Loading...
HomeMy WebLinkAboutFull Repair Septic - Correspondence - 160 CARLTON LANE 3/24/2021 9/23/2019 Town of North Andover Mail-160 Carlton "NORTH ANDOVER Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov> 160 Carlton 2 messages Dan Ottenheimer<dano@millriverconsulting.com> Fri, Sep 20, 2019 at 3:18 PM To: Toni Wolfenden <twolfenden@northandoverma.gov>, Brian LaGrasse <blagrasse@northandoverma.gov> Brian, Toni - FYI,there were some sloppy construction issues that were identified at this site today. Notably the outlet from the septic tank was leaking as was one of the outlets from the d-box. He is a good guy, but was not fully ready for the inspection. Paperwork will not be coming to you until next week but I wanted to give you a heads up that he will be fixing the tank outlet and d-box outlet and contacting you to perform a final inspection. I am sure you can handle it but if it something that fits into my work for Peter Breen at 997 Dale Street I'd be glad to check on it if you'd prefer. I gave him the ok to backfill the other parts of the system. Dan Daniel Ottenheimer, PE President �tfs t� MILL RIVER CONSULTING (.rehire Solmiotte for latuf DevelopmcTit 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.miliriverconsulting.com https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f`/`3Al645223178195293352&simpl=msg-f%3Al64522317819... 1/2 9/23/2019 Town of North Andover Mail-160 Carlton Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association Toni Wolfenden <tolfen den @north andoverma.gov> Mon, Sep 23, 2019 at 8:31 AM Draft To: Dan Ottenheimer<dano@millriverconsulting.com> Cc: Brian LaGrasse <blagrasse@northandoverma.gov> Toni K. Wolfenden Health Department Assistant 978-688-9540 1LO,,;cid:image002.jpg@01 CD02A1.85A49B40 [Quoted text hidden] u image001.jpg 4K https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1645223178195293352&simpl=msg-f°/o3Al64522317819... 2/2 8/7/2019 Town of North Andover Mail-Revised plan review-160 Carlton Lane NORTH AN DOVER Massachusetts Toni Wolfenden <tolfenden@northandoverma.gov> Revised plan review - 160 Carlton Lane 1 message Dan Ottenheimer<dano@millriverconsulting.com> Wed, Aug 7, 2019 at 3:24 PM To: Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey <scasey@northandoverma.gov>, Toni Wolfenden <tolfenden@northandoverma.gov> Cc: Sandra Lezcano <sandral@millriverconsulting.com> We have completed our review of the revised plan for 160 Carlton Lane and find it meets the requirements in state and local regulations. Note they are requesting a local Upgrade Approval for a reduced setback from the foundation to the soil absorption system which we think makes sense in this instance. Any questions, do let me know. Dan Daniel Ottenheimer, PE President f ZN L RIVER CONSULTING Creative Solutims for L:uid lk-vulopment 6 Sargent Street Gloucester, MA 01930-2719 Phone: 978-282-0014 ext.802 www.millriverconsulting.com https://mail.google.com/mail/u/0?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f`/o3Al 641237314285065562&simpl=msg4%3A164123731428... 1/2 8/7/2019 Town of North Andover Mail-Revised plan review-160 Carlton Lane Member: New England Water Environment Association, Yankee Onsite Wastewater Association, Massachusetts Environmental Health Association https://mail.google.com/mail/u/0?ik=a0c6f4e4cf&view=pt&search=all&permthid=th read-f%3A 1641237314285065562&simpl=msg-f%3A164123731428... 2/2 Brian Lagrasse, CEHT T1 & WILLIAMS Director of Public Health V�/ SPARAGES North Andover Health Department ENGINEERS . VLANNERS . SURVEYORS Community and Economic Development Division ,,•P. Town Hall, 120 Main Street North Andover, MA 01845 Re: 160 Carlton Lane(Map 107A, Lot 192) �Nploo Ow, �A Dear Mr. Lagrasse, tt Please see your comments below with notes regarding revisions to the proposed septic design plan at 160 Carlton Lane. 1. Notate all piping is to be Schedule 40(NA 3.2) Note 26 on sheet S-2 has been added identifying the requirement that all piping is to be schedule 40.All piping in the system profile on sheet S-2 is identified as Schedule 40. 2. Indicate building sewer pipe joints are to be watertight(310 CMR 15.222) A note has been added in the system profile section on sheet S-2 indicating the requirement for building sewer pipe joints to be watertight. 3. Indicate building sewer is to be laid on a compact firm base and on a continuous grade in a straight line (310 CMR 15.222) A note has been added in the system profile section on sheet S-2 indicating the requirement for the building sewer to be laid on a compact firm base and on a continuous grade. 4. Indicate or depict tees inside tank to extend 6"above the flow line(310 CMR 15.227) A note has been added in addition to 6"arrowheads in the septic tank detail on sheet S-2 indicating that tees inside the septic tank must extend 6"above the flow line. 5. Indicate requirement for tank to be watertight(310 CMR 15.221) A note has been added to the septic tank detail on sheet S-2 indicating that the septic tank must be watertight. 6. Indicate piping exiting the distribution box are to be laid level for at least first 2'and to be at the same elevation as each other(310 CMR 15.232). A note was already in the system profile section on sheet S-2 indicating that the piping exiting the distribution box is to be laid level for the first 2; however this note has been revised to indicate that this piping must also be at the some elevation. 189 North Main Street, Suite 101 • Middleton, MA 01949 • Tel: (978) 539-8088 9 www.wsengineers.com 7. Indicate the leach pipe orifice size to be 3/8"-5/8" (310 CMR 15.251) A note has been added to the system profile section on sheet S-2 indicating the requirement for the leach pipe orifice size to be 3/8"-5/8". If you have any other questions or concerns please let us know. Thanks, Thorsen Akerley, R.S. Williams&Sparages, LLC.