Loading...
HomeMy WebLinkAboutConstruction Notes - - Consultant Review - 234 HAY MEADOW ROAD 3/18/2021 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 234 Hay Meadow Road MAP: 104.B LOT: 0079 INSTALLER: John DIVincenzo – Stewarts/J and S Dev Permit # 58734 INSPECTIONS - D-box, 40' of PVC pipe, baffle and 2 risers DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) Schedule 40 PVC Pipe Comments: Stephen Casey – 3.18.2021 2 Risers Checked Baffle Checked – will send image, will approve once image is received – received 40’ PVC pipe