rl . Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low leads 7 Secondary 24 .70' 10,01 1ong x 2 .0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Do f. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 INscarded OutFlow Ma =0.21 efs @ 12.12 hrs bull=242. ' (Free Discharge) 1=Exf1ltrat1on cfiltration Controls 0.21 ofs) Primary OutFlow Max=3. 1 cfs @ 12.12 hrs HWv 242. ' (Free Discharge) 24� ulve (Passes 2.56 cfs of 2.57 cfs potential flow) 1 � rlfl e/G rate (Weir Controls 1.28 cfs@ 1.30 fps) ;)=0r1fice/G rate (Weir Controls 1.28 cfs @ 1.30 fps) -culvert (Barrel Controls 0.98 cfs @ 2.72 fps) *��=Orfflce/Grate (Passes 0.96 ofs of 1.28 cfs potential flow) §econdary OutFlow Ma 4.00 ofs @ 0.00 hrs HW=241. 0' (Free Discharge) =B road-C rested Rectangular Weir Controls 0.00cfs) 819 Proposed conditions Type ///24-hr 00-Fear F i r 1l=6#50" Prepared by The Morin-Cameron Group, Inc. Printed 3 2019 IjLdroCADO . o-`i /n 00401 0 2014 H droCAD Software Solutions LLG Pgge 12 Summary for Pond P2: Subsurface Detention Inflow Area - 29,533 sf, 6 .34% Impervious, Inflow Depth 2.30" for too-Year evert Inflow 3.50 cfs @ 12.12 hrs, Volume e , 9 cf Ou tflo 2.27 s @ '12.22 hrs, ol�.mew ,272 cf, At er =3 %, Lague l r Primary 2.27 cfs @ 12.22 hrs, Volume= 5,272 cf Routing y Stor-Ind method, Time Span 0.00-3 .0 hr , dt=0.01 hrs Peak Elev 242.37' @ 12.22 hrs S rf.Ar a= 2,466 sf Storage= 1 f Plug-Flog detention time 23.3 miry calculated for 6,271 cf 93° of inflow Center-of-Mass detr time 16.7 rn in 758.1 -741. Volume Invert Avail.S ora a Storage Description ##1A 240.70' 947 of 1 .8 iW x 87.651 x 1,82'H Field A 2, 27 cf Overall - 160 cf Embedded 2,367 cf x 4 .0%Voids #2A 241.2 ' 160 cf CPP 8 x 16 Inside Inside 8.0 Outside= 9.9"W x , "H = .47 sf x 20.001 9.4 of 4 Rows s of 4 Chambers 10. 0' deader x 0.47 sf x 2 10.1 cf Inside 3 241.20' 37 of .0" Round Pipe Storage x 2 L= 3.7' ##4C 240.7 ' 731 cf 4 .80'W x 7. 6'L x 1.82'H Field e 1,951 cf Overall - 123 cf Embedded 1,828 of x 40.0%Voids # C 24 .20' 123 cf CPP 8 x 12 Inside##4 inside= . " V x 8-0"H => 0.47 sf x 20.00%= 9.4 of Outside= 9.9"W x 9.9"H = .47 sf x 20.0 1 9.4 of 4 Fos of Chambers 1 . o' Header x 0.47 sf x 2 10.1 cf Inside #6 240. ' 34 cf 4. 0'D x 2.70'H Vertical Conelc llinder 21033 of Total Available Storage Storage Group A created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing tin Invert Outlet Devices Primary 241.10' 1 o. ' long � 2. ' breadth Broad-Crested Rectangular Weir Head (feet) .2 0.40 0. 0.801.0 .2 .40 1.60 1.80 2.00 2.50 3. 0 3.50 Coef. (English) 2.54 2.61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32 2 Device 1 240.70' #o" Round Culvert L 47.0' CPP, projecting, no headwall, Ke= 0.900 I nlet 10 utlet I nvert=240.70' 240. ' S=0.0043' ' Cc= 900 = 0.012 Corrugated PE, smooth interior, Flow Area- 0.79 sf 3 Device 2 240.70' * "Vert. orifice/Grate C= 0.600 #4 Crevice 2 241.30' 12. "W x 3.0" H Vert,oritloe/Grate C= 0.600 #5 Device 2 244. ' 1 . "VIA x 3.0" H alert. orifice/Grate C= o. o Device 2 242.4 ' 4. ' long x 0. ' breadth B road-Crested Rectangular We!r Head (feet) 0.20 0.40 0.60 0.80 1.0 3819 Proposed conditions Type it/2 - r -Year Rainfall=6.5 #► Prepared by The Morin-Cameron Group, Inc. Printed 3115/2019 Hi droCA 0. - 3 s/n 00401 @ 2014roCAD Software Solutions LLC Page 13 Coef. (English) 2;30 2.92 3.08 3.30 3.3 Primary Oufflow Max=2.27 cfs @ 12.22 hrs HWl .3 ' (Free Discharge) t.4~Broad-crested Rectangular lar err (Passes 2.27 cfs of 38.84 cfs potential flog) ~:3=0 ulvert (Passes 2.2 cfs of 3.23 cfs potential flow) rifice/Grate (Orifice Controls 0.27 cfs @ 5.42 fps) =0rifioe/Grate (Orifice Controls 1.17 cfs @ 4.67 fps) -orifice/Grate (Orifice Controls 0.83 cfs @ 4.00 fps) Br at-crested Rectangular Weir Controls 0.00 cfs) IMIT of BORDERING + - VEGETATED coc cc 1 � � � � art . s• � ,i �'kLLI But cri CONC.RAMP t L. r l �J rr E7Q 7. 1 1 �r IU f f J i PARKING � � �� � � � � .. .. r Ll `M XI S I N N IN 1 S A BUILDING 2 ' PPWr 00 LLo STREET) ' *• DEO , MIPROAMAM LAWN ES < Lo DEPRESSION P CL 19 ! / I mllsli� y� 7M� ES1f15T + C yn ��' i �a� �y_4� � •-•l_+'x'�+ . fir f fJ �x� •�,F ili��; ,� 4�tii Y•I-.`.4�. yss tip,._y� � �{] Ld ES5 19-2 a PLAN pal 0 W I'V\ T `lR-- 40 so �................................................. .. ... ....... ...................................................................................................................................................................................................................................................I.............................................................. C) 0� W r� Ot s II -A* + �+ - � 4 1i *Akl-mm + ILo 244 ..F Al 44 i r k .. �: 1 , { r 1i S rn , . WNW U) COD rn +f `A I I , O ` .� i . . ,. II # rri ol -10 I '' � r - �, ,__► v ,�. —A\ PROPOSED SUBCATCHMENT FLAN FIGURE 5 The,, 100 1 LL 1 STREET M orin-Cameron (ASSESSOR'S MAP 9W,LOT 54) Y NORTH ANDOVER, MASSACHUSETTS OATS; FEBR ARY 13, 019 Y �_ US ]] PREPARED FOR: REV.: 1 1 CPAI ENONEERS I ENMRONME r oNI TAWS y GOURMET S l LT FOODS i 1�. y F Q SURMOR I LAM USE PLANNERS N am rrmud DQWm imasAmmm 4m P.m7n4w i,r7frJa A W,w"mwomwowm