HomeMy WebLinkAboutConstruction Notes - - Consultant Review - 234 HAY MEADOW ROAD 3/18/2021
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 234 Hay Meadow Road MAP: 104.B LOT: 0079
INSTALLER: John DIVincenzo – Stewarts/J and S Dev
Permit # 58734
INSPECTIONS - D-box, 40' of PVC pipe, baffle and 2 risers
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe
Comments: Stephen Casey – 3.18.2021
2 Risers Checked
Baffle Checked – will send image, will approve once image is received – received
40’ PVC pipe