Loading...
HomeMy WebLinkAbout2015-01-06 Drainage Report July 2014 I+. I DRAINAGE REPORT FOR BRADSTRE,ET PARTNERS,L LC, I 70 I MAIN STREE B R. J. PICA ENGM, RING CO,,INC. 8 WENMARKS ROAD NEWTON, has 03858r 63-32-666 JULY 21 Ronald pica 31369 ell I1 T" `� i EXISTING VS. PROPOSED SUMMARY OF SITE REDEVELOPMENT The existing Saunders street drainage system appears undersized per analysis of pre- development conditions. This is likely due to the small diameter r l 0" of the clay pipes used in the road drainage system. In the pre-development analysis, existing catch is ire Saunders Street overtop in I 0-year and higher storm events. 2. Based on the proposed site layout and grading, there is a reduction in off-site flog t the Saunders Street drainage system at catch basin 44. Additionally,there is a reduction of off-site flow to the adjacent parcel (Lot 58- 4 . There will be a negligible increase to off-site flog to the Main Street drainage system at catch basin # . See attached comparisons. 3. The total net impacts to all ff-site areas are as follows: '/2" Storm: -o.l4 o s -0.0 of (overall reduction) 2-Year storm: -0. 0 e s -0.0 of overall reduction) t 0-Year storm: -1.42 e s -0.1 o of (overall reduction) 2 -Year storrn: -J. s -0.12 of (overall reduction) o -Year Storm.; -l. 2 es -o.l ` (overall reduction) I i r s f Y r• r lII i I i e I e e I iI 1 F k EXISTING VS, PROPOSED ANALYSIS OF SITE REDEVELOPMENT On-Site Soils : Canton (hydrologic group B) Impact to Saunders Street Drainage System (at e . catch basin#4): 2" Rainfall Flow es Volume(at) Existing :0.25 0.02 Proposed.. o.I l o.o l 2-Year Storm Event Flow cs Volume f) Existing 2.97 0.21 Proposed... � 2.12 0.15 10-Year Storm Event Flow f' Volume f) . 8 0.3 Proposed 3; 2 0.2 ....................... 2 -Year Storm Event Flo1w(cfs) Volume (af) Exis i .g 5.96 0.44 Proposed . l 0.33 10 0Year Storm et flow(Cfs) Volume(af) t Existing 8.74 0.64 Proposed 7.66 0.52 ■ S k { t Impact to Main Street Drainage System t e . catch basin # ; V2" Rainfall Flow Volume a Existing 0.00 0.000 Proposed 1 .0 0.000 .................. 2-Year Storm EBret Flow es Volume af) Existing 0.07 0.004 Propose PEoposed 0.12 0.008 10-Year Storm Fucat Flow es Volume f Existing 0.13 0.008 I Proposed 0.19 0.013 I } I 2 -Year Storm Event f lq e s Volume a f) EExisting 17 0.012 Proposed 0.24 0.017 100-Year Storm Event Flow(cN Volume i Existing 0.28 0.019 Pao o ed 0.36 0.026 { i I' i i I t , I EX-2 -3 _ CB i i i i i i CB B B B B 3 5 6 f � s f EX CD-1 EX CB-2 EX(0-13-3 EX C AU DE EEC C13-5 EEC CB-(;(NSA � S 5 L TOTAL.OFFSITE IMPACT FACT I. t� S cat C k Drainage Diagram for B AD TREET RE Prepared R.J. PICA ENGINEERING CO., INC. 12 /2014 FY6HydroCADV8. 0 s/n 000961 0 2006HydroCAD Software Solutions LLC 4 r BRADSTREET-PRE Prepared by R.J. PICA ENGINEERING CO., INC. Page 2 dro AD s 1 0 2006 c roCAD Software Solutions LLC 7 26 '14 Area Listing (all nodes) Are (acreslC e r p ion b) 0.327 7 % Grass cover, Poor, HSG E $ E , EX.,7EX 0.840 98 Paved parking & roofs EX, EX,3EX,4EX, E , EX 1.167 f k I i i i' I a i. i 1 I RA ST EET-PRE Type 1/1 2 - r 2"STORM r r 11= . " Prepared by R.J. PICA ENGINEERING CO., INC. Page 3 ,HydroCADO 8.00 n 000961 0 2006 HLdroCAD Software Solutions LLC 712 / 0'14 Time p n=5. 0-20. hrs, dt=0. 5 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method -- Pond routing by Stor-Ind method s bo fo rnent I EX EX-1 Runoff Area=14,742 sf Runoff Depth 0.01" Flow Length=2 0' Tc=5.0 rein CN=86 Runoff= .00 ofs 0.000 arf s boas tit E : EX-2 Runoff Area=6,300 sf Runoff epth 0.30" Flow Length=93' T = .0 rain C1 =98 Runoff=0.05 cfs 0.004 of s b apt ent EX: X-3 Runoff Areas=9,040 sf Runoff C e th .30" Flow Len the 171' T =5.0 min CN=93 Runoff=9.08 ofs 0.005 of Surb atchme t 4E t X-4 f Runoff Area=5} 90 sf Runoff Depth 0.30" Flow Lerngth=140' Tc= .0 rein CN=98 Runoff--0.05 efs 0.003 af subGato ment SEX: EX-5 Runoff Area=10,562 sf Runoff epth 0.24" Flow Length=278' To=5.0 min CW97 Runoff--0.07 cfs 0.005af S boartch nt X# EX-6 Runoff Area=1,665 sf Runoff l e th>0.00" Flow Lengt =197' Tc=5.0 rein CN=81 Runoff--0.00 efs 0.000 of S bo to e t EXt EEC-7 Runoff Area=3+140 sf Runoff Depth=0.90" Flow Length=80' Slope= .0 50 'f Tc=5.0 rain C =79 Runoff-- . 9 ofs 0.000 of Pond 1: EX CB-1 Peak Elev=67. 1' lnflow=0.00 cfs 0.000 af 8.0"x 0 .0' Culvert Oufflow=0.00 ofs 0.000 of Pond 2: EX CB-2 Peary Elea=05.92' Inflow=9.05 nfs 0.004 of 10.0 x 13 . 'Culvert utflow=0.05 cfs 0.004 of Pond 3: EX CB-CB-3 Peak Elev=63.70' Inflow=0.13 ofs 0.009 aMf 1 .0 x 23.0'Gulvert Outflow-0.13 ofs 0.009af r Pond 4: EEC C SAu Rs Peak Elev= 3.03' lnf#ow=0. 5 efs 0.017 of 10.0 00.0'C u Ivert 0 utflovwr=0.25 ofs 0.0 17 of f Pond 5w. EX CB-CB-5 Peak lev= 4. ' Inflow=0.07 efs 0.005 of 0.011 x 01.0'Culver# Outflow=0. 7 cfs 0.005 of Pond : EX CB-8 MAID Peak lev= 7. 9' Inflow=9. 0 cfs 0.000 arf 1 . tN x .0'Culv,.+rt Oufflow=0.00 cis 0.000 of k Y Y k Lin L: TOTAL OFFSITE IMPACT l flo =0. 5 ofs 0.017 of Y k -Primary=0.25 cfs0.017 arf r'. k k Total Runoff Area 1.167 ac Runoff volume-0.017 a f Average Runoff Depth .18" h 28.02% Pervious Area 0.327 ac 71.98% Impervious Area 8.848 ac k s. "s P x RA ST R T-PRE Type !2 -fir 2-YEAR Rainfall 3.2 'f Prepared by R.J. PICA ENGINEERING CO., INC. Page 4 flydroCADO8.00 /n 000961 0 2006 HyoroCAD Software Solutions LLC 7 26 2 14 Time span= , -2 . 0 hrs, dt=0.05 hr } 31 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor ind+Trans method - Pond routing by St or-Ind method sub, of n 1 XF EX-1 runoff Aree=14,742 sf Runoff Depth . 1" Flow Lengt =290' To=6.0 min CIS=88 Runoff--0,73 ofs 0.048 of Subcatchment 2EX. X-2 Runoff Arear=6t3 0 sf Runoff Depth 2. 7" Flow Leng =98' Tc=5.0 min CIS=98 Runoff=0.45 cfs 0.033 arf Subs nt 3EX: EX-3 Runoff Area:9,o46 sf Runoff De th 2.77" Flow Length=171' Te= . min CIS=08 Runoff=0,65efs 9. 4 of suboa en 4 * EX4 Runoff Area=6, 99 sf Runoff ept .77" Flow Len th 149' T = .0 min CIS=08 runoff=0.89 cfs 0.029af Subcatchment 5EX: EX-5 runoff Area=1 0,562 sf Runoff D t . " Flow Len th= 78' T = .o min CIS=97 # urn f-- .7 cfs 0.054af s boar h # X-6 Runoff Area=1,666 sf Runoff De th 1.86„ Flow Length 197' Tc�5.0 rrrlrr C =81 f noff= .07 efs 0.804 arf subca oh e 7 : X-7 Runoff Arear=8,148 sf Runoff De t 1.28„ Flaw Len th=8 ' Slope= .0250 T Tc=6.0 m In C N=79 Runoff-- .11 cfs 0.007 arf Pond 1: EX CB-1 Peak le =67.61' lnflow=0.73 cfs 0.048 of 8.0#'x 92.0' Culvert Outflow=0.73 ds 0.048 of Pond 2; EEC C -2 Peak Ele =66.39' Inflow=1.18 cfs 0.082 of 10. +' 182.9' Culvert utflovw=l,18 cfs 0.082 of Pond 3: EX CB-CB-3 Peak le =84.37' Inflow=1.83 ofs 0.1 o arf 12.011 8.0' v o wr= .88 cfs 0.130 of � � I e u�ifl 1 Pond : EEC C SAu D s Peek leer=6 .02' Inflow=2.97 cfs 0.213 aEf 10.9"x 100. ' Culvert Outflow= .97 cfs 0.213arf Pond : EX C13-5 Peak le =84.9 ' l flow= .76 cfs 0.054 af 10.011 x 1. ' ulvert utflow=0.76 ifs 0.054 of k Pond : EX CB- (MAIN) Peak Ele =6 .61' Inflow= . 7 cfs 0.004 af 12.01P x 56.0'Culvert ufflow=8.07 ifs 0.004 of h Link 1 Lw TOTAL OFFSITE IMPACT Inflow=8.14 cfs 0.224af Prlmarry= .14 cfs 0.224 of } Total Runoff Area 1.167 ac Runoff Volume 0.224 af Average Runoff Depth h 2.31" 2 . 2 o Pervious Area 0.327 ac 71. % Impervious Area 0.840 ac k 3 BRADSTREET-PRE Type/1/24-hf 10-YEAR Rainfall=4. " Prepared by R.J. PICA ENGINEERING Co., INC. Page droCAD 8.00 n 000961 oo HydroCAD Software Solutions LLC 7 26/20 4 Time spa = .o -2o.00 hrs, dt�0.05 hrs, 301 points Runoff by SCS Tf --20 method, UH=SCS Reach routing by Stor-ind+Trans method - Pond routing by Sfor-Ind method Sub at br t 1 EX: X-1 Runoff Area=14,742 sf Runoff Depth 3.o "r Flow Len th=200' T =5.o min CN=86 Runoff--1.29 nfs 0.087 of Subcatchment 2 X: EX-2 Runoff Area=8,380 sf Runoff Depth 4.24" Flow Length=g3' T -=8.0 min CW 8 Runoff=0.88 ds 0.051 of suboat hment 3 : X-3 runoff Area= ,o48 sf Runoff Depth 4. 4" Flow Length 171` To= .o min CN=98 l unoff--o. 8 ofs 0.073 of Subcatchment 4 X: -4 Runoff ,390 sf Runoff Dept 4.24" Flow Length= 4o' T =8.8 min C = 8 Runoff--o. 8 ofs 0.044 of suboa h re t X: EX-5 Runoff Area=10,882 sf Runoff Depth 4.16" Flow Len the 78' T =B.o min CW97 f nofl'=1.14 ifs 0.084 of sub a chment : X-6 Runoff Area=1,665 sf Runoff Depth . " Flow Length=1 7' T = .o min CN=81 Runoff=o.'13 ofs 0.008 of Subcatchment'SEX: EX-7 Runoff ff Arear=3,140 sf runoff Depth .48," Flow Length=80' Slope=0.0280' T = .o ruin CN=79 Runoff=o.22 cfs 0.015 of Pond 1: EX C13-1 Peak lev= 7. 4' Inflow=1.29 ifs 0.087 of } 8.0 x 92.E Culvert Oufflow=l. ifs 0.087 of Pond 2+ EX C13-2 Peak lev= 8.8 ' I ow=1. 8 ofs 0.138 of .o#'x 132.0'Culvert outfl w�1. 8 ifs 0.138 of S k Pond 3: EX CB-3 Peak lev=84. 7' Inflow=2. 8 ds 0.211 of 1 .0"'x 23.0'Culvert Ou flow=2. 8 ofs 0.211 of k Pond 4: X C -4(SAUNDERS) Pear lev�88.g ' rr�flow= . ofs .�� of 1 . f Fx 1 oo. ' Culvert oufflow=4.68 cfs 0.33 of Pond : EX C13-6 Pear leer= 8.o3' Inflow=1.14 cfs 0.084 of 1 o.o'F 81.o'Culvert Oufflow=1.14cfs 0.084 of k `r Pond # EX CB-6 (MAIN)I Peak rev=67.88' Inflow=O.13 ofs 0.008 of 12.011 x 8 .0`Culvert outflow=o. 3 cfs 0.008 of Unk 1 L.: TOTAL OFFSITE IMPACT l nfl ow= .o3 ofs 0.362 of - rimary= .o3 ofs 0.36 of J Total Runoff Area= 1.167 ac Runoff Volume=0.362 of Average Runoff ff epth `3.7T' . °o Pervious Area - 0.327 ac 71. % Impervious Area 0.840 ao BRADSTREET-PRE Type // 24- 25-YEAR Rainfall= .00,r Prepared by R.J. PICA ENGINEERING CO., INC. Page dro A 3.00 In 000961 @ 2005 HLdroCAD Software solutions LLC 7 2014 Time s n�5,o -2o.00 hrs, dt=0.05 hrs, 301 points Runof' y SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+grans method - Pond routing by St r Ind method Subcatchment 1 E : EEC-1 Runoff Area=14f742 sf Runoff Dept 4.1 1 Flow Length=too' T = .o min CN=86 Runoff--1.72 efs 0.117 of subo tole ent 2EX: EX-2 Runoff Area=6,300 sf Runoff Depth 5.33tf Flow Length=93' ` c=5.g rein CW98 Runoff--o.86 efs 0.054 of subcatohr ent EX: EX-3 Runoff Areas=9,04 f Runoff Depth 5.33" Flow Len th=17'1' Tc= .o min CN=98 Runoff=1. 3 ifs 0.09 arf Subcatchment 4EX: EX-4 Runoff Area�5,390 sf Runoff e th 5.33 11 Flow Length=149' Tc=5.0 min CN=98 Runof o.73 cfs 0.0 of Subcatchment 6EX: EX-5 Runoff Area=10,562 sf Runoff epth 5.26" Flow Length= 7 ' Tc=5.0 min CN=97 Runoff=1.43 efs 0.106 of sutet EX: EX-6 Runoff Area=1, 5 sf Runoff depth>365" . Flow Len th-1 ' T -5.0 Amin CN=81 Runoff=o. 7 cfs 0.01 of su o tchment EX: EX-7 Runoff Area=3, 4o sf Runoff Depth .45" Flow Length o' Slope 0.o250'f T -5.0 miry C =79 Runoff-0.31 cfs 0.021 of Pond 1. EX CB-1 Peak leer= 9.# r I r flow= .72 sfs 0.11 of 3.9"x 92. 'Culvert outflo ws=1.72 fs o. 17 of Pond 2: EX -2 Peak lev= 7. ' Inflow=2. 7 cfs 0.182 of 1 .o"x 132.9'Culvert Outflow= . 7 cfs 0.132 of Pond 3: EEC C -3. Peak leer= 5. 1' Inflow=3. 0 cfs 0. 74 of 12.9'lx 23.0'C ulvert 0utflow=3. o cfs 0.274 of Road 4: EX C -4 SAUN ERS Peak Elea=7 . 3' f nflow=5.96 cfs 0.43 of 10.0"x 1 0.0' Culvert Outflow=5.96 cfs 0.435 of Pond : EX CE3-6 Peak lev= 5.11' l nflo =1.43 efs 0.10 of 10.0" 1. ' uivert Outflow=1.43 fs o.19 of f. Pond : EX C (MAIN) Peak lev= 7. 3' Inflow=0.17 efs 0.012 of 12.011x 55.0'Culvert Outflow=0.17 cfs 0.012 of i Link 1 L: TOTAL AL OFFSITE IMPACT lnflo wr=5.45 efs 0.467 of 'Primary=6.45 cfs 0.457 of } Total Runoff Area .1 Runoff Volume .4 Avre I Ct =4.80"' 2 . 2% Pervious Area 0.327 ac 7 . % Impervious Area= .84 RA D S R E ET-P R Ty ///2 -hr 100-YEAR air ll= . Prepared by R.J. FICA ENGINEERItiIG CO., INC. Page 7 .UydroCAD 8.00 s/n 000961 0 2006 HydroCAD Software Solutions t.LC 7/2 2014 Time span=5.00-20.00 hrs, df=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by tor-Ind+Tran method - Pond routing by Stor-i d method Subcatchment 1 X: EX-1 Runoff Area-14,742 sf Runoff D pt# 8.54" Flow Le a tl = oo' Tc=5.0 min C =88 Runoff--2.63 cfs 0.184 of subcatch e t 2FX; X- Runoff Area=B, oo sf Runoff Dept 7.6911 Flow Len th 93' T =5.o Amin C =98 Runoff--1.23 cfs 0.093 of Subcat meat 3 : X-3 Runoff Area= ,o48 sf Runoff Deptfr 7.89,1 Flow Le ft =171' Tc=5.0 min CN=98 Runoff=1.77 cfs 0.133 arf subcat l ment 4 : EX-4 Runoff Area= ,390 sf Runoff Depth 7.89" Flow Len t -' 40' T =5.0 min CN=98 Runo -1.05 cfs 0.079 of subatce X: EX-5 Runoff Area='10,882 sf Runoff Dept7.83" Flow Length=278' Tc=5.0 rein G1 =97 Runoff--2.06 cfs 0.154 of a Subcatchment X: EX-6 Runoff Area= }885 sf Runoff Depth 5.95" Flow Len th=197' Tc-5.0 rein CN=81 Ru off--9. 8 cfs 0.019 of Subcate 7XR EEC- ' Runoff Area=3,140 sf Runoff Depth5.72" Flow Length 80' Slope=0.0250'f Tc=5.0 min C =79 Runoff-- .51 cfs 0.034 of f Pond 1: EX CB-CB-1 Peak Riev=73.39' lnflow=2.83 cfs 0.184 of 8.0't x 92.0' Culvert oufflor-2.83 ofs 0.184 of Pond * EX c13-2 Peak Elev=71.1 lr flo =3.88 cfs 0.277 of 10.0"x 1 2.0'Culvert oufflow�3.88 cfs 0.277 of Pond : EX CB-CB-3 Peak Elev=87.52' lnftow=5.83 cfs 0.410 of 12.0"x 23.0'Culvert 0 ufflow-5. 3 cfs 0.410 of 'r yY Y k Ponce 4: EX c SAUNDERS) Peak E ev=85.40' Inflow=8.74 cfs 0.643 of 10.0'r C 189.9' Culvert outflow= .74 cfs 0.643 of Pond : EX C13-5 Peak Elev-65.30' lnflow=2.06 cfs 0.154 of 10.0"x 81.0'Culvert ouftflow= .08 cfs 0.154 of Pond * EEC c AI Peak Elov=57.73' lnftow=0.28 cfs 0.019 of 12.0 x 55.0'Culvert Outflow=0.28 cfs 0.019 of Unk IL: TOTAL OFFSITEIMPACT Inflow=9.52 cfs 0.697 of Primary=9.52 cfs 0.697 of Total Runoff Area 1.167 ac Runoff Volume 0.697 af Average Runoff Depth 7.16" 2 . 2% Pervious Area� .327 ac 71. 8% I ervious Area�0. 40ac r e APR 2PR 3 R R 5PR 6PR 2 P - P F`1OL-4 PFL i -6 IIFILTR O BED I �+ 11 r CB B CB CB B 8 2R 1 2 `�..� PR. ROOF## EX - -3 X CB (SAU RS) E CB- CB (MAIN) I I j B <-- 8R IL I I I PR CB-7 PR #8 8PR TOTAL OFFSITE IMPACT f f IR 3 PR. ROOF#1 2 x 1000 G SHALLOW DRY WELL k Y. h� S. yy I Y Y f I I S� I a t Subcat Reach on Link Drainage Diagram for B D T EET-POST(REV1 Prepared by R.J. MCA ENGINEERING CO., INC. 71 1 1 HydroCADO 8.00 sln 000961 Q 2006ydroCAD Software Solutions LLC BRADSTREET-POST(REVI) Prepared by R.J. PICA ENGINEERING CO., INC. Page 2 t!LdroCAD@ .00 n 000961 0 2006 HydroCADSoftware Solutions LLC 7/26/2014 Area Listing (all nodes) Area acres CN Description (subcatsj 0,147 61 75% Grass cover, Good, HSG PR,3PR,5PR,6PR,8PR) 1.020 98 Paved parking & roofs PR,lR,2PR,2R,3PR,4PR,5PR,6PR,8PR) 1.167 f } S: Y 'h }: k r. r r r. k 'r' e }: r I� i I IL A ST T-POST E Type it/2 - r 2"'STORM ire 1= .5 1 1 Prepared by R.J. PICA ENGINEERING CO., INC. Page 3 ELd,roCAD(R)8.00 s n 000961 C 2006 HLdroCADSoftware Solutions LLC 7 2 2014 Time n= . --2 . r , dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by sfor-ind+Trans method - Pond roofing by Stor-Ind method Sub at h nt't PR: PR-PR-1 Runoff Area= x705 sf Runoff f pth .15" Plow Len th=85' Slope= . 28 'P T =5.o min CN=95 Runoff-- .o3 cfs 0.002 of S be tchm n I : PIS. ROOF F #1 Runoff Area=4,990 sf Runoff Depth o.30" Te=5.0 ruin C1 = 8 I unoff-- . 4 cfs 0.003 of Subcatchment 2PR: Pry-2 Runoff Area=4,281 sf Runoff I epth .3 " Flow Length=1 3' Tc�5.0 miry C �08 Runoff= . 4 efs 0.002 of Subcatchment 2R: PR. ROOF#2 Runoff Area=8,0 4 sf Runoff[ e th 0.30" Tc=5.0 min C =08 Runoff= . 8 efs 0.005 of S beatch rit PT : PR-3 Runoff Area=8 5 sf Runoff Depth . 5" Flow Len th=83' Tc=5.0 min CN=90 I unof'f-- . o efs 0.000 of Suboatchm 4PI : PR-4 Runoff Area=1,2 0 sf Runoff epth 0.3 " Flow Len th=50' T -5.o min C =08 unoff=0. 1 efs . 8 of Subcatchment 5P : PR-5 Runoff Area=3#8 0 sf Runoff Depth=0.00 Flow Length=157' Tc- . min C1 =78 Runoff- .00 efs 0.000 of Subc tcb n SPIN* PR-6 Runoff Area=1,8 2 sf Runoff i epth 0.1 " Flow Length=1 ' Slope= . 8 T T =5.o min C1 =g3 Runoff=0.00 efs 0.000 of Sbeacbn P : P runoff Area=18f98 f nff eth .08" Flow Length= 3 ' Te=5.0 min CN=92 Runoff- . 3 ds 0.003 of f Pond I EX CB-1 Peak leer=07.1 ' lnfiow=0.03 ofs 0.002 of 8.0,E . 'Culvert Outflow=o. 3 cfs 0,002 of Pond ; EX C -2 Peak Elev= 5. ' Inflow=0.07 efs 0.004 of 10.0"x 80.0'Culver# Outflow=0.07 efs 0.004 of Pond P: INFILTRATION BED Peak Elev=70.1 1' Storage=3 cf Inflow=0.08 efs 0.005 of DI earde f= . 3 ds 0.005 of Prj ary� .00 ds 0.000 of Outflow= .08 ifs 0.005 of Pond 3: EX CB-3 Peak Elev=63.67' lnflow=0.10 efs 0.007 of k } 2.0"x 23.0'C ulvert 0 ufflo w=O.10 efs 0.007 of k } Y >. Pond 3P: 2 x 1000 G SHALLOW F WELL Peak El v=64.03' Storage=2 cf Inflow= . 4 efs 0.003 03 r is arded= .o4 efs 0.003 of Primary=0. 0 ds 0.000 of •Outflow= .84 ifs 0.003 of } Pond 4* EX e SA S Peak lev= .g5' Inflow= .1'I ifs 0.008 of 18.U'x 1 O. 'Culvert tflow=0.1 1 ofs 0.00 of 1 RA S R T- ST E 1 Type 1/124-h 2"STORM Fir I1= .5 ' Prepared by R.J. FICA ENGINEERING CO., INC. Page 4 d roCADO 8.00 s/n 000961 0 2006 H droCAD Software Solutions LLC 7/2 2014 Ponce : EX CB-5 Peak lev=6 . 0' infiow=0.00 cfs 0.000 of 10.011 c 1. `Culvert Oufflow=0.00 cfs 0.000 of { Pond : EX CBS AI Peak lev=6 . 2' Inflow= , 6 cfs 0.000 of 12.011 x 6. ' Culvert outflow=0.00 cfs 0.000 arf Ponce 7: PR CB-7 Peak Elev=64. 7' Inflow=0.07 cfs0.004 of 10.011 x 50.0' Culvert Oufflow=0.07 efs 0.004 of Ponce : P -8 Peak le =66. ' lnflow=0.03 cfs 0.003 of 12.011 2 'Culvert u ow=0. 3 cfs 0.003 of Link I L: TOTAL OFFSITE IMPACT fnfl w� .I I cfs 6.008 of P ri r a ry= .I I cfs0.008 of Total Runoff Area 1.167 ac Runoff Volume=0.016 of Average Runoff Depth= .17" 1 .61% Pervious Area 0.147 ac 87.39% Impervious Area= 1.020 ac 1 } } r } } } } r r BRADSTREET-POST(REVI) Type /if 24-hr 2-YEAR f l r l=3.20" Prepared by R.J. PICA ENGINEERING G CO., INC. Page 5 HydroCAD 8.09 s n 009961 0 2006 Hy roCAD Software Solutions LLC 7 2 /2 1 Time spars= . 0-2 .00 ors, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by st r-Ind+Trans method - Pond routing by St or-Ind method Subcatchment 1 P : PIS-1 Runoff~Area=6,706 sf Runoff Dept 2. 0" Flow Len th 88' Slope=9.9280# ' ` c= .9 min CN=95 Runoff--9.48 cfs 0.932 of Subcatchment I R: PR. ROOF#1 Runoff Area=4,990 sf Runoff Dept 2. 71t TO=5.0 min C1 =98 noff--0.36 ofs 0.026 of Subo t t 2P : PR-2 Runoff Area=4,281 sf Runoff Depth 2.77" Flow Length=123' Tc .9 min C 1=98 Runoff=0.31 ofs 0.023 of su cat men 21 : PR. ROOF#2 Runoff Area=8,904 sf Runoff Dept 2,77" Tc0 .0 min C =98 runoff--9.64 ofs 0.948 of Subcatchment PR: PR-3 Runoff Area=825 sf Runoff Depth 2.94" Flog Length=83' Tc= .9 ruin CW90 Runoff--0.05 cfs 9.003 of Subcatchment 4P1 : PR-4 Runoff Area='1,290 sf Runoff noff Depth 2.77" Flow Lengtl = 0# Tc= .9 miry Cl 98 F uneff--9.09 ofs 0.907 of Subcatchment P : PIS-5 runoff Area=3,829 sf Runoff Depth 9.89" Flow Length 1 ' Tc0 .9 rain C T73 Runoff--O. ofs 9.007 of s bo t l meat P : P Runoff Area=1 t8 2 sf runoff Dept 2.31" Flow Length 192' Slope=0.92 9' Tc=5.0 miry CN=93 Runoff=0.12 ofs 0.008 of Subcatchment P : 8PR Runoff Area=18,998 sf Runoff ff Depth 2.2 " Flow Length=232' To= .0 mitt CN=92 l unoff--1.12 ofs 9.077 of Pond 1: EX C -'1 Peak Elev�-- 7.49' lnflow=0.45 ofs 0.032 of 8.911 92.0`Culvert Oufflow=0.45 cfs 9.932 af Pond 2: EEC B-2 Peak lev= 0.2 ' Inflow=0.76 ofs 0.055 of 10.0" 80.9'C lvert Oufflow=0.76 ofs 0.055 of Pond 2P* INFILTRATION BED Peak Elev=71.10' storage=30 lnflow=0.64 cfs 9.948 of Disare �9.21 ofs 9.948 of Priarr0.90 ofs 9.000 of Oufflow=0.21 ifs 0.048 of Road 3: EX CB-3 Pear Elev= 4.41 lnflow=1.93 ofs 0.135 of 12.9 23.9'C lvert Outflow=1.93 ofs 0.13 of } } Pond 3P: 2 x 1000 G SHALLOW DRY LL Peak leer= .77' storage=349 cf Inflow=036 ofs 0.026 at } Discarded=0.05 efs 0.026 of Pri nary=0.00 ofs 9.000 af -Outflow=0.05 cfs9.926 of } Pond : EEC CB- SAUNDE S Peak lev= . 2' lnflo =2.12 ofs 0.148 of 10.0 x 190.9'Culvert utor-2.12 ofs 0.148 of ri S: k } S: k } yk h$Y L BRADSTREET-POST(REVI) T ! 12 - 2-YEAR Riff =3,20" Prepared by R.J. PICA ENGINEERING CO., INC. Page HyqroCAD@8.00 000961 0 2006 HydroCAD Software Solutions LLC 7/26/2014 Pond : EX D Peak El v= 4. ' inflow=0.10 cfs 0.007 of 10.011 c 61.0' Culvert ut w=8.18 ofs 0.007 arf Pond * EEC D (MAIN) Peak E ar=87. ' Inflow= . 2 ofs 0.008 of 1 .8"x 56.0' Culvert t#1 w .12 cfs 0.008 of Ponce 7# PR CB-7 Peak Elo = 8.10' lnflow=0.76 cfs 0.055 af 10.011 0.8' Culvert Outflow=0.76cfs 0.055 of Pond ' PIS CB-CB-8 Peak lov=8 .38' Inflow=1.12 ofs 0.077 of 12.011 x 24.0'Culvert Oufflow=1.12 ofs 0,077 of Link n I L w TOTAL OFFSITE IMPACT lnflow=2.24 ofs 0.1 af P ri m a ry=2.24 ofs 0.1 8 of Tot f Runoff Area 1.167 ac Runoff volume=0.230 of Average Runoff Depth= .37" 1 . 1!; Pervious Area 0.147 ac 87.39% Impervious Area 1,020 ac i 1 I r i i} r pp}} } f i k yE 3s kY F 7. r: ri i k t• k 's r: h s JJ I i 1 I. A STR T-P ST REVI Type /I!2 -hr -YEAR Rainf 11= . '' Prepared by R.J. PICA ENGINEERING CO., INC. Page 7 droCAD 8.00 s 000961 C 2006droCAD Software Solutions LLC 7/26/2014 Time a span 5. - .00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, 1 =SCS Reach routing by Str-id+Trans method - Pond routing by Sr-Ind method Subca r e I PR: PR-1 runoff Area=6,706 sf Runoff De th 3.98,1 Flow Length= 5' Slope=0. 2 0`' c 5.0 min CN=95 Runoff=0.71 efs 0.051 of Suboat r e I R: PR. ROOF##1 Runoff Area=4,990 sf Runoff ff Depth 4• 4IF Te=5.0 min C N=98 Runoff=0.54 cfs 0.040 of Suboafoh en 2P1 : PR-PR-2 Runoff Area=4,281 sf Runoff f th . 4" Flow Length�123' c=5.0 min CN=98 Runoff=0.40 cfs 0.035 of Subo tch ent 2 : PR. ROOF#2 ! Runoff Areas=8,964 sf Runoff De th 4.24" Tc=5.0 rain CN=98 Runoff--0.97 cfs 0.073 of Subo t e t PR: PR-3 Runoff Area=825 sf Runoff De th 3.48" Flow Length=8 ' Tc=5.0 min CN=90 l unoff--0.08 cfs 0.005 of Su oast a 4PR: PR4 Runoff Area=1, 90 sf Runoff Depth 4. 4" Flow Length=5 ' Tc=5.0 min CN=98 Runoff--0.14 cfs 0.010 of Sub at hme t SPIN: PI Runoff Area=3,829 sf Runoff Depth .96" Flow Length=1 7' Tc=5. rein CN 7 Runoff- .2 ifs of Subcatchment PR: PR-PR-6 Runoff Area=1,862 sf Runoff Depth .7 " Flow Length=192' Slope= . 2 0? Tc=5.0 min CN=90 Runoff=0.19 cfs 0.018 of Subcatchment P : 8PR Runoff Aron=18, 98 sf Runoff D pth 8. 8" Flow Length=232' Tc= .0 min CN=92 Runoff--1.82 cfs 0.127 of Pond 1: EX C -1 Peak leer=07. 0' lnflow=0.71 cfs 0.051 of . "x 9 . 'Culvert ulo =0.71 cfs 0.051 of Ponce 2: EX CB-CB-2 Peak lev= .8 lnfl w=1.17 cfs U86 af 0.0"x 80.0' Culvert u ow=l.17 cfs 0.086 af Pond 2P: INFILTRATION BED Pearls lov�71. 0' Storage=7 a cf lnflow=0.97 efs 0.073 of Disoarrde&0.21 efs 0.073 of Pri air = .00 cfs 0.000 of utflovw=0.21 efs 0.073 arf Pond : EEC C Peak lov= 5.04' l flow= . 7 cfs 0.224 of 12.0 x 28.0'Culvert Outflow-8. 7 cfs 0.224 of k Y Pond 3P: 2 x 1000 G SHALLOW DRY WELL Peak lov=07.88' Storarge=428 of Inflow= .54 cfs 0.040 of Discarded=0.05 cfs 0.035 of Prlrnary=0. 4 cfs 0.006 arf -Outflow= .29 cfs 0.040 of h k } Pond : EX CB4 SAU RS Peak lev= 4.29' Inflow=8.42 cfs 0.249 of } 10.0 1 g .0' Culvert utfiovw= .42 cfs 0.249 of i i' z' r BRADSTREET-POST(REVI) T ///24-h -YEAR 1n 1- . " Prepared by R.J. MCA ENGINEERING CO., INC. Page flydroCADU 8.00 s/n 000961 Q 2006 HLdroCAD Software Solutions LL 7 2 /2 1 Pond : EX CB-5 Peals Flag= .71' lnfl w= .22 cfs 0.014 of 10.011 c 1. ' Culvert Oufflow=0.22 cfs0.014 of Pond : EX C (MAIN) Peals l v= . ' Inflow=9.19 efs 0.013of 12.Oil . 'CuIv rt Outflow=9.19 cfs 0.0 13 of Pond 7: PR CB-7 Peak l V= .2 ' lnflow=1.17 cfsof 10.011 x 50.0'Culvert Outflow=1.17 cfs 0.086 of Pond . PR CB-CB-8 Peak l v= . 2 lnflow=1.82 cfs 0.133of 12. '#x 24.9' Culy rt Oufflow=1.82 cfs .13 of Link 1 L: TOTAL OFFSITE IMPACT Inflow= . 1 cfs 0.263of Primary=161 cfs 0.263of Total Runoff Area 1.167 ac Runoff Volume=0.370 of Average Runoff Depth = . "' 'I , °o Pervious Area 0.147 ac 87.39% Impervious Area 1.020 arc E 1 r RADsTREET-P sT F I Tye ///2 - 25-YEAR Rainfall=6.001t Prepared by R.J. PICA NGII RING CO., INC. Page 9 .!jdr CAD .09 s/n 000901 0 2998 HydroCAD Software Solutions L C 7 2 12 14 Time span= .00- 0.00 brs, dt=0.05 hrs, 301 points Runoff by SCS T -20 method, UH=SCS Reach rousting by St r-ind+Trans method - Pond routing by St or-Ind method Subcatchment 1 P : P A � Runoff Area=6t79 sf runoff Dept .98" Flow Ler thL85' Src a 0.0 80 7' Tc= .0 rain CN=95 l ur cfff 9. 9 efs 0.065 of Subcatchment 1 : PR. ROOF f#1 Runoff rea=4,999 sf Runoff Depth .33" `fie= .9 min N=98 Runoff=0. 8 cfs 0.951 of Su cat h en P : PR-PR-2 Runoff Area=4, 81 sf Runoff Depth .33" Flow t..en tl 123' Tc= .0 min CIS=98 Runoff--9. 8 efs 0.044 of Subcatchment 2R: PR. ROOF#2 runoff Area= }984 sf Runoff Dep h .33" `c= .9 min CIS=98 Runoff--l.22 cfs 0.091 of Subcatchment 3P : PR-3 Runoff Area=825 sf Runoff Dept 4. 8" Flow Length= 3' T = .0 min CI 1=98 Runoff--O.19 efs 0.007 arf Subcatchment 4P : PR-4 Runoff Area=1# 99 sf Runoff Depth .33" Flow Len th= ' Te= .0 rain C1 =98 Runoff--0.18 ifs 0.013 of Subcatchment P : PR-PR-5 Runoff Area=3,829 sf Runoff Depth 2.8 " Flow Le gth�1 7' Tc= .0 min CN=73 Runoff=0.32 cfs 0.021 of Subcatchment 6PR: P f Runoff Area=1,8 2 sf Runoff Depth 4.09" Flow Len tl' ='.19 ' slope=0.0 80'' Tc.-5.0 min I �93 Runoff=-0.� cfs O. '1 of Su# artht P : 8PR Runoff Area= ,098 sf Runoff Depth4.79" Flow Len th= 32' 'c= .0 min CIS=92Runoff--2.33 efs 9.100 of Pond 1: EX CB-1 Peak lev=67.09' Inflow=0.09 efs 0.065 of 8.9"x 92.9'Culvert fflo =0. 9 efs 9.065 of Pond : EEC C13-2 Peak Elev=66.48' 1nflo w=1.4 'ifs 0.114 of 10.9"x 80.0' Culvert ufflow=1.4 cfs 0.114 of Pond 2P: INFILTRATION BED Peak lev=7 .2 ' Storage=907 cf Inflow=1.22 ifs 0.091 arf Discarded=0.21 cfs 0.086 of Prlrnar =0. 0 cfs 0.005 of u ow=9.4`l efs 0.091 of Pond 3: EX C -3 Peak Slav=6 .09' Inflow=4.12 ifs 0.298 of 1 .01'x 23.0'Culvert Outflows-4. 2 ifs 0.298 of n Ponce 3P: 2 x 1000 G SHALLOW DRY WELL Peak lev=8 . ' storage=48 cf 1nfl w�0.68 cfs 0.051 of r: Disca rded=0.05 efs 0.040 of Prim ary=0.45 ifs 0.9 11 of •0utflow=9.50 efs 0.0 1 of h Y ri k k k Pond : EX CB-4 sAUNDERS Peat le =00.89' Inflow=4.01 cfs 9.332 of j 10.0"x 109.0'Culvert Outflow=4.61 cfs 9.332 of n 'h k: S f RA ST ET-POST EV Ty ///24-fir 2 -YEAR Rainfall=6.0011 Prepared by R.J. FICA ENGINEERING CO., INC. Page 10 HydroCADO 8.00 /n 000961 2006 HydroCADSoftware Solutions LLC 2 / 014 k Pond 5: EX CB-5 Peak Elev=64.76' lnflow=0.32 efs 0.021 of 10.011 C 1. #C lv rt Oufflow=0.32 efs0.021 arf Pond : EX CB-6 MAIN Peak Elev=67.7 V In o wr-moo.24 cfs .0 17 of 12.019x 56.0' Culvert Outflow= . 4 cfs 0.017arf Pared : PR CB-7Peak Elev=6 5.33' Inflow=1.47 cfs 0.114 of 10.011x 50.0'Culvert Oufflow=1.47cfs 0.11 of Pored 8# PR CB-8 Peak l v=67.9 ' Inflow=2.59 cfs0.177 af 12.011 I . " 2 .9'Culvert Outflow=2.59cfs 0.177af Lid IL:TOTAL OFFSITEIMPACT lnflow�4.85 efs0.350 of Primary=4.85 cfs 0.350 f Total Runoff Area 1.167 ac Runoff Volume=0.476 of Average Runoff Depth=4.89"' 12.61% Pervious Area=0.147 ac 8 '.89% Impervious Area= 1. 2 f Sf f z 4' F. 2. i 3 3 i I. RADSTREET-P s " R v y ///2 -fir 100-YEAR Rainfall=8.60" Prepared by R.J. FICA ENGINEERI G CO., INC. Page II !:!ydroCADO8.00 n 000961 2006 HydroCAD Software Solutions LLC 7f26/2 1 Time span- . -2 .0 r , dt=0.05 hrs, 301 points Runoff by SCS T -20 method, UH=SCS Reach reefing by Ster-Ind+Trams method - Pend routing by Str-Ind method Subc t PR: P A Runoff Area=6,706 sf Runoff De th 7. " Flow Length=8 ' Slope=0.0289'' Tc= .8 rein CN=95 Runoff--1.29 cfs 0.096 of Su catch e I I : PR. ROOF#1 Runoff Arear=4,999 sf Runoff Dept 7. 9" c= .0 min CN=98 Ru off-- .97 cfs 6.073 of Subc t h e t P : PR-PR-2 Runoff Area=4,281 sf Runoff Depth 7.69" Flow Length=1 3' T = .0 min CN=98 Runoff=0.84 cfs 6.063 of Subcatchment 2R: PR. ROOF#2 Runoff Area=8,964 sf Runoff Depth 7. 9" Tc=8.0 rain cN=98 Runoff=1.75 cfs 0.132 of Subcatchment 3PI : PR-3 Runoff Areas=8 8 sf Runoff Dept1 0.98" Flow Length=83' Tc= .0 miry C N` 90 Runoff--O.15 cfs 0.011 of suctret P # PI -4 Runoff Area=1 x290 sf runoff Dept7.69" Flow Length= ' Tc=5.0 resin CN=98 Runoff--0.25 cfs 0.019 of sccet 6P : PR-5 Runoff Area=3,829 sf Runoff Depth .01" Flew Length=1 7' Tc= .0 min CN 73 Runoff-=� .88 cfs 0.037 of Subcatchment 6PI : PR-6 Runoff Area=1,862 sf runoff Depth 7.29„ Plow Length=192' Slope=6. 80'f Tc= .0 min cN=93 l un ff-0.30 cfs 0.026 af Subcatchment PI : 8PR Runoff Area 18,098 sf Runoff Dept 7.1 " Flow Length 32' Tc= .0 min CN=92 Runoff=3.43 cfs 0.249 of Pond . EX CB-1 Peak Elev=68.16' l f ow=1.29 cfs 6,696 of 8.Otrx 92.0'Culvert Outflow=1.29 cfs 0.096 arf Pond : EX CB-CB-2 Peak Elev=67. 1' Inflow= . 7 cfs 0.182 of 16.0 80.0'Culvert Outflow=2. 7 cfs 0. 8 of Pond P: INFILTRATION BED Peak EIev-73.01' Stc rage=1,1 3 cf Inflow=1.7 cfs 0.132 of Discarded=0.2 cfs 0.109 of Primary= .69 cfs 6.023 of Outflow= .91 cfs 0.132 arf Pond : EX C13-3 Peak lev=6 .31' Inflow= .8 'cfs 0.467 af 12.0 x 23.0' Culvert Outflow= .87 cfs 0.467 arf Pond P: 2 x 1000 G SHALLOW DRY WELL Peak lev�6 . 9T �� r e� 23 of �nflow� 7 cfs 0.873 f Discarded=0.05 cfs 0.049 of Prim ry=0.96 cfs 0.028 of Outflow=1.61 cfs 0.073 of } Pond CB- sAUI s Peak lev=79. ' Inflow=7.68 cfs 0.522 of } 10. "x 100.0'Culvert Outflow=7.06 cfs 6.822 of 'r r } `r } } 'r i p# }6 g}#3 F r i k RA STR T- oST(REVI) T a 11 2 -fir -YEAR rainfall=8.60" Prepared by R.J. PICA ENGINEERING CO., INC. Page 2 d roCAr .off s n 000961 0 2006 HydroCAD Software Solutions LLC 7 26 2014 Pond : EX C13-5 Peak lov�54. 5' In ovw=0.55 cfs 0.037 of 1 o.o"x 51.0'CuIv rf 0 of ow= .55 cfs 0.037 of Fond : EX CB-6(MAIN) Peals 1 -= 7.75' lnfiow=o. 6 ofs 0.026 of 12.otr 5 .0' uiv r Oufflow=0.36 cfs0.025 of Pond 7: PR CB-7 Peak EI v=65. ' Inflow=2.47 cfs o.1 2 of 0.01 1 5 .0' Culy rf ufflow=2.47 cfs 0.182 of Pored y PR C13-8 Peak El v= .2 ' lnflow=4.28 cfs 0.274 of 12.011x 24.0'Culver# Oufflow=4.28 efs0. 74 of Lank 1 L; TOTAL.OFFSITE IMPACT Inflow= .00 cfs 0.54 of Prlrory= .00 ofs 0.54 of Total Runoff Area= 1.1 7 a o runoff Vol ume=0.706 of Average Runoff Depth=7. " . 1% Pervious Area .147 ago 87.39% Impervious Area .020 arc